Green Arched
UMR PROJECTS · Medchal-Malkajgiri · RERA P02200008655
GREEN ARCHED is a residential apartment project at Ammuguda, Malkajgiri mandal, Medchal-Malkajgiri district, being developed by the registered promoter UMR PROJECTS, recorded as a partnership. The project covers 749.81 sq. m and comprises one proposed residential building, “A,” with 1 Stilt + 5 upper floors and 15 3BHK apartments, each with a RERA-filed saleable area of 145.24 sq. m. Its TG-RERA registration number is P02200008655, and the stated completion date is 22 December 2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | GREEN ARCHED RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; the registration refers to the project at Ammu Guda and its stated site extent. RERA record |
| TG-RERA registration | P02200008655 RERA record |
| Registration validity | 20 August 2024–22 December 2026; this is registration validity, not a statement that the project is complete or has an occupancy certificate. RERA record |
| Registered promoter | UMR PROJECTS, recorded as a partnership. RERA record Corporate record |
| RERA status | New Project; the supplied registration record gives the above validity dates. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Ammuguda; the building permit describes the locality as Radhakrishnapuram, Ammuguda. RERA record RERA filing |
| Revenue village | Ammu Guda (also rendered as Ammuguda in the approval documents). RERA record |
| Mandal | Malkajgiri. RERA record |
| District | Medchal-Malkajgiri; the building permit uses “Medchal.” RERA record |
| PIN | 500094. RERA record |
| Project survey numbers / subdivisions | 5, 6, 7, 10/1, 11/1, 12/1, 12/4213/2. RERA record Land records |
| Site extent | 749.81 sq. m; the RERA land record gives total and net area as 749.81 sq. m, with affected area 0 sq. m. RERA filing Land records |
| Boundaries as recorded | East: 40 wide road; west: Plot No. 122; north: Plot Nos. 116 and 117; south: neighbour’s property. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building permit | 4929/GHMC/LBN/2023-BP, approved 23 December 2023. Approvals record |
| Other approval reference on file | TS/031999/2023, dated 06-05-2023, shown in the submitted plan record. Approvals record |
| Approved built-up area | The supplied RERA fields record approved built-up area as 2,247.95 sq. m. The submitted plan extraction separately labels residential net BUA as 1,849.25 sq. m and total proposed built-up area including parking as 2,247.95 sq. m. RERA filing |
| Building count and floors | One proposed residential building, “A,” with 1 Stilt + 5 upper floors. The permit extraction records building height as 14.94 m. |
| Parking provision in plan record | Stilt parking area recorded as 398.70 sq. m in the submitted plan extraction; the permit extraction also states total parking area 398.7. A sanctioned space count is not established in the supplied record. |
| Unit count | 15 units in the submitted plan record; the RERA unit data also records 15 units. RERA unit table |
Offering and status
| Field | Record |
|---|---|
| Unit type | 3BHK apartments. RERA unit table |
| RERA-filed saleable area | 145.24 sq. m per 3BHK configuration. RERA unit table |
| Booking / availability | Portal data records 0 booked and 15 available; no as-of date is supplied, so these counts are indicative. RERA unit table |
| Construction stage | No project construction-progress figure or independently verified site-progress record is supplied. RERA record RERA amenities |
| Completion timeline | RERA registration and Form B state 22 December 2026 as the completion date; the GHMC building permit states construction is to be completed before 23 December 2026. |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is identified in the supplied records; the building permit requires an occupancy certificate before occupation. |
2. The project story
GREEN ARCHED is registered with TG-RERA as a residential apartment project on a stated 749.81 sq. m site at Ammu Guda, Malkajgiri, Medchal-Malkajgiri. The project record identifies survey numbers 5, 6, 7, 10/1, 11/1, 12/1 and 12/4213/2. RERA record Land records
The filed development is one proposed building with 1 stilt level and 5 upper floors, offering 15 3BHK units. The portal-derived unit count records all 15 as available and none booked, but the record has no as-of date. No construction stage is supplied, so the project’s physical progress cannot be stated from this evidence. RERA unit table
The promoter’s RERA-filed completion undertaking is 22 December 2026. Registration remains a separate matter: the certificate states validity through that date, subject to the Act and rules. No occupancy certificate is included in the supplied documents, and the building permit says an occupancy certificate is required before occupation.
