Fortune Smart City-1
FORTUNE INFRA DEVELOPERS PVT LTD · Rangareddy · RERA P02400005817
FORTUNE SMART CITY-1 is a plotted development in Amangal, Amangal Mandal, Ranga Reddy District. It is being developed by the registered promoter FORTUNE INFRA DEVELOPERS PVT LTD. The layout covers **304523.41 sq. m** and comprises **705 residential plots**; individual plot configurations are not disclosed. The project is registered with TG-RERA as **P02400005817**, with proposed completion on **29/12/2023**.
More from Fortune Infra Developers Pvt Ltd · 31 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | FORTUNE SMART CITY-1 RERA record |
| Project type | Plotted development / proposed residential layout RERA record RERA filing |
| Phase / registered portion | Registered as a plotted project covering the listed Amangal survey parcels; phase designation is not separately disclosed. |
| TG-RERA registration | P02400005817 |
| Registration validity | 15/03/2023 to 29/12/2023; the certificate says “0 years” and provides for extension by the Authority. No extension is evidenced in the supplied record. Registration validity is distinct from the completion date and from layout approval. |
| Registered promoter | FORTUNE INFRA DEVELOPERS PVT LTD RERA record |
| RERA record status | The project record identifies it as a New Project. Current registration status is not otherwise established by the supplied materials. RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Amangal; the title and layout documents identify Amangal Revenue Village / Amangal Village. RERA record |
| Mandal | Amangal RERA record |
| District | Ranga Reddy RERA record |
| PIN | 509321 RERA record |
| Project survey numbers / subdivisions as registered | 349/P, 352/P, 353/P, 354/P, 355/P, 356/P, 357/P, 358/P, 359/P, 361/P & 363/P RERA record |
| Extent in RERA land record | Total area 304523.41 sq. m; net area 304523.41 sq. m; affected area 0.00 sq. m. Land records |
| Extent stated in final layout order | 304184.57 Sq.mt.; the order labels this the total net layout. |
| Boundaries in RERA land record | East: Others Land; West: Others Land; North: Others Land; South: Existing Road. Land records |
Development identity
| Field | Project record |
|---|---|
| Principal layout approval / authority | Final Layout Order 2175/HMDA/SWFL/2026, approved 02/06/2026, issued by Amangal Municipality; the order refers to an HMDA technical permit. Approvals record |
| Earlier layout instrument | DTCP Revised Draft Technical Layout Pattern, File No. DTCP-HT3/OTH/4/2020-HYD Sec-DTCP, approved 06-01-2022; it describes a proposed 705-plot layout and forwards the application for final layout approval subject to conditions. Approvals record |
| Plot count | 705 plots, stated in the final layout order. |
| Approved built-up area / building configuration | Not disclosed in the supplied project record; this is a plotted layout, and no building count, floor configuration or building-level sanction is supplied. RERA filing |
| Land-use distribution in final layout order | Plotted Area 159965.61 (52.59); Road Area 97893.73 (32.18); Open Space Area 30453.39 (10.01); Buffer Area 8785.41 (2.89); Amenities Area 7084.23 (2.33). The order also records 0 for social infrastructure, common parking, utilities and green belt areas. |
Offering and status
| Field | Project record |
|---|---|
| Offering | Residential plots; the final layout order states plots are for residential dwelling-house use. Individual plot sizes, plot-wise availability and saleable-size bands are not supplied here. |
| Booked / available | Not disclosed in the supplied project evidence. RERA filing |
| Construction / development stage | The RERA-filed September 2023 architect’s certificate reports percentages for layout works; these are professional-filed progress figures, not an independent site inspection in this report. |
| Proposed completion date | 29/12/2023, as entered in the project record and promoter’s Form B completion undertaking. RERA record |
| Occupancy / completion certificate | An occupancy certificate is not evidenced. The supplied 2026 instrument is a final layout order, not an occupancy certificate for buildings. |
| Plot-level building permissions | The final layout order states that residential building permissions are to be considered under Building Rules - 2012 and amended rules; no individual plot building permit is supplied. |
2. The project story
FORTUNE SMART CITY-1 is registered with TG-RERA as a plotted development at Amangal, in Amangal Mandal, Ranga Reddy District. The registered land identity comprises survey subdivisions 349/P, 352/P, 353/P, 354/P, 355/P, 356/P, 357/P, 358/P, 359/P, 361/P and 363/P. The filed RERA land record gives a total and net area of 304523.41 sq. m. RERA record Land records
The project’s approved offering is a layout of 705 residential plots, with roads, open space and amenities land shown in the final layout record. The final layout order requires residential dwelling-house use and says roads are to remain open for public access. It does not itself evidence construction or completion of houses on the plots.
