GREEN MEADOWS-PHASE 1 is a plotted residential layout in Kalwakurthy, Kalwakurthy Mandal, Nagarkurnool District. The registered promoter is GANGULA MALLAREDY AND CHINTALA NARSIMHA REDDY. The project covers 29427.05 sq.m. and comprises 128 residential plots; no building or floor configuration is stated. It is registered under TG-RERA number P01600008411, with a proposed completion date of 22 June 2025.

01What we found

Period endedTG-RERA registration ran to 22 Jun 2025 - check its extension on TG-RERA
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Kalwakurthy, Kalwakurthy, Nagarkurnool · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameGREEN MEADOWS-PHASE 1 RERA record
Project typePlotted development / residential layout RERA record RERA filing
Phase / registered portionPhase 1; registered as a project in its own right RERA record
TG-RERA registrationP01600008411 RERA record Approvals record
Registration validity22/06/2024 to 22/06/2025; any extension is not established in the supplied record Approvals record
Registered promoterGANGULA MALLAREDY AND CHINTALA NARSIMHA REDDY RERA record Corporate record
Entity type“Others”; filing describes the organization as “TWO INDIVIDUALS” RERA filing
RERA statusThe filing identifies the project as “New Project.” Current registration status is not established by the supplied certificate alone. RERA record

Land and geographic identity

ItemRecord
LocalityKalwakurthy / Kalwakurthy Municipality RERA record RERA filing
Revenue villageKalwakurthy; the layout document specifies KALWAKURTHY (PROPER) and the RERA certificate records Kalwakurthy. RERA record
Mandal / district / PINKalwakurthy Mandal / Nagarkurnool District / 509324 RERA record
Project survey numbers262/AA/1 and 262/AA/2 RERA record Land records
Registered site extent29427.05 sq.m. in the RERA land details RERA filing
Layout plan extent29427.05 SQ.MT. in the layout-plan record; the tentative-layout approval also prints 7 Acer 10.87 Gts; 35196 Sq. Yds
Net / total areaRERA land details state total and net area as 29427.05 sq.m. RERA filing
BoundariesEast: ROAD; West: NEIGHBOURS LAND; North: NEIGHBOURS LAND; South: OWNER OPEN PLACE RERA filing

Development identity

ItemRecord
Principal layout approvalTentative layout plan 0002/LO/3061/2023, dated 22 June, 2023, issued by Kalwakurthy Municipality/Municipal Corporation Approvals record
Related approval referenceDTCP approval G/282/02/KLKY/2021-22, dated 23-05-2023; application TS/035986/2023 Approvals record
Approved developmentTentative residential layout with 128 plots
Built-up area / buildings / floorsThe layout filing records proposed coverage area and total proposed built-up area as 0.00; no building or floor configuration is supplied.
ParkingThe layout filing records 0 proposed number of parkings and 0.00 common parking area.
Mortgage area2335.72 sq.m. in the RERA land details and layout filing RERA filing

Offering and status

ItemRecord
Unit typeResidential plots; the approved layout schedule is reported as containing 128 plots. Layout record
Plot sizesSoftware-read drawing schedule: 64.3–308.37 sq.m.; median 100.34 sq.m. These are drawing-derived measurements, not a RERA unit-area disclosure. Layout record
Booked / available countsNot established in the supplied records.
Construction / development stageNo independently verified site-progress measurement is supplied. The filing’s proposed completion undertaking is 22/06/2025.
Completion deadlinePromoter-declared completion date: 22 June 2025.
Occupancy / completion certificateNo project completion or occupancy certificate is identified in the supplied project records. The supplied certificate bearing an occupancy-certificate reference relates to another project and is not evidence for Green Meadows Phase 1. Document index

2. The project story

GREEN MEADOWS-PHASE 1 is presented in the TG-RERA record as a plotted residential layout in Kalwakurthy, Nagarkurnool, on land identified as Survey Nos. 262/AA/1 and 262/AA/2. The tentative layout approval describes 128 plots and reserves land for roads, open space/park, social infrastructure and utilities. It is a land-subdivision and infrastructure project, not a filing for apartment blocks: the layout record reports 0.00 proposed built-up area and no proposed parking count. RERA record Land records

The promoter’s Form B declaration undertakes completion by 22 June 2025. The supplied evidence does not establish the actual completion of layout works, final layout release, or an occupancy/completion certificate for this project; the stated deadline should therefore be read as a promoter declaration, not as verified delivery.

