Divine Meadows Phase- D
SR LANDMARK DEVELOPERS · Yadadri Bhuvanagiri · RERA P02000002493
DIVINE MEADOWS PHASE- D is a plotted development at Turkapally, Yadadri Bhuvanagiri district; the mandal is not disclosed. The registered promoter is SR LANDMARK DEVELOPERS. The registered site extent is 20,031.93 sq m, with a net area of 13,273.68 sq m; the project is identified with survey numbers 148/P and 150/P, and the number of plots and plot sizes are not disclosed. It is registered with TG-RERA as P02000002493, with a proposed completion date of 15/07/2025.
More from Sr Landmark Developers · 6 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | DIVINE MEADOWS PHASE- D RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Phase D; registered portion is associated with survey numbers 148/P and 150/P. No separate phase-area breakdown is supplied. RERA record |
| TG-RERA registration number | P02000002493 RERA record |
| Registration validity | 31/01/2021–15/07/2025; the certificate says four years and records no extension. This is registration validity, not proof of completion or an occupancy/completion certificate. RERA record |
| Registered promoter | SR LANDMARK DEVELOPERS RERA record Corporate record |
| RERA status in supplied record | New Project; registration certificate issued under section 5. The supplied record gives a completion date of 15/07/2025 and does not establish a later extension. RERA filing |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Turkapally is the locality and the recorded village. The title report refers to Velpupally village; the supplied records do not resolve whether these names identify the same revenue village for this parcel. RERA record Land records |
| Mandal | Not disclosed. Land records |
| District | Yadadri Bhuvanagiri RERA record Land records |
| PIN | 508116 RERA record |
| Project survey numbers / subdivisions | 148/P and 150/P; the supplied project identity does not specify further subdivisions. RERA record Land records |
| Registered site extent | Total area 20,031.93 sq m; area affected in road widening/FTL of tanks/nala widening 6,758.25 sq m; net area 13,273.68 sq m. RERA filing Land records |
| Boundaries | North: NEIGHBOUR LAND; South: VILLAGE ROAD; East: NEIGHBOUR LAND; West: NEIGHBOUR LAND. RERA filing Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | DTCP is named in the RERA project information. RERA filing |
| Principal approval number / date | Approval date shown as 15/07/2020; approval number is not disclosed. The number 1832 appears in an unclear commencement-certificate OCR fragment and is not established as the project’s approval number. RERA filing Approvals record |
| Approved built-up area | 13,273.68 sq m is recorded as approved built-up area; the supplied data does not explain the area calculation or identify it as plot saleable area. RERA filing |
| Building / block count and floors | Not established. No legible project-specific sanctioned drawing or building configuration is supplied. This is a plotted development. RERA filing Document index |
| Parking | Mortgage area is recorded as 2,185.30 sq m; this is not a parking count. No parking-space count or arrangement is established. RERA filing |
| Approved versus RERA-declared plot count | Not disclosed in the supplied record. RERA filing Document index |
Offering and status
| Field | Record |
|---|---|
| Unit type | Plots; no RERA-filed plot count or plot-size schedule is supplied. RERA filing Document index |
| Booked / available | Not disclosed in the supplied data. RERA filing |
| Completion dates | RERA project information gives 15/07/2025; the Form B declaration dated 02/11/2020 undertakes completion by 25th July 2025. These are recorded completion statements, not evidence of completion. RERA filing |
| Construction / development stage | No independently verified site progress or phase-wise completion data is supplied. RERA amenity progress fields show 0 for listed items; these are filing values, not an independent site inspection. RERA amenities |
| OC / completion certificate | Not established in the supplied project record. Document index Approvals record |
2. The project story
Divine Meadows Phase D is registered as a plotted development on the project land identified as survey numbers 148/P and 150/P, at Turkapally, Yadadri Bhuvanagiri district. The filed land details give a total area of 20,031.93 sq m and a net area of 13,273.68 sq m after recording 6,758.25 sq m affected by road widening/FTL of tanks/nala widening. RERA record RERA filing RERA filing
The supplied RERA information identifies DTCP as the authority and records an approval date of 15/07/2020, but does not provide a legible approved layout drawing or an approval number that can be confidently attributed to this project. Consequently, the plot arrangement, internal road geometry, plot inventory and phase-specific development works cannot be described from the available project documents. RERA filing Document index
The project’s filed completion date is 15/07/2025, and the promoter’s Form B affidavit records an undertaking to complete by 25th July 2025. Neither statement establishes actual completion. No occupancy/completion certificate or independently verified progress record is included in the supplied evidence. RERA filing Document index
3. Master plan, architecture & building design
