Ace Arendale
ACE ESTATES · Rangareddy · RERA P02400006184
ACE ARENDALE is a plotted development beside PMR Medical College in Chevella, Chevella Mandal, Ranga Reddy District. The registered promoter is ACE ESTATES, a partnership. The project filing records a land area of 39335.00 sqmts and 93 proposed building units; it is an open-plot layout, with no plot-size range stated. Its TG-RERA registration is P02400006184, and its proposed completion date is 12/02/2026.
More from Ace Estates · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | ACE ARENDALE RERA record RERA filing |
| Project type | Plotted development / open-plot layout RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; registration covers the project named ACE ARENDALE RERA record |
| TG-RERA registration | P02400006184 RERA record |
| Registration validity | Form ‘C’ states validity from 13/02/2023 to 12/02/2026, unless extended by the Authority; certificate records no extension |
| Registered promoter | ACE ESTATES, a partnership RERA filing Corporate record |
| RERA-filed project status | On-Going Project RERA record RERA filing |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Beside PMR Medical College RERA record RERA filing |
| Revenue village | Chevella RERA record RERA filing |
| Mandal / district / PIN | Chevella / Ranga Reddy / 501503 RERA record RERA filing |
| Project survey numbers | Sy No 54 and 55; no subdivisions are specified in the RERA project identity RERA record RERA filing |
| Registered site extent | The project filing records total area 39335.00 sqmts RERA filing |
| Approved layout area statement | Draft HMDA layout letter records total site area 33690.01, road-affected area 284.18, and net site area 33405.83 sq.m |
| Boundaries recorded in RERA | East: land belongs to PMR Medical College and Sabitha; West: land belongs to Visveshwar Reddy; North: land belongs to D Narasimha Reddy; South: 100 feet wide Road RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal approval | Draft layout approval 000040/LO/Plg/HMDA/2023, dated 13 February, 2023 Approvals record |
| Approved built-up area | 25417.28 sqmts is recorded in the RERA fields; the supplied approval extract does not identify this as an applicable built-up area for the plotted layout RERA filing |
| Buildings / floors | Not disclosed as a building development; the record is for an open-plot layout. The draft letter says construction in plots is not to be allowed until final layout issuance |
| Parking | No project-wide parking count or parking levels established in the supplied records RERA filing |
| Plot / unit count | RERA records 93 proposed building units, but the supplied RERA data does not provide a plot-by-plot inventory or confirm that figure as the approved plot count RERA filing |
| HMDA mortgage plots | Draft letter identifies Plots 1 to 09, 12 & 13, covering 3141.88 Sq.mtrs, as mortgaged to HMDA; conveyance of those plots is restricted under the draft conditions |
Offering and status
| Field | Record |
|---|---|
| Offered product | Open plots; no plot-size range or plot-wise schedule is provided in the supplied RERA data RERA filing Promoter website |
| Booked / available counts | Not disclosed in the supplied evidence RERA record RERA filing |
| Declared completion | 12/02/2026 in the RERA project fields and Form B completion undertaking RERA filing |
| Construction / development stage | RERA status is “On-Going Project”; a supplied completeness figure is 80%, with no independently verified site-progress evidence or defined measurement basis in the provided records RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The draft layout letter is not a final layout release; it requires development works and local-body handover steps before final layout approval |
| OC scope | Not applicable as a building/flat OC scope in the supplied evidence; final layout status remains unestablished |
2. The project story
ACE ARENDALE is registered as a plotted development at Beside PMR Medical College in Chevella village, Chevella Mandal, Ranga Reddy District, on Sy No 54 and 55. The TG-RERA record describes the project as ongoing and records 93 proposed units, but the supplied filing does not include a plot-wise schedule, plot-size range, or booked-versus-available inventory. RERA record RERA filing RERA filing
HMDA’s 13 February 2023 document is a draft layout letter for an open-plot layout, forwarded to the Chevella Village Gram Panchayat for release of plans. It requires infrastructure and handover actions before final layout release and states that construction in plots is not permitted until final layout issuance. The records supplied here do not establish that the final layout has been issued or that the required development works have been independently verified as complete.
