Sign in

Balaji Infra Projects

BALAJI INFRA PROJECTS · Jayashankar Bhupalpally · RERA P00500008172

BALAJI INFRA PROJECTS is a plotted development with open plots at Kompally / Kompalle, Bhupalpally mandal, Jayashankar / Jayashankar-Bhupalpally district. The registered promoter developing it is BALAJI INFRA PROJECTS, a partnership. The layout covers 11 Acer 1.88 Gts; 53469 Sq. Yds and has 163 plots, with plot sizes of 124.18–250.6 sq.m (148.5–299.7 sq.yd); no towers or floors are recorded. Its TG-RERA registration is P00500008172, and the proposed completion date is 17 January 2025.

More from Balaji Infra Projects · 2 projects →

01What we found

Period endedTG-RERA registration ran to 17 Jan 2025 - check its extension on TG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameBALAJI INFRA PROJECTS RERA record
Development typePlotted development / layout with open plots RERA record RERA filing
Phase or registered portionNo separate phase identified in the supplied RERA record; registered scope is the plotted layout RERA record
TG-RERA registrationP00500008172 Approvals record
Registration validity5 May 2024 to 17 January 2025. This is the registration-validity period shown in the supplied record, not a statement of completion or occupancy certification. Approvals record
Registered promoterBALAJI INFRA PROJECTS, a partnership RERA record Corporate record RERA filing
RERA statusThe supplied record identifies the project as “New Project”; the registration certificate is on file. Current registration status beyond the stated validity dates is not established by the supplied evidence. RERA record

Land and geographic identity

ItemRecord
LocalityKompally / Kompalle, as stated in the RERA and filed layout records RERA record Land records
Revenue village(s)Bhupalpally Revenue Village and Kompalli Village are both named in the filed layout approval record; the RERA certificate identifies Bhupalpally.
MandalBhupalpally RERA record Land records
DistrictJayashankar / Jayashankar-Bhupalpally RERA record
PIN500014 in the RERA project record RERA record
Project survey numbers149 and 155, as stated in the RERA certificate; filed layout records specify 149/1, 155/, and 155/2. The tentative-layout record also lists 149, 155 to, 149/1, 155/, 155/2.
Registered site extent11 Acer 1.88 Gts; 53469 Sq. Yds in the tentative-layout approval record.
Area figures in the layout record44705.47 sq.m total layout area; 44099.60 sq.m net layout area.
RERA-filed land figuresTotal area 44707 sq.m; road widening/FTL/Nala affected area 12767 sq.m; net area 31940.00 sq.m. Land records RERA filing
BoundariesEast: SY NO 149 PART 30 FET WIDE ROAD; West: SY NO 155; North: LAND OF OTHERS; South: SY NO149 PART SY NO 154. RERA filing

Development identity

ItemRecord
Sanctioning authorityBhupalpally Municipality / Municipal Corporation, as named in the filed layout records; the project record also identifies DTCP as the authority. Approvals record
Principal layout approvalTentative Layout Plan approval 0012/LO/DTCP/3001/2023, dated 17 January 2023. Approvals record
Layout application / permit referencesApplication 011615/LO/DTCP/3001/0012/2022; the other filed layout record lists permit TS/068889/2022, dated 07-11-2022.
Approved development form and scaleLayout with open plots; 163 plots. Proposed coverage, proposed built-up area (excluding or including parking), and proposed parking are each recorded as 0.00 / 0 in the filed layout details.
Building / floor configurationNo building, tower, floor, or parking-level configuration is recorded for this plotted-layout approval.
Plot-area distributionThe drawing-derived layout record identifies 163 plots; its plot schedule is software-read. Layout record

Offering and status

ItemRecord
Unit typePlots RERA record
Plot sizesSoftware-read from the layout drawing: 124.18–250.6 sq.m (148.5–299.7 sq.yd); median 153.19 sq.m (183.2 sq.yd). Verify against the drawing. Layout record
Booked / available countsNot established in the supplied evidence. RERA record
Promoter-declared completion date17 January 2025, in Form B.
Construction / development stageThe RERA record reports 70% completeness; this is a filed status and is not independent site verification. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. For a plotted layout, the evidence does not establish an OC or completion-certificate status for the layout. Document index

2. The project story

BALAJI INFRA PROJECTS is registered with TG-RERA as a plotted-development project at Kompally/Kompalle, in the Bhupalpally area of Jayashankar district. The RERA record identifies Survey Nos. 149 and 155; the filed layout records further refer to 149/1, 155/, and 155/2. Both Bhupalpally Revenue Village and Kompalli Village appear in the layout-approval material. RERA record Land records

The filed plan describes a 163-plot layout, with internal roads, park/open space, social-infrastructure land and utility land. Its layout figures record 26246.00 sq.m of plotted area, 12316.37 sq.m of roads, 3983.64 sq.m of organized open space/park, 1103.96 sq.m of social infrastructure and 449.63 sq.m of utility area. The proposed built-up area and proposed parking are recorded as zero, consistent with a plotted-layout submission rather than a building plan.

