Haritha Green City
BANDHAN INFRA · Hanamkonda · RERA P00300007433
HARITHA GREEN CITY is a plotted development at Hasanparthy, Hasanparthy Mandal, Warangal Urban District, developed by the registered promoter BANDHAN INFRA. The registered land area is 28734.7 sq. m, and the approved layout comprises 91 plots; buildings, floors and plot configurations are not disclosed in the RERA record. The project is registered under TG-RERA number P00300007433, and the promoter’s Form B undertaking states a proposed completion date of 07/09/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | HARITHA GREEN CITY RERA record |
| Project type | Plotted development / tentative layout RERA record |
| Phase or registered portion | New Project; no separate phase name or phase-wise scope is disclosed RERA record |
| TG-RERA registration | P00300007433 Approvals record |
| Registration validity | 22/12/2023–07/09/2024; the supplied certificate records no extension Approvals record |
| Registered promoter | BANDHAN INFRA RERA record Corporate record |
| RERA status | Certificate states registration was granted; the recorded validity end date has passed. Current registration status is not independently established by the supplied evidence Approvals record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Hasanparthy RERA record RERA filing |
| Revenue village | Pegadapally Revenue Village in the tentative layout approval; the RERA project record identifies Hasanparthy RERA record |
| Mandal | Hasanparthy Mandal |
| District | Warangal Urban / Warangal (Urban) RERA record |
| PIN | 505162 in the project header and RERA project record RERA record |
| Project survey numbers and subdivisions | 410/F6/A1/1, 410/F6/A2, 410/F6/A4, 410/F6/A3/A and 410/F6/A3/B RERA record Land records |
| Registered site extent | 7 Acer 4.02 Gts; 34367 Sq. Yds in the tentative-layout approval |
| RERA land area | Total 28734.7 sq. m; net 28734.70 sq. m; affected area 0 sq. m RERA filing |
| Boundaries in RERA record | East: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: OTHERS LAND RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | GWMC Municipality/Municipal Corporation Approvals record |
| Principal approval | Tentative Layout Plan No. 0201/LO/3006/2022, approved 08 September, 2022 Approvals record |
| Application number | 005203/LO/DTCP/3006/0209/2022 Approvals record |
| Approved built-up area | 18603 sq. m is listed in the project filing; no building or dwelling-unit configuration is supplied RERA filing |
| Buildings / floors | Not disclosed; the approval is for a plotted layout, not a building configuration |
| Approved layout scale | 91 plots |
| Authority-mortgaged layout area | RERA filing: 2953.2 sq. m; the approval describes 0 Acer 29.19 Gts, 3532 Sq. Yds as mortgage area, covering specified plots RERA filing |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Plots RERA record RERA filing |
| Plot count and sizes | Drawing-derived schedule: 91 plots; smallest 130.68 sq. m (156.3 sq. yd), median 175.59 sq. m (210.0 sq. yd), largest 515.2 sq. m (616.2 sq. yd). These are software-read from the approved layout drawing, not RERA-filed unit areas Layout record |
| Booked / available | Not supplied RERA unit table |
| Construction / development stage | RERA project data records 70% completeness; the evidence does not establish independent site verification or specify which works this percentage covers RERA record |
| Completion deadline | Promoter’s Form B undertaking: 07/09/2024 |
| Occupancy / completion certificate | Not supplied; no project OC or completion certificate is evidenced in the supplied documents Document index |
2. The project story
HARITHA GREEN CITY is registered as a plotted development at Hasanparthy, with a tentative layout approval for land identified as Pegadapally Revenue Village, Hasanparthy Mandal, Warangal (Urban) District. The project covers survey subdivisions 410/F6/A1/1, 410/F6/A2, 410/F6/A4, 410/F6/A3/A and 410/F6/A3/B. The approved plan organizes the site into 91 plots with internal roads and areas reserved for open space, social infrastructure and utilities. RERA record Land records
The RERA-filed completeness figure is 70%, but the supplied record does not define the measurement basis or independently verify on-site progress. The promoter’s Form B set a completion date of 07/09/2024. Registration validity and the completion undertaking are separate dates and do not, by themselves, establish that development is complete. No occupancy or completion certificate is supplied. RERA record
3. Master plan, architecture & building design
This is a plotted layout, rather than a disclosed multi-storey residential building plan. The tentative-layout approval records a site extent of 7 Acer 4.02 Gts; 34367 Sq. Yds and 91 plots. Its stated land-use allocation is: 4 Acer 23.87 Gts, 22249 Sq. Yds (65.73%) plotted area; 1 Acer 20.46 Gts, 7316 Sq. Yds (21.61%) roads; 0 Acer 25.57 Gts, 3094 Sq. Yds (9.14%) open space/park; 0 Acer 7 Gts, 847 Sq. Yds (2.5%) social infrastructure; and 0 Acer 2.84 Gts, 344 Sq. Yds (1.02%) utilities. The approval separately identifies 0 Acer 29.19 Gts, 3532 Sq. Yds (15.84% of plotted area) as mortgage area.
