HARI HARA TOWNSHIP is a plotted development at Edulapuram(Part), Khammam (Rural) Mandal, Khammam District. The registered promoter developing it is Vulli Venkateshwarlu. The site extent is 20,252.80 sq. m, and the tentative layout has 65 plots; no building or floor configuration is disclosed. The project is registered with TG-RERA as P00800006856, with a proposed completion date of 22/02/2025.

01What we found

Period endedTG-RERA registration ran to 22 Feb 2025 - check its extension on TG-RERA
17documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameHARI HARA TOWNSHIP RERA record
Project typePlotted development / tentative layout RERA record
Phase / registered portionNo separate phase is identified; the registration covers the layout land and surveys listed below.
TG-RERA registrationP00800006856
Registration validity05/09/2023 to 22/02/2025; the certificate records no extension. This is the registration period, not a statement about completion or occupancy certification.
Registered promoterVulli Venkateshwarlu; the promoter record identifies a proprietorship. RERA record Corporate record
RERA statusThe project is recorded as New Project. Its proposed completion date was 22/02/2025; the supplied record does not establish a current registration extension or a completion certificate. RERA record RERA filing

Land and geographic identity

FieldProject record
LocalityEdulapuram / Edulapuram(Part) RERA record
Revenue villageEdulapuram Revenue Village; the RERA record specifies Edulapuram(Part).
MandalKhammam (Rural) Mandal RERA record
DistrictKhammam RERA record
PIN507163 RERA record
Project survey numbers and subdivisions344/A/3/25, 344/A/1, 344/A/3/18, 344/A/3/19, 344/A/3/20, 344/A/3/21, 344/A/3/23, 344/C, 344/PART (also described as “ADSLR Sy. No. 344/PART”).
Registered site extent20,252.80 sq. m in the RERA land record. RERA filing
Layout drawing extentAc. 5.004 cents 24222.157 Sq.Yds, as stated in the tentative layout approval.
Net area / area affectedThe RERA land record states net area 20,252.80 sq. m and affected area 0 sq. m. The layout approval separately records roads, plots, open space, utilities and social infrastructure. RERA filing
Boundaries (RERA-filed)East: OTHERS LAND; West: ROAD WIDTH - 30; North: OTHERS LAND; South: ROAD WIDTH - 60. RERA filing

Development identity

FieldProject record
Layout-sanctioning authoritySUDA, with the approval document describing delegation to Edulapuram Grampanchayat.
Principal layout approval216286/LP/GP/202427/0002/2022, approved 23-02-2023; described as approval for a Tentative Layout Plan. Approvals record
Approved layout scale65 plots in the tentative layout approval.
Approved built-up areaRERA-filed: 11780.20 sq. m. The supplied material does not explain its calculation or provide a building schedule. RERA filing
Building / floor configurationNot disclosed for this plotted layout. Individual dwelling construction is subject to separate building permission; no sanctioned floor configuration, parking levels or dwelling count is supplied.
Mortgage areaRERA-filed: 1906.80 sq. m. The layout drawing identifies mortgage plots as Plot Nos. 1, 2, 3, 14, 4, 32, 33, 34, with an area stated as Ac 0.471 cents 2280.521 Sq.Yds. RERA filing

Offering and status

FieldProject record
OfferingPlots in a 65-plot layout; plot schedule and software-read size information are set out below. Layout record
Booked / available countsNot supplied in the available project data. RERA record RERA amenities
Construction stageThe project record reports 70% completeness, but the basis and date of that figure are not supplied; it is not an independent site inspection. RERA record
Completion datesRERA project record: proposed completion 22/02/2025. A Form B affidavit by the named promoter gives the same date; another Form B in the file states 30th MAR, 2024. RERA record
Occupancy / completion certificateNo project completion certificate or occupancy certificate is established by the supplied material. The layout approval is tentative and calls for completion certification and final layout approval.

2. The project story

HARI HARA TOWNSHIP is registered as a plotted development at Edulapuram(Part), in Khammam (Rural) Mandal, Khammam District. The project’s RERA identity lists the land as 344/A/3/25, 344/A/1, 344/A/3/18, 344/A/3/19, 344/A/3/20, 344/A/3/21, 344/A/3/23, 344/C and 344/PART. RERA record

The filed SUDA document approves a tentative layout of 65 plots and designates land for plots, roads, park/open space, utilities and social infrastructure. It is not a building plan: the approval states that individual sites are for detached single-family dwelling houses and that individual building permission is to be considered separately.

