GO GREEN CHANDRA VIHAAR is a residential apartment project in Janna Banda, Alwal mandal, Medchal-Malkajgiri district. It is being developed by the registered promoter M/s VIVEK'S GREEN HOMES PRIVATE LIMITED on a site measuring 445.93 sq. m, with one building recorded as having 1 Stilt + 4 upper floors and 1 proposed upper floor. The TG-RERA filing lists 10 3BHK apartments. Its TG-RERA registration is P02200006707, and the project header lists proposed completion as 30/11/2026.
More from Viveks Green Homes Pvt Ltd · 13 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | GO GREEN CHANDRA VIHAAR RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase is not separately identified in the supplied record; registration is for the project. RERA record |
| TG-RERA registration | P02200006707; certificate issued 17/08/2023. RERA record |
| Registration validity | 17/08/2023 to 22/06/2026; the certificate records no extension. This is registration validity, not a statement that the project is completed or has an occupancy certificate. RERA record |
| Registered promoter | M/s VIVEK'S GREEN HOMES PRIVATE LIMITED; company. RERA record Corporate record |
| RERA status in supplied record | Project is registered. The supplied status is “New Project”; current registration status after 22/06/2026 is not established by the materials provided. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / site address | Janna Banda / Jonna Banda; the RERA record gives Plot No. 233 & 234, H.No. 5-1015/3/233. RERA record RERA filing |
| Revenue village | Janna Banda is the RERA-recorded village; the filed building permit also describes the site as Jonna Banda. RERA record |
| Mandal / district / PIN | Alwal; Medchal-Malkajgiri; 500014. RERA record |
| Survey numbers | 588, 589, 590 and 591 (recorded as “588 TO 591”). No subdivision number is supplied for the project parcel. RERA record Land records |
| Registered site extent | 445.93 sq. m total and net area in the RERA land details and 2023 building permit. RERA filing |
| Boundaries in RERA record | North: 9 MTS WIDE ROAD; South: PLOT NO 238 AND 239; East: PLOT NOs 235 AND 236; West: PLOT NO 232. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building permit | 2040/GHMC/KPL/2023-BP, dated 22 June, 2023; file no. 000718/GHMC/0340/KPL2/2023-BP. Approvals record |
| Approved built-up area | 1,239.41 sq. m in the RERA project fields; the 2023 permit extraction records 1,239.40 for residential area. RERA filing |
| Buildings / blocks | One building is recorded in the RERA project fields. RERA filing |
| Sanctioned floor configuration | The 2023 permit describes existing 1 Stilt + 4 upper floors and 1 proposed upper floor—a proposed-construction entry referring to a fifth upper floor. |
| Height / parking provision | The 2023 permit lists building height 14.99 and total parking area 227; the supplied extraction does not state a unit for these figures. |
| Approved vs. RERA-filed unit count | GHMC’s 2023 permit says the sanctioned number of units must not be increased, but the supplied extraction does not state that number. The RERA filing records 10 apartments. RERA unit table |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 3BHK, 10 units; filed saleable area 148.65 sq. m per unit. RERA unit table |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative. RERA unit table |
| Declared completion date | The RERA Form B undertaking states 22nd June 2026; the project header separately lists proposed completion 30/11/2026. These are recorded here as separate supplied entries, not as verified completion. RERA record |
| Construction stage | No independently verified site-progress information is supplied. The RERA amenities record shows 0% against its listed progress fields; this does not establish overall construction progress. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The 2023 GHMC permit requires a completion notice and occupancy certificate before occupation. |
2. The project story
- GO GREEN CHANDRA VIHAAR is a registered residential apartment project on a 445.93 sq. m site recorded at Plot No. 233 & 234, H.No. 5-1015/3/233, Janna Banda / Jonna Banda, Alwal, Medchal-Malkajgiri. Its parcel is identified in the project record by survey numbers 588, 589, 590 and 591. The RERA filing lists one building and ten 3BHK apartments. RERA record RERA filing RERA unit table
- GHMC’s building permit dated 22 June 2023 describes one stilt floor and four existing upper floors, with one additional upper floor proposed. The RERA registration certificate is valid through 22/06/2026 as stated in that certificate; the promoter’s Form B undertaking gives a completion date of 22nd June 2026, while the project header lists 30/11/2026 as proposed completion. No site-verified progress or occupancy/completion certificate is included, so the materials do not establish a completed or occupancy-certified portion. RERA record
- The project’s RERA filing records all ten units as available and none booked, but provides no as-of date for those counts. The filed saleable area is 148.65 sq. m for the 3BHK configuration. RERA unit table
