Sign in

Aura Homes

SAANVI INFRA PROPERTIES · Rangareddy · RERA P02400006410

AURA HOMES is a residential apartment project in Marva Township-B, Narsingi Village, Gandipet Mandal, Ranga Reddy District. Registered promoter Saanvi Infra Properties is developing the project on a 384.55 sq. m. site, with one residential building comprising 1 stilt + 5 upper floors and 10 apartments: five 2BHK and five 3BHK. Its TG-RERA registration number is P02400006410, and the promoter-declared completion date is 1 April 2026.

More from Saanvi Infra Properties · 21 projects →

01What we found

Period endedTG-RERA registration ran to 1 Apr 2026 - check its extension on TG-RERA
13documents on file - each fact links to its page
6court cases on this project's land (survey 300, 303, Narsingi)
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameAURA HOMES RERA record
Project typeResidential apartment project RERA record
Phase / registered portionThe record identifies the western portion of Plot Nos. 32/P and 33 in Marva Township-B; no separate phase name is disclosed.
TG-RERA registrationP02400006410
Registration validity7 July 2023 to 1 April 2026, unless extended by the Authority. The certificate states a two-year validity.
Registered promoterSaanvi Infra Properties
RERA statusThe certificate records the registration dates above; a current registration-status verification is not supplied.

Land and geographic identity

FieldProject record
LocalityMarva Township-B, Narsingi Village
Revenue villageNarsingi (also written “Narsinghi” in the plan record)
Mandal / district / PINGandipet / Ranga Reddy / 500075
Project survey numbers300, 301, 302, 303, 306, 307, 308, 309, 310, 311, 313, 314 and 315
Site extent384.55 sq. m.; the plan labels both plot area and net plot area as 384.55 sq. m.
Plot identificationWestern portion of Plot Nos. 32/P and 33; the building-permit record also identifies old Plot Nos. 494/P and 493.
BoundariesEast: Plot Nos. 32/P and 33; west: Plot Nos. 32 part, 33 and 34; north: Plot Nos. 28 and 29/P; south: 40-foot-wide road. RERA filing

Development identity

FieldProject record
Sanctioning authorityHMDA building permission recorded in a Building Permit Order issued through Narsingi Municipality / Municipal Corporation.
Principal building-permit reference010748/BP/HMDA/2211/SKP/2022, approved 1 April 2023; proceedings 002594/BP/HMDA/SKP/2023.
Approved building-plan referenceTS/065049/2022; the plan records 17 October 2022.
Approved built-up area1,366.86 sq. m. including parking; the plan separately states 1,142.66 sq. m. excluding parking and 1,121.15 sq. m. net residential BUA.
Building / floorsOne residential building, labelled “A (RESIDENTIAL)”: 1 stilt + 5 upper floors, stated building height 15.00 m.
ParkingStilt is designated for vehicle parking. The plan records “PROPOSED NUMBER OF PARKINGS 0” and separately shows 224.20 sq. m. parking area; a sanctioned bay count is not established by the supplied record.
Unit count10 units in the plan and RERA unit schedule.

Offering and status

FieldProject record
RERA-filed configurations5 × 2BHK and 5 × 3BHK RERA unit table
RERA saleable areas2BHK: 119.84 sq. m.; 3BHK: 148.64 sq. m. RERA unit table
Booked / availablePortal-derived counts show 0 booked and 5 available in each configuration (10 available total). The source gives no as-of date; treat these as indicative. RERA unit table
Promoter-declared completion date1 April 2026, stated in the Form B declaration.
Occupancy certificateForm 1A records HMDA OC 004756/OC/HMDA/SKP/2024, dated 18 March 2024, and certifies overall project completion.
Construction stageThe architect’s Form 1A describes the registered project as completed in all aspects; this is a filed certification, not an independent site inspection.

2. The project story

AURA HOMES is recorded with TG-RERA as a residential apartment project on a 384.55 sq. m. site in Marva Township-B, Narsingi Village, Gandipet Mandal, Ranga Reddy District. The registered land identity lists survey numbers 300–303, 306–311 and 313–315, and the site is identified in the plan records as the western portion of Plot Nos. 32/P and 33.

The approved scheme is a single residential building with a stilt and five upper floors, containing ten apartments: five 2BHK and five 3BHK. The RERA-filed unit schedule reports all ten as available and none booked, but the portal-derived count has no stated “as of” date.

