Sign in

Gangasani Surya Towers

VASUDHA BUILDERS · Hanamkonda · RERA P00300000618

GANGASANI SURYA TOWERS is a residential apartment project in Subedari, Hanamkonda mandal, Warangal Urban district, developed by registered promoter VASUDHA BUILDERS, partnership. It has a registered land area of 4,434.16 m² and one residential building, approved as Stilt + 5, with 75 homes: 50 2BHK units and 25 3BHK units. Its TG-RERA registration number is P00300000618, and its proposed and revised completion date is 27/11/2023.

01What we found

Period endedTG-RERA registration ran to 27 Nov 2023 - check its extension on TG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from downloadbrochures.com

1. Project at a glance

Project identity

FieldProject record
Registered project nameGANGASANI SURYA TOWERS
Project type / phaseResidential apartment project; the record identifies one registered project and one building. A separate phase name or phase number is not disclosed.
TG-RERA registrationP00300000618
Registration validity18 April 2019 to 27 November 2023; the supplied registration certificate records no extension. Registration validity is distinct from the completion date and the building’s occupancy certificate.
Registered promoterVASUDHA BUILDERS, partnership
RERA statusListed as “On-Going Project” in the project record. The registration certificate’s stated validity ended on 27 November 2023.

RERA record RERA filing Corporate record

Land and geographic identity

FieldProject record
Locality / address identifiersSUBEDARI, HANAMKONDA; Pragathi Nagar is named in the building-permit record. Address record: 1-8-515, PATTABHI RAM, BALASAMUDRAM, PRAGATHI NAGAR, Subedari, PIN 506001.
Revenue villageSubedari in the project identity record. The title report describes land in Waddepally Revenue Village; the relationship between that description and the registered project location is not resolved in the supplied material.
MandalHanamkonda in the registration certificate; the land record does not disclose a mandal.
DistrictWarangal Urban
Project survey numbersSurvey Nos. 491 NEW and 541 OLD, as stated in the building-permit and occupancy-certificate records.
Title-report survey referencesTitle records also refer to Sy.No.491 (New), corresponding to Sy.No.541 (Old), and separately describe Sy.Nos.541 Old and 491 New.
Registered site extent4,434.16 m²; the permit record also states 4,434.16 m² net area and zero road-affected area.
Boundaries in the project recordEast: 9 METER ROAD; West: EXISTING BUILDING; North: EXISTING BUILDING; South: 12 METER ROAD.

RERA record RERA filing Land records

Development identity

FieldProject record
Sanctioning authorityGreater Warangal Municipal Corporation
Principal building approvalBuilding Permit Order 3006/6106/W1/2017, approved 27 November 2017
Approved buildingBuilding A / A (APARTMENT), one residential apartment building
Approved floor configurationPermit: Stilt + 5; the occupancy-certificate extraction describes Cellar + Stilt Ground + Upper Floors 5 Upper Floor.
Height14.95 m in the permit and occupancy-certificate records
Site / net area4,434.16 m² / 4,434.16 m² in the permit extraction
Approved built-up areaProject record: 9,276.45 m². The occupancy-certificate extraction separately records floor area of 14,000.57 m² as per both sanctioned plan and site building plan; these figures are identified by their respective source labels and are not interchangeable.
Unit countThe RERA record states 75 total units in one building. The permit extraction does not provide a sanctioned unit count.
Parking evidenceThe occupancy-certificate extraction records Parking Area (m²): 2326.79 236.06. A number of parking spaces, allocation by unit, and parking-level breakdown are not established in the supplied extracts.

Approvals record RERA filing RERA unit table

Offering and status

FieldProject record
RERA-filed configurations2BHK: 50 units; 3BHK: 25 units
RERA-filed saleable areas2BHK: 92.4 m²; 3BHK: 127.09–140.8 m²
Booked / availablePortal-derived figures show 0 booked and 75 available (50 2BHK; 25 3BHK). The portal record provides no as-of date, so these counts are indicative, not a current availability confirmation.
Construction / completion informationThe registration record’s proposed and revised completion date is 27/11/2023. The Form B declaration undertakes completion by 27/09/2023. These are different record fields; this Overview does not determine which deadline governs.
Occupancy certificateA Greater Warangal Municipal Corporation Occupancy Certificate is recorded for the single building A (APARTMENT), Survey Nos. 491 NEW and 541 OLD, approval no. 3006/33484/W1/2021, dated 23/11/2021. The certificate extraction records the building as fit for occupation. It is building-specific evidence, not evidence of current construction progress or current RERA registration validity.