3. Master plan, architecture & building design
The project is recorded as a single residential building on a 445.93 sq. m net site. The 2023 GHMC permit describes one stilt and four upper floors as existing, with one additional upper floor proposed; the permit extraction lists 1,239.40 for residential area, while the RERA project fields list approved built-up area as 1,239.41 sq. m. These are the figures as recorded in their respective supplied project records. RERA filing RERA filing
- The permit lists stilt area 227 and total parking area 227, without a unit stated in the extracted fields. It also records height 14.99, likewise without a unit in the extraction. No verified information is supplied on floor-by-floor unit arrangement, number of flats per floor, lifts, stairs, entries, internal circulation, building footprint, or FSI-counted area. The floor-plan material supplied is partial; it does not provide a complete independently verified architectural description. Floor plans
- The RERA registration file includes a layout-plan document entry, but the available extraction does not establish a separately approved site-layout plan or its detailed land-use distribution. The public HMDA layout lookup was unavailable in the supplied record. Document index HMDA
4. Homes, configurations & floor plans
The TG-RERA filing records ten 3BHK units, none booked and ten available in the last-read portal data; the record has no as-of date. Filed saleable area is 148.65 sq. m per unit. Drawing-based software measurements are not RERA disclosures and require review against the drawings. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 148.65 sq. m | Software-measured median 92.0 sq. m; range 86.5–94.8 sq. m | 38% (software-measured) |
- Software measurement covers six flat designs from the supplied floor-plan drawings; five measurements are marked as needing review. The supplied drawing identifies a kitchen, three bedrooms, dining area, drawing room, wash area, two toilets and two balconies for one flat design. The two balconies are excluded from the software carpet-area measurement. RERA unit details Floor plans
- Carpet area is the measured internal area represented in the drawings; saleable area is the RERA-filed unit area and may include the home’s share of common areas. The software-measured figures are not RERA-filed measurements and should be checked against the approved drawing. The supplied record does not provide a RERA-filed carpet-area figure or unit-specific loading schedule. RERA unit details Floor plans
5. Parking & vehicle circulation
- The GHMC permit extraction records stilt parking: 1 floor, 211.10 m2 in the 2020 permit and lists Total Parking Area 227 in the 2023 permit; the 2023 extraction also lists stilt area 227. These are permit-recorded area figures, not a count of parking spaces.
- The 2023 permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a space count, visitor or accessible parking allocation, vehicle-type breakdown, parking assignment to individual apartments, ramp/driveway details, or EV-charging provision in the supplied extraction. A parking area in the permit does not by itself establish exclusive allocation or ownership for a particular unit.
6. Amenities, recreation & open spaces
The RERA amenities record lists 14 infrastructure and facility categories. Each has a recorded progress value of 0%; Water Supply, Water Conservation/Rain Water Harvesting, and Electrical Meter Room/Sub-Station/Receiving Station are marked “YES” as available in the filing. These entries are RERA-recorded information, not independent verification of completed facilities. RERA amenities
| Description / size | Green Strip/TOT LOT/Park and aggregate recreational open space are listed; no area supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Water Conservation, Rain water Harvesting marked “YES”; the GHMC permit requires a rainwater-harvesting percolation pit and records one pit. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA entry marked available; completion not independently verified. |
| Description / size | Listed; no description or size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed; no quantity or specification supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed; no dimensions or layout details supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Water supply; sewerage; storm-water drains; sewage/sullage treatment and disposal; solid-waste management and disposal; energy management; fire protection and fire safety; electrical meter room/sub-station/receiving station. No capacities or detailed specifications supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress fields show 0%; Water Supply and Electrical Meter Room/Sub-Station/Receiving Station marked “YES”; completion not independently verified. |
The permit also requires a tot-lot to be fenced and maintained as greenery, a garbage house within the premises, and a transformer space. The same permit’s extracted amenities field records “Tot Lot NA”; the overview reports the permit conditions and recorded field without treating either as proof of delivery.
