ASBL Lakeside

Ashoka Builders India Private Limited · Rangareddy · RERA P02400000612

ASBL Lakeside is a residential apartment project in Gachibowli, Serilingampally mandal, Ranga Reddy district, developed by registered promoter Ashoka Builders India Private Limited. The RERA land record gives a total area of 23,874.24 sq. m, an affected area of 6,438.41 sq. m and a net area of 17,435.83 sq. m; the HMDA technical approval lists ABULDAM and Towers A, B and C, with configurations of 1Ground + 3, 2Cellar + 1Ground + 9, 1Ground + 9 and 1Ground + 9, respectively. The TG-RERA filing records 367 apartments: 227 2BHK and 140 3BHK, with saleable areas of 124.03 sq. m and 183.91 sq. m, respectively. Its TG-RERA registration is P02400000612, and the proposed and revised proposed completion date is 31/03/2022.

More from Ashoka Builders India Pvt Ltd · 6 projects →

01What we found

Period endedTG-RERA registration ran to 30 Jun 2021 - check its extension on TG-RERA
15documents on file - each fact links to its page
1court case on this project's land (survey 449, Gachibowli)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in
Gachibowli, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameASBL Lakeside RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase-wise registration scope is not identified in the supplied record. RERA record
TG-RERA registrationP02400000612, granted 12/04/2019; registration certificate states validity through 30/06/2021. RERA record
Registered promoterAshoka Builders India Private Limited RERA record Corporate record
RERA statusListed as On-Going Project in the project record. The supplied registration certificate gives the validity dates above; no extension is recorded in the supplied certificate. RERA record

Land and geographic identity

ItemProject record
LocalityGachibowli RERA record RERA filing
Revenue villageRERA project record: Gachibowli. The HMDA technical approval and title report identify the site as Puppalaguda Village. RERA record
MandalRERA registration certificate: Serilingampally; HMDA technical approval: Gandipet Mandal (Rajendranagar Old).
DistrictRanga Reddy (also written “Rangareddy District” in the HMDA approval) RERA record
PIN500089 RERA record RERA filing
Survey / subdivisionSy No. 449/P RERA record Land records
Site areaRERA land details: total 23,874.24 sq. m, affected area 6,438.41 sq. m, net area 17,435.83 sq. m. HMDA technical approval records an extent of 17,435.83 Sq. Mt. Land records
Boundaries in RERA recordEast: Existing Road; West: Proposed 30 Mtrs Road and Lake Buffer; North: Existing Road; South: Neighbour Land Sy No 449 RERA filing
Road-affected land recorded by HMDA4545.98 Sq.mts for a proposed 30 mts wide master plan road and 1418.22 Sq.mts of 12 Mts wide road-affected area; the approval states these were handed over under Document No. 3013/2018, dated 29-3-2018.

Development identity

ItemProject record
Sanctioning / technical approval authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal approvalTechnical Approval No. 006785/SKP/R1/U6/HMDA/04012018, dated 31/05/2018. The letter says building plans are to be sanctioned by the Executive Authority in conformity with the technically approved plans. Approvals record
Approved built-up areaHMDA technical approval records total built-up area 53712.16 Sq.mts.
Buildings in HMDA technical approvalFour named building entries: ABULDAM, Tower A, Tower B and Tower C. The RERA land details list 3 total/proposed building units; the supplied record does not explain that count’s relationship to the four HMDA entries. RERA filing
Floor configuration in technical approvalABULDAM: 1Ground + 3; Tower A: 2Cellar + 1Ground + 9; Tower B: 1Ground + 9; Tower C: 1Ground + 9.
Heights recordedABULDAM: 14.9; Towers A, B and C: 30 each. The supplied extraction does not state a unit for these height figures.
Parking levelsThe approval specifies that cellar(s) are exclusively for vehicle parking and are not to be partitioned or converted; Tower A is listed with 2 cellars. A total parking-space count is not provided.
RERA unit count367 apartments across three recorded building units: 227 2BHK and 140 3BHK. RERA unit table RERA unit table