The drawing-derived layout analysis counts 91 plots and reports plot-area sizes from 130.68 sq. m to 515.2 sq. m, with a median of 175.59 sq. m. The software-read plot areas sum to the plotted area in the drawing’s own area statement; the plot schedule and sizes should be checked against the drawing. Layout record
No residential building arrangement, building footprint, floor configuration, building parking levels or apartment circulation plan is evidenced. The project filing lists 18603 sq. m as approved built-up area, but the supplied materials do not explain its scope or provide a building breakdown. RERA filing Document index
4. Homes, configurations & floor plans
The RERA record identifies the offering as plots, not apartments. No RERA unit-type schedule, booked or available plot count, or plot-by-plot RERA saleable areas is supplied. RERA record RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 91 in the approved layout schedule | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
The drawing-derived size schedule reports 91 plots: 8 in the 150–200 sq. yd band, 66 in 200–250 sq. yd, 5 in 250–300 sq. yd, 1 in 300–400 sq. yd, 10 in 400–500 sq. yd and 1 in 500–1000 sq. yd. These size bands and the stated smallest, median and largest areas are software-read from the layout drawing, not RERA-filed saleable-area figures. Layout record
The supplied floor-plan analysis records two layout sheets and no dwelling-unit floor plans; it reports no measured plans. Therefore, no home room configuration or carpet-area measurement can be presented. Floor plans
5. Parking & vehicle circulation
The tentative-layout approval describes internal roads and requires roads to be opened for access to neighbouring sites. It does not provide a parking-space count, parking allocation by plot, visitor or accessible parking provision, or a vehicle-entry/exit arrangement.
The vendor record lists “Open Parking,” but does not state a quantity or establish a sanctioned or plot-specific allocation. A buyer should not treat that description as proof of an exclusive parking right. Promoter website
6. Amenities, recreation & open spaces
The tentative-layout approval reserves land for open space, social infrastructure and utilities. Its listed infrastructure and amenity works are approval requirements, not evidence that each facility has been completed. The RERA filing includes percentage-complete entries for selected works; the supplied evidence does not independently verify completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 0 Acer 25.57 Gts; 3094 Sq. Yds; 9.14% in the approval | RERA filing lists “Aggregate area of recreational Open Space” at 0%; not independently verified RERA amenities | |
| Social infrastructure | 0 Acer 7 Gts; 847 Sq. Yds; 2.5% reserved | No specific community building is identified; RERA filing lists community buildings at 0% RERA amenities | |
| Internal roads and footpaths | Layout roads; approval requires roads to be opened for access to neighbouring sites | RERA filing: 60%; not independently verified RERA amenities | |
| Green strip / tot lot / park | No separate size or facility detail supplied | RERA amenities | RERA filing: 0%; not independently verified RERA amenities |
| Street lighting | No quantity or specification supplied | RERA filing: 50%; not independently verified RERA amenities | |
| Community buildings | No facility description or size supplied | RERA amenities | RERA filing: 0%; not independently verified RERA amenities |
7. Utilities, building services & safety
The layout approval lists water reservoir, overhead tank/sump, internal water-supply pipelines, common septic tank or STP, underground drainage lines, storm-water drains, electric transformer, solid-waste management, street lights, avenue plantation and rainwater-harvesting pits among the required layout works. It also specifies that open space, utilities and roads are to be handed over to the municipality by registered gift deed before release of the tentative layout. These are approval provisions; the supplied record does not establish that all have been delivered.
