DREAM HOME APARTMENTS is a residential apartment project in Hanamkonda, Warangal Urban district; the mandal is not disclosed. It is being developed by the registered promoter VINAYAKA DEVELOPERS AND REAL ESTATES. The project covers 2,174.79 sq.m. and comprises one residential building with 1 Stilt + 5 upper floors and 45 apartments: 10 2BHK and 35 3BHK. Its TG-RERA registration is P00300004018, granted 31/01/2022, and the proposed completion date recorded in the project header is 17/03/2028.

01What we found

RegisteredTG-RERA - valid till 17 Nov 2027
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameDREAM HOME APARTMENTS RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNo separate phase name disclosed; the registration covers the project at the identified site RERA record
TG-RERA registrationP00300004018, granted 31/01/2022; recorded validity through 17/11/2027 RERA record
Registered promoterVINAYAKA DEVELOPERS AND REAL ESTATES; partnership Corporate record Parties record
RERA statusThe project record labels it “New Project.” Registration validity is separate from the completion undertaking and from occupancy certification. RERA record RERA filing
RERA record captured10 September 2026 Approvals record

Land and geographic identity

FieldRecord
Locality / revenue villageHanamkonda is the RERA-recorded village; the building-permit document identifies the site as WADDEPALLY. RERA record RERA filing
MandalNot disclosed in the project land identity record. Land records
DistrictWarangal Urban RERA record RERA filing
PIN506002 RERA record
Project survey numbers and subdivisions311, 311/C (OLD), 422/C (NEW) RERA record Land records
Registered site extent2,174.79 sq.m. total area; net area 2,174.79 sq.m.; road-affected area recorded as 0 sq.m. RERA filing
BoundariesEast: 18 M ROAD; West: HNO2-7-1327 AND 1328 OF SAMPATH AND HNO2-7-1330; North: HOUSE OF BHASKAR; South: OPEN PLACE AND HOUSE OF KOMURAIAH. RERA filing
RERA-recorded plot reference311, 311/C, (OLD), 422/C(NEW)

Development identity

FieldRecord
Sanctioning authorityGreater Warangal Municipal Corporation Approvals record
Principal building-permit number / date3006/33495/W1/2021, 17 November 2021 Approvals record
Approved buildingOne residential building, 1 Stilt + 5 upper floors
Approved upper-floor residential area5,241.20 sq.m.
Approved stilt area1,159.59 sq.m.
Approved height14.25 m
Building / unit countsThe project record states 1 building and 1 proposed building unit; the RERA configuration record lists 45 apartments. RERA filing RERA unit table
Parking levelsStilt approved for parking; the permit also refers to cellar parking, but the supplied extract does not establish its extent or configuration.
Layout / subdivision referenceC/GWMC/026734/2020 Approvals record

Offering and status

FieldRecord
RERA-filed configurations10 × 2BHK and 35 × 3BHK; 45 apartments total RERA unit table
RERA-filed saleable area2BHK: 104.51 sq.m.; 3BHK: 106.83 sq.m. RERA unit table
Booked / availablePortal-derived counts show 0 booked and 10 available 2BHK; 0 booked and 35 available 3BHK. These counts have no stated as-of date and are indicative. RERA unit table
Construction stageThe supplied record gives no independently verified current site progress. The amenity progress fields shown are 0%; this is not a site inspection. RERA amenities
Completion dateThe Form B declaration undertakes completion by 17-11-2027; the project header separately records a proposed completion date of 17/03/2028. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied; the building-permit record says an occupancy certificate is required before occupation.

2. The project story

DREAM HOME APARTMENTS is registered as a residential apartment project on land identified by the RERA record as Hanamkonda, Warangal Urban, across survey references 311, 311/C (OLD) and 422/C (NEW). The building-permit document describes the site as WADDEPALLY and sanctions one residential building with a stilt and five upper floors. The sanctioned site extent is 2,174.79 sq.m. RERA record Land records

The RERA unit schedule lists 45 homes: 10 2BHK and 35 3BHK. The portal-derived booking snapshot lists all 45 as available, but has no as-of date. No current construction progress or independently verified completion status is supplied. The registration remains valid through 17/11/2027 in the certificate; that validity is not itself evidence that the building is complete or occupiable. No occupancy certificate is included in the supplied documents. RERA unit table Document index

3. Master plan, architecture & building design

The building permit sanctions one residential building of 1 Stilt + 5 upper floors, height 14.25 m, with 5,241.20 sq.m. of residential upper-floor area and 1,159.59 sq.m. of stilt area. The permit records a 2,174.79 sq.m. site area and a 14% open-space figure. These are sanctioned-document figures; no separate FSI-counted area or gross built-up-area figure is supplied.

The filed building-permit record names survey numbers 311, 311/C (Old), 422/C (New) and gives layout/subdivision reference C/GWMC/026734/2020. It specifies front, rear and side setbacks as 4, 5, 5 and 5.04 respectively; the supplied extract does not state their units.