The RERA filing records an approved built-up area of 13,273.68 sq m. The supplied material does not define that built-up-area figure further or provide a basis for treating it as plot saleable area. RERA filing
This is a plotted development, not a documented apartment or tower scheme. The evidence supplied does not establish the number or dimensions of plots, layout of roads or parks, utility-land allocation, building footprint, floor configuration, or sanctioned residential/common-area distribution. The RERA document list includes a layout-plan filing entry, but the underlying approval is not available as an extracted, legible project drawing. RERA filing Document index
The HMDA layout lookup is unavailable through the public portal in the supplied evidence, and no project-specific approved layout number is recorded. The supplied information therefore does not support a drawing-based description of the layout. HMDA
4. Homes, configurations & floor plans
The project is registered as plotted development. The supplied RERA data does not provide plot counts, plot-by-plot sizes, booked or available inventory, or a RERA-filed plot-size schedule. RERA filing Document index
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Two drawings are listed for floor-plan review, but 0 have been measured and 2 are scans pending. No measured plot or building configuration can therefore be reported. Floor plans
5. Parking & vehicle circulation
No parking-space count, parking location, visitor or accessible parking provision, driveway plan, vehicle-entry arrangement, or parking-allocation terms are established in the supplied project evidence. The recorded 2,185.30 sq m mortgage area is not identified as parking area and should not be read as a parking provision. RERA filing Document index
6. Amenities, recreation & open spaces
The RERA amenity data lists infrastructure and facility categories, but does not supply dimensions or capacities. The listed progress values are 0; these are RERA-record fields and do not independently verify on-site status. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Listed; size/details not supplied | RERA amenities | RERA-listed; progress 0; not independently verified |
| Green strip / tot lot / park | Listed; area and quantity not supplied | RERA amenities | RERA-listed; progress 0; not independently verified |
| Community buildings | Listed; size and facilities not supplied | RERA amenities | RERA-listed; progress 0; not independently verified |
| Sports / recreation facilities | No project-specific RERA facility details or dimensions supplied | RERA amenities | Not established |
The promoter website lists additional marketed features, including a kids’ play area, landscaped parks, swimming pool, indoor facilities and gated-community features. These are promoter-marketed claims, not established here as sanctioned or delivered Phase D facilities. Promoter website
7. Utilities, building services & safety
RERA lists water supply, sewerage, storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, an electrical meter room/sub-station/receiving station, and recreational open space. The supplied filing data gives no technical specifications, capacities, design details, completion evidence or statutory clearances for these items. The listed progress values are 0 and are not independently verified. RERA amenities
The promoter website separately markets underground drainage, an overhead water tank, electrical lines with street lights and rainwater harvesting. Those descriptions are not project-specific evidence of approved capacity or completed works. Promoter website
8. Location, access & connectivity
The registered project location is Turkapally, Yadadri Bhuvanagiri district, PIN 508116; the project survey numbers are 148/P and 150/P. The mandal is not disclosed. The site boundary information identifies a village road on the south, with neighbouring land on the other three sides. RERA record Land records
A supplied location record places the cadastral parcel centroid at 17.415275719570207, 78.35458902767974; this is a software-provided parcel-centroid coordinate, not a surveyed boundary point. The location dataset lists Financial District (Nanakramguda) at 1.2 km, but the supplied evidence does not explain the route or measurement method. Location record
No project-specific public-transport access, approach-road description beyond the village-road boundary, or verified landmark-distance schedule is supplied. Promoter website connectivity statements are not used here as verified access measurements. Location record Promoter website
9. Developer & development status
The RERA record names SR LANDMARK DEVELOPERS, a partnership, as the registered promoter. The supplied promoter record lists RAVINDAR REDDY PALLE as authorized signatory and SATYANARAYANA MANGA, PURNACHANDAR KURETY, RAGHAVA REDDY GADDAM, LAXMIKANTH PADALA and ANURADHA DATRAK as partners. The promoter’s website is listed as https://landmarkgroup.co/project/divine-meadows/; the supplied record does not establish a separate legal identity for a marketing brand. Corporate record Parties record
The Form B affidavit dated 02/11/2020 is signed by PALLE RAVINDER REDDY as authorized signatory and records the promoter’s completion undertaking for 25th July 2025 and its declaration concerning project title and encumbrances. These are promoter declarations, not independent verification of those matters.