Offering and status

ItemProject record
Unit types2BHK and 3BHK apartments RERA unit table RERA unit table
RERA-filed saleable area2BHK: 124.03 sq. m; 3BHK: 183.91 sq. m RERA unit table RERA unit table
Booked / available2BHK: 120 booked / 107 available; 3BHK: 73 booked / 67 available. Counts were read from the TG-RERA portal; no as-of date is supplied, so they are indicative. RERA unit table RERA unit table
Construction stageThe project is recorded as on-going. No independently verified current construction-stage report is supplied. RERA record
Completion datesThe project record gives proposed and revised proposed completion as 31/03/2022; the Form B declaration states a completion undertaking of 30th June, 2021. RERA record
Occupancy / completion certificateThe supplied HMDA technical approval is not an occupancy certificate. It states that occupation is permitted only after completion in accordance with the approved plans and issue of a “Fit for Occupancy” certificate. No occupancy or completion certificate is supplied.

2. The project story

ASBL Lakeside is registered with TG-RERA as a residential apartment project on Sy No. 449/P, in the Gachibowli locality. The project’s RERA record identifies Gachibowli as the village, while the HMDA technical approval and title report identify the site as Puppalaguda Village. The registration certificate also records Serilingampally mandal, whereas the HMDA approval records Gandipet Mandal (Rajendranagar Old). RERA record

The HMDA technical approval describes residential buildings and specifies four entries—ABULDAM and Towers A, B and C—with the floor configurations shown above. The RERA filing, by contrast, records three total/proposed building units and 367 apartments. The documents supplied do not explain the building-count presentation, so this overview does not resolve it. RERA filing RERA unit table

The filed apartment offering comprises 2BHK and 3BHK homes. TG-RERA portal counts show 193 booked and 174 available units in total, but the record gives no count retrieval date. These are portal-recorded counts, not an independently verified sales update. RERA unit table RERA unit table

The project is listed as on-going, with 31/03/2022 recorded as both the proposed and revised proposed completion date. The supplied material does not establish current site progress or completion, and includes no occupancy or completion certificate. HMDA’s technical approval says occupation is conditional on completion in accordance with the technical approval and issue of a “Fit for Occupancy” certificate. RERA record

3. Master plan, architecture & building design

The RERA land record gives a total site area of 23,874.24 sq. m, an affected area of 6,438.41 sq. m and a net area of 17,435.83 sq. m. The HMDA technical approval also records 17,435.83 Sq. Mt. as the extent. The technical approval’s total built-up area is 53712.16 Sq.mts; this is an approved built-up-area figure, not a carpet-area or saleable-area figure. Land records

The HMDA approval lists the following residential building entries and floor configurations:

Building entry in technical approvalFloor configurationBuilt-up area recorded
ABULDAM (ABULDAM)1Ground + 31730.42
Tower A2Cellar + 1Ground + 919178.5
Tower B1Ground + 920753.1
Tower C1Ground + 912050.14

The approval lists the individual built-up areas without a unit in the extracted building schedule; it separately states total built-up area 53712.16 Sq.mts. The approval also records heights of 14.9 for ABULDAM and 30 for Towers A, B and C, without stating the unit in the supplied extraction.

The HMDA letter is a technical approval, and says the building plans shall be sanctioned by the Executive Authority in conformity with the technically approved plans. It also refers to displaying the released plan at the site and requires construction in accordance with the approved plan. The supplied record does not include a readable floor-plan set or layout drawing from which to describe flat arrangements, footprints, lifts, stairs, internal circulation or open-space dimensions. Document index Floor plans

HMDA’s conditions refer to open space/tot-lot/buffer use, rainwater-harvesting structures, transformer and garbage-house provision, and road handover. These are approval conditions or recorded site provisions; the supplied documents do not independently verify their current completion.

