GREEN FIELDS PHASE-II is a residential plotted development in PNDYAL, Maheshwaram Mandal, Ranga Reddy District, developed by registered promoter DSR SR ISR DEVELOPERS. The registered site extent is 9441.70 sq. m, and the offering is residential plots; the overview does not provide a verified plot count or plot-size schedule, and buildings or floors are not applicable to the recorded offering. Its TG-RERA registration is P02400006332, and the proposed completion date is 20/02/2026.

More from Dsr Sr Isr Developers · 2 projects →

01What we found

Period endedTG-RERA registration ran to 20 Feb 2026 - check its extension on TG-RERA
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Pndyal, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameGREEN FIELDS PHASE-II RERA record
Project typePlotted development / residential open-plot layout RERA record Approvals record
Phase / registered portionPhase-II; the registration identifies the project as GREEN FIELDS PHASE-II RERA record
TG-RERA registrationP02400006332, granted under section 5; Form C states validity from 07/07/2023 to 20/02/2026, unless extended by the Authority. The certificate record says it was not extended as captured. Approvals record
Registered promoterDSR SR ISR DEVELOPERS; partnership RERA record Corporate record RERA filing
RERA statusRegistration certificate on file. Its stated validity ended 20/02/2026; the certificate record reports no extension. This is separate from the completion undertaking and the layout’s completion certification. Approvals record

Land and geographic identity

FieldRecord
Locality / revenue villageLocality recorded as PNDYAL; the approval documents identify Pendyal Village. RERA record
MandalMaheshwaram in the HMDA approval records; not disclosed in the RERA land-identity fields. Land records
DistrictRanga Reddy RERA record Land records
PIN509325 RERA record
Project survey identitySY NO 131/P in the RERA record; HMDA layout documents refer to Sy.Nos. 131/PART and 131/PART. Land records
Registered site extent9441.70 sq. m in the RERA land record; the final-layout letter records 9,441.70 Sqm. Land records
Total / net land areaHMDA draft-layout area statement: Total Site area 9569.12; Master plan Road affected area 127.42; Net Site Area 9441.7. Units are stated as square metres in the approval document.
BoundariesEast: ROAD; West: OTHERS LAND; North: OTHERS LAND; South: EXISTING WIDE ROAD. Land records
Mandal in RERA recordNot disclosed in the RERA land-identity fields. Land records

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal layout approvalFinal Layout Permit No. 000045/LO/Plg/HMDA/2023, dated 04 December, 2023; the HMDA draft-layout letter with the same approval number is dated 20 February, 2023. Approvals record
Approved built-up areaRERA record states 6346.19 sq. m; the plotted-layout approval’s area statement labels 6346.19 as plotted area, not building built-up area. RERA filing
Buildings / floorsNot applicable to the recorded plotted-layout offering; no building count or sanctioned floor configuration is supplied. Individual dwelling construction is subject to separate building permission. RERA record
Layout areasHMDA draft-layout statement: plotted area 6346.19; open space 240.56; layout road area 1799.56; amenities area 0; park 1055.34; social infrastructure 240.56.
RERA-declared unit countThe available RERA filing extracts do not provide a verified plot-count or plot-size schedule. Document index
Mortgage area993.15 sq. m in the RERA land record. Land records

Offering and status

FieldRecord
Unit typeResidential plots / open plots RERA record Approvals record
RERA-filed plot sizes and inventoryNot established in the available extracted RERA records. Document index
Construction stageRERA data records 70% completeness; this is a reported project figure, not an independent site inspection. RERA record
Completion datePromoter’s Form B declaration undertakes completion by 20TH FEB,2026; the RERA record also lists 20/02/2026 as the proposed completion date. RERA record
Occupancy / completion certificate statusNo apartment-building OC is identified. HMDA issued a Final Layout Letter on 04 December, 2023; separately, the architect’s Form 1A dated 04.12.2024 certifies overall completion of the registered project and refers to an HMDA occupancy certificate dated 04 December, 2023. The document record therefore describes a completed layout, not occupancy certification of individual homes.
Sales / availabilityNo reliable RERA-filed booked or available plot count is supplied in the extracted records. Document index

