Darshan Castle
SRI SKYLINE CONSTRUCTIONS · Rangareddy · RERA P02400003758
DARSHAN CASTLE is a residential apartment project in Ward No. 4, Balaji Nagar, Hayathnagar, Hayathnagar mandal, Ranga Reddy district, developed by the registered promoter SRI SKYLINE CONSTRUCTIONS. The site area is 397.52 sq. m, and the project comprises one proposed residential building with 1 stilt + 5 upper floors and 10 apartments: 5 2BHK units and 5 3BHK units. It is registered under TG-RERA **P02400003758**, and its proposed completion is listed as **25/06/2027**.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | DARSHAN CASTLE RERA record |
| Project type | Residential apartment project RERA filing |
| Registered phase/portion | One proposed residential building; phase designation is not disclosed |
| TG-RERA registration | P02400003758; registration certificate issued 20/12/2021 Approvals record |
| Registration validity | Certificate states five years, from 20/12/2021 to 25/02/2027; no extension is recorded in the supplied certificate |
| Registered promoter | SRI SKYLINE CONSTRUCTIONS, a partnership RERA filing Corporate record |
| RERA project status | Listed as “New Project” in the RERA project record RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / PIN | Ward No. 4, Balaji Nagar, Hayathnagar; PIN 501505 RERA filing |
| Revenue village | Balaji Nagar in the project identity record; the building-permit and title documents refer to Bagh Hayathnagar Village. Both names are retained as recorded; the supplied material does not reconcile them. RERA record |
| Mandal / district | Hayathnagar / Ranga Reddy RERA record |
| Survey number and subdivision | Survey No. 100 PART; title and supporting instruments also describe Survey No. 100 (Part). Land records |
| Plots | Plot Nos. 29, 30 and 31 North Part RERA filing |
| Site extent | Total area 397.52 sq. m; net area 397.52 sq. m; road-affected area recorded as 0 RERA filing |
| Boundaries | East: neighbours’ plots; west: 30 ft road; north: Plot No. 28; south: Plot No. 31 South Part RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building permission | Building Permit Order 2/C3/03044/2021, File No. 2/C3/02802/2021, approved 25 February 2021 Approvals record |
| Approved built-up area | 1,328.67 sq. m in the project fields. The permit extraction separately records residential upper-floors area 1,107.20 m² and stilt parking area 197.58 m²; these are distinct filed figures. RERA filing |
| Building count and floors | One proposed residential building: 1 stilt + 5 upper floors RERA filing |
| Height | 15.00 m, as recorded in the permit parameters |
| Parking level / mortgage area | Stilt parking is recorded; 112.84 sq. m is recorded as the mortgage area, with the permit extraction identifying the handed-over area as the second floor, 112.84 RERA filing |
| Units | RERA filing records 10 proposed building units; the approved-plan record states that sanctioned unit numbers must not be increased without prior GHMC approval. RERA filing |
Offering and status
| Item | Project record |
|---|---|
| Configurations | 2BHK: 5 units; 3BHK: 5 units RERA unit table |
| RERA-filed saleable area | 2BHK: 126.12 sq. m; 3BHK: 144.92 sq. m RERA unit table |
| Booked / available | Portal-derived counts show 0 booked and 5 available in each configuration (10 available total). The portal record supplied has no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | No construction-progress percentage or independently verified site stage is supplied. The RERA amenity schedule records 0% for its listed items; that is a filed progress figure, not an independent site inspection. RERA amenities |
| Completion dates | Form B declares completion by 25/02/2027; the project header lists proposed completion as 25/06/2027. The supplied record does not establish a revised completion order or reconcile these fields. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents; the building permit requires an occupancy certificate before occupation. Document index |
2. The project story
DARSHAN CASTLE is registered as a residential apartment project at Plot Nos. 29, 30 and 31 North Part, Survey No. 100 PART, in the Hayathnagar/Balaji Nagar location recorded for the project. Its filed scale is one proposed building with ten apartments: five 2BHK and five 3BHK units. RERA record RERA filing RERA unit table
GHMC’s building-permit order describes a proposed building with one stilt level and five upper floors. The supplied material does not establish the current construction stage, completion of any floor or whether the building is occupied. The registration certificate remains valid through 25/02/2027; that is a registration-validity date, not proof of completion or occupancy. Document index
3. Master plan, architecture & building design
The project record gives a site extent of 397.52 sq. m and approved built-up area of 1,328.67 sq. m. The building-permit extraction further records 1,107.20 m² for residential upper floors and 197.58 m² for stilt parking; the supplied information does not label these figures as carpet area or provide an FSI-counted-area figure. RERA filing RERA filing
The sanctioned building description is one residential block with 1 stilt + 5 upper floors, at a recorded height of 15.00 m. The supplied plan extraction does not provide a reliable floor-by-floor unit schedule, lift or stair details, internal circulation plan, or a measured building footprint. The RERA filing lists two apartment configurations and ten units in total. RERA unit table
The permit extraction records a tot-lot area of 0 m² and includes conditions requiring periphery greenery and tree planting, a fenced tot-lot to be maintained as greenery, rainwater harvesting and a transformer space. These are permit conditions; the supplied record does not establish their completed or independently inspected status.