| Service | Evidence and reported progress |
|---|---|
| Water | Approval lists a water reservoir, overhead tank/sump and internal pipelines. RERA filing reports water supply at 60%; source, storage capacity and independent completion status are not supplied. RERA amenities |
| Sewerage and drainage | Approval lists a common septic tank/STP, underground drainage and storm-water drains. RERA filing reports sewerage at 60% and storm-water drains at 20%; no capacity or independent verification is supplied. RERA amenities |
| Electrical | Approval lists an electric transformer; RERA filing lists an electrical meter room/sub-station/receiving station at 0%. No supply capacity or backup arrangement is supplied. RERA amenities |
| Rainwater harvesting | Approval lists harvesting pits; RERA filing reports water conservation/rainwater harvesting at 50%. RERA amenities |
| Solid waste | Approval lists solid-waste management; RERA filing reports solid-waste management and disposal at 0%. RERA amenities |
| Fire and accessibility | No project-specific fire-system, accessible-circulation or accessibility-facility details are supplied. The RERA filing lists fire protection and fire-safety requirements at 0%. RERA amenities |
8. Location, access & connectivity
The project’s registered geographic identity is Hasanparthy, Warangal Urban District, PIN 505162; the tentative-layout approval places the land in Pegadapally Revenue Village, Hasanparthy Mandal. The approved layout identifies a road boundary on the west and requires internal roads to be opened for access to neighbouring sites. RERA record RERA filing
The supplied location data includes a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and a listed distance of 1.2 km to Financial District (Nanakramguda). The evidence provides no approach-road name, public-transport details or measured distances to other landmarks. Location record
9. Developer & development status
The registered promoter is BANDHAN INFRA, identified in the RERA project data as a partnership. The supplied corporate identifier is GSTIN 36AAZFB3648Q1ZE. The project record names VIJAY KUMAR PINNINTI and NARESH RESSY RAVULA as authorised signatories. The RERA certificate lists the promoter office district as Warangal Urban, but gives PIN 506001; the project-header PIN is 505162. Corporate record Parties record
Ravula Narsimha Reddy and Ravula Venkatesh are recorded as landowners under revenue-share agreements. The promoter’s Form B, dated NOV-09-2023, declares a completion date of 07/09/2024. RERA project data reports 70% completeness, without a supplied definition or independent site verification. No phase-wise construction schedule or OC status by phase is documented. Parties record RERA record
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA certificate, P00300007433 | FORM C records registration for HARITHA GREEN CITY from 22/12/2023 through 07/09/2024 and includes registration conditions. |
| Tentative Layout Plan, 0201/LO/3006/2022 | GWMC Municipality/Municipal Corporation approval dated 08 September, 2022 for a 91-plot layout; the approval states that layout approval is not proof of land title. |
| Layout application, 005203/LO/DTCP/3006/0209/2022 | Application number recorded in the layout approval. |
| Mortgage deed, 22214/2022 | Referenced in the layout approval for specified plots mortgaged to the Municipality/Municipal Corporation. |
| Form B declaration | Promoter declaration dated NOV-09-2023, including the completion undertaking of 07/09/2024. |
| Occupancy / completion certificate | None supplied in the reviewed project documents. Document index |
The supplied RERA record includes an approved-layout drawing (document 370658) and an approval document (document 370667). The available evidence does not include a project OC or completion certificate. Layout record Document index
1. Project at a glance
Project identity
Registered project name: HARITHA GREEN CITY
Project type: Plotted development / tentative layout
Phase or registered portion: New Project; no separate phase name or phase-wise scope is disclosed
TG-RERA registration: P00300007433
Registration validity: 22/12/2023–07/09/2024; the supplied certificate records no extension
Registered promoter: BANDHAN INFRA
RERA status: Certificate states registration was granted; the recorded validity end date has passed. Current registration status is not independently established by the supplied evidence
Land and geographic identity
Locality: Hasanparthy
Revenue village: Pegadapally Revenue Village in the tentative layout approval; the RERA project record identifies Hasanparthy
Mandal: Hasanparthy Mandal
District: Warangal Urban / Warangal (Urban)
PIN: 505162 in the project header and RERA project record
Project survey numbers and subdivisions: 410/F6/A1/1, 410/F6/A2, 410/F6/A4, 410/F6/A3/A and 410/F6/A3/B
Registered site extent: 7 Acer 4.02 Gts; 34367 Sq. Yds in the tentative-layout approval
RERA land area: Total 28734.7 sq. m; net 28734.70 sq. m; affected area 0 sq. m
Boundaries in RERA record: East: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: OTHERS LAND
Development identity
Sanctioning authority: GWMC Municipality/Municipal Corporation
Principal approval: Tentative Layout Plan No. 0201/LO/3006/2022, approved 08 September, 2022
Application number: 005203/LO/DTCP/3006/0209/2022
Approved built-up area: 18603 sq. m is listed in the project filing; no building or dwelling-unit configuration is supplied
Buildings / floors: Not disclosed; the approval is for a plotted layout, not a building configuration
Approved layout scale: 91 plots
Authority-mortgaged layout area: RERA filing: 2953.2 sq. m; the approval describes 0 Acer 29.19 Gts, 3532 Sq. Yds as mortgage area, covering specified plots
Offering and status
Unit type: Plots
Plot count and sizes: Drawing-derived schedule: 91 plots; smallest 130.68 sq. m (156.3 sq. yd), median 175.59 sq. m (210.0 sq. yd), largest 515.2 sq. m (616.2 sq. yd). These are software-read from the approved layout drawing, not RERA-filed unit areas
Booked / available: Not supplied
Construction / development stage: RERA project data records 70% completeness; the evidence does not establish independent site verification or specify which works this percentage covers
Completion deadline: Promoter’s Form B undertaking: 07/09/2024
Occupancy / completion certificate: Not supplied; no project OC or completion certificate is evidenced in the supplied documents
2. The project story
HARITHA GREEN CITY is registered as a plotted development at Hasanparthy, with a tentative layout approval for land identified as Pegadapally Revenue Village, Hasanparthy Mandal, Warangal (Urban) District. The project covers survey subdivisions 410/F6/A1/1, 410/F6/A2, 410/F6/A4, 410/F6/A3/A and 410/F6/A3/B. The approved plan organizes the site into 91 plots with internal roads and areas reserved for open space, social infrastructure and utilities.