The September 2023 RERA-filed architect’s certificate records progress for selected layout infrastructure: internal roads and footpaths 90%, water supply 80%, sewerage 90%, stormwater drains 80%, green strip/TOT LOT/park 95%, street lighting 80%, and electrical meter room/sub-station/receiving station 70%. These are certificate-reported percentages for that filing, not independently verified present-day completion.
The project’s stated completion undertaking and RERA registration end date are both 29/12/2023, but they are different record items: one is the promoter’s completion commitment and the other is the registration validity period. The supplied materials do not establish an extension or an occupancy/completion certificate.
3. Master plan, architecture & building design
This is a plotted layout, not an apartment or multi-tower scheme. The DTCP draft technical layout record describes 705 plots and a layout area of 364210.00 Sq. Yds., allocating 36421.00 Sq. Yds. to open space, 116610.12 Sq. Yds. to roads and 211178.88 Sq. Yds. to plotted area. It also lists land for a primary school (7260.00 Sq Yds.), nursery school (1210.00 Sq. Yds.) and convenient shops (2995.96 Sq. Yds.). This is the earlier draft technical layout instrument.
The final layout order records 304184.57 Sq.mt. as total net layout and the following land-use areas: plotted area 159965.61 (52.59), road area 97893.73 (32.18), open space area 30453.39 (10.01), buffer area 8785.41 (2.89), and amenities area 7084.23 (2.33). It records zero for social infrastructure, common parking, utilities and green belt areas.
The final order records that roads, open spaces, social infrastructure and utilities were taken over by the local authority under registered Gift Deed No. 2723, dated 31/01/2022, and that a deed of relinquishment concerning mortgaged plots was executed by HMDA as Document No. 10183-2026, dated 02/06/2026.
No sanctioned building drawings, building footprint, floor configuration, plot-size schedule, individual plot arrangement drawing, or building-level construction details are supplied for this overview. The project record’s approved built-up area is 0.00 sq. m. RERA filing
4. Homes, configurations & floor plans
The offering is 705 residential plots in the final layout order. Plot-wise sizes, configuration bands, booked and available counts, and plot-level saleable areas are not disclosed in the supplied data.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 705 plots | Not disclosed | Not disclosed | Not disclosed | Not applicable to plots | Not supplied |
Two floor-plan drawings are listed as awaiting scan review; no measurements were produced. The software-measurement dataset therefore provides no drawing-based carpet-area figures. Floor plans
5. Parking & vehicle circulation
The final layout order records 0.0 for common parking area. It does not provide a sanctioned parking-space count, visitor or accessible parking provision, plot-specific parking allocation, or EV charging details.
The earlier DTCP draft layout sets minimum carriageway widths of 4 metres for one lane of traffic and 7 metres for two lanes of traffic. The final layout order requires roads to remain open for free public access. No separate evidence of ramps, pedestrian separation or vehicle-entry arrangements is supplied.
6. Amenities, recreation & open spaces
Landscape / open space
| Description / size | 30453.39; 10.01 in final layout land-use schedule. The earlier draft record states 36421.00 Sq. Yds. and describes open space as reserved for park purpose. |
|---|---|
| Evidence source | Final layout order; DTCP draft layout |
| Declared progress / verified status | Final layout order records the open space and says it was taken over by the local authority under Gift Deed No. 2723. RERA architect’s September 2023 certificate reports Green Strip/TOT LOT/Park at 95%. No independent present-day verification is supplied. |
| Description / size | Final layout order records Road Area 97893.73; the DTCP draft lists roads and avenue plantation among development works. |
|---|---|
| Evidence source | Final layout order; DTCP draft layout |
| Declared progress / verified status | The architect’s September 2023 certificate reports internal roads and footpaths at 90%. This is a filed progress statement, not independent verification. |
Convenience / community
| Description / size | 7260.00 Sq Yds. in the earlier DTCP draft layout. |
|---|---|
| Evidence source | DTCP draft layout |
| Declared progress / verified status | Draft-layout allocation; the final layout schedule records social infrastructure area as 0. No delivered facility is independently verified in the supplied materials. |
| Description / size | 1210.00 Sq. Yds. in the earlier DTCP draft layout. |
|---|---|
| Evidence source | DTCP draft layout |
| Declared progress / verified status | Draft-layout allocation; no delivered facility is independently verified in the supplied materials. |
| Description / size | 2995.96 Sq. Yds., sites 362 to 372, in the earlier DTCP draft layout. |
|---|---|
| Evidence source | DTCP draft layout |
| Declared progress / verified status | Draft-layout allocation; the final layout order limits use to residential dwelling houses and disallows shops except where specially reserved. No delivered shops are independently verified. |
| Description / size | Listed as “Yes” in the RERA architect’s certificate facility schedule; no size or building details supplied. |
|---|---|
| Evidence source | Architect’s certificate |
| Declared progress / verified status | No percentage or independent completion verification supplied. |
7. Utilities, building services & safety
The RERA-filed architect’s certificate for September 2023 lists these infrastructure items and progress: water supply 80%; sewerage (chamber, lines, septic tank, STP) 90%; stormwater drains 80%; street lighting 80%; and electrical meter room/sub-station/receiving station 70%. These are certificate-reported figures, not independently verified completion status.
