BV HEIGHTS is a residential apartment project in Bhoodhan Pochampally Municipality, B. Pochampally mandal, Yadadri Bhuvanagiri district, developed by the registered promoter BV DEVELOPERS. The registered site extent is 1921.35 sq. m, and the project comprises one residential building with 1 stilt + 5 upper floors and 40 homes: 20 2BHK and 20 3BHK. TG-RERA registration number P02000006330 was issued 07/07/2023, and the proposed completion date is 25/02/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | BV HEIGHTS |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | The record identifies one building and does not disclose a separate phase name. RERA filing |
| TG-RERA registration | P02000006330; certificate issued 07/07/2023. [REGCERT-47048] |
| Registration validity | Certificate states validity from 07/07/2023 to 25/02/2026, unless extended by the Authority. The supplied certificate says “extended: false.” [REGCERT-47048] |
| Registered promoter | BV DEVELOPERS; the RERA record identifies it as a partnership. RERA filing |
| RERA status | The RERA record labels the project “On-Going Project.” RERA filing |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / address recorded | Bhoodhan Pochampally Municipality; the approval record also gives “7-31,M.G.ROAD,POCHAMPALLE, TELANGANA.” RERA filing |
| Revenue village | RERA-filed documents identify Bhoodhan Pochampally / Pochampally Village. The RERA land record’s village field is not disclosed. |
| Mandal | B. Pochampally in the project header; the approval records Pochampally Mandal. [header; doc:330885 p1] |
| District / PIN | Yadadri Bhuvanagiri; 508284. [header; REGCERT-47048] |
| All registered project survey numbers | SY NOs 467/U/1, 467/U/2, 467AA3, 467/U/4 AND 467/U/5. [REGCERT-47048] |
| Registered site extent | 1921.35 sq. m; RERA-filed architect’s certificate also states 2299 sq. yards or its equivalent to 1921.35 sq. metres. RERA filing |
| Total / net area | Total area: 1921.35 sq. m; net area: 1921.35 sq. m. RERA filing |
| Boundaries | North: 30 feet wide road; east, west and south: land in Survey No. 467 part. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authorities | HMDA technical approval, followed by Pochampally Municipality’s release of the technically approved plan. |
| Principal building approval | HMDA approval 012112/BP/HMDA/2509/GHT/2022, dated 25 February 2023. |
| Municipal proceedings | G/49 /MCP/2023, dated 27.03.2023. |
| Approved built-up area | Proposed built-up area: 4,405.73; total built-up area: 5,443.09. The approval extraction does not state a unit alongside these figures. |
| Building count / arrangement | One residential building, identified in the HMDA approval as “A (BOGA VISHNU).” |
| Sanctioned floors | 1 stilt + 5 upper floors; building height stated as 14.95. The approval extraction does not state a unit for the height. |
| Parking | Stilt is required to be used exclusively for vehicle parking; no parking or construction is permitted in setback areas. A parking-space count is not supplied. |
| Approved vs RERA-declared units | The project record lists 40 total units in one building; the supplied approval extraction does not state a sanctioned apartment count. [units; fields: Land Details; doc:330885] |
Offering and status
| Item | Record |
|---|---|
| Configurations | 2BHK and 3BHK; 20 units of each are listed in the RERA unit record. RERA unit table |
| RERA-filed saleable area | 2BHK: 112.27 sq. m; 3BHK: 128.12 sq. m. RERA unit table |
| Booked / available | 2BHK: 8 booked, 12 available; 3BHK: 4 booked, 16 available. Portal figures have no supplied “as of” date and are indicative. RERA unit table |
| Construction-stage evidence | Architect’s certificate dated 31-03-2025 reports construction percentages, including stilt at 55% and superstructure slabs at 20%; it is not a completion certificate. |
| Original / revised completion date | 25/02/2026 for both the proposed and revised date in the project record; Form B also declares completion on or before 25/02/2026. [header; fields: Project Information; doc:331583] |