4. Homes, configurations & floor plans
The RERA filing lists five 2BHK and five 3BHK units, with saleable areas of 126.12 sq. m and 144.92 sq. m respectively. The counts shown as booked and available are portal-derived and lack an as-of date. RERA unit table
Software measurements from the supplied floor-plan drawing are not RERA-filed carpet-area disclosures and require review against the drawing. The drawing measurement source notes that RERA saleable area includes the home’s share of common areas and is not interchangeable with carpet area. Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 126.12 sq. m | 65.7–67.8 sq. m; median 66.8 sq. m (software-measured) | 47% (software-derived) |
| 3BHK | 5 | 0 | 5 | 144.92 sq. m | 86.6 sq. m (software-measured) | 40% (software-derived) |
The measured drawing examples show a hall, kitchen, bedrooms and toilets in each configuration; utilities are separately identified in the drawing measurement. For the measured 2BHK example, two utility areas are marked as excluded from the measured carpet area; the measured 3BHK example shows one utility area excluded. These measurements are drawing-based, not RERA-filed room-area commitments.
5. Parking & vehicle circulation
The GHMC permit identifies stilt parking with an area of 197.58 m² and requires approved cellar/stilt parking space to be used exclusively for vehicle parking. The supplied record does not state a sanctioned number of car or two-wheeler spaces, visitor or accessible spaces, or unit-specific parking allocations. A parking area in a sanctioned plan does not by itself establish exclusive ownership or allocation to a particular apartment.
No details are supplied for parking ramps, internal driveways, pedestrian separation, mechanical parking or EV charging. Document index
6. Amenities, recreation & open spaces
The RERA amenity schedule includes the following items. Its recorded 0% figures are filed progress entries and do not establish independent inspection or delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No size or quantity stated | RERA amenity schedule RERA amenities | 0% recorded; independent status not supplied |
| Water Supply | No source, capacity or size stated | RERA amenity schedule RERA amenities | 0% recorded; independent status not supplied |
| Sewerage (Chamber, Lines, Septic Tank, STP) | No capacity stated | RERA amenity schedule RERA amenities | 0% recorded; independent status not supplied |
| Storm Water Drains | No size stated | RERA amenity schedule RERA amenities | 0% recorded; independent status not supplied |
| Green Strip / Tot Lot / Park | No area stated in the amenity schedule; permit records tot-lot area of 0 m² | RERA amenity schedule RERA amenities; GHMC permit | 0% recorded; permit includes greenery/tot-lot conditions; completion not verified |
| Street Lighting | No details stated | RERA amenity schedule RERA amenities | 0% recorded; independent status not supplied |
| Community Buildings | No size or facility details stated | RERA amenity schedule RERA amenities | 0% recorded; independent status not supplied |
| Treatment and Disposal of Sewage and Sullage Water | No capacity or treatment details stated | RERA amenity schedule RERA amenities | 0% recorded; independent status not supplied |
| Solid Waste Management and Disposal | No details stated | RERA amenity schedule RERA amenities | 0% recorded; independent status not supplied |
| Water Conservation / Rainwater Harvesting | RERA schedule marks “YES”; permit extraction lists 3 No. of RWHPs and requires rainwater harvesting structure(s) | RERA amenity schedule RERA amenities; GHMC permit | 0% recorded in schedule; no independent completion verification |
| Energy management | No details stated | RERA amenity schedule RERA amenities | 0% recorded; independent status not supplied |
| Fire Protection and Fire Safety Requirements | No system details stated | RERA amenity schedule RERA amenities | 0% recorded; independent status not supplied |
| Electrical Meter Room / Sub-Station / Receiving Station | Permit records space for a transformer; no capacity stated | RERA amenity schedule RERA amenities; GHMC permit | 0% recorded in schedule; completion not verified |
| Aggregate recreational open space | No area stated | RERA amenity schedule RERA amenities | 0% recorded; independent status not supplied |
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drainage, sewage and sullage treatment, solid-waste management, energy management, fire safety and an electrical meter room/sub-station/receiving station, but supplies no system capacities or detailed design specifications. Its listed progress entries are 0%; no independent completion status is available. RERA amenities