The final layout order states that the layout is provided with water supply, sewerage and drainage disposal systems, street lighting and rainwater-harvesting structure, and requires these civic amenities to be properly maintained. The DTCP draft layout also lists protected water supply, sewerage disposal, drains and rainwater-harvesting pits. The supplied materials do not specify water source or storage capacity, treatment or reuse capacity, electrical capacity, backup power, or waste-management arrangements.
The RERA architect’s certificate lists fire protection and fire-safety requirements, energy management, solid-waste management and water conservation/rainwater harvesting in its facility schedule, but supplies no corresponding capacities or project-specific completion percentages for these items. No fire clearance, safety-system specifications, accessibility features or independent compliance verification is supplied.
8. Location, access & connectivity
The registered location is Amangal, Amangal Mandal, Ranga Reddy District, Telangana, PIN 509321. The project record gives the site’s south boundary as an Existing Road; the other listed boundaries are “Others Land.” RERA record Land records
The supplied location data identifies Financial District (Nanakramguda) at 1.2 km from the cadastral parcel centroid. This is the only connectivity distance provided; no approach-road route, public-transport service, travel time or additional landmark is documented here. Location record
9. Developer & development status
The registered promoter is FORTUNE INFRA DEVELOPERS PVT LTD, a company, with GSTIN 36AAACF9926B1ZR. The RERA certificate lists the promoter office as Village: Mandal: District: Hyderabad, Pin: 500033. A promoter website, fortunebutterflycity.com, is listed in the supplied vendor data; no official contact details are provided here. RERA record Corporate record Promoter website
The promoter’s Form B affidavit, dated 25th day of July, 2022, is signed by BATTULA SESHAGIRI RAO and states that the project shall be completed within two years, with the date 29-12-2023. This is a promoter declaration.
The project record contains a September 2023 architect’s certificate reporting progress for layout infrastructure; the certificate does not establish present-day completion. No occupancy or completion certificate for buildings is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400005817, issued 15/03/2023; valid through 29/12/2023 |
|---|---|
| What it establishes in the supplied documents | Form C registration for FORTUNE SMART CITY-1; includes the separate-account condition and registration validity terms. |
| Identifier / date | File No. DTCP-HT3/OTH/4/2020-HYD Sec-DTCP; 06-01-2022 |
|---|---|
| What it establishes in the supplied documents | Draft technical layout record for the proposed 705-plot layout, with land-use and development conditions; the document states permission is not proof of land title. |
| Identifier / date | 2175/HMDA/SWFL/2026, dated 02/06/2026; application 017209/HMDA/04402/SWFL/SHZ/2026 |
|---|---|
| What it establishes in the supplied documents | Final layout release for 705 plots at Amangal; records land-use schedule and conditions for plot use, infrastructure maintenance and public access. |
| Identifier / date | Dated 25th day of July, 2022 |
|---|---|
| What it establishes in the supplied documents | Promoter’s declarations concerning title, encumbrances, project funds, audits, pending approvals and completion commitment. |
| Identifier / date | RERA Quarter Updates – Sept-2023; registration P02400005817 |
|---|---|
| What it establishes in the supplied documents | Filed infrastructure progress percentages and facility schedule. |
| Identifier / date | Not supplied |
|---|---|
| What it establishes in the supplied documents | No building occupancy or completion certificate is evidenced. The final layout order is a layout approval/release document. |
1. Project at a glance
Project identity
Registered project name: FORTUNE SMART CITY-1
Project type: Plotted development / proposed residential layout
Phase / registered portion: Registered as a plotted project covering the listed Amangal survey parcels; phase designation is not separately disclosed.