No reliable phase-wise construction progress, completed-works record, extension order or occupancy/completion certificate is supplied. The RERA registration certificate states validity through 15/07/2025; registration validity and the promoter’s completion undertaking are separate from evidence that development was completed. Document index
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate | Form C registration for DIVINE MEADOWS PHASE- D, number P02000002493, issued 31/01/2021 and valid through 15/07/2025; includes conditions concerning agreement for sale, conveyance, the separate account and compliance. |
| Principal planning authority / approval entry | DTCP is named as authority; RERA project information records approval date 15/07/2020. An approval number and legible project-specific sanctioned layout are not established in the supplied evidence. RERA filing |
| Layout-plan filing entry | The RERA document list contains a layout-plan entry, but no legible approved layout or extracted layout terms are supplied. |
| Commencement-certificate filing | The OCR fragment is insufficient to establish a project-specific commencement certificate, its issuing authority or its terms; the number 1832 is unidentified. |
| Form B promoter declaration | Form B affidavit-cum-declaration dated 02/11/2020, signed by PALLE RAVINDER REDDY as authorized signatory; includes the completion undertaking and promoter declarations. |
| Completion / occupancy record | No occupancy or completion certificate is established in the supplied documents. Document index |
| Title report | Advocate P. Sai Shakthi Rao’s report dated 31.07.2020 identifies Divine Meadows-Sector-D and examines land described as Ac.04-38 Gts in Sy.No.148/p & 150/p at Velpupally village; see Land & Title for the title-chain account. |
1. Project at a glance
Project identity
Registered project name: DIVINE MEADOWS PHASE- D
Project type: Plotted development
Phase / registered portion: Phase D; registered portion is associated with survey numbers 148/P and 150/P. No separate phase-area breakdown is supplied.
TG-RERA registration number: P02000002493
Registration validity: 31/01/2021–15/07/2025; the certificate says four years and records no extension. This is registration validity, not proof of completion or an occupancy/completion certificate.
Registered promoter: SR LANDMARK DEVELOPERS
RERA status in supplied record: New Project; registration certificate issued under section 5. The supplied record gives a completion date of 15/07/2025 and does not establish a later extension.
Land and geographic identity
Locality / revenue village: Turkapally is the locality and the recorded village. The title report refers to Velpupally village; the supplied records do not resolve whether these names identify the same revenue village for this parcel.
Mandal: Not disclosed.
District: Yadadri Bhuvanagiri
PIN: 508116
Project survey numbers / subdivisions: 148/P and 150/P; the supplied project identity does not specify further subdivisions.
Registered site extent: Total area 20,031.93 sq m; area affected in road widening/FTL of tanks/nala widening 6,758.25 sq m; net area 13,273.68 sq m.
Boundaries: North: NEIGHBOUR LAND; South: VILLAGE ROAD; East: NEIGHBOUR LAND; West: NEIGHBOUR LAND.
Development identity
Sanctioning authority: DTCP is named in the RERA project information.
Principal approval number / date: Approval date shown as 15/07/2020; approval number is not disclosed. The number 1832 appears in an unclear commencement-certificate OCR fragment and is not established as the project’s approval number.
Approved built-up area: 13,273.68 sq m is recorded as approved built-up area; the supplied data does not explain the area calculation or identify it as plot saleable area.