The project’s architect Form 1A, dated 5 April 2024, certifies overall completion and cites an HMDA occupancy certificate dated 18 March 2024. This is the project-level completion certification in the supplied record; no separate tower-wise or phase-wise OC scope is provided.

3. Master plan, architecture & building design

The plan records a single residential block, A (RESIDENTIAL), configured as 1 stilt + 5 upper floors with a stated height of 15.00 m. The site area and net site area are each 384.55 sq. m. The plan gives proposed coverage of 224.23 sq. m. (58.31%), vacant plot area of 160.32 sq. m., net residential BUA of 1,121.15 sq. m., total proposed built-up area excluding parking of 1,142.66 sq. m., and total proposed built-up area including parking of 1,366.86 sq. m. These are distinct plan labels and should not be treated as apartment carpet or saleable area.

The building-permit order records 10% of built-up area as required mortgage area (112.12 sq. m.) and 117.61 sq. m. provided; the plan also identifies 117.61 sq. m. as built-up area to mortgage.

The plan identifies a stilt floor for parking and lists a lift and stair. It does not provide a reliable count of parking bays, flats per floor, lifts, stairs, entries/exits, or accessible routes. The supplied plan record identifies 12.00 m main-road and 40-foot-wide road references; internal-road or landscape design detail is not established here.

4. Homes, configurations & floor plans

The RERA unit schedule reports five units of each configuration and supplies the saleable areas below. Carpet-area figures are software measurements from the filed drawing geometry, not RERA disclosures; the source notes that drawing measurements need review. The stated loading figures are likewise drawing-derived. Saleable area and measured carpet area are different measures; saleable area may include the home’s share of common areas. [units; floor_plans; doc:315742 p1]

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505119.84 sq. m.74.8 sq. m. / 805 sq. ft. (software-measured)38% (drawing-derived)
3BHK505148.64 sq. m.86.1 sq. m. / 926 sq. ft. (software-measured)42% (drawing-derived)

The measured 2BHK drawing shows a hall, kitchen, two bedrooms, three toilets and a wash area. The measured 3BHK drawing shows a hall, kitchen, three bedrooms, three toilets and a wash area. Room dimensions are drawing-derived and should be checked against the plan before reliance: the listed bedroom dimensions include 3.13 × 4.6 m, 4.54 × 2.92 m, and, for the 3BHK, 3.31 × 4.21 m; the hall is listed as 5.74 × 3.9 m and the kitchen as 2.06 × 2.99 m. [unit_details; doc:315742]

5. Parking & vehicle circulation

The sanctioned building-permit record designates the stilt exclusively for vehicle parking and prohibits construction or parking in setback areas. The plan lists 224.20 sq. m. as parking area but also records proposed parking count as 0; therefore, the supplied records do not establish a reliable sanctioned number of bays or a spaces-per-home figure.

No resident-versus-visitor allocation, accessible parking count, mechanical or basement parking, ramp arrangement, EV charging provision, or unit-specific parking allotment is established by the supplied evidence. The vendor listing mentions car parking, but does not specify a count or legal allocation. Promoter website

6. Amenities, recreation & open spaces

The following table separates plan-listed facilities, RERA-filed infrastructure disclosures, and vendor claims. A “YES” or 100% in the RERA amenities record is a filed declaration, not independent verification of current operation. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Lift and stairListed on the building plan; quantities and specifications not suppliedPlan-listed; operational status not independently verified
Internal roads and footpathsNo size or detail suppliedRERA amenitiesRERA amenities record: 0%
Green strip / tot lot / parkNo size or detail suppliedRERA amenitiesRERA amenities record: 0%
Aggregate recreational open spaceNo area suppliedRERA amenitiesRERA amenities record: 0%
Community buildingsNo facility or size specifiedRERA amenitiesRERA amenities record: 0%
Solar fencingNo size or specification suppliedPromoter websiteVendor-listed; not established as delivered
24-hour security camerasNo quantity or coverage detail suppliedPromoter websiteVendor-listed; not independently verified
Intercom facilityNo specification suppliedPromoter websiteVendor-listed; not independently verified

The supplied evidence does not identify a clubhouse or separate indoor or sports facilities. [amenities; vendor]

7. Utilities, building services & safety

The building-permit order lists a separate underground static water-storage tank with 25,000-litre capacity and a separate terrace tank with 25,000-litre capacity. The plan also lists a sump and overhead water tank. The RERA amenities record marks water supply as available at 100%, but does not state the water source or independently verify operation.