The project’s RERA filing records a completion date of 12/02/2026 and a completeness figure of 80%, but the evidence does not identify the basis of that percentage or independently verify physical progress. The RERA registration certificate is valid through 12/02/2026 unless extended; the certificate extract records no extension. Registration validity, the declared completion date, and final-layout/occupancy status are separate matters. RERA record RERA filing
3. Master plan, architecture & building design
The supplied approved-drawing extraction describes a plotted layout, not a multi-storey building scheme. The HMDA draft letter’s area statement records 33690.01 total site area, 284.18 road-affected area and 33405.83 sq.m net site area. Its stated land-use components are:
| Layout component | Area recorded | Evidence |
|---|---|---|
| Plotted area | 20510.64 | |
| Layout road area | 8950.92 | |
| Park | 3096.05 | |
| Open space | 848.22 | |
| Social infrastructure | Area not supplied in the extracted figure | |
| Amenities area | 0 |
The RERA layout-drawing extraction separately describes the 3096.05 park/open-space figure as “Organized open space/park Area/Uitility Area.” These drawing-derived land-use entries are reported as extracted; the supplied data notes that software-read drawing text and area statements should be checked against the drawing. Layout record
The draft letter identifies roads of 200 ft wide Master plan road, 18 mts and above, and 60 feet and above roads, and requires internal roads, footpaths, cycling tracks, avenue planting and underground utility works. It also records a requirement to hand over internal roads, open space, utility and social-infrastructure areas to the local body by registered gift deed before final layout-plan release.
The supplied records do not establish a building count, building footprint, floor configuration, tower height, or residential/commercial building allocation. The approved built-up-area field is 25417.28 sqmts, but the evidence supplied does not explain its application to this plotted-layout project. RERA filing
4. Homes, configurations & floor plans
This is a plotted development. The RERA fields record 93 proposed building units, while the project configuration records identify open plots; no plot-size range, plot-wise count, booking status, or available inventory is supplied. RERA filing Promoter website
| Units | RERA records 93 proposed units; approved plot count not established in the supplied extract |
|---|---|
| Booked | Not disclosed |
| Available | Not disclosed |
| RERA saleable area | Not disclosed |
| Measured carpet area | Not applicable / not supplied |
| Loading (if supplied) | Not supplied |
The draft HMDA letter refers to plots 1 to 09, 12 & 13 as mortgaged plots; this is not a complete plot inventory. The layout drawing extraction does not provide plot sizes or a complete plot schedule. Layout record
5. Parking & vehicle circulation
No project-wide parking-space count, parking allocation, visitor or accessible parking provision, or parking levels are established in the supplied evidence. The development is recorded as a plotted layout rather than a building scheme. RERA filing
The draft HMDA letter requires internal roads and footpaths, access to neighbouring sites, pedestrian footpaths, and cycling tracks. It also states that the applicant shall not construct a compound wall or fencing around the site. These are approval conditions; the supplied record does not verify their completion.
6. Amenities, recreation & open spaces
The RERA amenity record lists 14 categories, with progress shown as 0 where supplied; it does not establish completed facilities. The draft layout letter sets out infrastructure and open-space requirements. The facilities below are therefore described as filed or approval-conditioned, not as independently verified delivered features.
| Facility | Park |
|---|---|
| Description / size | 3096.05 in the draft layout area statement |
| Declared progress / verified status | Approval drawing entry; completion not verified |
| Facility | Green strip / tot lot / park; aggregate recreational open space |
|---|---|
| Description / size | Size not specified in the amenity record |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity record marks available “YES” and progress 0; completion not verified |
| Facility | Cycling tracks |
|---|---|
| Description / size | Required by draft layout conditions; no size supplied |
| Declared progress / verified status | Approval condition; completion not verified |
| Facility | Community buildings |
|---|---|
| Description / size | No size or quantity supplied |
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0; no completed facility verified |
| Facility | Avenue plantation |
|---|---|
| Description / size | Required by draft layout conditions |
| Declared progress / verified status | Approval condition; completion not verified |
The promoter-vendor data also lists a clubhouse, swimming pool, gym and children’s play area. These are promoter-marketed items; the supplied RERA amenity and approval records do not establish their sanctioned status or delivery. Promoter website
7. Utilities, building services & safety
The HMDA draft letter prescribes infrastructure for the layout, while the RERA amenity list records relevant categories. These entries establish filed or approval-conditioned provision, not verified operational service or statutory compliance.