RERA unit table RERA record RERA filing

2. The project story

GANGASANI SURYA TOWERS is recorded with TG-RERA as a residential apartment project at Subedari, Hanamkonda, in Warangal Urban district. Its registered land area is 4,434.16 m², and the RERA record describes one building and 75 apartment units: 50 two-bedroom and 25 three-bedroom units. The building-permit record identifies Building A as a residential Stilt + 5 building. RERA record Land records RERA unit table

The project file contains a municipal Occupancy Certificate for Building A (APARTMENT), covering Survey Nos. 491 NEW and 541 OLD. The certificate records completion on 08 June 2021 and declares the inspected building fit for occupation. This is an authority-issued building record; the supplied evidence does not establish a separate, independently verified site-progress assessment as of the report date.

The project’s TG-RERA certificate states registration validity from 18 April 2019 to 27 November 2023. That validity period should be read separately from the municipal occupancy record and from the project’s stated completion dates. RERA record

3. Master plan, architecture & building design

The municipal building-permit extraction identifies one residential building, Building A, on a site of 4,434.16 m², with 4,434.16 m² net area and no road-affected area recorded. It describes the building as Stilt + 5 and records a height of 14.95 m. The permit also lists a tot-lot of 236.06 m².

The occupancy-certificate extraction describes the building as “Cellar + Stilt Ground + Upper Floors 5 Upper Floor,” and records 14.95 m height. It lists floor area of 14,000.57 m² both for the sanctioned plan and the site building plan. Separately, the project record gives approved built-up area as 9,276.45 m². The supplied material does not reconcile these differently labelled area figures, and they should not be treated as equivalent measurements. RERA filing

The building-permit record lists a 2,274.11 m² stilt component. The supplied extracts do not establish the number of flats per floor, lift or stair count, building footprint, detailed internal circulation, or a full floor-by-floor common-area schedule. The RERA filing lists the project’s single building and unit total; the available evidence does not provide a separate phase organization. RERA unit table

4. Homes, configurations & floor plans

RERA-filed unit counts and saleable areas are shown below. Drawing-based carpet measurements are software measurements from the filed plan drawing, not RERA disclosures; they require review against the drawing. Carpet area and saleable area are distinct, and saleable area may include the home’s share of common areas. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK5005092.4 m²80.1–85.6 m²; median 82.0 m² (software-measured)Not supplied
3BHK25025127.09–140.8 m²71.5–112.8 m²; median 103.3 m² (software-measured)23% (supplied for the 3BHK drawing measurement)

RERA unit table RERA unit details Floor plans

For one 2BHK plan example, the drawing labels living/dining, kitchen, two bedrooms, two toilets and a balcony. One 3BHK plan example labels living/dining, kitchen, three bedrooms, two toilets and a balcony. The drawing-based room labels and measurements are not a substitute for the registered agreement or unit-specific RERA particulars. The portal booking and availability counts have no supplied as-of date. RERA unit details

5. Parking & vehicle circulation

The municipal permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The occupancy-certificate extraction lists parking area as 2326.79 236.06 m²; the supplied extraction does not clarify the relationship between those two figures or provide a car-space count.

The documents supplied do not establish resident, visitor or accessible parking counts, a unit-by-unit parking allocation, or the detailed arrangement of ramps, vehicle entries/exits and internal driveways. A drawn or permitted parking area alone does not establish exclusive ownership or allocation to a particular apartment.

6. Amenities, recreation & open spaces

The TG-RERA amenity record lists the following project-level provisions and status percentages. These are reported filing values, not an independent inspection of delivery. The building-permit record separately requires a fenced tot-lot maintained as greenery before issue of an occupancy certificate, and records a 236.06 m² tot-lot. RERA amenities

Internal roads & footpaths
Description / sizeSize not stated
Evidence sourceTG-RERA amenity record
Declared progress / verified statusYES; 100% declared
Green strip / tot-lot / park
Description / sizePermit extraction gives tot-lot: 236.06 m²
Evidence sourceTG-RERA amenity record; municipal permit
Declared progress / verified statusYES; 100% declared in amenity record; permit specifies fencing and greenery. No independent completion verification supplied.
Community buildings
Description / sizeSize or capacity not stated
Evidence sourceTG-RERA amenity record
Declared progress / verified statusYES; 100% declared
Aggregate recreational open space
Description / sizeArea not stated in the supplied amenity record
Evidence sourceTG-RERA amenity record
Declared progress / verified statusYES; 100% declared
Swimming pool, library, clubhouse, gymnasium, children’s play area, basketball facilities, cycling track and elevated yoga/lounge
Description / sizePromoter/vendor-listed; no verified sizes supplied
Evidence sourceVendor material only
Declared progress / verified statusMarketing claims; not established by the supplied TG-RERA amenity record or independent verification.