For sewerage, the permit requires an STP and lists underground drainage; the plan conditions also refer to a sump and septic tank. The RERA amenities record marks sewerage and treatment/disposal of sewage and sullage water as available at 100%. No STP capacity, treated-water reuse quantity, storm-water-drain status or rainwater-harvesting capacity is provided.

The permit lists a transformer, generator and rainwater-harvesting structures. The plan lists a transformer and rainwater harvesting; the vendor also lists a power-backup generator. Generator capacity, backup coverage, transformer rating and EV charging provision are not supplied.

Fire safety is addressed in the plan conditions, including responsibility for fire-safety and structural-stability requirements and a sprinkler condition where basement area exceeds 200 sq. m. The supplied records do not establish a fire-clearance certificate or independently verify installed systems. Details of escape stairs, fire access, alarms, extinguishers and accessibility provisions are not established.

8. Location, access & connectivity

The registered location is Narsingi Village, Gandipet Mandal, Ranga Reddy District, PIN 500075; the plan identifies the locality as Marva Township-B. [header; doc:315743 p1; doc:REGCERT-46652]

The plan references a 12.00 m-wide main road and a 40-foot-wide road; the building-permit order also states a minimum approach-road width of 4.5 m and requires the indicated approach road to be developed and maintained as a black-topped road before release of occupancy. These are plan/permit records, not a current road-condition inspection.

The supplied location record gives the Financial District (Nanakramguda) as 3.5 km from the cadastral parcel centroid. The vendor describes the project as near major IT hubs but gives no measured distance or travel time. No public-transport, route or travel-time data is supplied. [location; vendor]

9. Developer & development status

The registered legal promoter is Saanvi Infra Properties, identified in the project records as a partnership. The project documents identify Saddikuti Madhu as managing partner/authorized signatory; the partnership deed records Saddikuti Madhu and Saddikuti Madhavi as partners. The RERA certificate lists the promoter office as Puppalguda, Gandipet Mandal, Ranga Reddy District, PIN 500089. The project site PIN in the certificate is 500075. [header; corporate; doc:315734; doc:315736; doc:REGCERT-46652]

The Form B affidavit dated 9 April 2023 declares the project completion date as 1 April 2026 and states that the land is free from encumbrances. Those are promoter declarations. The architect’s Form 1A separately certifies overall project completion and records the HMDA OC dated 18 March 2024.

10. Approvals, official records & documents

TG-RERA registration certificate
Reference / dateP02400006410, issued 7 July 2023
What it recordsRegistration of AURA HOMES; validity stated through 1 April 2026 unless extended.
Building Permit Order
Reference / date010748/BP/HMDA/2211/SKP/2022, approved 1 April 2023; proceedings 002594/BP/HMDA/SKP/2023
What it recordsHMDA building permission for a residential building of 1 stilt + 5 upper floors.
Approved-plan record
Reference / dateTS/065049/2022, dated 17 October 2022
What it recordsPlan for the residential building, 10 units, site and area figures, and plan conditions.
Occupancy certificate, as recorded in architect’s certificate
Reference / date004756/OC/HMDA/SKP/2024, dated 18 March 2024
What it recordsForm 1A records the OC and certifies overall completion of the registered project.
Form B affidavit
Reference / dateDated 9 April 2023
What it recordsPromoter declarations on title, encumbrances, separate account and completion undertaking.
Project completion certificate from architect
Reference / dateForm 1A, dated 5 April 2024
What it recordsArchitect’s overall-completion certification for AURA HOMES.

The supplied approval records identify HMDA as the building-permission authority. Full sanction conditions and their application are addressed separately in the Approvals review.

Frequently asked questions

Is AURA HOMES registered with Telangana RERA?

Yes. AURA HOMES is registered with the Telangana Real Estate Regulatory Authority as P02400006410; the registration status is New Project.

Who is the developer of AURA HOMES?

The promoter named in the RERA registration is SAANVI INFRA PROPERTIES.

Where is AURA HOMES located?

AURA HOMES is in Narsingi Village, Narsingi, Gandipet, Rangareddy, Telangana (500075).

When will AURA HOMES be completed?

The promoter's proposed date of completion filed with RERA is 01/04/2026. This is the promoter's declaration, not a guarantee.

More projects in Narsingi