TG-RERA registration: P02400005817
Registration validity: 15/03/2023 to 29/12/2023; the certificate says “0 years” and provides for extension by the Authority. No extension is evidenced in the supplied record. Registration validity is distinct from the completion date and from layout approval.
Registered promoter: FORTUNE INFRA DEVELOPERS PVT LTD
RERA record status: The project record identifies it as a New Project. Current registration status is not otherwise established by the supplied materials.
Land and geographic identity
Locality / revenue village: Amangal; the title and layout documents identify Amangal Revenue Village / Amangal Village.
Mandal: Amangal
District: Ranga Reddy
PIN: 509321
Project survey numbers / subdivisions as registered: 349/P, 352/P, 353/P, 354/P, 355/P, 356/P, 357/P, 358/P, 359/P, 361/P & 363/P
Extent in RERA land record: Total area 304523.41 sq. m; net area 304523.41 sq. m; affected area 0.00 sq. m.
Extent stated in final layout order: 304184.57 Sq.mt.; the order labels this the total net layout.
Boundaries in RERA land record: East: Others Land; West: Others Land; North: Others Land; South: Existing Road.
Development identity
Principal layout approval / authority: Final Layout Order 2175/HMDA/SWFL/2026, approved 02/06/2026, issued by Amangal Municipality; the order refers to an HMDA technical permit.
Earlier layout instrument: DTCP Revised Draft Technical Layout Pattern, File No. DTCP-HT3/OTH/4/2020-HYD Sec-DTCP, approved 06-01-2022; it describes a proposed 705-plot layout and forwards the application for final layout approval subject to conditions.
Plot count: 705 plots, stated in the final layout order.
Approved built-up area / building configuration: Not disclosed in the supplied project record; this is a plotted layout, and no building count, floor configuration or building-level sanction is supplied.
Land-use distribution in final layout order: Plotted Area 159965.61 (52.59); Road Area 97893.73 (32.18); Open Space Area 30453.39 (10.01); Buffer Area 8785.41 (2.89); Amenities Area 7084.23 (2.33). The order also records 0 for social infrastructure, common parking, utilities and green belt areas.
Offering and status
Offering: Residential plots; the final layout order states plots are for residential dwelling-house use. Individual plot sizes, plot-wise availability and saleable-size bands are not supplied here.
Booked / available: Not disclosed in the supplied project evidence.
Construction / development stage: The RERA-filed September 2023 architect’s certificate reports percentages for layout works; these are professional-filed progress figures, not an independent site inspection in this report.
Proposed completion date: 29/12/2023, as entered in the project record and promoter’s Form B completion undertaking.
Occupancy / completion certificate: An occupancy certificate is not evidenced. The supplied 2026 instrument is a final layout order, not an occupancy certificate for buildings.
Plot-level building permissions: The final layout order states that residential building permissions are to be considered under Building Rules - 2012 and amended rules; no individual plot building permit is supplied.
2. The project story
FORTUNE SMART CITY-1 is registered with TG-RERA as a plotted development at Amangal, in Amangal Mandal, Ranga Reddy District. The registered land identity comprises survey subdivisions 349/P, 352/P, 353/P, 354/P, 355/P, 356/P, 357/P, 358/P, 359/P, 361/P and 363/P. The filed RERA land record gives a total and net area of 304523.41 sq. m.
The project’s approved offering is a layout of 705 residential plots, with roads, open space and amenities land shown in the final layout record. The final layout order requires residential dwelling-house use and says roads are to remain open for public access. It does not itself evidence construction or completion of houses on the plots.
The September 2023 RERA-filed architect’s certificate records progress for selected layout infrastructure: internal roads and footpaths 90%, water supply 80%, sewerage 90%, stormwater drains 80%, green strip/TOT LOT/park 95%, street lighting 80%, and electrical meter room/sub-station/receiving station 70%. These are certificate-reported percentages for that filing, not independently verified present-day completion.