A layout-plan document is listed in the RERA file, but it is not extracted. No reliable details are supplied for floor-by-floor flat arrangement, building footprint, number of flats per floor, lifts, stairs, entries, landscaping plan or phase-wise organization. Document index

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010104.51 sq.m.76.3–85.5 sq.m.; median 81.1 sq.m.22%
3BHK35035106.83 sq.m.73.3–89.8 sq.m.; median 82.0 sq.m.23%

Unit counts and saleable areas are from the TG-RERA filing; booking figures are portal-derived and have no stated as-of date. Carpet-area ranges and loading are software measurements from the supplied floor-plan drawings, not RERA-filed disclosures, and the measured geometry requires review. Saleable area and carpet area are distinct measures; the drawing analysis notes that saleable area also includes the home’s share of common areas. RERA unit table RERA unit details Floor plans

The drawing extract includes a 2BHK example with two bedrooms, kitchen, living/dining, two toilets and two balconies, and a 3BHK example with three bedrooms, living/dining, kitchen, toilets, balcony and utility. These are examples from the measured drawings, not a complete description of every unit. RERA unit details

5. Parking & vehicle circulation

The building permit identifies the stilt as parking and refers to cellar and stilt areas approved for parking. It requires those areas to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The supplied permit extract does not establish a parking-space count, visitor or accessible provision, parking allocation to individual homes, or the extent and arrangement of any cellar parking.

The RERA unit data marks the 3BHK units as mortgaged and the 2BHK units as not mortgaged; this is not a parking-allocation record. A drawn or sanctioned parking provision does not, on the supplied evidence, establish exclusive ownership or allocation to a particular apartment. RERA unit table

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green areaTot-lot: 119.31 sq.m.; permit also records a 14% open-space figurePermit condition; no independent completion verification supplied
Water supplyListed as available “YES” in the RERA amenity recordRERA amenitiesProgress shown as 0%; no independent verification
SewerageSewerage (chamber, lines, septic tank, STP) listed “YES”RERA amenitiesProgress shown as 0%; no independent verification
Rainwater harvesting13 rainwater-harvesting structures recorded in the permit; RERA amenity record lists water conservation/rainwater harvesting “YES”RERA amenitiesPermit requirement / filing declaration; no independent completion verification
Transformer spaceRequired by the permitNo completion evidence supplied
Garbage houseRequired within the premises by the permitNo completion evidence supplied

The RERA amenity schedule also lists internal roads and footpaths, storm-water drains, street lighting, community buildings, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection and safety, electrical meter room/substation/receiving station, and aggregate recreational open space. The supplied schedule shows 0% progress for these entries; this is a filed status, not an independent site assessment. RERA amenities

7. Utilities, building services & safety

The permit requires rainwater-harvesting structures, transformer space, a garbage house, and utility and building services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations under qualified technical supervision. It also requires fire-fighting installations and states that occupancy certification is required before occupation and for public-amenity service connections. These are permit conditions; the supplied record does not establish installation, commissioning, capacity or current compliance.

The permit additionally requires a fenced tot-lot maintained as greenery before occupancy certification, and tree planting along the site periphery and in front of the premises. It requires safety provisions for construction and addresses clearance from electrical lines. No supplied record specifies water source or storage capacity, STP capacity or reuse, electrical backup, lift count/capacity, CCTV, access control, or accessible circulation.

8. Location, access & connectivity

The registered location is recorded as Hanamkonda, Warangal Urban, PIN 506002; the RERA land schedule identifies village Hanamkonda, while the building-permit document calls the site WADDEPALLY. The permit records an 18 M ROAD on the eastern boundary. RERA record RERA filing RERA filing

The supplied location dataset gives a software geocode identified as a cadastral parcel centroid at 17.41528, 78.35459, and records Financial District (Nanakramguda) at 1.2 km. No public-transport details or additional verified approach-road or landmark information are supplied. Location record

9. Developer & development status

The registered promoter is VINAYAKA DEVELOPERS AND REAL ESTATES, recorded as a partnership, with GSTIN 36AATFV0824AIZ9. The promoter address in the project record is Lashkar Bazar, Hanamkonda, Waddepally, Hanamkonda, Warangal Urban, 506002. Named partners include Ramesh Akula, Vijay Kumar Potlabathini, Nitin Teja Maddikunta, Srikanth Ponnala, Uppula Prabhakar, Kokkirala Ravinder Rao, Shailaja Rani Potlabathini and Swapnaja Rani Kokkirala. Vijay Kumar Potlabathini and Nitin Teja Maddikunta are listed as authorized signatories. Corporate record Parties record

The Form B filing undertakes completion by 17-11-2027. The header separately lists 17/03/2028 as the proposed completion date. No independently verified construction progress is provided here; no occupancy certificate is included in the supplied project documents. RERA record Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for DREAM HOME APARTMENTS, registration P00300004018, issued 31/01/2022 and valid through 17/11/2027.
Building permitGreater Warangal Municipal Corporation Building Permit Order 3006/33495/W1/2021, dated 17 November 2021; sanctions one residential building of 1 Stilt + 5 upper floors.
Layout referenceC/GWMC/026734/2020 appears in the building-permit record. A separate layout-plan document is listed but not extracted.
Promoter declarationForm B affidavit-cum-declaration, document 211386; includes a completion undertaking by 17-11-2027.
Title-related filingsRERA-filed title report and supporting title documents are listed as documents 211378–211382. Document index
Occupancy / completion certificateNo certificate supplied in the reviewed project documents. Document index

Frequently asked questions

Is DREAM HOME APARTMENTS registered with Telangana RERA?

Yes. DREAM HOME APARTMENTS is registered with the Telangana Real Estate Regulatory Authority as P00300004018; the registration status is New Project.

Who is the developer of DREAM HOME APARTMENTS?

The promoter named in the RERA registration is VINAYAKA DEVELOPERS AND REAL ESTATES.

Where is DREAM HOME APARTMENTS located?

DREAM HOME APARTMENTS is in HANAMKONDA, Telangana (506002).

When will DREAM HOME APARTMENTS be completed?

The promoter's proposed date of completion filed with RERA is 17/03/2028. This is the promoter's declaration, not a guarantee.