Sign in

Haritha Green City

BANDHAN INFRA · Hanamkonda · RERA P00300007433

HARITHA GREEN CITY is a plotted development at Hasanparthy, Hasanparthy Mandal, Warangal Urban District, developed by the registered promoter BANDHAN INFRA. The registered land area is 28734.7 sq. m, and the approved layout comprises 91 plots; buildings, floors and plot configurations are not disclosed in the RERA record. The project is registered under TG-RERA number P00300007433, and the promoter’s Form B undertaking states a proposed completion date of 07/09/2024.

01What we found

Period endedTG-RERA registration ran to 7 Sep 2024 - check its extension on TG-RERA
22documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameHARITHA GREEN CITY RERA record
Project typePlotted development / tentative layout RERA record
Phase or registered portionNew Project; no separate phase name or phase-wise scope is disclosed RERA record
TG-RERA registrationP00300007433 Approvals record
Registration validity22/12/2023–07/09/2024; the supplied certificate records no extension Approvals record
Registered promoterBANDHAN INFRA RERA record Corporate record
RERA statusCertificate states registration was granted; the recorded validity end date has passed. Current registration status is not independently established by the supplied evidence Approvals record

Land and geographic identity

FieldProject record
LocalityHasanparthy RERA record RERA filing
Revenue villagePegadapally Revenue Village in the tentative layout approval; the RERA project record identifies Hasanparthy RERA record
MandalHasanparthy Mandal
DistrictWarangal Urban / Warangal (Urban) RERA record
PIN505162 in the project header and RERA project record RERA record
Project survey numbers and subdivisions410/F6/A1/1, 410/F6/A2, 410/F6/A4, 410/F6/A3/A and 410/F6/A3/B RERA record Land records
Registered site extent7 Acer 4.02 Gts; 34367 Sq. Yds in the tentative-layout approval
RERA land areaTotal 28734.7 sq. m; net 28734.70 sq. m; affected area 0 sq. m RERA filing
Boundaries in RERA recordEast: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: OTHERS LAND RERA filing

Development identity

FieldProject record
Sanctioning authorityGWMC Municipality/Municipal Corporation Approvals record
Principal approvalTentative Layout Plan No. 0201/LO/3006/2022, approved 08 September, 2022 Approvals record
Application number005203/LO/DTCP/3006/0209/2022 Approvals record
Approved built-up area18603 sq. m is listed in the project filing; no building or dwelling-unit configuration is supplied RERA filing
Buildings / floorsNot disclosed; the approval is for a plotted layout, not a building configuration
Approved layout scale91 plots
Authority-mortgaged layout areaRERA filing: 2953.2 sq. m; the approval describes 0 Acer 29.19 Gts, 3532 Sq. Yds as mortgage area, covering specified plots RERA filing

Offering and status

FieldProject record
Unit typePlots RERA record RERA filing
Plot count and sizesDrawing-derived schedule: 91 plots; smallest 130.68 sq. m (156.3 sq. yd), median 175.59 sq. m (210.0 sq. yd), largest 515.2 sq. m (616.2 sq. yd). These are software-read from the approved layout drawing, not RERA-filed unit areas Layout record
Booked / availableNot supplied RERA unit table
Construction / development stageRERA project data records 70% completeness; the evidence does not establish independent site verification or specify which works this percentage covers RERA record
Completion deadlinePromoter’s Form B undertaking: 07/09/2024
Occupancy / completion certificateNot supplied; no project OC or completion certificate is evidenced in the supplied documents Document index

2. The project story

HARITHA GREEN CITY is registered as a plotted development at Hasanparthy, with a tentative layout approval for land identified as Pegadapally Revenue Village, Hasanparthy Mandal, Warangal (Urban) District. The project covers survey subdivisions 410/F6/A1/1, 410/F6/A2, 410/F6/A4, 410/F6/A3/A and 410/F6/A3/B. The approved plan organizes the site into 91 plots with internal roads and areas reserved for open space, social infrastructure and utilities. RERA record Land records

The RERA-filed completeness figure is 70%, but the supplied record does not define the measurement basis or independently verify on-site progress. The promoter’s Form B set a completion date of 07/09/2024. Registration validity and the completion undertaking are separate dates and do not, by themselves, establish that development is complete. No occupancy or completion certificate is supplied. RERA record