7. Utilities, building services & safety
| Service | Supplied project evidence |
|---|---|
| Water | Water Supply is marked “YES” in the RERA amenities record. No source, storage capacity, treatment system or independent completion verification is supplied. RERA amenities |
| Sewerage / drainage | Sewerage, storm-water drains, and treatment/disposal of sewage and sullage are listed in the RERA amenities record. No system design, capacity, reuse details or completion verification is supplied. RERA amenities |
| Rainwater harvesting | RERA lists Water Conservation, Rain water Harvesting as “YES”; GHMC’s 2023 permit requires a rainwater-harvesting percolation pit and records one pit. No completion evidence is supplied. RERA amenities |
| Electrical | Electrical Meter Room/Sub-Station/Receiving Station is marked “YES”; the GHMC permit requires space for a transformer. Supply capacity and backup arrangements are not stated in the supplied project records. RERA amenities |
| Lifts / vertical circulation | No project-specific lift count, capacity, service lift or stair details supplied. Document index Floor plans |
| Fire and life safety | Fire Protection and Fire Safety Requirements are listed in the RERA amenities record. The GHMC permit requires an occupancy Fire NOC from the Director (EV&DM) before an occupancy certificate. No Fire NOC or completed fire-system evidence is supplied. RERA amenities |
| Waste management / security | Solid Waste Management and Disposal is listed in the RERA amenities record; the GHMC permit requires a garbage house. The supplied project record does not establish CCTV, access control or security-system provision. RERA amenities |
| Accessibility | No project-specific accessibility or accessible-circulation details supplied. Document index Floor plans |
8. Location, access & connectivity
The registered site location is Janna Banda / Jonna Banda, Alwal mandal, Medchal-Malkajgiri district, PIN 500014. The RERA record gives the site address as Plot No. 233 & 234, H.No. 5-1015/3/233, on survey numbers 588, 589, 590 and 591. RERA record
The RERA land details describe a 9 MTS WIDE ROAD along the north boundary. The supplied location record lists the nearest sampled Outer Ring Road interchange at 6.4 km (approx.). No verified public-transport route, travel time, or further project-specific approach-road details are supplied. RERA filing Location record
9. Developer & development status
- The registered legal promoter is M/s VIVEK'S GREEN HOMES PRIVATE LIMITED, a company, GSTIN 36AAGCV0592D1ZD. The RERA project record identifies VENKAT RAO PUSALA as Managing Director and authorized signatory, and RAJANI SRI PUSALA as Director. Corporate record Parties record RERA filing
- The RERA record gives the promoter’s address as 3RD FLOOR, H.NO 1-11-22, PLOT NO 24, TEMPLE ROAD, HMT Officers Colony, kompally, Alwal, Medchal-Malkajgiri, 500014. No official project contact details or promoter website are established in the supplied RERA information. RERA filing Parties record
- The RERA filing identifies KOMARAVELLI KASHINATH as a landowner under an AreaShare arrangement. The GHMC permit names him as owner/applicant and identifies the promoter as acting through its DAGPA holders. The RERA Form B is the promoter’s declaration, including its stated completion undertaking; it is not independent confirmation of construction progress or completion. Parties record
10. Approvals, official records & documents
| Identifier / date | P02200006707; issued 17/08/2023; validity stated through 22/06/2026. |
|---|---|
| What the supplied record establishes | Registration under section 5 and stated project conditions, including the separate-account condition. |
| Identifier / date | 2040/GHMC/KPL/2023-BP; 22 June, 2023; file no. 000718/GHMC/0340/KPL2/2023-BP. |
|---|---|
| What the supplied record establishes | Permit for residential construction on survey numbers 588 TO 591, subject to its stated conditions. |
| Identifier / date | 2/C27/02461/2020; 20 February, 2020; file no. 2/C27/13931/2019. |
|---|---|
| What the supplied record establishes | Earlier building-permit order in the supplied RERA-filed documents for survey numbers 588 TO 591. |
| Identifier / date | Declared 14* day of July 2023; completion undertaking: 22nd June 2026. |
|---|---|
| What the supplied record establishes | Promoter’s filed declaration and undertakings. |
| Identifier / date | Documents 341774, 341775, 341776, 341777. |
|---|---|
| What the supplied record establishes | RERA-filed title and development-related materials; detailed title assessment is addressed in the Land & Title section. Document index |
| Identifier / date | Documents 341803 and 341957. |
|---|---|
| What the supplied record establishes | RERA-filed encumbrance records. Document index |
| Identifier / date | Documents 341778–341782; extraction incomplete or unavailable for some entries. |
|---|---|
| What the supplied record establishes | Layout-related documents are listed in the RERA file; the supplied record does not establish a complete, detailed approved-layout drawing. Document index HMDA |
| Identifier / date | None supplied. |
|---|---|
| What the supplied record establishes | The 2023 GHMC permit requires a completion notice and occupancy certificate before occupation; this overview does not treat that requirement as evidence that a certificate has been issued. |
The public HMDA approved-layout lookup is reported unavailable in the supplied project record; that access limitation does not establish whether a layout approval exists. HMDA
1. Project at a glance
Project identity
Registered project name: GO GREEN CHANDRA VIHAAR
Project type: Residential apartment project
Phase / registered portion: Phase is not separately identified in the supplied record; registration is for the project.