| Occupancy certificate | The project record lists an HMDA occupancy-certificate record under 010400/HMDA/03054/SWOC/GTK/2025. Separately, the filed Form 1A dated 31/12/2025 records an HMDA occupancy certificate with that number and certifies overall project completion. [other_numbers; doc:667097] |
2. The project story
BV HEIGHTS is recorded with TG-RERA as a single-building residential apartment project at Bhoodhan Pochampally Municipality, in B. Pochampally mandal, Yadadri Bhuvanagiri district. The registered land extent is 1921.35 sq. m, and the RERA-filed survey identity is SY NOs 467/U/1, 467/U/2, 467AA3, 467/U/4 AND 467/U/5. [header; land; REGCERT-47048]
The project record lists 40 homes—20 2BHK and 20 3BHK. A filed architect’s certificate dated 31-03-2025 provides construction-stage percentages, while a later filed Form 1A dated 31/12/2025 certifies overall completion and records an HMDA occupancy certificate. These are documentary statements; no independent site inspection is supplied. [units; doc:572855; doc:667097]
3. Master plan, architecture & building design
The filed HMDA technical approval describes one residential building of 1 stilt + 5 upper floors. It states a proposed built-up area of 4,405.73 and a total built-up area of 5,443.09; the extraction does not provide units for those figures. The RERA land record gives a site area of 1921.35 sq. m. No separate FSI-counted area, building footprint, flats-per-floor schedule, lift/stair count, circulation plan, landscaping plan or phase-wise building arrangement is provided in the supplied drawing-derived data.
The stilt is designated exclusively for vehicle parking, without partition walls or rolling shutters, and the approval prohibits parking or construction in setback areas. The municipal plan-release record also describes 1 stilt + 5 upper floors.
The project’s RERA-filed architect’s certificates list a green strip along the site and identify water supply, sewerage, rainwater-harvesting pits and electrical metering/substation facilities. The supplied evidence does not establish their detailed drawing locations or dimensions.
4. Homes, configurations & floor plans
The following unit counts and saleable areas are from the TG-RERA unit record. Carpet-area figures are software measurements from the filed floor-plan drawing, not RERA-filed areas; the drawing measurements require review. Saleable area includes the home’s share of common areas, so it is not interchangeable with carpet area. Balcony and utility areas are shown separately from measured carpet area where identified in the drawing data. [units; doc:331575]
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 8 | 12 | 112.27 sq. m | 71.2–88.9 sq. m; median 79.5 sq. m (software-measured) | 29% |
| 3BHK | 20 | 4 | 16 | 128.12 sq. m | 83.5–99.5 sq. m; median 86.0 sq. m (software-measured) | 33% |
The measured 2BHK drawing example shows a master bedroom, bedroom, kitchen, dining, hall, two toilets and a utility area. The measured 3BHK example shows bedrooms, kitchen, hall, drawing room, toilets, utility and a balcony. These descriptions relate to measured drawing examples and should be checked against the relevant unit’s plan.
The booking counts are from the TG-RERA portal record, which supplies no as-of date; treat them as indicative. RERA unit table
5. Parking & vehicle circulation
The HMDA approval requires the stilt to be used exclusively for vehicle parking and prohibits parking or construction in setback areas. It also requires the building to follow the sanctioned plan and specifies that stilt parking is not to be partitioned or converted to another use.
A number of parking spaces, visitor or accessible bays, two-wheeler provision, ramp arrangement, internal driveways, pedestrian separation, EV charging facilities, and unit-specific parking allocations are not established by the supplied records. A drawn or approved parking area alone would not establish exclusive ownership or allocation.