3. Master plan, architecture & building design

The approved-plan material describes a plotted layout, so the relevant design features are plot arrangement and reserved land rather than building or floor plans. The software-read layout drawing indicates 128 plots and the following land-use schedule, with percentages and areas as printed in the drawing: Layout record

Layout useAreaShare
Plotted area14958.33 sq.m.50.83%
Roads10700.89 sq.m.36.36%
Organized open space / park2649.98 sq.m.9.01%
Social infrastructure821.55 sq.m.2.79%
Utilities296.29 sq.m.1.01%
Amenity area0.00 sq.m.0.00%

The drawing-derived plot schedule reports plot sizes from 64.3 sq.m. to 308.37 sq.m., with a median of 100.34 sq.m. and 128 plots with sizes read. These are software-measured values from the layout drawing and should be checked against the approved drawing schedule. Layout record

The tentative-layout approval lists internal-road widths of 9.14M, 12.00MT and 18.00M, and references existing and proposed roads of 30.00 MT and 12.00 MT, along with “EXISTING ROAD 40' WIDE” and “EXISTING ROAD 40'-0" WIDE.” No building count, floor configuration, tower height, FSI-counted area, or apartment carpet/saleable area is evidenced in the supplied project records. The plan’s reported built-up area is 0.00.

4. Homes, configurations & floor plans

This is a plotted project. The drawing-derived schedule reports 128 plots; it is not a RERA-filed unit-type inventory, and the supplied RERA evidence does not establish booked or available plot counts. Layout record

Plot schedule measureDrawing-derived value
Plot count128
Smallest plot64.3 sq.m. (76.9 sq.yd.)
Median plot100.34 sq.m. (120.0 sq.yd.)
Largest plot308.37 sq.m. (368.8 sq.yd.)

The software-read size bands are: 3 plots in 0–100 sq.yd.; 105 in 100–150 sq.yd.; 7 in 150–200 sq.yd.; 1 in 200–250 sq.yd.; 11 in 250–300 sq.yd.; and 1 in 300–400 sq.yd. Layout record These measurements were read from the layout drawing and are not RERA-filed saleable areas. The supplied floor-plan review identifies two layout sheets and no flat plans; apartment carpet-area comparisons are therefore not applicable. Floor plans

5. Parking & vehicle circulation

The layout filing records 0 proposed number of parkings and 0.00 common parking area. No sanctioned resident or visitor parking count, accessible parking, parking allocation to individual plots, EV provision, or separate parking level is established in the supplied project records.

The layout approval requires roads to remain open for access to neighbouring sites and states that the layout owner/developer shall not construct a compound wall or fencing around the site. This is an approval condition, not evidence of completed road works or a particular vehicle-circulation arrangement on site.

6. Amenities, recreation & open spaces

The project records include reserved open-space and social-infrastructure land and list infrastructure works required under the tentative layout approval. The supplied amenity-status fields show no progress percentage above 0; they do not independently verify construction or delivery. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organized open space2649.98 sq.m.; 9.01% of layout areaLayout recordReserved in layout; completion not independently verified
Social infrastructure821.55 sq.m.; 2.79%Layout recordReserved in layout; no facility or completion details supplied
Internal roadsLayout roads 10700.89 sq.m.; 36.36%Layout recordRoad works required by approval; completion not independently verified
Utility land296.29 sq.m.; 1.01%Layout recordReserved in layout; see Utilities section for approval-listed services

The tentative-layout approval calls for park development, avenue plantation, road formation with black top, and related layout infrastructure. These are approval requirements, not evidence that the works are complete.

7. Utilities, building services & safety

The tentative-layout approval lists planned infrastructure works, including internal water-supply pipelines, an overhead tank and assured water-supply source; underground drainage and storm-water drains; a common septic tank / STP; electrical supply lines, street lights and a transformer; solid-waste management; and rainwater-harvesting pits. It also requires an overhead tank or sump and septic tank, as applicable, and sufficient harvesting pits. The supplied materials do not give capacities or independently verify installation or operation.

Water
Evidence in the project recordInternal water-supply pipelines, overhead tank and an assured supply source are listed as layout works.
Status limitationProposed/required in approval; source, capacity and completion are not verified.
Sewerage and drainage
Evidence in the project recordUnderground drainage, common septic tank / STP and storm-water drains are listed.
Status limitationProposed/required in approval; capacity and completion are not verified.
Electrical
Evidence in the project recordElectrical lines, street lights and transformer are listed.
Status limitationProposed/required in approval; capacity and energisation are not verified.
Waste
Evidence in the project recordSolid-waste management is listed in the approval.
Status limitationDetails and completion are not supplied.
Rainwater
Evidence in the project recordRainwater-harvesting pits are listed.
Status limitationNumber, capacity and completion are not supplied.
Fire / life safety, security, accessibility
Evidence in the project recordNo project-specific approved or verified details are supplied.
Status limitationNot established by the available project records.