3. Master plan, architecture & building design
The submitted GHMC plan describes one proposed residential building, identified as “A,” with 1 stilt + 5 upper floors on a site of 749.81 sq. m. Its extracted figures include 1,849.25 sq. m residential net BUA and 2,247.95 sq. m total proposed BUA including parking; these are distinct plan-record measures. The RERA field also records approved built-up area of 2,247.95 sq. m. RERA filing
The plan extraction records a proposed coverage area of 398.67 sq. m, vacant plot area of 351.15 sq. m, stilt floor area of 398.70 sq. m, and 14.94 m building height. It lists each of the first through fifth floors at 369.85 sq. m net BUA and terrace floor total BUA of 12.01 sq. m. The extraction also records “TOTAL BUA 2259.96,” deductions of 9.00, and net BUA of 1,849.25; the plan does not provide a single consolidated explanation of these separate labels.
The submitted plan describes one entry and one exit, with a minimum width of 4.5 m and height clearance of 5 m. It identifies no sanctioned unit increase without prior GHMC approval. No supplied drawing-derived information establishes the number of flats per floor, lifts, stairs, detailed circulation, or the layout of common areas.
4. Homes, configurations & floor plans
The RERA filing records 15 3BHK units, with a filed saleable area of 145.24 sq. m per unit. Portal counts show 0 booked and 15 available, but have no supplied as-of date. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 15 | 0 | 15 | 145.24 sq. m | Software-measured: median 95.5 sq. m; range 90.0–116.0 sq. m | 34% RERA unit table RERA unit details Floor plans |
The carpet-area figures are software measurements from the submitted floor-plan drawings, not RERA-filed figures, and are marked as requiring review. Nine flat designs were measured; four are flagged as needing review. The same drawing record identifies a balcony and utility area, which are excluded from its carpet measurement. RERA saleable area is a separate measure that includes the home’s share of common areas; do not treat it as carpet area. RERA unit details Floor plans
One measured example shows three bedrooms, living, dining, kitchen, three toilets, a balcony labelled 1.09 m wide, and a utility area of 2.07 sq. m. These room measurements are drawing-derived and should be checked against the approved drawing. RERA unit details
5. Parking & vehicle circulation
The building-permit extraction records a stilt parking area of 384.28 sq. m; the submitted plan extraction records 398.70 sq. m as parking area. The plan’s “proposed number of parkings” field is recorded as 0, so a sanctioned count of parking spaces cannot be established from the supplied extracted figures.
The permit conditions state that the stilt area approved for parking is to be used exclusively for vehicle parking, without partition walls or rolling shutters. The plan describes one entry and one exit, each subject to a minimum width of 4.5 m and height clearance of 5 m. No supplied record establishes visitor or accessible-space counts, EV charging installation, a ramp arrangement, or a legally documented exclusive parking allocation to any apartment.