RERA amenities Promoter website

7. Utilities, building services & safety

The TG-RERA amenity record marks water supply, sewerage (chambers, lines, septic tank, STP), storm-water drains, water conservation/rainwater harvesting, street lighting, and an electrical meter room/sub-station/receiving station as “YES; 100%.” It records treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements at 0%. These are filing-status entries; the supplied material does not independently verify installation or operational performance. RERA amenities

The building permit requires a rainwater-harvesting percolation pit, space for a transformer, and a garbage house within the premises. It also makes an occupancy certificate compulsory before occupation. The supplied project extracts do not establish water-source quantities or storage capacity, STP capacity or reuse arrangements, electrical or generator capacity, lift count or capacity, fire-system details, CCTV coverage, accessibility provisions, or current completion status for these services. RERA amenities

8. Location, access & connectivity

The registered project location is Subedari, Hanamkonda, Warangal Urban district, PIN 506001. The project record gives road boundaries of 9 METER ROAD to the east and 12 METER ROAD to the south. The building-permit extraction identifies Pragathi Nagar. RERA record RERA filing Land records

The supplied location dataset gives the following measured distances: Panchavati Hospital, 1.7 km; Zilla Parishath High School Bhuthpur, 1.7 km; MVS Degree College, 3.2 km; and the nearest sampled Outer Ring Road interchange, approximately 71.0 km. These are dataset distances; no travel times or public-transport service details are provided. Location record

9. Developer & development status

The registered promoter is VASUDHA BUILDERS, identified in the project record as a partnership. The project record names PATTABHI RAM REDDY MARRI and DILIP KUMAR MARAM as authorized signatories. The registration certificate gives the promoter office location as Village GMH Hanmakonda, Mandal Hanamkonda, Warangal Urban, PIN 506001. A firm-registration filing identifies M/S VASUDHA BUILDERS as entered in the Register of Firms as No. 344 of 2017. Corporate record Parties record

The RERA project record lists 75 units and reports 80% completeness, but the supplied record does not give an as-of date or independent site verification for that percentage. The municipal Occupancy Certificate is for the single identified building A (APARTMENT). The registration certificate states validity through 27 November 2023 and records no extension. RERA unit table RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP00300000618; issued 18 April 2019; valid to 27 November 2023
Scope and evidenceForm C for GANGASANI SURYA TOWERS; certificate states validity of four years and includes a separate-account condition.
Municipal building permit
Identifier / date3006/6106/W1/2017; 27 November 2017
Scope and evidenceGreater Warangal Municipal Corporation permit for Building A, Stilt + 5, at Survey Nos. 491 NEW and 541 OLD.
Municipal Occupancy Certificate
Identifier / date3006/33484/W1/2021; dated 23 November 2021
Scope and evidenceGreater Warangal Municipal Corporation certificate for A (APARTMENT), Survey Nos. 491 NEW and 541 OLD; records completion date 08 June 2021 and states the building is fit for occupation.
Form B declaration
Identifier / dateDated 30 November 2018
Scope and evidencePromoter declaration identifying GANGASANI SURYA TOWERS and undertaking completion by 27/09/2023.
Title-report documents
Identifier / dateIDs 46848, 46851, 46852, 46850
Scope and evidenceFiled title materials refer to Survey No. 491 (New) / 541 (Old), Waddepally Revenue Village, and a development agreement-cum-GPA dated 16 October 2017; the record also includes other title instruments and Urban Land Ceiling proceedings.
Layout-plan document
Identifier / date12927
Scope and evidenceListed in the RERA file as layout plan; the supplied extraction does not provide a usable layout description.

The supplied evidence does not disclose a project survey subdivision, a separate approved-layout number beyond the recorded LRS/C3/554/2010 reference, or a complete, drawing-derived description of building services and internal circulation. Land records

Frequently asked questions

Is GANGASANI SURYA TOWERS registered with Telangana RERA?

Yes. GANGASANI SURYA TOWERS is registered with the Telangana Real Estate Regulatory Authority as P00300000618; the registration status is On-Going Project.

Who is the developer of GANGASANI SURYA TOWERS?

The promoter named in the RERA registration is VASUDHA BUILDERS.

Where is GANGASANI SURYA TOWERS located?

GANGASANI SURYA TOWERS is in SUBEDARI, HANAMKONDA, Hanamkonda, Telangana (506001).

When will GANGASANI SURYA TOWERS be completed?

The promoter's proposed date of completion filed with RERA is 27/11/2023. This is the promoter's declaration, not a guarantee.

More projects in Hanamkonda