3. Master plan, architecture & building design

This is a plotted layout, rather than a disclosed multi-storey residential building plan. The tentative-layout approval records a site extent of 7 Acer 4.02 Gts; 34367 Sq. Yds and 91 plots. Its stated land-use allocation is: 4 Acer 23.87 Gts, 22249 Sq. Yds (65.73%) plotted area; 1 Acer 20.46 Gts, 7316 Sq. Yds (21.61%) roads; 0 Acer 25.57 Gts, 3094 Sq. Yds (9.14%) open space/park; 0 Acer 7 Gts, 847 Sq. Yds (2.5%) social infrastructure; and 0 Acer 2.84 Gts, 344 Sq. Yds (1.02%) utilities. The approval separately identifies 0 Acer 29.19 Gts, 3532 Sq. Yds (15.84% of plotted area) as mortgage area.

The drawing-derived layout analysis counts 91 plots and reports plot-area sizes from 130.68 sq. m to 515.2 sq. m, with a median of 175.59 sq. m. The software-read plot areas sum to the plotted area in the drawing’s own area statement; the plot schedule and sizes should be checked against the drawing. Layout record

No residential building arrangement, building footprint, floor configuration, building parking levels or apartment circulation plan is evidenced. The project filing lists 18603 sq. m as approved built-up area, but the supplied materials do not explain its scope or provide a building breakdown. RERA filing Document index

4. Homes, configurations & floor plans

The RERA record identifies the offering as plots, not apartments. No RERA unit-type schedule, booked or available plot count, or plot-by-plot RERA saleable areas is supplied. RERA record RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots91 in the approved layout scheduleNot suppliedNot suppliedNot suppliedNot applicableNot supplied

The drawing-derived size schedule reports 91 plots: 8 in the 150–200 sq. yd band, 66 in 200–250 sq. yd, 5 in 250–300 sq. yd, 1 in 300–400 sq. yd, 10 in 400–500 sq. yd and 1 in 500–1000 sq. yd. These size bands and the stated smallest, median and largest areas are software-read from the layout drawing, not RERA-filed saleable-area figures. Layout record

The supplied floor-plan analysis records two layout sheets and no dwelling-unit floor plans; it reports no measured plans. Therefore, no home room configuration or carpet-area measurement can be presented. Floor plans

5. Parking & vehicle circulation

The tentative-layout approval describes internal roads and requires roads to be opened for access to neighbouring sites. It does not provide a parking-space count, parking allocation by plot, visitor or accessible parking provision, or a vehicle-entry/exit arrangement.

The vendor record lists “Open Parking,” but does not state a quantity or establish a sanctioned or plot-specific allocation. A buyer should not treat that description as proof of an exclusive parking right. Promoter website

6. Amenities, recreation & open spaces

The tentative-layout approval reserves land for open space, social infrastructure and utilities. Its listed infrastructure and amenity works are approval requirements, not evidence that each facility has been completed. The RERA filing includes percentage-complete entries for selected works; the supplied evidence does not independently verify completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open space / park0 Acer 25.57 Gts; 3094 Sq. Yds; 9.14% in the approvalRERA filing lists “Aggregate area of recreational Open Space” at 0%; not independently verified RERA amenities
Social infrastructure0 Acer 7 Gts; 847 Sq. Yds; 2.5% reservedNo specific community building is identified; RERA filing lists community buildings at 0% RERA amenities
Internal roads and footpathsLayout roads; approval requires roads to be opened for access to neighbouring sitesRERA filing: 60%; not independently verified RERA amenities
Green strip / tot lot / parkNo separate size or facility detail suppliedRERA amenitiesRERA filing: 0%; not independently verified RERA amenities
Street lightingNo quantity or specification suppliedRERA filing: 50%; not independently verified RERA amenities
Community buildingsNo facility description or size suppliedRERA amenitiesRERA filing: 0%; not independently verified RERA amenities

7. Utilities, building services & safety

The layout approval lists water reservoir, overhead tank/sump, internal water-supply pipelines, common septic tank or STP, underground drainage lines, storm-water drains, electric transformer, solid-waste management, street lights, avenue plantation and rainwater-harvesting pits among the required layout works. It also specifies that open space, utilities and roads are to be handed over to the municipality by registered gift deed before release of the tentative layout. These are approval provisions; the supplied record does not establish that all have been delivered.