The GHMC permit requires rainwater harvesting, transformer space and a garbage house, and refers to execution of sanitation, plumbing, fire-safety, lift and electrical services under qualified technical supervision. It also requires fire-fighting installations and an occupancy fire NOC before issue of an occupancy certificate. These are conditions in the permit, not evidence that the systems or clearances have been completed.
No project-specific water-storage or treatment capacities, STP capacity, backup-power capacity, lift count or capacity, CCTV/access-control system, waste-segregation arrangements or accessibility layout are documented in the supplied RERA project records. Document index RERA amenities
8. Location, access & connectivity
The project is registered at Ward No. 4, Balaji Nagar, Hayathnagar mandal, Ranga Reddy district, PIN 501505. The building permit identifies the locality as Balaji Nagar (Hayath Nagar), and the title report refers to Bagh Hayathnagar Village. RERA record
The supplied location data lists the nearest sampled Outer Ring Road interchange at approximately 3.5 km. No approach-road route, public-transport service, other landmark distance or project-specific travel time is documented in the supplied records. Location record
9. Developer & development status
The registered promoter is SRI SKYLINE CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AEIFS4232E1Z5. The RERA project record lists Doctors Colony, Balaji Nagar, Ward No. 4, Hayathnagar, Ranga Reddy, PIN 501505 as the promoter address; the registration certificate’s promoter-office field is incomplete apart from district Ranga Reddy and PIN 500079. Corporate record RERA filing
The partnership deed identifies Bandaru Venkat Reddy and Resham Amarlingam as partners with equal 50% profit/loss shares. Resham Amarlingam is identified as the Form B declarant and authorized signatory.
The promoter’s Form B declaration dated 22-09-2021 undertakes completion by 25/02/2027. The project header separately records proposed completion as 25/06/2027; the supplied material does not identify an order revising the completion date. No construction progress report or independently verified site status is supplied. RERA record
10. Approvals, official records & documents
| Record | Scope / information established |
|---|---|
| TG-RERA registration certificate, P02400003758 | Registers DARSHAN CASTLE; issued 20/12/2021 and states validity to 25/02/2027. |
| GHMC Building Permit Order, 2/C3/03044/2021, File No. 2/C3/02802/2021 | Approved 25 February 2021 for a proposed residential building, Survey No. 100 PART; records 1 stilt + 5 upper floors. |
| Form B affidavit-cum-declaration | Promoter declaration by Resham Amarlingam dated 22-09-2021, including the stated title, encumbrance and completion undertakings. |
| Development Agreement cum GPA with possession, Document No. 700 of 2021 | Filed title-supporting document for the land-owner/developer arrangement; describes 476 sq. yards in Survey No. 100 (Part). |
| Gift Deed, Document No. 63/2021 | Filed title-chain document concerning the land described as 476 sq. yards in Survey No. 100 (Part). |
| Advocate’s title search report dated 24.09.2021 | Filed report covering Plot Nos. 29, 30 and 31 North Part, Survey No. 100 (Part), Bagh Hayathnagar Village. |
| Encumbrance statement 63391518 | Filed extract covering 01-01-1983 to 21-09-2021; the supplied record notes that a fresh current search is not included. |
| Floor-plan/layout document | Document 188140 is listed as a layout-plan submission, but the supplied document record is not extracted as a readable approval or drawing set; floor-plan measurements attributed to it are software-measured. Floor plans |
| Occupancy / completion certificate | Not present in the supplied project documents. Document index |
1. Project at a glance
Project identity
Registered name: DARSHAN CASTLE
Project type: Residential apartment project
Registered phase/portion: One proposed residential building; phase designation is not disclosed
TG-RERA registration: P02400003758; registration certificate issued 20/12/2021
Registration validity: Certificate states five years, from 20/12/2021 to 25/02/2027; no extension is recorded in the supplied certificate
Registered promoter: SRI SKYLINE CONSTRUCTIONS, a partnership
RERA project status: Listed as “New Project” in the RERA project record
Land and geographic identity
Locality / PIN: Ward No. 4, Balaji Nagar, Hayathnagar; PIN 501505
Revenue village: Balaji Nagar in the project identity record; the building-permit and title documents refer to Bagh Hayathnagar Village. Both names are retained as recorded; the supplied material does not reconcile them.