6. Amenities, recreation & open spaces
The RERA-recorded amenities schedule provides the following declared status. A stated 100% is the filed percentage, not independent verification of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip/TOT LOT/Park | No size supplied | RERA amenities schedule; architect’s certificate describes a green strip along the site [amenities; doc:572855] | 100% in the schedule; not independently verified |
| Community Buildings | No size or facility detail supplied | RERA amenities schedule RERA amenities | 0% |
| Aggregate area of recreational open space | No area supplied | RERA amenities schedule RERA amenities | 0% |
No project-specific evidence supplied for this overview establishes a clubhouse, gym, pool, indoor games facility or children’s play area as a RERA-filed or sanctioned amenity. [amenities; documents]
7. Utilities, building services & safety
The HMDA approval lists a transformer, garbage house, STP, rainwater-harvesting structures, a separate underground static water-storage tank with stated capacity of 25,000 Its., and a separate residential terrace tank with stated capacity of 25,000 Its. It also requires water-supply and sewerage arrangements and specifies that services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be carried out under qualified technical personnel.
RERA-filed architect certificates list water supply, sewerage (including chambers, lines, septic tank and STP), rainwater-harvesting pits, and electrical metering/substation or receiving-station provision; the 2025 certificate names HMWSSB for water supply and sewerage and TSSPDCL for electrical provision. These are filed descriptions and do not by themselves verify operational status or capacity.
The RERA amenities schedule reports water supply, sewerage and rainwater harvesting at 100%; it records storm-water drains, street lighting, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements at 0%. RERA amenities
The supplied records do not state lift numbers or capacities, backup-power capacity, fire-system specifications, waste-segregation arrangements, CCTV details, access control, or accessible routes.
8. Location, access & connectivity
The registered location is Bhoodhan Pochampally Municipality, B. Pochampally mandal, Yadadri Bhuvanagiri district, PIN 508284. The RERA land record describes the northern boundary as a 30 feet wide road; the other stated boundaries are land in Survey No. 467 part. [header; REGCERT-47048; fields: Land Details]
The HMDA approval refers to a minimum approach-road width of 4.5 mts. and requires the approach road indicated in the plan to be developed and maintained as a black-topped road before release of occupancy. The supplied data does not identify public-transport services or measured distances to landmarks or employment centres.
9. Developer & development status
The registered promoter is BV DEVELOPERS, recorded as a partnership. The project record gives the promoter’s address as BV DEVELOPERS, NEAR MARKHANDEYA TEMPLE, BHOODHAN POCHAMPALLY MUNICIPALITY, YADADRI BHONGIR DISTRICT, B. Pochampally, Yadadri Bhuvanagiri, 508284, and GSTIN 36ABAFB8562D1ZL. A promoter PAN value is masked in the supplied record. No official website or contact details are supplied. RERA filing
The RERA record lists one building and 40 units. The promoter’s Form B declaration dated 30/05/2023 undertakes completion on or before 25/02/2026. A filed architect certificate reports construction-stage percentages as at 31-03-2025; a later Form 1A dated 31/12/2025 certifies project completion. No independent site verification is supplied. RERA filing
10. Approvals, official records & documents
| Record | Evidence and scope |
|---|---|
| TG-RERA registration | Form C for BV HEIGHTS, registration P02000006330, issued 07/07/2023; stated validity ends 25/02/2026 unless extended. [REGCERT-47048] |
| HMDA building technical approval | 012112/BP/HMDA/2509/GHT/2022, dated 25 February 2023; describes a residential building of 1 stilt + 5 upper floors. |
| Municipal plan release | Pochampally Municipality proceedings G/49 /MCP/2023, dated 27.03.2023, releasing the technically approved plan. |
| RERA-filed Form B | Promoter declaration by Boga Vishnu for BV DEVELOPERS, dated 30/05/2023; includes a completion undertaking and project-fund declarations. |
| RERA-filed construction-stage certificates | Architect certificates dated 31-03-2024 and 31-03-2025; the 2025 certificate reports construction percentages and common-area facilities. |
| HMDA occupancy-certificate record | 010400/HMDA/03054/SWOC/GTK/2025 is listed in the project documents. The supplied extraction describes an occupancy certificate and authorization relating to a relinquishment deed for the 453.56 sq. m mortgaged area. |
| RERA-filed overall completion certificate | Form 1A dated 31/12/2025 records an HMDA occupancy certificate with number 010400/HMDA/03054/SWOC/GTK/2025 and certifies project completion. |
The supplied records do not include a project-specific approved-layout plan or a detailed drawing set sufficient to describe floor-by-floor unit placement, parking-space counts or detailed site circulation. [documents; hmda]
1. Project at a glance
Project identity
Registered project name: BV HEIGHTS
Project type: Residential apartment project
Phase / registered portion: The record identifies one building and does not disclose a separate phase name.