| Evidence in supplied records | Draft letter requires potable-water connectivity and internal water-supply pipelines, with an overhead tank; the RERA amenity list marks water supply “YES” with progress 0 RERA amenities |
|---|---|
| Status / limitation | Source, storage capacity and completion are not independently verified |
| Evidence in supplied records | Draft letter requires underground storm-water drainage and sewerage arrangements; it specifies septage treatment for layouts under 10 acres and an STP area for sites over 10 acres |
|---|---|
| Status / limitation | The applicable treatment configuration and completed operational system are not established |
| Evidence in supplied records | Draft letter lists rainwater-harvesting pits; the RERA amenity record marks water conservation/rainwater harvesting “YES” with progress 0 RERA amenities |
|---|---|
| Status / limitation | Capacity and installation status not verified |
| Evidence in supplied records | Draft letter requires underground utility ducting, a transformer yard and LED street lighting; RERA amenity record marks electrical meter room/sub-station/receiving station “YES” with progress 0 RERA amenities |
|---|---|
| Status / limitation | Supply capacity, receiving-station details and completion not supplied |
| Evidence in supplied records | Draft letter requires a waste-disposal area, bio-compost unit and source segregation |
|---|---|
| Status / limitation | Completion and operating arrangements not verified |
| Evidence in supplied records | Fire protection and fire safety appear as a RERA amenity category, with no progress established RERA amenities |
|---|---|
| Status / limitation | No project-specific fire-system details or clearance supplied |
| Evidence in supplied records | Draft letter requires pedestrian footpaths and says footpath space is to remain available to pedestrians |
|---|---|
| Status / limitation | No accessible-route or ramp details supplied |
The draft letter also requires street lighting, footpaths and underground utility lines, but the supplied records do not verify completed installation or service connections.
8. Location, access & connectivity
The registered project location is Beside PMR Medical College, Chevella village, Chevella Mandal, Ranga Reddy District, Telangana 501503. The RERA location record provides a geocode of 17.3062296, 78.1370079. RERA record RERA filing Location record
The RERA/drawing records identify a 100 feet wide Road along the southern boundary and a 200 ft wide Master plan road affecting the layout area. The location record gives the nearest sampled Outer Ring Road interchange at approximately 25.0 km. RERA filing Location record
The promoter-vendor material lists distances to Moinabad, TSPA Junction, ORR, Shadnagar, Shankarpalle, Anantagiri Hills and Vikarabad; these are promoter-marketed connectivity claims and are not independently verified in the supplied project record. Promoter website
9. Developer & development status
The registered promoter is ACE ESTATES, recorded as a partnership. The RERA filing gives GSTIN 36ABQFA5176N1ZP. The named partners are GANGAPATNAM VENKATA SATISH KUMAR REDDY (authorized signatory) and GANGAPATNAM KAVITHA REDDY (partner). RERA filing Corporate record Parties record
The registration certificate lists the promoter office as Village: INDIRA NAGAR II (Jubilee Hills), Mandal: Shaikpet, District: Hyderabad, Pin: 500033. The project address is separately recorded at Beside PMR Medical College, Chevella.
Form B, dated 02/03/2023, is an affidavit-cum-declaration by the authorized signatory stating a title basis for the project land, declaring the land free from encumbrances or referring to an encumbrance statement, and undertaking completion by 12/02/2026. These are promoter declarations, not independent verification.