The project record states 70% completeness, but the supplied data does not identify the measurement date, underlying work items or an independent inspection. The layout approval requires infrastructure and amenity works, handover of designated public-use land, a licensed technical person’s work-completion certificate and approval of the final layout. The supplied evidence does not establish that these steps have been completed or that the project has a completion/occupancy certificate. RERA record

3. Master plan, architecture & building design

This is a plotted layout rather than a multi-storey residential building project. The approved drawing’s schedule contains 65 plots, and the RERA land record gives the site extent as 20,252.80 sq. m. The tentative approval states an extent of Ac. 5.004 cents 24222.157 Sq.Yds. Layout record RERA filing

The following land-use figures are printed in the SUDA approval:

Layout useArea as stated in approvalShare as stated in approval
Plotted areaAc2.911 cents 14089.012 Sq.Yds58.1657996192101375425623524%
Roads areaAc1.407 cents 6808.481 Sq.Yds28.1084836347261394070106416%
Open space (Park)Ac0.503 cents 2432.329 Sq.Yds10.0417525813918580491234723%
UtilitiesAc0.052cents 250.526 Sq.Yds1.0342849129792461624756081%
Social InfrastructureAc 0.133 cents 641.331 Sq.Yds2.6477042005387939547634284%
High School / Degree CollageAcN/A cents N/A Sq.YdsNot stated

These are layout land-use allocations, not building-area or dwelling-area measures. The approval describes the open space, social infrastructure, utilities and roads as land to be developed and handed over to the relevant local authority by registered gift deed before release of the final layout. It also requires the applicant to keep roads open for neighbouring access and to submit a work-completion certificate for final-layout approval.

The layout drawing has one sheet; the supplied software extraction identifies 65 plots with sizes. It reports plot sizes from 137.42 sq. m to 330.17 sq. m, with a median of 167.22 sq. m. These are drawing-derived measurements and should be checked against the drawing; they are not a RERA-filed plot schedule in the structured record. Layout record

4. Homes, configurations & floor plans

The project offering evidenced here is plots, not RERA-listed apartment configurations. The approved layout approval specifies 65 plots. The drawing-based extraction reports the following plot-size distribution; these are software-read values, not RERA-filed saleable areas. Layout record

Plot-size bandPlot count
150–200 sq. yd (125–167 sq. m)35
200–250 sq. yd (167–209 sq. m)22
250–300 sq. yd (209–251 sq. m)3
300–400 sq. yd (251–334 sq. m)5

The drawing extraction reports smallest 137.42 sq. m (164.4 sq. yd), median 167.22 sq. m (200.0 sq. yd) and largest 330.17 sq. m (394.9 sq. yd). It also records 14 plots printed as 167.22 sq. m, 10 as 153.29 sq. m, 5 as 139.35 sq. m, 3 as 181.15 sq. m and 2 as 183.94 sq. m. Layout record

No RERA configuration table, plot-wise booking status, available-plot count, plot-wise saleable area or unit-level measurement is supplied. The floor-plan data contains one layout sheet and no measured home floor plans; two scans are pending. Floor plans

5. Parking & vehicle circulation

The supplied project record does not establish a total number of parking spaces, visitor or accessible parking, or plot-wise parking allocation. It is a plotted layout; the tentative approval states that individual sites are for detached single-family dwelling houses, but does not provide dwelling parking schedules.

The approval’s layout land-use table allocates Ac1.407 cents 6808.481 Sq.Yds to roads and requires roads to remain open for neighbouring access. It does not specify driveway widths, vehicle entries/exits, pedestrian separation or EV charging.

6. Amenities, recreation & open spaces

The RERA amenity record lists 14 items. “YES” is shown for the listed internal roads, water supply, sewerage, storm-water drains, green strip/park, street lighting, rainwater harvesting and electrical meter room/sub-station/receiving station items; the record shows 0% progress for every amenity item, so it does not establish completion. RERA amenities

Landscape/open space
FacilityPark / open space
Description / sizeAc0.503 cents 2432.329 Sq.Yds; 10.0417525813918580491234723% of layout area as stated in the approval
Declared progress / verified statusEarmarked in tentative approval; completion not established.
Landscape/open space
FacilityGreen Strip/TOT LOT/Park
Description / sizeSize not stated
Evidence sourceRERA amenities
Declared progress / verified statusListed as available “YES”; 0% progress recorded; not independently verified.
Sports/recreation
FacilityNo specific sports facility identified in the RERA-filed material
Description / size—
Evidence sourceRERA amenities
Declared progress / verified statusNot established.
Clubhouse/indoor
FacilityNo clubhouse or indoor facility identified in the RERA-filed material
Description / size—
Evidence sourceRERA amenities
Declared progress / verified statusNot established.
Convenience/community
FacilitySocial Infrastructure
Description / sizeAc 0.133 cents 641.331 Sq.Yds; 2.6477042005387939547634284% as stated in the approval
Declared progress / verified statusEarmarked; completion and handover not established.
Convenience/community
FacilityCommunity Buildings
Description / sizeNo size or facility detail supplied
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified.
Convenience/community
FacilityUtilities land
Description / sizeAc0.052cents 250.526 Sq.Yds; 1.0342849129792461624756081% as stated in the approval
Declared progress / verified statusEarmarked; completion and handover not established.

