Sign in

Fairmount Square

FAIRMOUNT DEVELOPERS · Medchal-Malkajgiri · RERA P02200004675

FAIRMOUNT SQUARE is a commercial project in Kompally, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, developed by registered promoter FAIRMOUNT DEVELOPERS. It is on 3,265.32 sq. m. of land and comprises one building with 2 Cellar + 1 Ground + 4 upper floors and 64 commercial units: 45 offices and 19 shops. The registered configurations are offices with saleable areas of 113.62–175.58 sq. m and shops with saleable areas of 115.61–299.43 sq. m. Its TG-RERA registration is P02200004675, and its proposed completion date is 12/02/2025.

01What we found

Period endedTG-RERA registration ran to 12 Feb 2025 - check its extension on TG-RERA
17documents on file - each fact links to its page
7court cases on this project's land (survey 25, Kompally-Tanda)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameFAIRMOUNT SQUARE RERA record
Project typeCommercial; TG-RERA records the project as a commercial project. RERA record RERA filing
Phase / registered portionA single registered building/project is recorded; no separate phase name is disclosed. RERA record RERA unit table
TG-RERA registrationP02200004675, issued 27/06/2022; the certificate states validity from 27/06/2022 to 12/02/2025. The supplied registration record says no extension. Registration validity is distinct from the completion date and occupancy certificate. Approvals record
Registered promoterFAIRMOUNT DEVELOPERS, recorded as a partnership. RERA record RERA filing Corporate record
RERA statusThe supplied record labels the project “New Project”; registration validity ended 12/02/2025, and no extension is recorded in the supplied certificate. RERA record

Land and geographic identity

FieldRecord
LocalityKompally / Kompally-Tanda as recorded in project fields. RERA record RERA filing
Revenue villagesKompally and Pet Basheerabad are named in the filed title documents and approval records; the project identity field separately records Kompally-Tanda. Land records
MandalDundigal Gandimaisamma. RERA record RERA filing
DistrictMedchal-Malkajgiri. RERA record RERA filing
PIN500043. RERA record
Project survey numbers and subdivisionsSurvey No. 102/ABCD and Survey No. 25/1/VOO; the RERA land description also identifies plot portions as PLOT NO 1 IN SY NO 102/ABCD AND PLOT NO 1 AND 2 IN SY NO 25/1/VOO. RERA record Land records
Registered site extent3,265.32 sq. m. in the project land record and building-permit documents. RERA filing
Net / total areaRERA fields state total area 3265.32 sq. m, affected area 0, and net area 3265.32 sq. m. RERA filing
BoundariesNorth: Road; East: Road; South: Neighbours land; West: Neighbours land. RERA filing

Development identity

FieldRecord
Sanctioning authorityHMDA technical approval, followed by building-permit proceedings issued by Kompally Municipality / Municipal Corporation. Approvals record
Principal building approval003906/BP/HMDA/0491/MED/2021, HMDA technical approval dated 02 February 2022; local-body proceedings 000240/BP/HMDA/MED/2022, dated 12 February 2022. Approvals record
Approved built-up areaThe building-permit record states total built-up area 14,459.39 sq. m. A separate proposed built-up-area figure of 9,795.07 sq. m appears in the same permit record. These are the document’s separately labelled figures.
Building countOne building/unit is recorded in the project fields. RERA filing
Sanctioned floor configuration2 Cellar + 1 Ground + 4 upper floors.
Parking levelsCellars are approved for parking; the permit says cellar and stilt areas approved for parking are to be used exclusively for vehicle parking. No stilt floor is specified in the recorded floor configuration.
Unit countRERA fields record 64 commercial units: 45 offices and 19 shops. RERA unit table
Approved versus RERA-declared countThe supplied approval extraction does not state a unit count; 64 is the RERA-filed count. RERA unit table