Mandal / district: Hayathnagar / Ranga Reddy
Survey number and subdivision: Survey No. 100 PART; title and supporting instruments also describe Survey No. 100 (Part).
Plots: Plot Nos. 29, 30 and 31 North Part
Site extent: Total area 397.52 sq. m; net area 397.52 sq. m; road-affected area recorded as 0
Boundaries: East: neighbours’ plots; west: 30 ft road; north: Plot No. 28; south: Plot No. 31 South Part
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permission: Building Permit Order 2/C3/03044/2021, File No. 2/C3/02802/2021, approved 25 February 2021
Approved built-up area: 1,328.67 sq. m in the project fields. The permit extraction separately records residential upper-floors area 1,107.20 m² and stilt parking area 197.58 m²; these are distinct filed figures.
Building count and floors: One proposed residential building: 1 stilt + 5 upper floors
Height: 15.00 m, as recorded in the permit parameters
Parking level / mortgage area: Stilt parking is recorded; 112.84 sq. m is recorded as the mortgage area, with the permit extraction identifying the handed-over area as the second floor, 112.84
Units: RERA filing records 10 proposed building units; the approved-plan record states that sanctioned unit numbers must not be increased without prior GHMC approval.
Offering and status
Configurations: 2BHK: 5 units; 3BHK: 5 units
RERA-filed saleable area: 2BHK: 126.12 sq. m; 3BHK: 144.92 sq. m
Booked / available: Portal-derived counts show 0 booked and 5 available in each configuration (10 available total). The portal record supplied has no as-of date, so these counts are indicative.
Construction stage: No construction-progress percentage or independently verified site stage is supplied. The RERA amenity schedule records 0% for its listed items; that is a filed progress figure, not an independent site inspection.
Completion dates: Form B declares completion by 25/02/2027; the project header lists proposed completion as 25/06/2027. The supplied record does not establish a revised completion order or reconcile these fields.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents; the building permit requires an occupancy certificate before occupation.
2. The project story
DARSHAN CASTLE is registered as a residential apartment project at Plot Nos. 29, 30 and 31 North Part, Survey No. 100 PART, in the Hayathnagar/Balaji Nagar location recorded for the project. Its filed scale is one proposed building with ten apartments: five 2BHK and five 3BHK units.
GHMC’s building-permit order describes a proposed building with one stilt level and five upper floors. The supplied material does not establish the current construction stage, completion of any floor or whether the building is occupied. The registration certificate remains valid through 25/02/2027; that is a registration-validity date, not proof of completion or occupancy.
3. Master plan, architecture & building design
The project record gives a site extent of 397.52 sq. m and approved built-up area of 1,328.67 sq. m. The building-permit extraction further records 1,107.20 m² for residential upper floors and 197.58 m² for stilt parking; the supplied information does not label these figures as carpet area or provide an FSI-counted-area figure.