TG-RERA registration: P02200006707; certificate issued 17/08/2023.
Registration validity: 17/08/2023 to 22/06/2026; the certificate records no extension. This is registration validity, not a statement that the project is completed or has an occupancy certificate.
Registered promoter: M/s VIVEK'S GREEN HOMES PRIVATE LIMITED; company.
RERA status in supplied record: Project is registered. The supplied status is “New Project”; current registration status after 22/06/2026 is not established by the materials provided.
Land and geographic identity
Locality / site address: Janna Banda / Jonna Banda; the RERA record gives Plot No. 233 & 234, H.No. 5-1015/3/233.
Revenue village: Janna Banda is the RERA-recorded village; the filed building permit also describes the site as Jonna Banda.
Mandal / district / PIN: Alwal; Medchal-Malkajgiri; 500014.
Survey numbers: 588, 589, 590 and 591 (recorded as “588 TO 591”). No subdivision number is supplied for the project parcel.
Registered site extent: 445.93 sq. m total and net area in the RERA land details and 2023 building permit.
Boundaries in RERA record: North: 9 MTS WIDE ROAD; South: PLOT NO 238 AND 239; East: PLOT NOs 235 AND 236; West: PLOT NO 232.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permit: 2040/GHMC/KPL/2023-BP, dated 22 June, 2023; file no. 000718/GHMC/0340/KPL2/2023-BP.
Approved built-up area: 1,239.41 sq. m in the RERA project fields; the 2023 permit extraction records 1,239.40 for residential area.
Buildings / blocks: One building is recorded in the RERA project fields.
Sanctioned floor configuration: The 2023 permit describes existing 1 Stilt + 4 upper floors and 1 proposed upper floor—a proposed-construction entry referring to a fifth upper floor.
Height / parking provision: The 2023 permit lists building height 14.99 and total parking area 227; the supplied extraction does not state a unit for these figures.
Approved vs. RERA-filed unit count: GHMC’s 2023 permit says the sanctioned number of units must not be increased, but the supplied extraction does not state that number. The RERA filing records 10 apartments.
Offering and status
RERA-filed configuration: 3BHK, 10 units; filed saleable area 148.65 sq. m per unit.
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative.
Declared completion date: The RERA Form B undertaking states 22nd June 2026; the project header separately lists proposed completion 30/11/2026. These are recorded here as separate supplied entries, not as verified completion.
Construction stage: No independently verified site-progress information is supplied. The RERA amenities record shows 0% against its listed progress fields; this does not establish overall construction progress.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The 2023 GHMC permit requires a completion notice and occupancy certificate before occupation.
2. The project story
- GO GREEN CHANDRA VIHAAR is a registered residential apartment project on a 445.93 sq. m site recorded at Plot No. 233 & 234, H.No. 5-1015/3/233, Janna Banda / Jonna Banda, Alwal, Medchal-Malkajgiri. Its parcel is identified in the project record by survey numbers 588, 589, 590 and 591. The RERA filing lists one building and ten 3BHK apartments.
- GHMC’s building permit dated 22 June 2023 describes one stilt floor and four existing upper floors, with one additional upper floor proposed. The RERA registration certificate is valid through 22/06/2026 as stated in that certificate; the promoter’s Form B undertaking gives a completion date of 22nd June 2026, while the project header lists 30/11/2026 as proposed completion. No site-verified progress or occupancy/completion certificate is included, so the materials do not establish a completed or occupancy-certified portion.
- The project’s RERA filing records all ten units as available and none booked, but provides no as-of date for those counts. The filed saleable area is 148.65 sq. m for the 3BHK configuration.
3. Master plan, architecture & building design
The project is recorded as a single residential building on a 445.93 sq. m net site. The 2023 GHMC permit describes one stilt and four upper floors as existing, with one additional upper floor proposed; the permit extraction lists 1,239.40 for residential area, while the RERA project fields list approved built-up area as 1,239.41 sq. m. These are the figures as recorded in their respective supplied project records.