2. The project story

  • GREEN FIELDS PHASE-II is registered as a residential plotted development on land identified in the RERA record as SY NO 131/P, at Pndyal/Pendyal, Ranga Reddy District. The HMDA final-layout letter identifies Survey No. 131/PART, in Pendyal Village, Maheshwaram Mandal, and records an approved residential open-plot layout with a net area of 9,441.70 Sqm. RERA record Land records
  • The HMDA file contains a draft layout letter dated 20 February 2023 and a final layout letter dated 04 December 2023. The latter records that roads and open spaces were taken over by the local authority through registered gift deed 6001/2023 and that a relinquishment deed concerning mortgaged plots was executed as 19374/2023. The RERA record separately reports 70% completeness, while the architect’s certificate dated 04.12.2024 says the registered project is complete in all aspects. These are documentary and promoter/project-record statements; no independent site inspection is supplied here. RERA record
  • The offering is plots rather than completed homes. The final layout permits residential use, while individual building permission is to be considered separately under the applicable building rules. No dwelling count, house designs, or individual plot schedule is verified in the available RERA extracts. Document index

3. Master plan, architecture & building design

  • This is a plotted layout, not a multi-tower or apartment scheme. The HMDA draft-layout area statement records a total site area of 9569.12, a master-plan road-affected area of 127.42, and a net site area of 9441.7 square metres. It further identifies 6346.19 as plotted area, 1799.56 as layout road area, 1055.34 as park, 240.56 as open space and 240.56 as social infrastructure; the same statement lists amenities area as 0.
  • The draft letter states road area of 1799.56 sq.mtr (19.06 %), organised open space of 1055.34 Sq. mtrs (11.18 %) and social infrastructure of 240.56 sq.mtrs (2.55%). It also specifies 18 mts roads. These are layout-document figures; no building footprint, building height, dwelling floor plans, or apartment-area schedule is supplied.
  • The HMDA final-layout letter limits the sites to residential dwelling houses and says individual building permissions are to be considered separately. The layout drawing is recorded as two sheets with plot numbers printed from 1 to 36; that count is drawing-derived and the drawing-text extraction is incomplete. Plot sizes are not available from the supplied RERA data. Layout record

4. Homes, configurations & floor plans

The RERA-filed offering is residential plots. The supplied records do not provide a verified RERA plot-size schedule, booked/available inventory, or unit-wise saleable areas. RERA record Document index

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plotNot verified in extracted RERA recordsNot disclosedNot disclosedNot disclosedNot applicableNot supplied

The drawing review records two layout sheets, but no measured plot areas; the layout extraction notes that plot count and sizes read from drawing text should be verified against the drawing. No apartment floor plans or carpet-area measurements are available. Layout record Floor plans

5. Parking & vehicle circulation

  • No sanctioned car- or two-wheeler-parking count, visitor or accessible parking allocation, or plot-wise parking arrangement is established in the supplied records.
  • The HMDA draft-layout letter identifies 18 mts roads and requires roads to be opened for accessibility to neighbouring sites. The final-layout letter requires roads to remain open for free access to the general public.

6. Amenities, recreation & open spaces

Layout roads
Description / size1799.56 sq.mtr; draft letter states 19.06 % and identifies 18 mts roads.
Evidence sourceHMDA draft-layout letter
Declared progress / verified statusFinal-layout letter says roads were taken over by the local authority through registered gift deed 6001/2023.
Park / organised open space
Description / size1055.34 Sq. mtrs; draft letter states 11.18 %.
Evidence sourceHMDA draft-layout letter
Declared progress / verified statusFinal-layout letter records roads and open spaces taken over by the local authority.
Open space
Description / size240.56 in the draft area statement.
Evidence sourceHMDA draft-layout letter
Declared progress / verified statusStatus beyond the document’s area statement is not independently verified.
Social infrastructure
Description / size240.56 sq.mtrs; draft letter states 2.55%.
Evidence sourceHMDA draft-layout letter
Declared progress / verified statusDraft letter requires handover to the local body; independent current-use verification is not supplied.
Amenities area
Description / size0 in the HMDA draft area statement.
Evidence sourceHMDA draft-layout letter
Declared progress / verified statusNo separate amenity-area provision recorded in that statement.
Green strip / tot lot / park
Description / sizeRERA amenity record marks “Green Strip/TOT LOT/Park” YES, 100%.
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusRERA-declared percentage; not independently inspected.
Internal roads & footpaths
Description / sizeRERA amenity record marks YES, 100%.
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusRERA-declared percentage; not independently inspected.

The HMDA draft letter also lists park development, avenue plantation, cycling tracks and common civic works as development requirements. These are conditions or provisions in the approval record, not evidence of independently verified delivery.