6. Amenities, recreation & open spaces
The TG-RERA amenities record lists 14 project facilities or works. Its progress entries are 0% where supplied; “YES” indicates a recorded availability entry, not independent verification of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size or specification supplied | RERA amenities | 0%; completion not independently verified |
| Water supply | No source, capacity or system details supplied | RERA amenities | “YES”; progress 0%; completion not independently verified |
| Sewerage | Record labels “Chamber, Lines, Septic Tank, STP”; no capacity supplied | RERA amenities | “YES”; progress 0%; completion not independently verified |
| Storm-water drains | No further details supplied | RERA amenities | 0%; completion not independently verified |
| Green strip / tot lot / park | No area or facility dimensions supplied | RERA amenities | 0%; completion not independently verified |
| Street lighting | No specifications supplied | RERA amenities | 0%; completion not independently verified |
| Community buildings | No description or size supplied | RERA amenities | 0%; completion not independently verified |
| Treatment and disposal of sewage and sullage water | No process or capacity supplied | RERA amenities | 0%; completion not independently verified |
| Solid-waste management and disposal | No method or capacity supplied | RERA amenities | 0%; completion not independently verified |
| Water conservation / rainwater harvesting | Permit specifies 2 rainwater-harvesting pits | RERA amenities | “YES” in RERA amenities record; progress 0%; completion not independently verified |
| Energy management | No systems or capacity supplied | RERA amenities | 0%; completion not independently verified |
| Fire protection and fire-safety requirements | Permit and plan list fire-safety provisions; details are in the services section below | RERA amenities | 0%; completion not independently verified |
| Electrical meter room / sub-station / receiving station | Permit requires space for a transformer; further details not supplied | RERA amenities | “YES”; progress 0%; completion not independently verified |
| Aggregate recreational open space | No area supplied | RERA amenities | 0%; completion not independently verified |
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage and storm-water drains as available entries, but does not state water source, treatment, storage capacity, sewerage-treatment capacity, or storm-water system design. The submitted plan specifies separate underground static water storage and terrace tanks, each with a stated capacity of 25,000 litres. RERA amenities
The GHMC permit lists 2 rainwater-harvesting pits, a space for a transformer, and a garbage house. The submitted plan also lists a generator, emergency lighting, fire extinguishers, hose reel, down corner, automatic sprinkler system, electrical wiring and installations, transformer and lift. These are plan-recorded provisions; no supplied evidence establishes installation, capacity, commissioning or operational status.
The building-permit conditions require an occupancy fire NOC from the Director (EV&DM) before issue of an occupancy certificate, and state that an occupancy certificate is required before occupation. The permit assigns responsibility for structural safety and means-of-escape safety and refers to fire-fighting installations under the National Building Code of India, 2016. No supplied record confirms that the NOC or occupancy certificate has been issued.
No supplied record gives lift capacity, number of lifts, backup-power capacity, accessibility arrangements, CCTV, access-control details, or waste-segregation specifications. The permit includes conditions concerning C&D waste disposal and safety of construction workers.
8. Location, access & connectivity
The registered location is Ammu Guda, Malkajgiri, Medchal-Malkajgiri, PIN 500094, with the building permit describing the site locality as Radhakrishnapuram, Ammuguda. The recorded site boundaries include a 40 wide road on the east. The plan also refers to existing and proposed 12.00 MT roads and an 18 mt. road width; the supplied information does not establish a complete access-road route. RERA record RERA filing
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 5.3 km. This is a measured-distance record, not a travel-time estimate. Location record
9. Developer & development status
The registered promoter is UMR PROJECTS, recorded as a partnership, with GSTIN 36AAIFU2286L1ZM. The supplied promoter address is SRI SAI HEIGHTS, NAVODAYA COLONY, RADHAKRISHNAPURAM, AMMUGUDA, Malkajgiri, Medchal-Malkajgiri, 500094. No official contact details or promoter website are supplied. Corporate record Parties record
The registration record identifies one project building and 15 units; no phase-wise construction progress or independently verified site status is supplied. The promoter’s Form B declares a completion date of 22 December 2026. This is a promoter-filed undertaking, not evidence of completion. RERA unit table
10. Approvals, official records & documents
| Supplied evidence | Certificate P02200008655, captured in the supplied record; validity stated as 20 August 2024–22 December 2026. |
|---|---|
| What it establishes | Registration identity and stated validity; not a conveyance of title or an occupancy certificate. |
| Supplied evidence | 4929/GHMC/LBN/2023-BP, dated 23 December 2023. |
|---|---|
| What it establishes | Permit record for one residential building with 1 stilt + 5 upper floors, subject to its conditions. |
| Supplied evidence | Reference TS/031999/2023, dated 06-05-2023; plan extraction identifies 15 units and one building. |
|---|---|
| What it establishes | Plan information and extracted development parameters. |
| Supplied evidence | Promoter’s declaration includes a completion undertaking of 22/12/2026 and other promoter declarations. |
|---|---|
| What it establishes | Promoter-filed declarations, not independent verification of the underlying statements. |
| Supplied evidence | Not identified in the supplied documents. Document index |
|---|---|
| What it establishes | Issuance status is not established by this evidence. |
The permit conditions include obtaining an occupancy certificate before occupation and require a fire NOC before issue of that certificate. The detailed permit conditions should be checked against the building-permit document; this overview reports only the project profile and selected design/service provisions.