TG-RERA registration: P02000006330; certificate issued 07/07/2023. [REGCERT-47048]
Registration validity: Certificate states validity from 07/07/2023 to 25/02/2026, unless extended by the Authority. The supplied certificate says “extended: false.” [REGCERT-47048]
Registered promoter: BV DEVELOPERS; the RERA record identifies it as a partnership.
RERA status: The RERA record labels the project “On-Going Project.”
Land and geographic identity
Locality / address recorded: Bhoodhan Pochampally Municipality; the approval record also gives “7-31,M.G.ROAD,POCHAMPALLE, TELANGANA.”
Revenue village: RERA-filed documents identify Bhoodhan Pochampally / Pochampally Village. The RERA land record’s village field is not disclosed.
Mandal: B. Pochampally in the project header; the approval records Pochampally Mandal. [header; doc:330885 p1]
District / PIN: Yadadri Bhuvanagiri; 508284. [header; REGCERT-47048]
All registered project survey numbers: SY NOs 467/U/1, 467/U/2, 467AA3, 467/U/4 AND 467/U/5. [REGCERT-47048]
Registered site extent: 1921.35 sq. m; RERA-filed architect’s certificate also states 2299 sq. yards or its equivalent to 1921.35 sq. metres.
Total / net area: Total area: 1921.35 sq. m; net area: 1921.35 sq. m.
Boundaries: North: 30 feet wide road; east, west and south: land in Survey No. 467 part.
Development identity
Sanctioning authorities: HMDA technical approval, followed by Pochampally Municipality’s release of the technically approved plan.
Principal building approval: HMDA approval 012112/BP/HMDA/2509/GHT/2022, dated 25 February 2023.
Municipal proceedings: G/49 /MCP/2023, dated 27.03.2023.
Approved built-up area: Proposed built-up area: 4,405.73; total built-up area: 5,443.09. The approval extraction does not state a unit alongside these figures.
Building count / arrangement: One residential building, identified in the HMDA approval as “A (BOGA VISHNU).”
Sanctioned floors: 1 stilt + 5 upper floors; building height stated as 14.95. The approval extraction does not state a unit for the height.
Parking: Stilt is required to be used exclusively for vehicle parking; no parking or construction is permitted in setback areas. A parking-space count is not supplied.
Approved vs RERA-declared units: The project record lists 40 total units in one building; the supplied approval extraction does not state a sanctioned apartment count. [units; fields: Land Details; doc:330885]
Offering and status
Configurations: 2BHK and 3BHK; 20 units of each are listed in the RERA unit record.
RERA-filed saleable area: 2BHK: 112.27 sq. m; 3BHK: 128.12 sq. m.
Booked / available: 2BHK: 8 booked, 12 available; 3BHK: 4 booked, 16 available. Portal figures have no supplied “as of” date and are indicative.
Construction-stage evidence: Architect’s certificate dated 31-03-2025 reports construction percentages, including stilt at 55% and superstructure slabs at 20%; it is not a completion certificate.