ServiceEvidence and reported progress
WaterApproval lists a water reservoir, overhead tank/sump and internal pipelines. RERA filing reports water supply at 60%; source, storage capacity and independent completion status are not supplied. RERA amenities
Sewerage and drainageApproval lists a common septic tank/STP, underground drainage and storm-water drains. RERA filing reports sewerage at 60% and storm-water drains at 20%; no capacity or independent verification is supplied. RERA amenities
ElectricalApproval lists an electric transformer; RERA filing lists an electrical meter room/sub-station/receiving station at 0%. No supply capacity or backup arrangement is supplied. RERA amenities
Rainwater harvestingApproval lists harvesting pits; RERA filing reports water conservation/rainwater harvesting at 50%. RERA amenities
Solid wasteApproval lists solid-waste management; RERA filing reports solid-waste management and disposal at 0%. RERA amenities
Fire and accessibilityNo project-specific fire-system, accessible-circulation or accessibility-facility details are supplied. The RERA filing lists fire protection and fire-safety requirements at 0%. RERA amenities

8. Location, access & connectivity

The project’s registered geographic identity is Hasanparthy, Warangal Urban District, PIN 505162; the tentative-layout approval places the land in Pegadapally Revenue Village, Hasanparthy Mandal. The approved layout identifies a road boundary on the west and requires internal roads to be opened for access to neighbouring sites. RERA record RERA filing

The supplied location data includes a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and a listed distance of 1.2 km to Financial District (Nanakramguda). The evidence provides no approach-road name, public-transport details or measured distances to other landmarks. Location record

9. Developer & development status

The registered promoter is BANDHAN INFRA, identified in the RERA project data as a partnership. The supplied corporate identifier is GSTIN 36AAZFB3648Q1ZE. The project record names VIJAY KUMAR PINNINTI and NARESH RESSY RAVULA as authorised signatories. The RERA certificate lists the promoter office district as Warangal Urban, but gives PIN 506001; the project-header PIN is 505162. Corporate record Parties record

Ravula Narsimha Reddy and Ravula Venkatesh are recorded as landowners under revenue-share agreements. The promoter’s Form B, dated NOV-09-2023, declares a completion date of 07/09/2024. RERA project data reports 70% completeness, without a supplied definition or independent site verification. No phase-wise construction schedule or OC status by phase is documented. Parties record RERA record

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA certificate, P00300007433FORM C records registration for HARITHA GREEN CITY from 22/12/2023 through 07/09/2024 and includes registration conditions.
Tentative Layout Plan, 0201/LO/3006/2022GWMC Municipality/Municipal Corporation approval dated 08 September, 2022 for a 91-plot layout; the approval states that layout approval is not proof of land title.
Layout application, 005203/LO/DTCP/3006/0209/2022Application number recorded in the layout approval.
Mortgage deed, 22214/2022Referenced in the layout approval for specified plots mortgaged to the Municipality/Municipal Corporation.
Form B declarationPromoter declaration dated NOV-09-2023, including the completion undertaking of 07/09/2024.
Occupancy / completion certificateNone supplied in the reviewed project documents. Document index

The supplied RERA record includes an approved-layout drawing (document 370658) and an approval document (document 370667). The available evidence does not include a project OC or completion certificate. Layout record Document index

Frequently asked questions

Is HARITHA GREEN CITY registered with Telangana RERA?

Yes. HARITHA GREEN CITY is registered with the Telangana Real Estate Regulatory Authority as P00300007433; the registration status is New Project.

Who is the developer of HARITHA GREEN CITY?

The promoter named in the RERA registration is BANDHAN INFRA.

Where is HARITHA GREEN CITY located?

HARITHA GREEN CITY is in HASANPARTHY, Hanamkonda, Telangana (505162).

When will HARITHA GREEN CITY be completed?

The promoter's proposed date of completion filed with RERA is 07/09/2024. This is the promoter's declaration, not a guarantee.

More projects in Hanamkonda