4. Homes, configurations & floor plans

The following counts and saleable areas are from the TG-RERA filing. The filing does not provide measured carpet areas in the supplied records.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK227120107124.03 sq. mNot availableNot supplied
3BHK1407367183.91 sq. mNot availableNot supplied

RERA unit table RERA unit table

The drawing-review record says six floor-plan drawings are present, but none has a measured apartment layout; it reports zero measured drawings. Therefore, room dimensions, internal layouts, balcony or utility areas, and software-measured carpet areas cannot be reported from the supplied evidence. Floor plans

Saleable area and carpet area are different measures; no project-specific common-area loading or carpet-area figure is provided here. The saleable areas above are the filed figures and should not be treated as measured carpet areas. RERA unit table Floor plans

5. Parking & vehicle circulation

The HMDA technical approval specifies that cellar space is to be used exclusively for vehicle parking, without partition walls or rolling shutters, and is not to be converted. Tower A is listed with 2Cellar levels. The approval extraction does not state the number of parking spaces or distinguish resident, visitor, two-wheeler or accessible bays.

The approval refers to visitor parking and says it must be used for its designated purpose and not misused or sold. It also requires no parking or construction in setback areas. These are approval conditions; no project-specific parking allocation document or unit-wise parking entitlement is supplied.

6. Amenities, recreation & open spaces

The TG-RERA amenities record lists the following as “YES” with 100% against each item. These are filing declarations; the supplied evidence does not independently verify completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsSize not suppliedRERA amenitiesRERA-listed “YES”; 100%; completion not independently verified
Water supplyDetails not suppliedRERA amenitiesRERA-listed “YES”; 100%; completion not independently verified
Sewerage (chamber, lines, septic tank, STP)Details not suppliedRERA amenitiesRERA-listed “YES”; 100%; completion not independently verified
Storm-water drainsDetails not suppliedRERA amenitiesRERA-listed “YES”; 100%; completion not independently verified
Green strip / tot lot / parkSize not suppliedRERA amenitiesRERA-listed “YES”; 100%; completion not independently verified
Street lightingDetails not suppliedRERA amenitiesRERA-listed “YES”; 100%; completion not independently verified
Community buildingsType and size not suppliedRERA amenitiesRERA-listed “YES”; 100%; completion not independently verified
Treatment and disposal of sewage and sullage waterDetails not suppliedRERA amenitiesRERA-listed “YES”; 100%; completion not independently verified
Solid-waste management and disposalDetails not suppliedRERA amenitiesRERA-listed “YES”; 100%; completion not independently verified
Water conservation / rainwater harvestingDetails not suppliedRERA amenitiesRERA-listed “YES”; 100%; completion not independently verified
Energy managementDetails not suppliedRERA amenitiesRERA-listed “YES”; 100%; completion not independently verified
Fire protection and fire-safety requirementsDetails not suppliedRERA amenitiesRERA-listed “YES”; 100%; completion not independently verified
Electrical meter room / sub-station / receiving stationDetails not suppliedRERA amenitiesRERA-listed “YES”; 100%; completion not independently verified
Aggregate recreational open spaceArea not suppliedRERA amenitiesNo percentage or “YES” value supplied; the record shows 0%

The HMDA technical approval also calls for rainwater-harvesting structures and a tot-lot/open space/buffer to be maintained as greenery and not used for other purposes. These are approval conditions, not independent evidence of delivery.

7. Utilities, building services & safety

The TG-RERA amenities record declares water supply, sewerage/STP, storm-water drains, sewage treatment and disposal, rainwater harvesting, energy management, fire protection, and electrical meter-room/sub-station/receiving-station provision as available at 100%. The record does not provide system capacities or independent verification of completion. RERA amenities

HMDA’s technical approval includes conditions requiring or referring to:

  • Water and sewerage: approach to HMWS&SB for bulk water supply; water-supply and sewerage-disposal locations; an STP; treated-sewerage connection or discharge arrangements subject to the stated conditions; and water recycling.
  • Drainage and water conservation: rainwater-harvesting structures, roof-water collection and storm-water drains.
  • Electrical services and backup: a transformer, generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, and electrical installations certified by electrical engineers.
  • Fire and life safety: fire extinguishers, automatic sprinklers if the basement area exceeds 200 Sq.Mts, a manually operated alarm system, fire-resistant lift swing doors, and compliance with Fire Service department norms.
  • Waste: a garbage house and refuse chute with a garbage-disposal system.