8. Location, access & connectivity

The registered project location is Kalwakurthy, Kalwakurthy Mandal, Nagarkurnool District, Telangana, PIN 509324; the layout documents identify Kalwakurthy Revenue Village, including the description KALWAKURTHY (PROPER). The project parcel centroid supplied for mapping is 16.657193656453806, 78.51215876868461. RERA record Location record

The layout record names existing and proposed road widths, including 30.00 MT, 12.00 MT and 40' roads, but does not establish a named public-road approach or completed connections. The nearest sampled Outer Ring Road interchange is listed as approximately 64.3 km away. Location record No public-transport details or independently verified travel times are supplied.

9. Developer & development status

The registered promoter is GANGULA MALLAREDY AND CHINTALA NARSIMHA REDDY. The RERA filing identifies the organization type as “Others” and describes it as “TWO INDIVIDUALS.” The supplied registered-office address is SREEDHAR COLONY, VANGA APARTMENTS BACK SIDE, KALWAKURTHY, KALWAKURTHY, Kalwakurthy, Nagarkurnool, 509324. No official project website or contact details are established in the supplied record. RERA record RERA filing Corporate record

The promoter’s Form B affidavit, dated 28th day of MAY, 2024, declares a completion date of 22 June 2025 and makes other project commitments, including depositing 70% of amounts realised into a separate account. These are promoter declarations; the supplied evidence does not independently establish current construction progress or completion. The TG-RERA certificate records a one-year registration period from 22/06/2024 to 22/06/2025; this registration validity is distinct from the promoter’s completion undertaking.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01600008411; valid 22/06/2024–22/06/2025
What the supplied document establishesForm C certificate for GREEN MEADOWS-PHASE 1, naming the registered promoters and stating registration conditions.
Tentative layout approval
Identifier / date0002/LO/3061/2023; 22 June, 2023
What the supplied document establishesKalwakurthy Municipality/Municipal Corporation approval for a tentative residential layout of 128 plots on Survey Nos. 262/AA/1 and 262/AA/2.
Related layout-plan filing
Identifier / dateDTCP approval G/282/02/KLKY/2021-22; 23-05-2023; application TS/035986/2023
What the supplied document establishesLayout-plan record with land-use schedule, plot count and road-width references.
Mortgage reference in tentative-layout approval
Identifier / dateDeed 4445/2023, dated 19 June, 2023
What the supplied document establishesApproval identifies plots 98, 128, 96, 95, 94, 93, 92, 91, 90, 97, 127, 126, 125, 124, 123, 122, 121, 120, 119, 118, 117, 116 and 115 as mortgaged in favour of the Municipality/Municipal Corporation, with stated extent 0 Acer 23.09 Gts 2794 Sq. Yds.
Promoter declaration
Identifier / dateForm B, dated 28th day of MAY, 2024
What the supplied document establishesPromoter’s declaration concerning title, encumbrances, project completion and fund arrangements.
Project completion / occupancy record
Identifier / dateNot identified in supplied project documents
What the supplied document establishesNo project-specific completion or occupancy certificate is established by the supplied records.
Other occupancy-certificate document in the file set
Identifier / date000216/LO/Plg/HMDA/2021, dated 31/07/2021
What the supplied document establishesArchitect’s certificate identifies SINGAPUR TOWN, developed by PRANEETA DEVELOPERS; it is not a certificate for Green Meadows Phase 1.

Frequently asked questions

Is GREEN MEADOWS-PHASE 1 registered with Telangana RERA?

Yes. GREEN MEADOWS-PHASE 1 is registered with the Telangana Real Estate Regulatory Authority as P01600008411; the registration status is New Project.

Who is the developer of GREEN MEADOWS-PHASE 1?

The promoter named in the RERA registration is GANGULA MALLAREDY AND CHINTALA NARSIMHA REDDY.

Where is GREEN MEADOWS-PHASE 1 located?

GREEN MEADOWS-PHASE 1 is in KALWAKURTHY, Nagarkurnool, Telangana (509324).

When will GREEN MEADOWS-PHASE 1 be completed?

The promoter's proposed date of completion filed with RERA is 22/06/2025. This is the promoter's declaration, not a guarantee.