7. Utilities, building services & safety

  • The HMDA draft-layout letter lists potable/drinking-water connectivity, internal water-supply pipelines, an overhead tank, a common septic tank / STP, underground drainage lines, storm-water drains, rainwater-harvesting pits, underground utility ducting, street lights, a transformer yard, solid-waste arrangements and a bio-compost unit. The letter also requires a mechanism for septage treatment, source segregation of garbage, underground storm-water drainage, LED street lighting and arrangements for potable-water supply. These are approval-document provisions; completion of each item is not independently verified.
  • The final-layout letter states that the layout has been provided with water supply, sewerage and drainage-disposal systems, street lighting, rainwater-harvesting structure and other civic amenities, and assigns maintenance of those services to the local body. The RERA amenities record marks water supply, sewerage, street lighting, energy management, fire protection and electrical meter room/sub-station/receiving station as YES, 100%; it records storm-water drains, community buildings, sewage/sullage treatment and disposal, solid-waste management and rainwater harvesting at 0%. These are filing-status fields, not an independent engineering inspection or a determination of statutory compliance. RERA amenities
  • No capacities, supply sources, treatment specifications, backup-power details, CCTV/security systems, accessible routes, or individual-house fire systems are supplied.
  • The final layout requires a minimum 3m (10’0”) safety distance, both vertical and horizontal, from high-tension electricity lines when individual residential building permissions are considered.

8. Location, access & connectivity

  • The registered location is Pndyal, Ranga Reddy District, PIN 509325; the HMDA layout documents identify Pendyal Village, Maheshwaram Mandal, Ranga Reddy District. The RERA land record describes the eastern boundary as ROAD and the southern boundary as EXISTING WIDE ROAD. HMDA’s draft letter specifies 18 mts roads and requires access roads to be opened to neighbouring sites; the final layout requires roads to remain open for free public access. RERA record Land records
  • The supplied location record lists Financial District (Nanakramguda) at 1.2 km from the cadastral parcel centroid. No public-transport detail or other independently measured distance is supplied. Location record

9. Developer & development status

  • The registered promoter is DSR SR ISR DEVELOPERS, a partnership, with GSTIN 36AASFD3582C1ZB. The RERA record identifies SUBASH BEZGAM as authorized signatory. A complete registered office address and official promoter contact details are not established in the supplied records. Corporate record RERA filing Parties record
  • The promoter’s Form B affidavit, made by BEZGAM SUBASH on behalf of the firm, declares that the project land is free from encumbrances, undertakes completion by 20TH FEB,2026, and states that 70% of amounts realized from allottees will be deposited in a separate scheduled-bank account and withdrawn against professional certification. These are promoter declarations in the RERA file.
  • The RERA record reports 70% completeness. The architect’s Form 1A dated 04.12.2024 certifies overall completion of the registered project; the supplied material does not include an independent site-progress inspection. Registration validity, the completion undertaking and the layout completion/occupancy-related documents are distinct records and should not be treated as interchangeable. RERA record

10. Approvals, official records & documents

TG-RERA registration
DetailsForm C for GREEN FIELDS PHASE-II, registration P02400006332, granted under section 5; validity stated as 07/07/2023–20/02/2026.
HMDA draft layout
DetailsDraft layout letter for Sy.Nos. 131/PART, approval no. 000045/LO/Plg/HMDA/2023, dated 20 February, 2023; includes layout-area statement and development conditions.
HMDA final layout
DetailsFinal Layout Permit 000045/LO/Plg/HMDA/2023, dated 04 December, 2023, for a residential open-plot layout in 131/PART, Pendyal Village, Maheshwaram Mandal, measuring 9,441.70 Sqm.
Architect’s completion certificate
DetailsForm 1A dated 04.12.2024, certifying completion of the registered project; it refers to an HMDA occupancy certificate dated 04 December, 2023.
Promoter declaration
DetailsForm B affidavit by BEZGAM SUBASH for M/S DSR SR ISR DEVELOPERS, including title, encumbrance, completion and separate-account declarations.
Layout drawing
DetailsTwo layout sheets; plot-number text indicates plots numbered 1 to 36, but the extraction is incomplete and plot-size measurements are not available.
SourceLayout record
Gram Panchayat record
DetailsExtracted text identifies the Office of Gram Panchayat Pendyal and references HMDA approval no. 000045/LO/Plg/HMDA/2023, but the OCR does not establish the heading or terms of an approval.

Other registrations of Green Fields

Frequently asked questions

Is GREEN FIELDS PHASE-II registered with Telangana RERA?

Yes. GREEN FIELDS PHASE-II is registered with the Telangana Real Estate Regulatory Authority as P02400006332; the registration status is New Project.

Who is the developer of GREEN FIELDS PHASE-II?

The promoter named in the RERA registration is DSR SR ISR DEVELOPERS.

Where is GREEN FIELDS PHASE-II located?

GREEN FIELDS PHASE-II is in PNDYAL, Rangareddy, Telangana (509325).

When will GREEN FIELDS PHASE-II be completed?

The promoter's proposed date of completion filed with RERA is 20/02/2026. This is the promoter's declaration, not a guarantee.