- The permit lists stilt area 227 and total parking area 227, without a unit stated in the extracted fields. It also records height 14.99, likewise without a unit in the extraction. No verified information is supplied on floor-by-floor unit arrangement, number of flats per floor, lifts, stairs, entries, internal circulation, building footprint, or FSI-counted area. The floor-plan material supplied is partial; it does not provide a complete independently verified architectural description.
- The RERA registration file includes a layout-plan document entry, but the available extraction does not establish a separately approved site-layout plan or its detailed land-use distribution. The public HMDA layout lookup was unavailable in the supplied record.
4. Homes, configurations & floor plans
The TG-RERA filing records ten 3BHK units, none booked and ten available in the last-read portal data; the record has no as-of date. Filed saleable area is 148.65 sq. m per unit. Drawing-based software measurements are not RERA disclosures and require review against the drawings.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 148.65 sq. m | Software-measured median 92.0 sq. m; range 86.5–94.8 sq. m | 38% (software-measured) |
- Software measurement covers six flat designs from the supplied floor-plan drawings; five measurements are marked as needing review. The supplied drawing identifies a kitchen, three bedrooms, dining area, drawing room, wash area, two toilets and two balconies for one flat design. The two balconies are excluded from the software carpet-area measurement.
- Carpet area is the measured internal area represented in the drawings; saleable area is the RERA-filed unit area and may include the home’s share of common areas. The software-measured figures are not RERA-filed measurements and should be checked against the approved drawing. The supplied record does not provide a RERA-filed carpet-area figure or unit-specific loading schedule.
5. Parking & vehicle circulation
- The GHMC permit extraction records stilt parking: 1 floor, 211.10 m2 in the 2020 permit and lists Total Parking Area 227 in the 2023 permit; the 2023 extraction also lists stilt area 227. These are permit-recorded area figures, not a count of parking spaces.
- The 2023 permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a space count, visitor or accessible parking allocation, vehicle-type breakdown, parking assignment to individual apartments, ramp/driveway details, or EV-charging provision in the supplied extraction. A parking area in the permit does not by itself establish exclusive allocation or ownership for a particular unit.
6. Amenities, recreation & open spaces
The RERA amenities record lists 14 infrastructure and facility categories. Each has a recorded progress value of 0%; Water Supply, Water Conservation/Rain Water Harvesting, and Electrical Meter Room/Sub-Station/Receiving Station are marked “YES” as available in the filing. These entries are RERA-recorded information, not independent verification of completed facilities.
| Description / size | Green Strip/TOT LOT/Park and aggregate recreational open space are listed; no area supplied. |
|---|---|
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Water Conservation, Rain water Harvesting marked “YES”; the GHMC permit requires a rainwater-harvesting percolation pit and records one pit. |
|---|---|
| Declared progress / verified status | RERA entry marked available; completion not independently verified. |
| Description / size | Listed; no description or size supplied. |
|---|---|
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed; no quantity or specification supplied. |
|---|---|
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed; no dimensions or layout details supplied. |
|---|---|
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Water supply; sewerage; storm-water drains; sewage/sullage treatment and disposal; solid-waste management and disposal; energy management; fire protection and fire safety; electrical meter room/sub-station/receiving station. No capacities or detailed specifications supplied. |
|---|---|
| Declared progress / verified status | Progress fields show 0%; Water Supply and Electrical Meter Room/Sub-Station/Receiving Station marked “YES”; completion not independently verified. |
The permit also requires a tot-lot to be fenced and maintained as greenery, a garbage house within the premises, and a transformer space. The same permit’s extracted amenities field records “Tot Lot NA”; the overview reports the permit conditions and recorded field without treating either as proof of delivery.
7. Utilities, building services & safety
Water: Water Supply is marked “YES” in the RERA amenities record. No source, storage capacity, treatment system or independent completion verification is supplied.
Sewerage / drainage: Sewerage, storm-water drains, and treatment/disposal of sewage and sullage are listed in the RERA amenities record. No system design, capacity, reuse details or completion verification is supplied.
Rainwater harvesting: RERA lists Water Conservation, Rain water Harvesting as “YES”; GHMC’s 2023 permit requires a rainwater-harvesting percolation pit and records one pit. No completion evidence is supplied.
Electrical: Electrical Meter Room/Sub-Station/Receiving Station is marked “YES”; the GHMC permit requires space for a transformer. Supply capacity and backup arrangements are not stated in the supplied project records.
Lifts / vertical circulation: No project-specific lift count, capacity, service lift or stair details supplied.