The sanctioned building description is one residential block with 1 stilt + 5 upper floors, at a recorded height of 15.00 m. The supplied plan extraction does not provide a reliable floor-by-floor unit schedule, lift or stair details, internal circulation plan, or a measured building footprint. The RERA filing lists two apartment configurations and ten units in total.
The permit extraction records a tot-lot area of 0 m² and includes conditions requiring periphery greenery and tree planting, a fenced tot-lot to be maintained as greenery, rainwater harvesting and a transformer space. These are permit conditions; the supplied record does not establish their completed or independently inspected status.
4. Homes, configurations & floor plans
The RERA filing lists five 2BHK and five 3BHK units, with saleable areas of 126.12 sq. m and 144.92 sq. m respectively. The counts shown as booked and available are portal-derived and lack an as-of date.
Software measurements from the supplied floor-plan drawing are not RERA-filed carpet-area disclosures and require review against the drawing. The drawing measurement source notes that RERA saleable area includes the home’s share of common areas and is not interchangeable with carpet area.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 126.12 sq. m | 65.7–67.8 sq. m; median 66.8 sq. m (software-measured) | 47% (software-derived) |
| 3BHK | 5 | 0 | 5 | 144.92 sq. m | 86.6 sq. m (software-measured) | 40% (software-derived) |
The measured drawing examples show a hall, kitchen, bedrooms and toilets in each configuration; utilities are separately identified in the drawing measurement. For the measured 2BHK example, two utility areas are marked as excluded from the measured carpet area; the measured 3BHK example shows one utility area excluded. These measurements are drawing-based, not RERA-filed room-area commitments.
5. Parking & vehicle circulation
The GHMC permit identifies stilt parking with an area of 197.58 m² and requires approved cellar/stilt parking space to be used exclusively for vehicle parking. The supplied record does not state a sanctioned number of car or two-wheeler spaces, visitor or accessible spaces, or unit-specific parking allocations. A parking area in a sanctioned plan does not by itself establish exclusive ownership or allocation to a particular apartment.
No details are supplied for parking ramps, internal driveways, pedestrian separation, mechanical parking or EV charging.
6. Amenities, recreation & open spaces
The RERA amenity schedule includes the following items. Its recorded 0% figures are filed progress entries and do not establish independent inspection or delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No size or quantity stated | RERA amenity schedule | 0% recorded; independent status not supplied |
| Water Supply | No source, capacity or size stated | RERA amenity schedule | 0% recorded; independent status not supplied |
| Sewerage (Chamber, Lines, Septic Tank, STP) | No capacity stated | RERA amenity schedule | 0% recorded; independent status not supplied |
| Storm Water Drains | No size stated | RERA amenity schedule | 0% recorded; independent status not supplied |
| Green Strip / Tot Lot / Park | No area stated in the amenity schedule; permit records tot-lot area of 0 m² | RERA amenity schedule; GHMC permit | 0% recorded; permit includes greenery/tot-lot conditions; completion not verified |
| Street Lighting | No details stated | RERA amenity schedule | 0% recorded; independent status not supplied |
| Community Buildings | No size or facility details stated | RERA amenity schedule | 0% recorded; independent status not supplied |
| Treatment and Disposal of Sewage and Sullage Water | No capacity or treatment details stated | RERA amenity schedule | 0% recorded; independent status not supplied |
| Solid Waste Management and Disposal | No details stated | RERA amenity schedule | 0% recorded; independent status not supplied |
| Water Conservation / Rainwater Harvesting | RERA schedule marks “YES”; permit extraction lists 3 No. of RWHPs and requires rainwater harvesting structure(s) | RERA amenity schedule; GHMC permit | 0% recorded in schedule; no independent completion verification |
| Energy management | No details stated | RERA amenity schedule | 0% recorded; independent status not supplied |
| Fire Protection and Fire Safety Requirements | No system details stated | RERA amenity schedule | 0% recorded; independent status not supplied |
| Electrical Meter Room / Sub-Station / Receiving Station | Permit records space for a transformer; no capacity stated | RERA amenity schedule; GHMC permit | 0% recorded in schedule; completion not verified |
| Aggregate recreational open space | No area stated | RERA amenity schedule | 0% recorded; independent status not supplied |
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drainage, sewage and sullage treatment, solid-waste management, energy management, fire safety and an electrical meter room/sub-station/receiving station, but supplies no system capacities or detailed design specifications. Its listed progress entries are 0%; no independent completion status is available.