Building / block count and floors: Not established. No legible project-specific sanctioned drawing or building configuration is supplied. This is a plotted development.
Parking: Mortgage area is recorded as 2,185.30 sq m; this is not a parking count. No parking-space count or arrangement is established.
Approved versus RERA-declared plot count: Not disclosed in the supplied record.
Offering and status
Unit type: Plots; no RERA-filed plot count or plot-size schedule is supplied.
Booked / available: Not disclosed in the supplied data.
Completion dates: RERA project information gives 15/07/2025; the Form B declaration dated 02/11/2020 undertakes completion by 25th July 2025. These are recorded completion statements, not evidence of completion.
Construction / development stage: No independently verified site progress or phase-wise completion data is supplied. RERA amenity progress fields show 0 for listed items; these are filing values, not an independent site inspection.
OC / completion certificate: Not established in the supplied project record.
2. The project story
Divine Meadows Phase D is registered as a plotted development on the project land identified as survey numbers 148/P and 150/P, at Turkapally, Yadadri Bhuvanagiri district. The filed land details give a total area of 20,031.93 sq m and a net area of 13,273.68 sq m after recording 6,758.25 sq m affected by road widening/FTL of tanks/nala widening.
The supplied RERA information identifies DTCP as the authority and records an approval date of 15/07/2020, but does not provide a legible approved layout drawing or an approval number that can be confidently attributed to this project. Consequently, the plot arrangement, internal road geometry, plot inventory and phase-specific development works cannot be described from the available project documents.
The project’s filed completion date is 15/07/2025, and the promoter’s Form B affidavit records an undertaking to complete by 25th July 2025. Neither statement establishes actual completion. No occupancy/completion certificate or independently verified progress record is included in the supplied evidence.
3. Master plan, architecture & building design
The RERA filing records an approved built-up area of 13,273.68 sq m. The supplied material does not define that built-up-area figure further or provide a basis for treating it as plot saleable area.
This is a plotted development, not a documented apartment or tower scheme. The evidence supplied does not establish the number or dimensions of plots, layout of roads or parks, utility-land allocation, building footprint, floor configuration, or sanctioned residential/common-area distribution. The RERA document list includes a layout-plan filing entry, but the underlying approval is not available as an extracted, legible project drawing.
The HMDA layout lookup is unavailable through the public portal in the supplied evidence, and no project-specific approved layout number is recorded. The supplied information therefore does not support a drawing-based description of the layout.
4. Homes, configurations & floor plans
The project is registered as plotted development. The supplied RERA data does not provide plot counts, plot-by-plot sizes, booked or available inventory, or a RERA-filed plot-size schedule.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Two drawings are listed for floor-plan review, but 0 have been measured and 2 are scans pending. No measured plot or building configuration can therefore be reported.
5. Parking & vehicle circulation
No parking-space count, parking location, visitor or accessible parking provision, driveway plan, vehicle-entry arrangement, or parking-allocation terms are established in the supplied project evidence. The recorded 2,185.30 sq m mortgage area is not identified as parking area and should not be read as a parking provision.
6. Amenities, recreation & open spaces
The RERA amenity data lists infrastructure and facility categories, but does not supply dimensions or capacities. The listed progress values are 0; these are RERA-record fields and do not independently verify on-site status.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Listed; size/details not supplied | RERA-listed; progress 0; not independently verified | |
| Green strip / tot lot / park | Listed; area and quantity not supplied | RERA-listed; progress 0; not independently verified | |
| Community buildings | Listed; size and facilities not supplied | RERA-listed; progress 0; not independently verified | |
| Sports / recreation facilities | No project-specific RERA facility details or dimensions supplied | Not established |
The promoter website lists additional marketed features, including a kids’ play area, landscaped parks, swimming pool, indoor facilities and gated-community features. These are promoter-marketed claims, not established here as sanctioned or delivered Phase D facilities.