The RERA-filed completeness figure is 70%, but the supplied record does not define the measurement basis or independently verify on-site progress. The promoter’s Form B set a completion date of 07/09/2024. Registration validity and the completion undertaking are separate dates and do not, by themselves, establish that development is complete. No occupancy or completion certificate is supplied.
3. Master plan, architecture & building design
This is a plotted layout, rather than a disclosed multi-storey residential building plan. The tentative-layout approval records a site extent of 7 Acer 4.02 Gts; 34367 Sq. Yds and 91 plots. Its stated land-use allocation is: 4 Acer 23.87 Gts, 22249 Sq. Yds (65.73%) plotted area; 1 Acer 20.46 Gts, 7316 Sq. Yds (21.61%) roads; 0 Acer 25.57 Gts, 3094 Sq. Yds (9.14%) open space/park; 0 Acer 7 Gts, 847 Sq. Yds (2.5%) social infrastructure; and 0 Acer 2.84 Gts, 344 Sq. Yds (1.02%) utilities. The approval separately identifies 0 Acer 29.19 Gts, 3532 Sq. Yds (15.84% of plotted area) as mortgage area.
The drawing-derived layout analysis counts 91 plots and reports plot-area sizes from 130.68 sq. m to 515.2 sq. m, with a median of 175.59 sq. m. The software-read plot areas sum to the plotted area in the drawing’s own area statement; the plot schedule and sizes should be checked against the drawing.
No residential building arrangement, building footprint, floor configuration, building parking levels or apartment circulation plan is evidenced. The project filing lists 18603 sq. m as approved built-up area, but the supplied materials do not explain its scope or provide a building breakdown.
4. Homes, configurations & floor plans
The RERA record identifies the offering as plots, not apartments. No RERA unit-type schedule, booked or available plot count, or plot-by-plot RERA saleable areas is supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 91 in the approved layout schedule | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
The drawing-derived size schedule reports 91 plots: 8 in the 150–200 sq. yd band, 66 in 200–250 sq. yd, 5 in 250–300 sq. yd, 1 in 300–400 sq. yd, 10 in 400–500 sq. yd and 1 in 500–1000 sq. yd. These size bands and the stated smallest, median and largest areas are software-read from the layout drawing, not RERA-filed saleable-area figures.
The supplied floor-plan analysis records two layout sheets and no dwelling-unit floor plans; it reports no measured plans. Therefore, no home room configuration or carpet-area measurement can be presented.
5. Parking & vehicle circulation
The tentative-layout approval describes internal roads and requires roads to be opened for access to neighbouring sites. It does not provide a parking-space count, parking allocation by plot, visitor or accessible parking provision, or a vehicle-entry/exit arrangement.
The vendor record lists “Open Parking,” but does not state a quantity or establish a sanctioned or plot-specific allocation. A buyer should not treat that description as proof of an exclusive parking right.