The project is recorded as ongoing, with 80% completeness in the supplied project header. The supplied evidence does not provide a progress methodology or independent site verification; it also contains no completion/occupancy certificate. RERA record
10. Approvals, official records & documents
| What it establishes in the supplied evidence | ACE ARENDALE registered as P02400006184; validity stated from 13/02/2023 to 12/02/2026, unless extended |
|---|
| What it establishes in the supplied evidence | Draft layout approval 000040/LO/Plg/HMDA/2023, dated 13 February, 2023, for Survey Nos. 54 and 55; conditions include HMDA mortgage plots and development/handover requirements |
|---|
| What it establishes in the supplied evidence | Promoter’s declared title basis, encumbrance statement and completion undertaking |
|---|
| What it establishes in the supplied evidence | Project type, location, survey numbers, land-area fields and proposed-unit figure |
|---|---|
| Reference | RERA filing RERA filing |
| What it establishes in the supplied evidence | Two layout sheets are recorded; software-extracted area statement is available, with drawing-text/measurement caveats |
|---|---|
| Reference | Layout record |
| What it establishes in the supplied evidence | Not supplied in the reviewed evidence |
|---|
| What it establishes in the supplied evidence | Not supplied; the evidence describes a plotted layout, not an occupied building phase |
|---|---|
| Reference | Document index |
1. Project at a glance
Project identity
Registered project name: ACE ARENDALE
Project type: Plotted development / open-plot layout
Phase / registered portion: Phase not separately identified; registration covers the project named ACE ARENDALE
TG-RERA registration: P02400006184
Registration validity: Form ‘C’ states validity from 13/02/2023 to 12/02/2026, unless extended by the Authority; certificate records no extension
Registered promoter: ACE ESTATES, a partnership
RERA-filed project status: On-Going Project
Land and geographic identity
Locality: Beside PMR Medical College
Revenue village: Chevella
Mandal / district / PIN: Chevella / Ranga Reddy / 501503
Project survey numbers: Sy No 54 and 55; no subdivisions are specified in the RERA project identity
Registered site extent: The project filing records total area 39335.00 sqmts
Approved layout area statement: Draft HMDA layout letter records total site area 33690.01, road-affected area 284.18, and net site area 33405.83 sq.m
Boundaries recorded in RERA: East: land belongs to PMR Medical College and Sabitha; West: land belongs to Visveshwar Reddy; North: land belongs to D Narasimha Reddy; South: 100 feet wide Road
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal approval: Draft layout approval 000040/LO/Plg/HMDA/2023, dated 13 February, 2023
Approved built-up area: 25417.28 sqmts is recorded in the RERA fields; the supplied approval extract does not identify this as an applicable built-up area for the plotted layout
Buildings / floors: Not disclosed as a building development; the record is for an open-plot layout. The draft letter says construction in plots is not to be allowed until final layout issuance
Parking: No project-wide parking count or parking levels established in the supplied records
Plot / unit count: RERA records 93 proposed building units, but the supplied RERA data does not provide a plot-by-plot inventory or confirm that figure as the approved plot count
HMDA mortgage plots: Draft letter identifies Plots 1 to 09, 12 & 13, covering 3141.88 Sq.mtrs, as mortgaged to HMDA; conveyance of those plots is restricted under the draft conditions
Offering and status
Offered product: Open plots; no plot-size range or plot-wise schedule is provided in the supplied RERA data
Booked / available counts: Not disclosed in the supplied evidence
Declared completion: 12/02/2026 in the RERA project fields and Form B completion undertaking
Construction / development stage: RERA status is “On-Going Project”; a supplied completeness figure is 80%, with no independently verified site-progress evidence or defined measurement basis in the provided records
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The draft layout letter is not a final layout release; it requires development works and local-body handover steps before final layout approval
OC scope: Not applicable as a building/flat OC scope in the supplied evidence; final layout status remains unestablished
2. The project story
ACE ARENDALE is registered as a plotted development at Beside PMR Medical College in Chevella village, Chevella Mandal, Ranga Reddy District, on Sy No 54 and 55. The TG-RERA record describes the project as ongoing and records 93 proposed units, but the supplied filing does not include a plot-wise schedule, plot-size range, or booked-versus-available inventory.
HMDA’s 13 February 2023 document is a draft layout letter for an open-plot layout, forwarded to the Chevella Village Gram Panchayat for release of plans. It requires infrastructure and handover actions before final layout release and states that construction in plots is not permitted until final layout issuance. The records supplied here do not establish that the final layout has been issued or that the required development works have been independently verified as complete.
The project’s RERA filing records a completion date of 12/02/2026 and a completeness figure of 80%, but the evidence does not identify the basis of that percentage or independently verify physical progress. The RERA registration certificate is valid through 12/02/2026 unless extended; the certificate extract records no extension. Registration validity, the declared completion date, and final-layout/occupancy status are separate matters.
3. Master plan, architecture & building design
The supplied approved-drawing extraction describes a plotted layout, not a multi-storey building scheme. The HMDA draft letter’s area statement records 33690.01 total site area, 284.18 road-affected area and 33405.83 sq.m net site area. Its stated land-use components are:
| Layout component | Area recorded | Evidence |
|---|---|---|
| Plotted area | 20510.64 | |
| Layout road area | 8950.92 | |
| Park | 3096.05 | |
| Open space | 848.22 | |
| Social infrastructure | Area not supplied in the extracted figure | |
| Amenities area | 0 |
The RERA layout-drawing extraction separately describes the 3096.05 park/open-space figure as “Organized open space/park Area/Uitility Area.” These drawing-derived land-use entries are reported as extracted; the supplied data notes that software-read drawing text and area statements should be checked against the drawing.
