DIVYADEEP KUTEER I is a residential apartment project in SURYA NAGAR COLONY, UPPAL, Uppal mandal, Medchal-Malkajgiri district. It is being developed by the registered promoter DIVYA DEEP CONSTRUCTIONS. The project has a land area of 399.38 sq. m and one building with 1 Stilt + 5 upper floors, comprising 10 3BHK units. It is registered under TG-RERA registration P02200006535, and the proposed completion date is 10/02/2026.

More from Divya Deep Constructions · 5 projects →

01What we found

Period endedTG-RERA registration ran to 10 Feb 2026 - check its extension on TG-RERA
16documents on file - each fact links to its page
7court cases on this project's land (survey 1, 282, Surya Nagar Colony , Uppal)
11items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameDIVYADEEP KUTEER I RERA record
Project type / registered portionResidential apartment project; one registered project/building is identified. A separate phase description is not disclosed. RERA record RERA filing
TG-RERA registrationP02200006535, issued 07/07/2023; certificate states validity through 10/02/2026. Registration validity is distinct from the project completion deadline. Approvals record
Registered promoterDIVYA DEEP CONSTRUCTIONS; RERA record identifies the entity type as Partnership. RERA record RERA filing Corporate record
RERA project statusRecorded as New Project. The supplied record does not establish current construction progress or an occupancy certificate. RERA filing Document index

Land and geographic identity

ItemProject record
LocalitySURYA NAGAR COLONY, UPPAL RERA record RERA filing
Revenue villageUppal Bhagath Village is named in the filed title and building-permit documents. The RERA land-record village field is not disclosed. Land records
Mandal / district / PINUppal / Medchal-Malkajgiri / 500039 RERA record RERA filing
Survey numbers and subdivisions1 TO 40, 282 TO 368, 369 PART, 370 TO 373, 374P, 375 TO 387, 395 TO 401, 454, 456 TO 459, 505P, 510 TO 564 RERA filing
Plot identifierPlot No. 881 NORTH WEST PART RERA filing
Site extentRERA land record: 399.38 sq. m total and net area. Building-permit document: 438.27 Sq. Mtrs plot area and net plot area. RERA filing
Boundaries in RERA land recordEast: PLOT NO 881 SOUTHERN PART; West: 1200 MT WIDE MAIN ROAD; North: PLOT NO881 SOUTHERN PART; South: PLOT NO 880. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permit0125/GHMC/LBN/2023-BP, approved 10 February 2023; file no. 000266/GHMC/0113/LBN2/2023-BP. Approvals record
Approved built-up area1432.00 sq. m in the RERA project fields. The permit extraction separately records residential 1,215.95 Sq.Mt. RERA filing
Building count and sanctioned floorsOne building; 1 Stilt + 5 upper floors in the building-permit extraction. RERA filing
Building height14.95 as recorded in the permit extraction; unit not stated there.
Parking provisionPermit extraction records Total Parking Area: 243.2; unit and parking-space count are not stated in the supplied extract. The order says approved cellar/stilt parking is to be used exclusively for parking.
UnitsRERA project fields record 1 total building unit; the RERA unit schedule records 10 3BHK units. The permit extract does not state a unit count. RERA filing RERA unit table RERA unit details

Offering and status

ItemProject record
RERA-filed configuration3BHK; 10 units; 0 booked, 10 available in the portal data, for which no as-of date is supplied. RERA unit table RERA unit details
RERA-filed saleable area153.85 sq. m per 3BHK unit. RERA unit table RERA unit details
Completion datePromoter’s Form B undertaking and the RERA certificate state 10/02/2026. The supplied evidence does not identify a revised completion date.
Construction stageNot established by the supplied evidence; portal amenity progress fields show 0% entries, which do not establish an independently verified site stage. RERA amenities Document index
Occupancy/completion certificateNo occupancy or completion certificate is supplied in the reviewed project documents. The building-permit order says an occupancy certificate is compulsory before occupation. Document index

2. The project story

DIVYADEEP KUTEER I is registered as a residential apartment project at Surya Nagar Colony, Uppal. Its RERA land record identifies Plot No. 881 NORTH WEST PART and the survey-number range listed above; the title and building-permit documents refer to Uppal Bhagath Village. The project’s RERA registration and GHMC building permit identify a single residential building, and the permit specifies one stilt level and five upper floors. RERA record RERA filing RERA filing