The promoter’s Form B undertakes completion by 17 January 2025; the RERA record gives the same proposed completion date and reports 70% completeness. These are filing-based statements, not independently verified completion. The supplied material does not establish the current construction status, whether the layout development works are complete, or whether a completion/occupancy certificate has been issued. RERA record Document index

3. Master plan, architecture & building design

This is a plotted layout, not a recorded apartment or tower scheme. The filed layout approval records 44705.47 sq.m total area and 44099.60 sq.m net layout area. It records 163 plots, with 0.00 proposed built-up area and 0 proposed parking. No building footprints, building heights, floor levels, apartment plans, lifts, stairs or tower arrangement are evidenced in the supplied project material.

The filed layout’s land-use schedule is:

Layout useAreaShare
Plotted area26246.00 sq.m59.52
Road area12316.37 sq.m27.93
Organized open space/park3983.64 sq.m9.03
Social infrastructure1103.96 sq.m2.50
Utility area449.63 sq.m1.02
Amenity area0.00 sq.m0.00
Common parking area0.00 sq.m0.00

The drawing-derived record identifies plot sizes from 124.18 sq.m to 250.6 sq.m, with a median of 153.19 sq.m. It identifies 129 plots in the 150–200 sq.yd band, 23 in the 200–250 sq.yd band, 9 in the 250–300 sq.yd band and 2 in the 100–150 sq.yd band. These are software-measured/read values from the layout drawing, not unit-area declarations in the RERA registration record; verify them against the drawing. Layout record

4. Homes, configurations & floor plans

The RERA-filed development is a plotted layout; no apartment configuration or carpet-area schedule is supplied. The layout drawing record reports 163 plots, with the following software-read size bands:

Plot size bandPlot count
100–150 sq.yd2
150–200 sq.yd129
200–250 sq.yd23
250–300 sq.yd9

Layout record

The drawing-derived size range is 124.18–250.6 sq.m (148.5–299.7 sq.yd), with a median of 153.19 sq.m (183.2 sq.yd). The layout record states that the plotted-area total matches the drawing’s area statement, but the plot count and individual sizes are software-read and should be checked against the approved drawing. Apartment carpet-area, balcony, loading and saleable-area comparisons do not apply to the supplied plotted-layout evidence. Layout record

5. Parking & vehicle circulation

The filed layout details record 0 proposed parking spaces and 0.00 sq.m common parking area. No separate resident/visitor parking count, accessible parking provision, parking allocation, mechanical parking or EV charging is evidenced. The layout includes internal roads; the filed records identify roads of 9.14M and 18.29M widths in the layout details, and a 14M WIDE ROAD in the tentative-layout approval material. No ramp or vehicle-entry/exit arrangement is established in the supplied data.

6. Amenities, recreation & open spaces

The layout approval describes proposed layout infrastructure and records development-progress percentages for selected items in the RERA amenities data. Those percentages are filed status indicators; the supplied evidence does not independently verify completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organized open space3983.64 sq.m; layout record also states 9.03%RERA amenitiesGreen strip/TOT LOT/Park: 75% declared; independently verified status not supplied. RERA amenities
Social infrastructure1103.96 sq.m reserved areaNo separate completion status supplied.
Internal roads and footpathsLayout roads; road widths include 9.14M and 18.29M in the filed layout detailsRERA amenities90% declared; independently verified status not supplied. RERA amenities
Street lightingNo quantity or capacity suppliedRERA amenities25% declared; independently verified status not supplied. RERA amenities
Tot-lotNo size or equipment details suppliedA tot-lot is listed in layout details; no separate verified completion status.
Community buildingsNo area or building details suppliedRERA amenities0% recorded. RERA amenities

7. Utilities, building services & safety

The layout approval describes proposed infrastructure including internal water-supply pipelines, an overhead tank, an assured water-supply source, storm-water drains, underground drainage, a common septic tank/STP, electrical supply lines, street lights, a transformer, solid-waste-management provision and rainwater-harvesting pits. These are approval-document descriptions of required/proposed layout works; they do not establish that the works are complete or operational.