The approval’s conditions describe utility works such as a water reservoir, septic tank or sewage treatment plant, electric transformer and solid-waste management, and mention possible community uses including a pharmacy, clinic, school, play school, creche, dispensary and convenience shops. These are approval-document references; the supplied evidence does not establish that those facilities have been constructed or delivered.

7. Utilities, building services & safety

The tentative layout approval requires the applicant to undertake infrastructure works, including construction of an overhead tank or sump and septic tank as applicable, harvesting pits, and utilities such as water reservoir, septic tank/sewerage treatment plant, electric transformer and solid-waste management. It identifies utility land of Ac0.052cents 250.526 Sq.Yds. These are approval conditions or identified provisions, not verified completed services.

The RERA amenity record lists water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, water conservation/rainwater harvesting, street lighting, and an electrical meter room/sub-station/receiving station. Progress is recorded as 0% for all listed amenities; no capacities, operating status, water source, power-backup system, fire-safety design or waste-management operating details are supplied. RERA amenities

The available evidence does not specify accessible routes or ramps, security/CCTV, lift provision, or dwelling-level fire and life-safety arrangements. The layout approval concerns plots and does not establish statutory compliance for future individual buildings.

8. Location, access & connectivity

The registered location is Edulapuram(Part), Edulapuram Revenue Village, Khammam (Rural) Mandal, Khammam District, Telangana 507163. The RERA-filed layout approval identifies Edulapuram Revenue Village and the same project surveys. RERA record

The RERA-filed site boundaries are: East OTHERS LAND; West ROAD WIDTH - 30; North OTHERS LAND; South ROAD WIDTH - 60. The approval requires internal roads to remain open for access to neighbouring sites. RERA filing

A supplied location record gives the cadastral parcel centroid as 17.625294168397353, 80.00119812197775 and lists the nearest sampled Outer Ring Road interchange at 141.4 km (approx). No other measured nearby landmarks or public-transport details are supplied. Location record

9. Developer & development status

The registered promoter is VULLI VENKATESHWARLU, recorded as a Proprietorship; the supplied record names him as authorized signatory. The available corporate record does not provide a company registration number or other corporate identifier for this proprietorship. Corporate record Parties record

The RERA registration certificate lists the promoter office as Village: Maripeda, Mandal: Maripeda, District: Mahabubabad, Pin: 506315. The promoter profile separately lists an address at NANDANAVANAM, MARIPEDA, EDULAPURAM, Khammam (Rural) Mandal, Khammam, 507163. The supplied record does not provide an official website or project contact details. Corporate record

The project’s RERA header reports 70% completeness, without an as-of date or supporting progress certificate in the supplied material. The registered proposed completion date is 22/02/2025. No RERA extension is recorded on the supplied registration certificate, and no project completion or occupancy certificate is established here. RERA record

10. Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA Form C certificate, P00800006856Registers HARI HARA TOWNSHIP from 05/09/2023 to 22/02/2025; includes a 70% separate-account condition.
SUDA tentative layout approval, 216286/LP/GP/202427/0002/2022, dated 23-02-2023Approves a tentative 65-plot layout for the listed project surveys at Edulapuram and identifies land-use allocations and development conditions.
Form B affidavit dated 31st May, 2023Promoter declaration by VENKATESWARLU VULLI; states a completion undertaking of 22/02/2025 and includes declarations concerning title, encumbrances, project funds and approvals.
Form B affidavit dated 11th day of JULY, 2023Declaration by KANDE HARI PRASAD, identified in the document as an authorized signatory; gives a completion undertaking of 30th MAR, 2024.
Layout drawingOne drawing sheet; the supplied extraction identifies 65 plots, plot sizes and layout land-use figures. Layout record
Completion / occupancy recordNo project completion certificate, occupancy certificate or final layout approval is established in the supplied evidence.

Frequently asked questions

Is HARI HARA TOWNSHIP registered with Telangana RERA?

Yes. HARI HARA TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P00800006856; the registration status is New Project.

Who is the developer of HARI HARA TOWNSHIP?

The promoter named in the RERA registration is VULLI VENKATESHWARLU.

Where is HARI HARA TOWNSHIP located?

HARI HARA TOWNSHIP is in EDULAPURAM, Edulapuram(Part), Khammam (Rural) Mandal, Khammam, Telangana (507163).

When will HARI HARA TOWNSHIP be completed?

The promoter's proposed date of completion filed with RERA is 22/02/2025. This is the promoter's declaration, not a guarantee.