The RERA unit schedule records ten 3BHK apartments, with zero booked and ten available as shown in the portal data; that schedule has no supplied as-of date. The promoter’s Form B declares completion by 10/02/2026. The supplied documents do not establish the project’s present construction progress or certify that any part is complete or occupied. RERA unit details Document index

3. Master plan, architecture & building design

The GHMC building-permit order sanctions a residential building named “MPL (DIVYA DEEP CONSTRUCTIONS)” with 1 Stilt + 5 upper floors. It records a building height of 14.95 (unit not stated), residential area of 1,215.95 Sq.Mt., and total parking area of 243.2 (unit not stated). The RERA project fields separately report approved built-up area of 1432.00 sq. m. These figures are retained under their respective source labels; the supplied materials do not provide a drawing-based area reconciliation. RERA filing

The permit extraction records 438.27 Sq. Mtrs as both plot area and net plot area, with road-affected and nala-affected areas each recorded as 0.0. The RERA land record separately records 399.38 sq. m total and net area. No building-footprint dimensions, floor-by-floor apartment arrangement, flats per floor, lift or stair details, internal circulation plan, or measured open-space area are available in the supplied extracted records. RERA filing

The registration file includes a layout-plan document entry, but the supplied record marks that document as not extracted. The permit lists layout reference 71563/HMDA/DEVELOPMENT/PD-1/UPPAL BHAGATH/17. Document index Approvals record

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010153.85 sq. mSoftware-measured: median 83.6 sq. m; range 81.1–86.0 sq. m46%

RERA-filed unit counts and saleable area are from the project unit schedule. Booked and available counts are portal figures with no supplied as-of date. Carpet measurements are software-measured from the approved floor-plan drawing record, not RERA-filed figures; four flat designs were measured, and the measurements are noted as needing review. RERA unit details Floor plans RERA unit table

The drawing record identifies a “TYPICAL - 1, 3, 4& 5 FLOOR PLAN.” In one measured flat, the room schedule includes three bedrooms, a kitchen, living/dining, three toilets, a balcony and a utility area. The balcony and utility are excluded from the measured carpet area; the living/dining dimensions are 5.72 m × 7.36 m, and the utility dimensions are 1.16 m × 2.49 m. The RERA saleable area and drawing-measured carpet area are different area measures; the supplied drawing-data caveat says saleable area also includes the home’s share of common areas. RERA unit details Floor plans

5. Parking & vehicle circulation

The GHMC permit extraction records Total Parking Area: 243.2, without stating a unit or number of parking spaces. Its conditions state that the cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use. The available extract does not establish the number or allocation of resident, visitor or accessible spaces, nor does it document parking assignments to individual units, ramps, driveway arrangements, or EV charging.

6. Amenities, recreation & open spaces

The RERA portal amenity schedule marks the following as available; its associated progress fields are recorded as 0%. Those entries are project-filed status data, not independent verification of completed facilities. The permit separately requires certain site provisions, identified below. RERA amenities

Green Strip/TOT LOT/Park
Description / sizeSize not stated
Evidence sourceRERA amenity schedule; permit conditions
Declared progress / verified statusRERA schedule marks “YES” and 0%; permit requires tot-lot fencing and maintenance as greenery before occupancy certificate. RERA amenities
Water conservation / rainwater harvesting
Description / sizeQuantity not stated in the RERA schedule; permit states one rainwater-harvesting pit
Evidence sourceRERA amenity schedule; GHMC permit
Declared progress / verified statusRERA schedule marks “YES” and 0%; permit requires a rainwater-harvesting structure (percolation pit). RERA amenities
Sewerage (chamber, lines, septic tank, STP)
Description / sizeCapacity and system details not stated
Evidence sourceRERA amenity schedule
Declared progress / verified statusMarked “YES” and 0%; completion is not independently verified. RERA amenities
Fire protection and fire safety requirements
Description / sizeSystem details not stated
Evidence sourceRERA amenity schedule; GHMC permit
Declared progress / verified statusRERA schedule marks “YES” and 0%; permit requires fire-safety provisions and an Occupancy FIRE NOC before issue of occupancy certificate. RERA amenities