Fire and life safety: Fire Protection and Fire Safety Requirements are listed in the RERA amenities record. The GHMC permit requires an occupancy Fire NOC from the Director (EV&DM) before an occupancy certificate. No Fire NOC or completed fire-system evidence is supplied.
Waste management / security: Solid Waste Management and Disposal is listed in the RERA amenities record; the GHMC permit requires a garbage house. The supplied project record does not establish CCTV, access control or security-system provision.
Accessibility: No project-specific accessibility or accessible-circulation details supplied.
8. Location, access & connectivity
The registered site location is Janna Banda / Jonna Banda, Alwal mandal, Medchal-Malkajgiri district, PIN 500014. The RERA record gives the site address as Plot No. 233 & 234, H.No. 5-1015/3/233, on survey numbers 588, 589, 590 and 591.
The RERA land details describe a 9 MTS WIDE ROAD along the north boundary. The supplied location record lists the nearest sampled Outer Ring Road interchange at 6.4 km (approx.). No verified public-transport route, travel time, or further project-specific approach-road details are supplied.
9. Developer & development status
- The registered legal promoter is M/s VIVEK'S GREEN HOMES PRIVATE LIMITED, a company, GSTIN 36AAGCV0592D1ZD. The RERA project record identifies VENKAT RAO PUSALA as Managing Director and authorized signatory, and RAJANI SRI PUSALA as Director.
- The RERA record gives the promoter’s address as 3RD FLOOR, H.NO 1-11-22, PLOT NO 24, TEMPLE ROAD, HMT Officers Colony, kompally, Alwal, Medchal-Malkajgiri, 500014. No official project contact details or promoter website are established in the supplied RERA information.
- The RERA filing identifies KOMARAVELLI KASHINATH as a landowner under an AreaShare arrangement. The GHMC permit names him as owner/applicant and identifies the promoter as acting through its DAGPA holders. The RERA Form B is the promoter’s declaration, including its stated completion undertaking; it is not independent confirmation of construction progress or completion.
10. Approvals, official records & documents
| Identifier / date | P02200006707; issued 17/08/2023; validity stated through 22/06/2026. |
|---|---|
| What the supplied record establishes | Registration under section 5 and stated project conditions, including the separate-account condition. |
| Identifier / date | 2040/GHMC/KPL/2023-BP; 22 June, 2023; file no. 000718/GHMC/0340/KPL2/2023-BP. |
|---|---|
| What the supplied record establishes | Permit for residential construction on survey numbers 588 TO 591, subject to its stated conditions. |
| Identifier / date | 2/C27/02461/2020; 20 February, 2020; file no. 2/C27/13931/2019. |
|---|---|
| What the supplied record establishes | Earlier building-permit order in the supplied RERA-filed documents for survey numbers 588 TO 591. |
| Identifier / date | Declared 14* day of July 2023; completion undertaking: 22nd June 2026. |
|---|---|
| What the supplied record establishes | Promoter’s filed declaration and undertakings. |
| Identifier / date | Documents 341774, 341775, 341776, 341777. |
|---|---|
| What the supplied record establishes | RERA-filed title and development-related materials; detailed title assessment is addressed in the Land & Title section. |
| Identifier / date | Documents 341803 and 341957. |
|---|---|
| What the supplied record establishes | RERA-filed encumbrance records. |
| Identifier / date | Documents 341778–341782; extraction incomplete or unavailable for some entries. |
|---|---|
| What the supplied record establishes | Layout-related documents are listed in the RERA file; the supplied record does not establish a complete, detailed approved-layout drawing. |
| Identifier / date | None supplied. |
|---|---|
| What the supplied record establishes | The 2023 GHMC permit requires a completion notice and occupancy certificate before occupation; this overview does not treat that requirement as evidence that a certificate has been issued. |
The public HMDA approved-layout lookup is reported unavailable in the supplied project record; that access limitation does not establish whether a layout approval exists.
Frequently asked questions
Is GO GREEN CHANDRA VIHAAR registered with Telangana RERA?
Yes. GO GREEN CHANDRA VIHAAR is registered with the Telangana Real Estate Regulatory Authority as P02200006707; the registration status is New Project.
Who is the developer of GO GREEN CHANDRA VIHAAR?
The promoter named in the RERA registration is M/s VIVEK'S GREEN HOMES PRIVATE LIMITED.
Where is GO GREEN CHANDRA VIHAAR located?
GO GREEN CHANDRA VIHAAR is in kompally, Janna Banda, Alwal, Medchal-Malkajgiri, Telangana (500014).
When will GO GREEN CHANDRA VIHAAR be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.