1. Project at a glance
Project identity
Registered project name: GREEN ARCHED
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified; the registration refers to the project at Ammu Guda and its stated site extent.
TG-RERA registration: P02200008655
Registration validity: 20 August 2024–22 December 2026; this is registration validity, not a statement that the project is complete or has an occupancy certificate.
Registered promoter: UMR PROJECTS, recorded as a partnership.
RERA status: New Project; the supplied registration record gives the above validity dates.
Land and geographic identity
Locality: Ammuguda; the building permit describes the locality as Radhakrishnapuram, Ammuguda.
Revenue village: Ammu Guda (also rendered as Ammuguda in the approval documents).
Mandal: Malkajgiri.
District: Medchal-Malkajgiri; the building permit uses “Medchal.”
PIN: 500094.
Project survey numbers / subdivisions: 5, 6, 7, 10/1, 11/1, 12/1, 12/4213/2.
Site extent: 749.81 sq. m; the RERA land record gives total and net area as 749.81 sq. m, with affected area 0 sq. m.
Boundaries as recorded: East: 40 wide road; west: Plot No. 122; north: Plot Nos. 116 and 117; south: neighbour’s property.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permit: 4929/GHMC/LBN/2023-BP, approved 23 December 2023.
Other approval reference on file: TS/031999/2023, dated 06-05-2023, shown in the submitted plan record.
Approved built-up area: The supplied RERA fields record approved built-up area as 2,247.95 sq. m. The submitted plan extraction separately labels residential net BUA as 1,849.25 sq. m and total proposed built-up area including parking as 2,247.95 sq. m.
Building count and floors: One proposed residential building, “A,” with 1 Stilt + 5 upper floors. The permit extraction records building height as 14.94 m.
Parking provision in plan record: Stilt parking area recorded as 398.70 sq. m in the submitted plan extraction; the permit extraction also states total parking area 398.7. A sanctioned space count is not established in the supplied record.
Unit count: 15 units in the submitted plan record; the RERA unit data also records 15 units.
Offering and status
Unit type: 3BHK apartments.
RERA-filed saleable area: 145.24 sq. m per 3BHK configuration.
Booking / availability: Portal data records 0 booked and 15 available; no as-of date is supplied, so these counts are indicative.
Construction stage: No project construction-progress figure or independently verified site-progress record is supplied.
Completion timeline: RERA registration and Form B state 22 December 2026 as the completion date; the GHMC building permit states construction is to be completed before 23 December 2026.
Occupancy / completion certificate: No occupancy certificate or completion certificate is identified in the supplied records; the building permit requires an occupancy certificate before occupation.
2. The project story
GREEN ARCHED is registered with TG-RERA as a residential apartment project on a stated 749.81 sq. m site at Ammu Guda, Malkajgiri, Medchal-Malkajgiri. The project record identifies survey numbers 5, 6, 7, 10/1, 11/1, 12/1 and 12/4213/2.
The filed development is one proposed building with 1 stilt level and 5 upper floors, offering 15 3BHK units. The portal-derived unit count records all 15 as available and none booked, but the record has no as-of date. No construction stage is supplied, so the project’s physical progress cannot be stated from this evidence.
The promoter’s RERA-filed completion undertaking is 22 December 2026. Registration remains a separate matter: the certificate states validity through that date, subject to the Act and rules. No occupancy certificate is included in the supplied documents, and the building permit says an occupancy certificate is required before occupation.
3. Master plan, architecture & building design
The submitted GHMC plan describes one proposed residential building, identified as “A,” with 1 stilt + 5 upper floors on a site of 749.81 sq. m. Its extracted figures include 1,849.25 sq. m residential net BUA and 2,247.95 sq. m total proposed BUA including parking; these are distinct plan-record measures. The RERA field also records approved built-up area of 2,247.95 sq. m.