Original / revised completion date: 25/02/2026 for both the proposed and revised date in the project record; Form B also declares completion on or before 25/02/2026. [header; fields: Project Information; doc:331583]
Occupancy certificate: The project record lists an HMDA occupancy-certificate record under 010400/HMDA/03054/SWOC/GTK/2025. Separately, the filed Form 1A dated 31/12/2025 records an HMDA occupancy certificate with that number and certifies overall project completion. [other_numbers; doc:667097]
2. The project story
BV HEIGHTS is recorded with TG-RERA as a single-building residential apartment project at Bhoodhan Pochampally Municipality, in B. Pochampally mandal, Yadadri Bhuvanagiri district. The registered land extent is 1921.35 sq. m, and the RERA-filed survey identity is SY NOs 467/U/1, 467/U/2, 467AA3, 467/U/4 AND 467/U/5. [header; land; REGCERT-47048]
The project record lists 40 homes—20 2BHK and 20 3BHK. A filed architect’s certificate dated 31-03-2025 provides construction-stage percentages, while a later filed Form 1A dated 31/12/2025 certifies overall completion and records an HMDA occupancy certificate. These are documentary statements; no independent site inspection is supplied. [units; doc:572855; doc:667097]
3. Master plan, architecture & building design
The filed HMDA technical approval describes one residential building of 1 stilt + 5 upper floors. It states a proposed built-up area of 4,405.73 and a total built-up area of 5,443.09; the extraction does not provide units for those figures. The RERA land record gives a site area of 1921.35 sq. m. No separate FSI-counted area, building footprint, flats-per-floor schedule, lift/stair count, circulation plan, landscaping plan or phase-wise building arrangement is provided in the supplied drawing-derived data.
The stilt is designated exclusively for vehicle parking, without partition walls or rolling shutters, and the approval prohibits parking or construction in setback areas. The municipal plan-release record also describes 1 stilt + 5 upper floors.
The project’s RERA-filed architect’s certificates list a green strip along the site and identify water supply, sewerage, rainwater-harvesting pits and electrical metering/substation facilities. The supplied evidence does not establish their detailed drawing locations or dimensions.
4. Homes, configurations & floor plans
The following unit counts and saleable areas are from the TG-RERA unit record. Carpet-area figures are software measurements from the filed floor-plan drawing, not RERA-filed areas; the drawing measurements require review. Saleable area includes the home’s share of common areas, so it is not interchangeable with carpet area. Balcony and utility areas are shown separately from measured carpet area where identified in the drawing data. [units; doc:331575]
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 8 | 12 | 112.27 sq. m | 71.2–88.9 sq. m; median 79.5 sq. m (software-measured) | 29% |
| 3BHK | 20 | 4 | 16 | 128.12 sq. m | 83.5–99.5 sq. m; median 86.0 sq. m (software-measured) | 33% |
The measured 2BHK drawing example shows a master bedroom, bedroom, kitchen, dining, hall, two toilets and a utility area. The measured 3BHK example shows bedrooms, kitchen, hall, drawing room, toilets, utility and a balcony. These descriptions relate to measured drawing examples and should be checked against the relevant unit’s plan.
The booking counts are from the TG-RERA portal record, which supplies no as-of date; treat them as indicative.
5. Parking & vehicle circulation
The HMDA approval requires the stilt to be used exclusively for vehicle parking and prohibits parking or construction in setback areas. It also requires the building to follow the sanctioned plan and specifies that stilt parking is not to be partitioned or converted to another use.
A number of parking spaces, visitor or accessible bays, two-wheeler provision, ramp arrangement, internal driveways, pedestrian separation, EV charging facilities, and unit-specific parking allocations are not established by the supplied records. A drawn or approved parking area alone would not establish exclusive ownership or allocation.
6. Amenities, recreation & open spaces
The RERA-recorded amenities schedule provides the following declared status. A stated 100% is the filed percentage, not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip/TOT LOT/Park | No size supplied | RERA amenities schedule; architect’s certificate describes a green strip along the site [amenities; doc:572855] | 100% in the schedule; not independently verified |
| Community Buildings | No size or facility detail supplied | RERA amenities schedule | 0% |
| Aggregate area of recreational open space | No area supplied | RERA amenities schedule | 0% |
No project-specific evidence supplied for this overview establishes a clubhouse, gym, pool, indoor games facility or children’s play area as a RERA-filed or sanctioned amenity. [amenities; documents]
7. Utilities, building services & safety
The HMDA approval lists a transformer, garbage house, STP, rainwater-harvesting structures, a separate underground static water-storage tank with stated capacity of 25,000 Its., and a separate residential terrace tank with stated capacity of 25,000 Its. It also requires water-supply and sewerage arrangements and specifies that services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be carried out under qualified technical personnel.