The draft letter identifies roads of 200 ft wide Master plan road, 18 mts and above, and 60 feet and above roads, and requires internal roads, footpaths, cycling tracks, avenue planting and underground utility works. It also records a requirement to hand over internal roads, open space, utility and social-infrastructure areas to the local body by registered gift deed before final layout-plan release.
The supplied records do not establish a building count, building footprint, floor configuration, tower height, or residential/commercial building allocation. The approved built-up-area field is 25417.28 sqmts, but the evidence supplied does not explain its application to this plotted-layout project.
4. Homes, configurations & floor plans
This is a plotted development. The RERA fields record 93 proposed building units, while the project configuration records identify open plots; no plot-size range, plot-wise count, booking status, or available inventory is supplied.
| Units | RERA records 93 proposed units; approved plot count not established in the supplied extract |
|---|---|
| Booked | Not disclosed |
| Available | Not disclosed |
| RERA saleable area | Not disclosed |
| Measured carpet area | Not applicable / not supplied |
| Loading (if supplied) | Not supplied |
The draft HMDA letter refers to plots 1 to 09, 12 & 13 as mortgaged plots; this is not a complete plot inventory. The layout drawing extraction does not provide plot sizes or a complete plot schedule.
5. Parking & vehicle circulation
No project-wide parking-space count, parking allocation, visitor or accessible parking provision, or parking levels are established in the supplied evidence. The development is recorded as a plotted layout rather than a building scheme.
The draft HMDA letter requires internal roads and footpaths, access to neighbouring sites, pedestrian footpaths, and cycling tracks. It also states that the applicant shall not construct a compound wall or fencing around the site. These are approval conditions; the supplied record does not verify their completion.
6. Amenities, recreation & open spaces
The RERA amenity record lists 14 categories, with progress shown as 0 where supplied; it does not establish completed facilities. The draft layout letter sets out infrastructure and open-space requirements. The facilities below are therefore described as filed or approval-conditioned, not as independently verified delivered features.
| Facility | Park |
|---|---|
| Description / size | 3096.05 in the draft layout area statement |
| Declared progress / verified status | Approval drawing entry; completion not verified |
| Facility | Green strip / tot lot / park; aggregate recreational open space |
|---|---|
| Description / size | Size not specified in the amenity record |
| Declared progress / verified status | RERA amenity record marks available “YES” and progress 0; completion not verified |
| Facility | Cycling tracks |
|---|---|
| Description / size | Required by draft layout conditions; no size supplied |
| Declared progress / verified status | Approval condition; completion not verified |
| Facility | Community buildings |
|---|---|
| Description / size | No size or quantity supplied |
| Declared progress / verified status | Progress 0; no completed facility verified |
| Facility | Avenue plantation |
|---|---|
| Description / size | Required by draft layout conditions |
| Declared progress / verified status | Approval condition; completion not verified |
The promoter-vendor data also lists a clubhouse, swimming pool, gym and children’s play area. These are promoter-marketed items; the supplied RERA amenity and approval records do not establish their sanctioned status or delivery.
7. Utilities, building services & safety
The HMDA draft letter prescribes infrastructure for the layout, while the RERA amenity list records relevant categories. These entries establish filed or approval-conditioned provision, not verified operational service or statutory compliance.