Water
What the supplied record describesInternal pipelines, overhead tank, water reservoir and an “assured water supply source”; no source, storage capacity or treatment capacity is stated.
Status evidenceWater Supply is recorded at 0% in the amenities data. RERA amenities
Sewerage and drainage
What the supplied record describesUnderground drainage, common septic tank/STP and storm-water drains are described. No capacity or reuse details are supplied.
Status evidenceSewerage: 90%; treatment/disposal of sewage and sullage: 85%; storm-water drains: 90% declared. RERA amenities
Electrical
What the supplied record describesElectrical supply lines, street lighting and transformer are described; no supply capacity or backup system is stated.
Status evidenceElectrical meter room/sub-station/receiving station: 0% recorded. RERA amenities
Rainwater harvesting
What the supplied record describesRainwater-harvesting pits are described.
Status evidenceWater conservation/rainwater harvesting: 50% declared. RERA amenities
Waste
What the supplied record describesSolid-waste-management provision is described in the layout approval.
Status evidenceSolid-waste management and disposal: 0% recorded. RERA amenities
Fire, security and accessibility
What the supplied record describesNo project-specific fire-system, CCTV/security, access-control or accessible-circulation details are supplied.
Status evidenceNot established in the supplied evidence. RERA amenities

8. Location, access & connectivity

The registered location is Bhupalpally, Bhupalpally mandal, Jayashankar district, PIN 500014, with Kompally/Kompalle named as the locality in the RERA and layout material. The records name Bhupalpally Revenue Village and Kompalli Village; the RERA certificate identifies Survey Nos. 149 and 155, while the layout records specify 149/1, 155/, and 155/2. RERA record

The filed layout details list internal roads, including 9.14M and 18.29M roads; the tentative-layout approval record also specifies a 14M WIDE ROAD. The supplied location data lists the nearest sampled Outer Ring Road interchange at approximately 167.0 km. No public-transport details or other project-specific landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is BALAJI INFRA PROJECTS, identified in the project record as a partnership, with GSTIN 36AAZFB1915A1ZL. The supplied corporate record does not establish a separate company registration identifier or a project-specific promoter contact or website. The project record names MADHUKAR BOMMA as authorized signatory and lists GANDRA HAREESH, SRINIVASA RAO NUKALA, JOSE NEDUMTHUNDAM, and RAVINDER KANKANALA as partners. Corporate record Parties record RERA filing

The promoter’s Form B, signed by KANKANALA RAVINDER and dated 29 February 2024 (as extracted), undertakes completion by 17 January 2025. The project header records 70% completeness, but no independent site inspection or current progress evidence is supplied. The TG-RERA registration certificate states its validity as 5 May 2024 to 17 January 2025; the supplied material does not establish a subsequent extension, current registration status or completion/occupancy certification. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationCertificate for BALAJI INFRA PROJECTS, registration P00500008172, with validity dates 5 May 2024 to 17 January 2025.
Tentative layout approval0012/LO/DTCP/3001/2023, dated 17 January 2023, for a 163-plot layout; the filed approval record names Bhupalpally Municipality / Municipal Corporation.
Layout permit / plan detailsPermit TS/068889/2022, dated 07-11-2022, with layout details filed under the RERA project.
Commencement / building-plan recordThe filed response says a tentative layout plan had been provided and that the original sanctioned plan had not yet been received, with receipt anticipated after obtaining the RERA number.
Project declarationForm B affidavit-cum-declaration by KANKANALA RAVINDER, including the promoter’s completion undertaking and other prescribed declarations.
Layout drawing and land-use scheduleFiled layout details show plot, road, open-space, social-infrastructure and utility areas; no proposed building area or parking is recorded.
Completion / occupancy certificateNo such certificate is included in the supplied documents. Document index

Frequently asked questions

Is BALAJI INFRA PROJECTS registered with Telangana RERA?

Yes. BALAJI INFRA PROJECTS is registered with the Telangana Real Estate Regulatory Authority as P00500008172; the registration status is New Project.

Who is the developer of BALAJI INFRA PROJECTS?

The promoter named in the RERA registration is BALAJI INFRA PROJECTS.

Where is BALAJI INFRA PROJECTS located?

BALAJI INFRA PROJECTS is in KOMPALLY, Bhupalpally, Jayashankar Bhupalpally, Telangana (500014).

When will BALAJI INFRA PROJECTS be completed?

The promoter's proposed date of completion filed with RERA is 17/01/2025. This is the promoter's declaration, not a guarantee.

More projects in Bhupalpally