The project’s stated completion undertaking and RERA registration end date are both 29/12/2023, but they are different record items: one is the promoter’s completion commitment and the other is the registration validity period. The supplied materials do not establish an extension or an occupancy/completion certificate.
3. Master plan, architecture & building design
This is a plotted layout, not an apartment or multi-tower scheme. The DTCP draft technical layout record describes 705 plots and a layout area of 364210.00 Sq. Yds., allocating 36421.00 Sq. Yds. to open space, 116610.12 Sq. Yds. to roads and 211178.88 Sq. Yds. to plotted area. It also lists land for a primary school (7260.00 Sq Yds.), nursery school (1210.00 Sq. Yds.) and convenient shops (2995.96 Sq. Yds.). This is the earlier draft technical layout instrument.
The final layout order records 304184.57 Sq.mt. as total net layout and the following land-use areas: plotted area 159965.61 (52.59), road area 97893.73 (32.18), open space area 30453.39 (10.01), buffer area 8785.41 (2.89), and amenities area 7084.23 (2.33). It records zero for social infrastructure, common parking, utilities and green belt areas.
The final order records that roads, open spaces, social infrastructure and utilities were taken over by the local authority under registered Gift Deed No. 2723, dated 31/01/2022, and that a deed of relinquishment concerning mortgaged plots was executed by HMDA as Document No. 10183-2026, dated 02/06/2026.
No sanctioned building drawings, building footprint, floor configuration, plot-size schedule, individual plot arrangement drawing, or building-level construction details are supplied for this overview. The project record’s approved built-up area is 0.00 sq. m.
4. Homes, configurations & floor plans
The offering is 705 residential plots in the final layout order. Plot-wise sizes, configuration bands, booked and available counts, and plot-level saleable areas are not disclosed in the supplied data.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 705 plots | Not disclosed | Not disclosed | Not disclosed | Not applicable to plots | Not supplied |
Two floor-plan drawings are listed as awaiting scan review; no measurements were produced. The software-measurement dataset therefore provides no drawing-based carpet-area figures.
5. Parking & vehicle circulation
The final layout order records 0.0 for common parking area. It does not provide a sanctioned parking-space count, visitor or accessible parking provision, plot-specific parking allocation, or EV charging details.
The earlier DTCP draft layout sets minimum carriageway widths of 4 metres for one lane of traffic and 7 metres for two lanes of traffic. The final layout order requires roads to remain open for free public access. No separate evidence of ramps, pedestrian separation or vehicle-entry arrangements is supplied.
6. Amenities, recreation & open spaces
Landscape / open space
| Description / size | 30453.39; 10.01 in final layout land-use schedule. The earlier draft record states 36421.00 Sq. Yds. and describes open space as reserved for park purpose. |
|---|---|
| Evidence source | Final layout order; DTCP draft layout |
| Declared progress / verified status | Final layout order records the open space and says it was taken over by the local authority under Gift Deed No. 2723. RERA architect’s September 2023 certificate reports Green Strip/TOT LOT/Park at 95%. No independent present-day verification is supplied. |
| Description / size | Final layout order records Road Area 97893.73; the DTCP draft lists roads and avenue plantation among development works. |
|---|---|
| Evidence source | Final layout order; DTCP draft layout |
| Declared progress / verified status | The architect’s September 2023 certificate reports internal roads and footpaths at 90%. This is a filed progress statement, not independent verification. |
Convenience / community
| Description / size | 7260.00 Sq Yds. in the earlier DTCP draft layout. |
|---|---|
| Evidence source | DTCP draft layout |
| Declared progress / verified status | Draft-layout allocation; the final layout schedule records social infrastructure area as 0. No delivered facility is independently verified in the supplied materials. |
| Description / size | 1210.00 Sq. Yds. in the earlier DTCP draft layout. |
|---|---|
| Evidence source | DTCP draft layout |
| Declared progress / verified status | Draft-layout allocation; no delivered facility is independently verified in the supplied materials. |
| Description / size | 2995.96 Sq. Yds., sites 362 to 372, in the earlier DTCP draft layout. |
|---|---|
| Evidence source | DTCP draft layout |
| Declared progress / verified status | Draft-layout allocation; the final layout order limits use to residential dwelling houses and disallows shops except where specially reserved. No delivered shops are independently verified. |
| Description / size | Listed as “Yes” in the RERA architect’s certificate facility schedule; no size or building details supplied. |
|---|---|
| Evidence source | Architect’s certificate |
| Declared progress / verified status | No percentage or independent completion verification supplied. |
7. Utilities, building services & safety
The RERA-filed architect’s certificate for September 2023 lists these infrastructure items and progress: water supply 80%; sewerage (chamber, lines, septic tank, STP) 90%; stormwater drains 80%; street lighting 80%; and electrical meter room/sub-station/receiving station 70%. These are certificate-reported figures, not independently verified completion status.