| Evidence in supplied records | Draft letter requires potable-water connectivity and internal water-supply pipelines, with an overhead tank; the RERA amenity list marks water supply “YES” with progress 0 |
|---|---|
| Status / limitation | Source, storage capacity and completion are not independently verified |
| Evidence in supplied records | Draft letter requires underground storm-water drainage and sewerage arrangements; it specifies septage treatment for layouts under 10 acres and an STP area for sites over 10 acres |
|---|---|
| Status / limitation | The applicable treatment configuration and completed operational system are not established |
| Evidence in supplied records | Draft letter lists rainwater-harvesting pits; the RERA amenity record marks water conservation/rainwater harvesting “YES” with progress 0 |
|---|---|
| Status / limitation | Capacity and installation status not verified |
| Evidence in supplied records | Draft letter requires underground utility ducting, a transformer yard and LED street lighting; RERA amenity record marks electrical meter room/sub-station/receiving station “YES” with progress 0 |
|---|---|
| Status / limitation | Supply capacity, receiving-station details and completion not supplied |
| Evidence in supplied records | Draft letter requires a waste-disposal area, bio-compost unit and source segregation |
|---|---|
| Status / limitation | Completion and operating arrangements not verified |
| Evidence in supplied records | Fire protection and fire safety appear as a RERA amenity category, with no progress established |
|---|---|
| Status / limitation | No project-specific fire-system details or clearance supplied |
| Evidence in supplied records | Draft letter requires pedestrian footpaths and says footpath space is to remain available to pedestrians |
|---|---|
| Status / limitation | No accessible-route or ramp details supplied |
The draft letter also requires street lighting, footpaths and underground utility lines, but the supplied records do not verify completed installation or service connections.
8. Location, access & connectivity
The registered project location is Beside PMR Medical College, Chevella village, Chevella Mandal, Ranga Reddy District, Telangana 501503. The RERA location record provides a geocode of 17.3062296, 78.1370079.
The RERA/drawing records identify a 100 feet wide Road along the southern boundary and a 200 ft wide Master plan road affecting the layout area. The location record gives the nearest sampled Outer Ring Road interchange at approximately 25.0 km.
The promoter-vendor material lists distances to Moinabad, TSPA Junction, ORR, Shadnagar, Shankarpalle, Anantagiri Hills and Vikarabad; these are promoter-marketed connectivity claims and are not independently verified in the supplied project record.
9. Developer & development status
The registered promoter is ACE ESTATES, recorded as a partnership. The RERA filing gives GSTIN 36ABQFA5176N1ZP. The named partners are GANGAPATNAM VENKATA SATISH KUMAR REDDY (authorized signatory) and GANGAPATNAM KAVITHA REDDY (partner).
The registration certificate lists the promoter office as Village: INDIRA NAGAR II (Jubilee Hills), Mandal: Shaikpet, District: Hyderabad, Pin: 500033. The project address is separately recorded at Beside PMR Medical College, Chevella.
Form B, dated 02/03/2023, is an affidavit-cum-declaration by the authorized signatory stating a title basis for the project land, declaring the land free from encumbrances or referring to an encumbrance statement, and undertaking completion by 12/02/2026. These are promoter declarations, not independent verification.
The project is recorded as ongoing, with 80% completeness in the supplied project header. The supplied evidence does not provide a progress methodology or independent site verification; it also contains no completion/occupancy certificate.
10. Approvals, official records & documents
| What it establishes in the supplied evidence | ACE ARENDALE registered as P02400006184; validity stated from 13/02/2023 to 12/02/2026, unless extended |
|---|
| What it establishes in the supplied evidence | Draft layout approval 000040/LO/Plg/HMDA/2023, dated 13 February, 2023, for Survey Nos. 54 and 55; conditions include HMDA mortgage plots and development/handover requirements |
|---|
| What it establishes in the supplied evidence | Promoter’s declared title basis, encumbrance statement and completion undertaking |
|---|
| What it establishes in the supplied evidence | Project type, location, survey numbers, land-area fields and proposed-unit figure |
|---|
| What it establishes in the supplied evidence | Two layout sheets are recorded; software-extracted area statement is available, with drawing-text/measurement caveats |
|---|
| What it establishes in the supplied evidence | Not supplied in the reviewed evidence |
|---|
| What it establishes in the supplied evidence | Not supplied; the evidence describes a plotted layout, not an occupied building phase |
|---|
Frequently asked questions
Is ACE ARENDALE registered with Telangana RERA?
Yes. ACE ARENDALE is registered with the Telangana Real Estate Regulatory Authority as P02400006184; the registration status is On-Going Project.
Who is the developer of ACE ARENDALE?
The promoter named in the RERA registration is ACE ESTATES.
Where is ACE ARENDALE located?
ACE ARENDALE is in Beside PMR Medical College, Chevella, Rangareddy, Telangana (501503).
When will ACE ARENDALE be completed?
The promoter's proposed date of completion filed with RERA is 12/02/2026. This is the promoter's declaration, not a guarantee.
More projects in Chevella