The plan extraction records a proposed coverage area of 398.67 sq. m, vacant plot area of 351.15 sq. m, stilt floor area of 398.70 sq. m, and 14.94 m building height. It lists each of the first through fifth floors at 369.85 sq. m net BUA and terrace floor total BUA of 12.01 sq. m. The extraction also records “TOTAL BUA 2259.96,” deductions of 9.00, and net BUA of 1,849.25; the plan does not provide a single consolidated explanation of these separate labels.
The submitted plan describes one entry and one exit, with a minimum width of 4.5 m and height clearance of 5 m. It identifies no sanctioned unit increase without prior GHMC approval. No supplied drawing-derived information establishes the number of flats per floor, lifts, stairs, detailed circulation, or the layout of common areas.
4. Homes, configurations & floor plans
The RERA filing records 15 3BHK units, with a filed saleable area of 145.24 sq. m per unit. Portal counts show 0 booked and 15 available, but have no supplied as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 15 | 0 | 15 | 145.24 sq. m | Software-measured: median 95.5 sq. m; range 90.0–116.0 sq. m | 34% |
The carpet-area figures are software measurements from the submitted floor-plan drawings, not RERA-filed figures, and are marked as requiring review. Nine flat designs were measured; four are flagged as needing review. The same drawing record identifies a balcony and utility area, which are excluded from its carpet measurement. RERA saleable area is a separate measure that includes the home’s share of common areas; do not treat it as carpet area.
One measured example shows three bedrooms, living, dining, kitchen, three toilets, a balcony labelled 1.09 m wide, and a utility area of 2.07 sq. m. These room measurements are drawing-derived and should be checked against the approved drawing.
5. Parking & vehicle circulation
The building-permit extraction records a stilt parking area of 384.28 sq. m; the submitted plan extraction records 398.70 sq. m as parking area. The plan’s “proposed number of parkings” field is recorded as 0, so a sanctioned count of parking spaces cannot be established from the supplied extracted figures.
The permit conditions state that the stilt area approved for parking is to be used exclusively for vehicle parking, without partition walls or rolling shutters. The plan describes one entry and one exit, each subject to a minimum width of 4.5 m and height clearance of 5 m. No supplied record establishes visitor or accessible-space counts, EV charging installation, a ramp arrangement, or a legally documented exclusive parking allocation to any apartment.
6. Amenities, recreation & open spaces
The TG-RERA amenities record lists 14 project facilities or works. Its progress entries are 0% where supplied; “YES” indicates a recorded availability entry, not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size or specification supplied | 0%; completion not independently verified | |
| Water supply | No source, capacity or system details supplied | “YES”; progress 0%; completion not independently verified | |
| Sewerage | Record labels “Chamber, Lines, Septic Tank, STP”; no capacity supplied | “YES”; progress 0%; completion not independently verified | |
| Storm-water drains | No further details supplied | 0%; completion not independently verified | |
| Green strip / tot lot / park | No area or facility dimensions supplied | 0%; completion not independently verified | |
| Street lighting | No specifications supplied | 0%; completion not independently verified | |
| Community buildings | No description or size supplied | 0%; completion not independently verified | |
| Treatment and disposal of sewage and sullage water | No process or capacity supplied | 0%; completion not independently verified | |
| Solid-waste management and disposal | No method or capacity supplied | 0%; completion not independently verified | |
| Water conservation / rainwater harvesting | Permit specifies 2 rainwater-harvesting pits | “YES” in RERA amenities record; progress 0%; completion not independently verified | |
| Energy management | No systems or capacity supplied | 0%; completion not independently verified | |
| Fire protection and fire-safety requirements | Permit and plan list fire-safety provisions; details are in the services section below | 0%; completion not independently verified | |
| Electrical meter room / sub-station / receiving station | Permit requires space for a transformer; further details not supplied | “YES”; progress 0%; completion not independently verified | |
| Aggregate recreational open space | No area supplied | 0%; completion not independently verified |
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage and storm-water drains as available entries, but does not state water source, treatment, storage capacity, sewerage-treatment capacity, or storm-water system design. The submitted plan specifies separate underground static water storage and terrace tanks, each with a stated capacity of 25,000 litres.