Offering and status

FieldRecord
Unit typesOffices and shops. RERA unit table
RERA saleable-area rangeOffices: 113.62–175.58 sq. m; shops: 115.61–299.43 sq. m. RERA unit table
Booked / availableThe portal-derived unit record reports 0 booked and 64 available (45 offices and 19 shops). Its as-of date is not supplied, so counts are indicative. RERA unit table RERA unit details
Construction stageThe supplied building-permit extraction establishes permission, not construction progress. The supplied project amenities record includes percentages for certain infrastructure items, but no independently verified site-progress report is supplied. RERA amenities
Completion dateThe RERA certificate and Form B undertaking state 12/02/2025 as the completion date.
Occupancy certificateAn HMDA occupancy certificate is included in the supplied project record as 004547/OC/HMDA/0980/MED/2024, dated 01/06/2024. It refers to FAIRMOUNT SQUARE and the project’s survey numbers; the supplied extract does not specify a separate tower or phase scope. Approvals record

2. The project story

FAIRMOUNT SQUARE is a single-building commercial development in the Kompally area, on land recorded in the project filing as plot portions in Survey No. 102/ABCD and Survey No. 25/1/VOO. The approval record describes a building with two cellar levels, a ground floor and four upper floors. The RERA inventory comprises offices and shops, rather than residential apartments. RERA record Land records RERA unit table

The RERA record states a completion date of 12/02/2025. The project file also contains an HMDA occupancy certificate dated 01/06/2024. The supplied material does not provide a current, independently verified physical inspection or a detailed construction-progress certificate; the filed amenity percentages should therefore be read as recorded progress information, not as an independent site verification. RERA amenities

3. Master plan, architecture & building design

The filed building approval describes one commercial building on a site of 3,265.32 sq. m, with 2 Cellar + 1 Ground + 4 upper floors. It records total built-up area of 14,459.39 sq. m and separately lists proposed built-up area of 9,795.07 sq. m. These are approval-document figures; the supplied material does not provide a verified FSI figure, building footprint, floor-by-floor unit plan, or a measured carpet-area schedule. RERA filing

The supplied floor-plan dataset has two drawing records, but neither is identified as a measured unit plan: 0 measured, 2 no-flats. Accordingly, this material does not establish unit layouts, rooms, floor-by-floor distribution, lifts, stairs, entries, exits, internal circulation, landscaping or open-area dimensions. Floor plans

4. Homes, configurations & floor plans

This is a commercial offering. The RERA filing records offices and shops, with unit counts and saleable areas as follows. The reported booking counts are portal-derived and have no supplied as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Offices45045113.62–175.58 sq. mNot availableNot supplied
Shops19019115.61–299.43 sq. mNot availableNot supplied

The filing records 15 office numbers and 10 shop numbers, with multiple units in some numbered categories. The supplied drawing dataset contains no measured unit layouts. Therefore no drawing-based carpet area or room dimensions can be reported. RERA saleable area is the filed unit-area measure; it is not a measured carpet-area figure. RERA unit table Floor plans

5. Parking & vehicle circulation

The building-permit order specifies that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The sanctioned floor configuration lists two cellars; the supplied record does not quantify car or two-wheeler spaces, identify visitor or accessible spaces, or provide parking-allocation terms for individual units. No parking ratio can be established from the supplied evidence.

6. Amenities, recreation & open spaces

The RERA amenity record reports percentage progress for the listed project infrastructure. The entries below are filing data, not independent verification of completion. No separate clubhouse or indoor-recreation schedule is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green Strip / TOT LOT / ParkSize not suppliedRERA amenities50% recorded; not independently verified
Community BuildingsSize or description not suppliedRERA amenities0% recorded
Aggregate recreational open spaceArea not suppliedRERA amenities0% recorded

The permit also requires a garbage house within the premises; the supplied evidence does not provide its size or completion status.

7. Utilities, building services & safety

The building-approval record requires or identifies the following provisions. Separately, the RERA amenity record reports progress percentages; those percentages are not independent site verification. RERA amenities