RERA-filed architect certificates list water supply, sewerage (including chambers, lines, septic tank and STP), rainwater-harvesting pits, and electrical metering/substation or receiving-station provision; the 2025 certificate names HMWSSB for water supply and sewerage and TSSPDCL for electrical provision. These are filed descriptions and do not by themselves verify operational status or capacity.
The RERA amenities schedule reports water supply, sewerage and rainwater harvesting at 100%; it records storm-water drains, street lighting, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements at 0%.
The supplied records do not state lift numbers or capacities, backup-power capacity, fire-system specifications, waste-segregation arrangements, CCTV details, access control, or accessible routes.
8. Location, access & connectivity
The registered location is Bhoodhan Pochampally Municipality, B. Pochampally mandal, Yadadri Bhuvanagiri district, PIN 508284. The RERA land record describes the northern boundary as a 30 feet wide road; the other stated boundaries are land in Survey No. 467 part. [header; REGCERT-47048; fields: Land Details]
The HMDA approval refers to a minimum approach-road width of 4.5 mts. and requires the approach road indicated in the plan to be developed and maintained as a black-topped road before release of occupancy. The supplied data does not identify public-transport services or measured distances to landmarks or employment centres.
9. Developer & development status
The registered promoter is BV DEVELOPERS, recorded as a partnership. The project record gives the promoter’s address as BV DEVELOPERS, NEAR MARKHANDEYA TEMPLE, BHOODHAN POCHAMPALLY MUNICIPALITY, YADADRI BHONGIR DISTRICT, B. Pochampally, Yadadri Bhuvanagiri, 508284, and GSTIN 36ABAFB8562D1ZL. A promoter PAN value is masked in the supplied record. No official website or contact details are supplied.
The RERA record lists one building and 40 units. The promoter’s Form B declaration dated 30/05/2023 undertakes completion on or before 25/02/2026. A filed architect certificate reports construction-stage percentages as at 31-03-2025; a later Form 1A dated 31/12/2025 certifies project completion. No independent site verification is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C for BV HEIGHTS, registration P02000006330, issued 07/07/2023; stated validity ends 25/02/2026 unless extended. [REGCERT-47048]
HMDA building technical approval: 012112/BP/HMDA/2509/GHT/2022, dated 25 February 2023; describes a residential building of 1 stilt + 5 upper floors.
Municipal plan release: Pochampally Municipality proceedings G/49 /MCP/2023, dated 27.03.2023, releasing the technically approved plan.
RERA-filed Form B: Promoter declaration by Boga Vishnu for BV DEVELOPERS, dated 30/05/2023; includes a completion undertaking and project-fund declarations.
RERA-filed construction-stage certificates: Architect certificates dated 31-03-2024 and 31-03-2025; the 2025 certificate reports construction percentages and common-area facilities.
HMDA occupancy-certificate record: 010400/HMDA/03054/SWOC/GTK/2025 is listed in the project documents. The supplied extraction describes an occupancy certificate and authorization relating to a relinquishment deed for the 453.56 sq. m mortgaged area.
RERA-filed overall completion certificate: Form 1A dated 31/12/2025 records an HMDA occupancy certificate with number 010400/HMDA/03054/SWOC/GTK/2025 and certifies project completion.
The supplied records do not include a project-specific approved-layout plan or a detailed drawing set sufficient to describe floor-by-floor unit placement, parking-space counts or detailed site circulation. [documents; hmda]
Frequently asked questions
Is BV HEIGHTS registered with Telangana RERA?
Yes. BV HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P02000006330; the registration status is On-Going Project.
Who is the developer of BV HEIGHTS?
The promoter named in the RERA registration is BV DEVELOPERS.
Where is BV HEIGHTS located?
BV HEIGHTS is in YADADRI BHONGIR DISTRICT, B. Pochampally, Yadadri Bhuvanagiri, Telangana (508284).
When will BV HEIGHTS be completed?
The promoter's proposed date of completion filed with RERA is 25/02/2026. This is the promoter's declaration, not a guarantee.