These approval conditions do not by themselves establish that the systems were installed, tested or certified. No service capacities, lift count or capacity, accessibility details, CCTV/security systems, or current fire/occupancy clearances are supplied. Document index

8. Location, access & connectivity

The project is recorded in the Gachibowli locality, PIN 500089, on Sy No. 449/P. The RERA record identifies Gachibowli village; the HMDA technical approval identifies Puppalaguda Village, Gandipet Mandal (Rajendranagar Old), and the registration certificate records Serilingampally mandal. RERA record RERA filing

RERA boundaries identify existing roads to the east and north, a proposed 30 Mtrs road and lake buffer to the west, and neighbouring land in Sy No 449 to the south. HMDA records that road-affected areas were handed over for a proposed 30 mts wide master plan road and a 12 Mts wide road. RERA filing

The supplied location record provides these mapped distances; it does not identify the routing method or establish travel times:

Listed placeCategoryDistance
Financial District (Nanakramguda)Anchor1.2 km
IndusInd BankBank0.4 km
(unnamed bus_station)Bus station2.2 km
Manuu Polytechnic HyderabadCollege1.6 km
Sankaraya Eye HospitalHospital1.6 km
ADPIT office0.0 km
South india shopping mallMall2.6 km
(unnamed park)Park1.2 km
Nanakramguda Govt primary schoolSchool0.5 km

Location record

9. Developer & development status

The registered promoter is Ashoka Builders India Private Limited, a company. The corporate record identifies its CIN as U45200TG2015PTC097583 and incorporation date as 6 February 2015. Its address in the project record is Vakula Mansion, Telecom Nagar, Puppalaguda Village, Gandipet Mandal, Gachibowli, Ranga Reddy, 500089. Corporate record

The project record names Nikitha Korupolu and Anil Kumar Thota as directors and Ajitesh Korupolu as authorized signatory. The listed website is https://www.asbl.in. Parties record Promoter website

The project is recorded as on-going, with a RERA-filed proposed completion date of 31/03/2022 and revised proposed completion date of 31/03/2022. The promoter’s Form B declaration states a completion undertaking of 30th June, 2021. No supplied evidence independently establishes present construction progress or occupancy status. RERA record

10. Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationForm C registration certificate for ASBL Lakeside, registration P02400000612, issued 12/04/2019, valid through 30/06/2021.
HMDA technical approvalTechnical Approval No. 006785/SKP/R1/U6/HMDA/04012018, dated 31/05/2018, for residential development on Sy No. 449/P. The letter states that building plans are to be sanctioned by the Executive Authority in conformity with the technical approval.
Building and site details in approvalBuilding entries, floor configurations, built-up areas, road-affected areas, mortgage area and technical conditions are recorded in the HMDA approval. It is not an occupancy certificate.
Title reportAdvocate K. Srinivas’s title opinion dated 12-06-2018 concerns Ac. 5-36 guntas in Sy.No.449 (Part), Puppalaguda Village, and describes the reported title chain and development-right documents.
Encumbrance statementStatement dated 20-08-2018 covering S.R.O. Gandipet and the period 01-10-2007 to 19-08-2018; it lists a Development Agreement-cum-GPA, supplemental deed/ratification, and deposit of title deeds.
Form B declarationAjitesh Korupolu’s promoter declaration, dated 12 January 2018, states a title basis, an unencumbered-land declaration and completion undertaking of 30th June, 2021.
Occupancy / completion recordNo occupancy or completion certificate is included in the supplied documents. The HMDA approval describes a required “Fit for Occupancy” certificate before occupation.
Plans available for reviewThe supplied drawing-review record lists six floor-plan drawings, none measured; no readable drawing-derived apartment measurements are available in this evidence set. Floor plans

Frequently asked questions

Is ASBL Lakeside registered with Telangana RERA?

Yes. ASBL Lakeside is registered with the Telangana Real Estate Regulatory Authority as P02400000612; the registration status is On-Going Project.

Who is the developer of ASBL Lakeside?

The promoter named in the RERA registration is Ashoka Builders India Private Limited.

Where is ASBL Lakeside located?

ASBL Lakeside is in Gachibowli, Rangareddy, Telangana (500089).

When will ASBL Lakeside be completed?

The promoter's proposed date of completion filed with RERA is 31/03/2022. This is the promoter's declaration, not a guarantee.