The GHMC permit requires rainwater harvesting, transformer space and a garbage house, and refers to execution of sanitation, plumbing, fire-safety, lift and electrical services under qualified technical supervision. It also requires fire-fighting installations and an occupancy fire NOC before issue of an occupancy certificate. These are conditions in the permit, not evidence that the systems or clearances have been completed.
No project-specific water-storage or treatment capacities, STP capacity, backup-power capacity, lift count or capacity, CCTV/access-control system, waste-segregation arrangements or accessibility layout are documented in the supplied RERA project records.
8. Location, access & connectivity
The project is registered at Ward No. 4, Balaji Nagar, Hayathnagar mandal, Ranga Reddy district, PIN 501505. The building permit identifies the locality as Balaji Nagar (Hayath Nagar), and the title report refers to Bagh Hayathnagar Village.
The supplied location data lists the nearest sampled Outer Ring Road interchange at approximately 3.5 km. No approach-road route, public-transport service, other landmark distance or project-specific travel time is documented in the supplied records.
9. Developer & development status
The registered promoter is SRI SKYLINE CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AEIFS4232E1Z5. The RERA project record lists Doctors Colony, Balaji Nagar, Ward No. 4, Hayathnagar, Ranga Reddy, PIN 501505 as the promoter address; the registration certificate’s promoter-office field is incomplete apart from district Ranga Reddy and PIN 500079.
The partnership deed identifies Bandaru Venkat Reddy and Resham Amarlingam as partners with equal 50% profit/loss shares. Resham Amarlingam is identified as the Form B declarant and authorized signatory.
The promoter’s Form B declaration dated 22-09-2021 undertakes completion by 25/02/2027. The project header separately records proposed completion as 25/06/2027; the supplied material does not identify an order revising the completion date. No construction progress report or independently verified site status is supplied.
10. Approvals, official records & documents
TG-RERA registration certificate, P02400003758: Registers DARSHAN CASTLE; issued 20/12/2021 and states validity to 25/02/2027.
GHMC Building Permit Order, 2/C3/03044/2021, File No. 2/C3/02802/2021: Approved 25 February 2021 for a proposed residential building, Survey No. 100 PART; records 1 stilt + 5 upper floors.
Form B affidavit-cum-declaration: Promoter declaration by Resham Amarlingam dated 22-09-2021, including the stated title, encumbrance and completion undertakings.
Development Agreement cum GPA with possession, Document No. 700 of 2021: Filed title-supporting document for the land-owner/developer arrangement; describes 476 sq. yards in Survey No. 100 (Part).
Gift Deed, Document No. 63/2021: Filed title-chain document concerning the land described as 476 sq. yards in Survey No. 100 (Part).
Advocate’s title search report dated 24.09.2021: Filed report covering Plot Nos. 29, 30 and 31 North Part, Survey No. 100 (Part), Bagh Hayathnagar Village.
Encumbrance statement 63391518: Filed extract covering 01-01-1983 to 21-09-2021; the supplied record notes that a fresh current search is not included.
Floor-plan/layout document: Document 188140 is listed as a layout-plan submission, but the supplied document record is not extracted as a readable approval or drawing set; floor-plan measurements attributed to it are software-measured.
Occupancy / completion certificate: Not present in the supplied project documents.
Frequently asked questions
Is DARSHAN CASTLE registered with Telangana RERA?
Yes. DARSHAN CASTLE is registered with the Telangana Real Estate Regulatory Authority as P02400003758; the registration status is New Project.
Who is the developer of DARSHAN CASTLE?
The promoter named in the RERA registration is SRI SKYLINE CONSTRUCTIONS.
Where is DARSHAN CASTLE located?
DARSHAN CASTLE is in WARD NO 4, Balaji Nagar, Hayathnagar, Rangareddy, Telangana (501505).
When will DARSHAN CASTLE be completed?
The promoter's proposed date of completion filed with RERA is 25/06/2027. This is the promoter's declaration, not a guarantee.
More projects in Hayathnagar