The GHMC permit lists 2 rainwater-harvesting pits, a space for a transformer, and a garbage house. The submitted plan also lists a generator, emergency lighting, fire extinguishers, hose reel, down corner, automatic sprinkler system, electrical wiring and installations, transformer and lift. These are plan-recorded provisions; no supplied evidence establishes installation, capacity, commissioning or operational status.
The building-permit conditions require an occupancy fire NOC from the Director (EV&DM) before issue of an occupancy certificate, and state that an occupancy certificate is required before occupation. The permit assigns responsibility for structural safety and means-of-escape safety and refers to fire-fighting installations under the National Building Code of India, 2016. No supplied record confirms that the NOC or occupancy certificate has been issued.
No supplied record gives lift capacity, number of lifts, backup-power capacity, accessibility arrangements, CCTV, access-control details, or waste-segregation specifications. The permit includes conditions concerning C&D waste disposal and safety of construction workers.
8. Location, access & connectivity
The registered location is Ammu Guda, Malkajgiri, Medchal-Malkajgiri, PIN 500094, with the building permit describing the site locality as Radhakrishnapuram, Ammuguda. The recorded site boundaries include a 40 wide road on the east. The plan also refers to existing and proposed 12.00 MT roads and an 18 mt. road width; the supplied information does not establish a complete access-road route.
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 5.3 km. This is a measured-distance record, not a travel-time estimate.
9. Developer & development status
The registered promoter is UMR PROJECTS, recorded as a partnership, with GSTIN 36AAIFU2286L1ZM. The supplied promoter address is SRI SAI HEIGHTS, NAVODAYA COLONY, RADHAKRISHNAPURAM, AMMUGUDA, Malkajgiri, Medchal-Malkajgiri, 500094. No official contact details or promoter website are supplied.
The registration record identifies one project building and 15 units; no phase-wise construction progress or independently verified site status is supplied. The promoter’s Form B declares a completion date of 22 December 2026. This is a promoter-filed undertaking, not evidence of completion.
10. Approvals, official records & documents
| Supplied evidence | Certificate P02200008655, captured in the supplied record; validity stated as 20 August 2024–22 December 2026. |
|---|---|
| What it establishes | Registration identity and stated validity; not a conveyance of title or an occupancy certificate. |
| Supplied evidence | 4929/GHMC/LBN/2023-BP, dated 23 December 2023. |
|---|---|
| What it establishes | Permit record for one residential building with 1 stilt + 5 upper floors, subject to its conditions. |
| Supplied evidence | Reference TS/031999/2023, dated 06-05-2023; plan extraction identifies 15 units and one building. |
|---|---|
| What it establishes | Plan information and extracted development parameters. |
| Supplied evidence | Promoter’s declaration includes a completion undertaking of 22/12/2026 and other promoter declarations. |
|---|---|
| What it establishes | Promoter-filed declarations, not independent verification of the underlying statements. |
| Supplied evidence | Not identified in the supplied documents. |
|---|---|
| What it establishes | Issuance status is not established by this evidence. |
The permit conditions include obtaining an occupancy certificate before occupation and require a fire NOC before issue of that certificate. The detailed permit conditions should be checked against the building-permit document; this overview reports only the project profile and selected design/service provisions.
Frequently asked questions
Is GREEN ARCHED registered with Telangana RERA?
Yes. GREEN ARCHED is registered with the Telangana Real Estate Regulatory Authority as P02200008655; the registration status is New Project.
Who is the developer of GREEN ARCHED?
The promoter named in the RERA registration is UMR PROJECTS.
Where is GREEN ARCHED located?
GREEN ARCHED is in AMMUGUDA, Ammu Guda, Malkajgiri, Medchal-Malkajgiri, Telangana (500094).
When will GREEN ARCHED be completed?
The promoter's proposed date of completion filed with RERA is 22/04/2027. This is the promoter's declaration, not a guarantee.
More projects in Ammu Guda