6. Amenities, recreation & open spaces
The tentative-layout approval reserves land for open space, social infrastructure and utilities. Its listed infrastructure and amenity works are approval requirements, not evidence that each facility has been completed. The RERA filing includes percentage-complete entries for selected works; the supplied evidence does not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 0 Acer 25.57 Gts; 3094 Sq. Yds; 9.14% in the approval | RERA filing lists “Aggregate area of recreational Open Space” at 0%; not independently verified | |
| Social infrastructure | 0 Acer 7 Gts; 847 Sq. Yds; 2.5% reserved | No specific community building is identified; RERA filing lists community buildings at 0% | |
| Internal roads and footpaths | Layout roads; approval requires roads to be opened for access to neighbouring sites | RERA filing: 60%; not independently verified | |
| Green strip / tot lot / park | No separate size or facility detail supplied | RERA filing: 0%; not independently verified | |
| Street lighting | No quantity or specification supplied | RERA filing: 50%; not independently verified | |
| Community buildings | No facility description or size supplied | RERA filing: 0%; not independently verified |
7. Utilities, building services & safety
The layout approval lists water reservoir, overhead tank/sump, internal water-supply pipelines, common septic tank or STP, underground drainage lines, storm-water drains, electric transformer, solid-waste management, street lights, avenue plantation and rainwater-harvesting pits among the required layout works. It also specifies that open space, utilities and roads are to be handed over to the municipality by registered gift deed before release of the tentative layout. These are approval provisions; the supplied record does not establish that all have been delivered.
Water: Approval lists a water reservoir, overhead tank/sump and internal pipelines. RERA filing reports water supply at 60%; source, storage capacity and independent completion status are not supplied.
Sewerage and drainage: Approval lists a common septic tank/STP, underground drainage and storm-water drains. RERA filing reports sewerage at 60% and storm-water drains at 20%; no capacity or independent verification is supplied.
Electrical: Approval lists an electric transformer; RERA filing lists an electrical meter room/sub-station/receiving station at 0%. No supply capacity or backup arrangement is supplied.
Rainwater harvesting: Approval lists harvesting pits; RERA filing reports water conservation/rainwater harvesting at 50%.
Solid waste: Approval lists solid-waste management; RERA filing reports solid-waste management and disposal at 0%.
Fire and accessibility: No project-specific fire-system, accessible-circulation or accessibility-facility details are supplied. The RERA filing lists fire protection and fire-safety requirements at 0%.
8. Location, access & connectivity
The project’s registered geographic identity is Hasanparthy, Warangal Urban District, PIN 505162; the tentative-layout approval places the land in Pegadapally Revenue Village, Hasanparthy Mandal. The approved layout identifies a road boundary on the west and requires internal roads to be opened for access to neighbouring sites.
The supplied location data includes a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and a listed distance of 1.2 km to Financial District (Nanakramguda). The evidence provides no approach-road name, public-transport details or measured distances to other landmarks.
9. Developer & development status
The registered promoter is BANDHAN INFRA, identified in the RERA project data as a partnership. The supplied corporate identifier is GSTIN 36AAZFB3648Q1ZE. The project record names VIJAY KUMAR PINNINTI and NARESH RESSY RAVULA as authorised signatories. The RERA certificate lists the promoter office district as Warangal Urban, but gives PIN 506001; the project-header PIN is 505162.
Ravula Narsimha Reddy and Ravula Venkatesh are recorded as landowners under revenue-share agreements. The promoter’s Form B, dated NOV-09-2023, declares a completion date of 07/09/2024. RERA project data reports 70% completeness, without a supplied definition or independent site verification. No phase-wise construction schedule or OC status by phase is documented.
10. Approvals, official records & documents
TG-RERA certificate, P00300007433: FORM C records registration for HARITHA GREEN CITY from 22/12/2023 through 07/09/2024 and includes registration conditions.
Tentative Layout Plan, 0201/LO/3006/2022: GWMC Municipality/Municipal Corporation approval dated 08 September, 2022 for a 91-plot layout; the approval states that layout approval is not proof of land title.
Layout application, 005203/LO/DTCP/3006/0209/2022: Application number recorded in the layout approval.
Mortgage deed, 22214/2022: Referenced in the layout approval for specified plots mortgaged to the Municipality/Municipal Corporation.
Form B declaration: Promoter declaration dated NOV-09-2023, including the completion undertaking of 07/09/2024.
Occupancy / completion certificate: None supplied in the reviewed project documents.
The supplied RERA record includes an approved-layout drawing (document 370658) and an approval document (document 370667). The available evidence does not include a project OC or completion certificate.
Frequently asked questions
Is HARITHA GREEN CITY registered with Telangana RERA?
Yes. HARITHA GREEN CITY is registered with the Telangana Real Estate Regulatory Authority as P00300007433; the registration status is New Project.
Who is the developer of HARITHA GREEN CITY?
The promoter named in the RERA registration is BANDHAN INFRA.
Where is HARITHA GREEN CITY located?
HARITHA GREEN CITY is in HASANPARTHY, Hanamkonda, Telangana (505162).
When will HARITHA GREEN CITY be completed?
The promoter's proposed date of completion filed with RERA is 07/09/2024. This is the promoter's declaration, not a guarantee.