Service / safety itemSupplied record
Water and storageThe approval extraction lists a separate underground static water storage tank of 25,000 lts. and a separate terrace tank of 25,000 lts. capacity. The RERA amenity record reports water supply at 90%. RERA amenities
Sewerage / treatmentThe approval requires an ETP. The RERA amenity record lists sewerage and treatment/disposal of sewage and sullage water at 100%; the record does not give plant capacity or identify a separate STP specification. RERA amenities
Storm water / rainwaterThe approval requires rainwater-harvesting structures; the RERA record reports water conservation/rainwater harvesting at 100% and storm-water drains at 100%. RERA amenities
ElectricalThe approval calls for a transformer. The RERA record reports electrical meter room/sub-station/receiving station at 90%. No supply capacity or backup capacity is given in the RERA amenity record. RERA amenities
Fire and life safetyThe RERA amenity record reports fire protection and fire-safety requirements at 100%. The supplied extracts do not give system specifications or a separate fire-clearance document. RERA amenities
Security / surveillanceThe approval requires CCTV cameras; the vendor record lists CCTV/video surveillance and 24-hour security, but these vendor statements are not evidence of installed or independently verified facilities. Promoter website
WasteThe approval requires a garbage house; the RERA record reports solid-waste management and disposal at 100%. No capacity or operating details are supplied. RERA amenities
Lifts / accessibilityThe vendor record lists a lift, but no RERA-filed lift count, capacity, accessibility details or independent verification is supplied. Promoter website

8. Location, access & connectivity

The project is recorded in Kompally, with the RERA identity fields specifying Kompally-Tanda, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district and PIN 500043. The site boundaries record roads to the north and east. The building-permit document specifies a minimum approach-road width of 4.5mts. and requires the indicated approach road to be developed and maintained as a black-topped road before release of the occupancy certificate. RERA record RERA filing

The supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 42.8 km. This is a sampled location measurement; no other measured transport, landmark or public-transport distances are supplied. Location record

9. Developer & development status

The registered promoter is FAIRMOUNT DEVELOPERS, recorded as a partnership, with GSTIN 36AAIFF2458B1ZO. The registered office address in the project record is KIMTEE SQUARE, ROAD NO 12, KOMPALLY, KOMPALLY, Dundigal Gandimaisamma, Medchal-Malkajgiri, 500043. The project record identifies Sahil Noorani as authorized signatory and Shah Azim Hameed as partner. Corporate record Parties record

The Form B affidavit, dated 11 April 2022, is a promoter declaration that the land is free from encumbrances and that the project would be completed by 12 February 2025. These statements are attributed to the declarant and are not independent verification. The supplied record contains an HMDA occupancy certificate dated 01/06/2024; no separate current construction-progress assessment is provided here.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200004675; issued 27/06/2022; validity stated to 12/02/2025
Scope in supplied evidenceForm C registration certificate for FAIRMOUNT SQUARE.
HMDA technical building approval
Identifier / date003906/BP/HMDA/0491/MED/2021; 02 February 2022
Scope in supplied evidenceTechnical approval for the commercial building and stated site/survey numbers.
Local-body building-permit proceedings
Identifier / date000240/BP/HMDA/MED/2022; 12 February 2022
Scope in supplied evidenceBuilding permit order issued by Kompally Municipality / Municipal Corporation, recording HMDA proceedings and the approved floor configuration.
HMDA occupancy certificate
Identifier / date004547/OC/HMDA/0980/MED/2024; 01/06/2024
Scope in supplied evidenceOccupancy certificate included in the project file; the supplied extraction identifies FAIRMOUNT SQUARE and Survey Nos. 102/ABCD and 25/1/VOO.
Form B affidavit-cum-declaration
Identifier / date11 April 2022
Scope in supplied evidencePromoter declaration concerning title, encumbrances, completion undertaking and RERA-related commitments.
Title report and filed title documents
Identifier / dateTitle-search report and supporting instruments
Scope in supplied evidenceAdvocate’s title report and cited title instruments are in the project file.

The supplied material does not include an approved-layout document or an extracted detailed floor-plan schedule. The occupancy-certificate entry is included above; this overview does not independently verify physical completion or the scope of any unit-specific occupancy. Document index Floor plans

Frequently asked questions

Is FAIRMOUNT SQUARE registered with Telangana RERA?

Yes. FAIRMOUNT SQUARE is registered with the Telangana Real Estate Regulatory Authority as P02200004675; the registration status is New Project.

Who is the developer of FAIRMOUNT SQUARE?

The promoter named in the RERA registration is FAIRMOUNT DEVELOPERS.

Where is FAIRMOUNT SQUARE located?

FAIRMOUNT SQUARE is in KOMPALLY, Kompally-Tanda, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500043).

When will FAIRMOUNT SQUARE be completed?

The promoter's proposed date of completion filed with RERA is 12/02/2025. This is the promoter's declaration, not a guarantee.

More projects in Kompally Tanda