7. Utilities, building services & safety
RERA lists water supply, sewerage, storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, an electrical meter room/sub-station/receiving station, and recreational open space. The supplied filing data gives no technical specifications, capacities, design details, completion evidence or statutory clearances for these items. The listed progress values are 0 and are not independently verified.
The promoter website separately markets underground drainage, an overhead water tank, electrical lines with street lights and rainwater harvesting. Those descriptions are not project-specific evidence of approved capacity or completed works.
8. Location, access & connectivity
The registered project location is Turkapally, Yadadri Bhuvanagiri district, PIN 508116; the project survey numbers are 148/P and 150/P. The mandal is not disclosed. The site boundary information identifies a village road on the south, with neighbouring land on the other three sides.
A supplied location record places the cadastral parcel centroid at 17.415275719570207, 78.35458902767974; this is a software-provided parcel-centroid coordinate, not a surveyed boundary point. The location dataset lists Financial District (Nanakramguda) at 1.2 km, but the supplied evidence does not explain the route or measurement method.
No project-specific public-transport access, approach-road description beyond the village-road boundary, or verified landmark-distance schedule is supplied. Promoter website connectivity statements are not used here as verified access measurements.
9. Developer & development status
The RERA record names SR LANDMARK DEVELOPERS, a partnership, as the registered promoter. The supplied promoter record lists RAVINDAR REDDY PALLE as authorized signatory and SATYANARAYANA MANGA, PURNACHANDAR KURETY, RAGHAVA REDDY GADDAM, LAXMIKANTH PADALA and ANURADHA DATRAK as partners. The promoter’s website is listed as https://landmarkgroup.co/project/divine-meadows/; the supplied record does not establish a separate legal identity for a marketing brand.
The Form B affidavit dated 02/11/2020 is signed by PALLE RAVINDER REDDY as authorized signatory and records the promoter’s completion undertaking for 25th July 2025 and its declaration concerning project title and encumbrances. These are promoter declarations, not independent verification of those matters.
No reliable phase-wise construction progress, completed-works record, extension order or occupancy/completion certificate is supplied. The RERA registration certificate states validity through 15/07/2025; registration validity and the promoter’s completion undertaking are separate from evidence that development was completed.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C registration for DIVINE MEADOWS PHASE- D, number P02000002493, issued 31/01/2021 and valid through 15/07/2025; includes conditions concerning agreement for sale, conveyance, the separate account and compliance.
Principal planning authority / approval entry: DTCP is named as authority; RERA project information records approval date 15/07/2020. An approval number and legible project-specific sanctioned layout are not established in the supplied evidence.
Layout-plan filing entry: The RERA document list contains a layout-plan entry, but no legible approved layout or extracted layout terms are supplied.
Commencement-certificate filing: The OCR fragment is insufficient to establish a project-specific commencement certificate, its issuing authority or its terms; the number 1832 is unidentified.
Form B promoter declaration: Form B affidavit-cum-declaration dated 02/11/2020, signed by PALLE RAVINDER REDDY as authorized signatory; includes the completion undertaking and promoter declarations.
Completion / occupancy record: No occupancy or completion certificate is established in the supplied documents.
Title report: Advocate P. Sai Shakthi Rao’s report dated 31.07.2020 identifies Divine Meadows-Sector-D and examines land described as Ac.04-38 Gts in Sy.No.148/p & 150/p at Velpupally village; see Land & Title for the title-chain account.
Other registrations of Divine Meadows
Frequently asked questions
Is DIVINE MEADOWS PHASE- D registered with Telangana RERA?
Yes. DIVINE MEADOWS PHASE- D is registered with the Telangana Real Estate Regulatory Authority as P02000002493; the registration status is New Project.
Who is the developer of DIVINE MEADOWS PHASE- D?
The promoter named in the RERA registration is SR LANDMARK DEVELOPERS.
Where is DIVINE MEADOWS PHASE- D located?
DIVINE MEADOWS PHASE- D is in TURKAPALLY, Yadadri Bhuvanagiri, Telangana (508116).
When will DIVINE MEADOWS PHASE- D be completed?
The promoter's proposed date of completion filed with RERA is 15/07/2025. This is the promoter's declaration, not a guarantee.