No project-filed evidence in the supplied RERA amenity schedule establishes a clubhouse, swimming pool, gym or indoor-games facility. RERA amenities

7. Utilities, building services & safety

The RERA amenity schedule marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Water Conservation, Rain water Harvesting, Fire Protection And Fire Safety Requirements, and Electrical Meter Room, Sub-Station, Receiving Station as available; the associated progress fields are 0%. It does not provide capacities, detailed system specifications or independent completion evidence. RERA amenities

The GHMC permit requires a rainwater-harvesting structure, space for a transformer, a garbage house within the premises, and services including sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. It also states that public amenities such as water and electricity connections are to be provided on production of an occupancy certificate, and that an Occupancy FIRE NOC is required before the occupancy certificate is issued. These are permit conditions, not evidence that the services have been installed or certified.

The supplied records do not specify water source or storage capacity, STP capacity or reuse arrangements, storm-water design, backup power, lift count or capacity, CCTV/security arrangements, accessibility features, or completed life-safety installations. RERA amenities Document index

8. Location, access & connectivity

The registered project location is SURYA NAGAR COLONY, UPPAL, in Uppal mandal, Medchal-Malkajgiri district, PIN 500039. The GHMC permit identifies the locality as Surya Nagar Colony, Uppal and the village as Uppal Bhagat. The RERA land record identifies the west boundary as “1200 MT WIDE MAIN ROAD.” RERA record RERA filing RERA filing

The supplied location record gives a geocoded cadastral parcel centroid of 17.41528, 78.35459 and lists Financial District (Nanakramguda), 1.2 km as a connectivity point. No further verified approach-road, public-transport, or landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is DIVYA DEEP CONSTRUCTIONS, identified in the RERA project fields as a partnership. Its GSTIN is 36AARFD6994R1Z3. The supplied RERA address record lists Raghavendra Residency, Krishi Nagar, Surya Nagar Colony, Uppal, Medchal-Malkajgiri, PIN 500039; the RERA certificate’s promoter-office field instead gives PIN 500068. RERA record RERA filing Corporate record Parties record

The RERA project filing identifies KACHARLA RAMESH REDDY as authorized signatory and lists KATUKURI VENKATA RANGA REDDY, PARNE KARUNAKAR REDDY, KATUKURI SUDARSHAN REDDY and GARLAPATI VENKAT REDDY as partners. The promoter’s Form B declares that the project will be completed by 10/02/2026. No present construction-stage assessment or occupancy certification is established in the supplied evidence. Parties record Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate for DIVYADEEP KUTEER I, registration P02200006535, issued 07/07/2023 and valid through 10/02/2026.
GHMC building permitBuilding Permit Order 0125/GHMC/LBN/2023-BP, approved 10 February 2023; file no. 000266/GHMC/0113/LBN2/2023-BP. It sanctions a residential building of 1 Stilt + 5 upper floors, subject to stated conditions.
Layout reference71563/HMDA/DEVELOPMENT/PD-1/UPPAL BHAGATH/17 appears in the building-permit extraction.
Title-report documents filed with RERADocuments 306574, 306575, 306576, 306570, 306572, 306573 and 310650 are listed as title-related records; the title search report 310650 is an advocate’s report. Document index
Project declarations and sale documentForm B declaration 315636; partially completed Agreement for Sale template 306539. Document index
Layout-plan fileDocument 306538 is listed as a layout plan and is not extracted in the shared document index; drawing-based unit measurements cite that document. Document index Floor plans
Occupancy/completion recordNo occupancy or completion certificate is included in the supplied project documents. Document index

Frequently asked questions

Is DIVYADEEP KUTEER I registered with Telangana RERA?

Yes. DIVYADEEP KUTEER I is registered with the Telangana Real Estate Regulatory Authority as P02200006535; the registration status is New Project.

Who is the developer of DIVYADEEP KUTEER I?

The promoter named in the RERA registration is DIVYA DEEP CONSTRUCTIONS.

Where is DIVYADEEP KUTEER I located?

DIVYADEEP KUTEER I is in SURYA NAGAR COLONY , UPPAL, Uppal, Medchal-Malkajgiri, Telangana (500039).

When will DIVYADEEP KUTEER I be completed?

The promoter's proposed date of completion filed with RERA is 10/02/2026. This is the promoter's declaration, not a guarantee.

More projects in Uppal