The final layout order states that the layout is provided with water supply, sewerage and drainage disposal systems, street lighting and rainwater-harvesting structure, and requires these civic amenities to be properly maintained. The DTCP draft layout also lists protected water supply, sewerage disposal, drains and rainwater-harvesting pits. The supplied materials do not specify water source or storage capacity, treatment or reuse capacity, electrical capacity, backup power, or waste-management arrangements.
The RERA architect’s certificate lists fire protection and fire-safety requirements, energy management, solid-waste management and water conservation/rainwater harvesting in its facility schedule, but supplies no corresponding capacities or project-specific completion percentages for these items. No fire clearance, safety-system specifications, accessibility features or independent compliance verification is supplied.
8. Location, access & connectivity
The registered location is Amangal, Amangal Mandal, Ranga Reddy District, Telangana, PIN 509321. The project record gives the site’s south boundary as an Existing Road; the other listed boundaries are “Others Land.”
The supplied location data identifies Financial District (Nanakramguda) at 1.2 km from the cadastral parcel centroid. This is the only connectivity distance provided; no approach-road route, public-transport service, travel time or additional landmark is documented here.
9. Developer & development status
The registered promoter is FORTUNE INFRA DEVELOPERS PVT LTD, a company, with GSTIN 36AAACF9926B1ZR. The RERA certificate lists the promoter office as Village: Mandal: District: Hyderabad, Pin: 500033. A promoter website, fortunebutterflycity.com, is listed in the supplied vendor data; no official contact details are provided here.
The promoter’s Form B affidavit, dated 25th day of July, 2022, is signed by BATTULA SESHAGIRI RAO and states that the project shall be completed within two years, with the date 29-12-2023. This is a promoter declaration.
The project record contains a September 2023 architect’s certificate reporting progress for layout infrastructure; the certificate does not establish present-day completion. No occupancy or completion certificate for buildings is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400005817, issued 15/03/2023; valid through 29/12/2023 |
|---|---|
| What it establishes in the supplied documents | Form C registration for FORTUNE SMART CITY-1; includes the separate-account condition and registration validity terms. |
| Identifier / date | File No. DTCP-HT3/OTH/4/2020-HYD Sec-DTCP; 06-01-2022 |
|---|---|
| What it establishes in the supplied documents | Draft technical layout record for the proposed 705-plot layout, with land-use and development conditions; the document states permission is not proof of land title. |
| Identifier / date | 2175/HMDA/SWFL/2026, dated 02/06/2026; application 017209/HMDA/04402/SWFL/SHZ/2026 |
|---|---|
| What it establishes in the supplied documents | Final layout release for 705 plots at Amangal; records land-use schedule and conditions for plot use, infrastructure maintenance and public access. |
| Identifier / date | Dated 25th day of July, 2022 |
|---|---|
| What it establishes in the supplied documents | Promoter’s declarations concerning title, encumbrances, project funds, audits, pending approvals and completion commitment. |
| Identifier / date | RERA Quarter Updates – Sept-2023; registration P02400005817 |
|---|---|
| What it establishes in the supplied documents | Filed infrastructure progress percentages and facility schedule. |
| Identifier / date | Not supplied |
|---|---|
| What it establishes in the supplied documents | No building occupancy or completion certificate is evidenced. The final layout order is a layout approval/release document. |
Frequently asked questions
Is FORTUNE SMART CITY-1 registered with Telangana RERA?
Yes. FORTUNE SMART CITY-1 is registered with the Telangana Real Estate Regulatory Authority as P02400005817; the registration status is New Project.
Who is the developer of FORTUNE SMART CITY-1?
The promoter named in the RERA registration is FORTUNE INFRA DEVELOPERS PVT LTD.
Where is FORTUNE SMART CITY-1 located?
FORTUNE SMART CITY-1 is in Amangal, Rangareddy, Telangana (509321).
When will FORTUNE SMART CITY-1 be completed?
The promoter's proposed date of completion filed with RERA is 29/12/2023. This is the promoter's declaration, not a guarantee.