Sign in

Highway Paradise

NR INFRA PROJECTS · Sangareddy · RERA P01100002855

HIGHWAY PARADISE is a plotted residential development in BUDHERA VILLAGE, MUNPALLY, Sangareddy. The registered promoter is NR INFRA PROJECTS. The TG-RERA certificate states a total area of 47044.70 sqmts and a net area of 39618.72 sqmts; the final-layout record identifies 86 open residential plots, with no tower or floor configuration disclosed. Registered under TG-RERA registration number P01100002855, the project has a proposed completion date of 21$ April, 2023.

01What we found

Period endedTG-RERA registration ran to 21 Apr 2023 - check its extension on TG-RERA
31documents on file - each fact links to its page
0court cases on this project's land in the court records searched
15items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

15 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldProject record
Registered project nameHIGHWAY PARADISE RERA record
Project typePlotted development / residential layout RERA record RERA filing
Registered phase or portionNo separate phase name is disclosed. TG-RERA certificate identifies Survey Nos. 71/PART and 72/PART.
TG-RERA registrationP01100002855; issued 30/04/2021, valid through 21/04/2023. The supplied certificate records no extension. Registration validity is distinct from the project’s completion and occupancy records below. Approvals record
Registered promoterNR INFRA PROJECTS; proprietor/authorized signatory identified in the filing as GADDAM RADHA CHARAN REDDY. RERA record RERA filing Parties record
RERA status in the supplied recordRegistration certificate and later completion-related filings are supplied; the certificate’s stated validity ended on 21/04/2023.

Land and geographic identity

FieldProject record
Locality / revenue villageBUDHERA VILLAGE; the layout documents refer to Budhera Gram Panchayat. RERA record RERA filing
Mandal / district / PINMUNPALLY, Sangareddy, 502345. RERA record RERA filing
Project survey numbers71/PART AND 72/PART in the project filing and TG-RERA certificate; layout approval documents identify Sy.Nos. 71/P and 72/P. RERA record
Registered site extentTG-RERA land details state Total Area: 47044.70 sqmts, Area affected in Road widening/FTL of Tanks/Nala Widening: 7425.98 sqmts, and Net Area: 39618.72 sqmts. RERA filing
Layout extent stated in sanctionAc. 9.79 Cents; 47383.60 Sq. Yds.
Boundaries filed with RERAEast: LAND OF RAMAIAH AND OTHERS; West: LAND OF KHAJA MIYA; North: GOPULARAM VILLAGE KALAN BOUNDARY; South: NATIONAL HIGHWAY NO 9. RERA filing

Development identity

FieldProject record
Sanctioning authority / principal layout approvalDirector of Town and Country Planning; TLP.No.95/2020/H. The supplied final-layout record is dated -04-2023 (month and year are stated in the extraction; day is not supplied).
Approved layout extent and plotted allocationAc. 9.79 Cents; 47383.60 Sq. Yds.; plotted area Ac. 6.61 Cents; 31992.40 Sq. Yds. (67.53 %).
Plot count86 plots in the final-layout record.
Approved built-up areaNot disclosed in the supplied project evidence. RERA filing
Building, floor and parking configurationNo building/tower count, floor configuration or parking provision is established in the supplied project record; this is a plotted layout, with individual dwelling permissions to be considered separately.

Offering and status

FieldProject record
Product offeredOpen residential plots; plot-wise size bands, RERA saleable-area schedule and inventory counts are not supplied. RERA unit table
Construction / completion commitmentThe promoter’s Form B declaration undertakes completion by 21$ April, 2023 (as transcribed in the supplied document extraction). The TG-RERA certificate validity ended 21/04/2023.
Layout completion recordA final Technical Layout Pattern is supplied for TLP.No.95/2020/H.
Occupancy certificateAn architect’s Form 1A reports occupancy certificate no. 10049/542/2020/H/e-Panchayath, dated 01-04-2023, and certifies the project completed in all aspects. This is a project-level architect certificate; the supplied evidence does not describe separate tower or building scopes.
Current site progress / plot availabilityNo independently verified current site inspection, current construction-stage record or current sold/available plot count is supplied. Document index RERA unit table

The project story

HIGHWAY PARADISE is a residential plotted layout in Budhera village, Munpally Mandal, Sangareddy District. The TG-RERA certificate identifies the project by registration number P01100002855 and the survey references 71/PART and 72/PART.

The final-layout record describes 86 plots over Ac. 9.79 Cents; 47383.60 Sq. Yds., allocating 10.00 % to open space, 22.47 % to roads and 67.53 % to plotted area. Its stated allocation is a layout-level land-use description, not a schedule of the dimensions of individual sale plots.

An architect’s certificate dated 30/06/2023 reports that the project was completed in all aspects and cites the occupancy certificate dated 01-04-2023. That certificate is professional evidence filed for the project; no independent current site verification is supplied here. The project’s registration validity, the promoter’s completion undertaking and the reported occupancy certificate are separate records and should not be read as interchangeable status dates.

Master plan, architecture & building design

This is a plotted layout, rather than a disclosed apartment or multi-storey building scheme. The supplied final-layout record for TLP.No.95/2020/H identifies 86 plots and these land-use allocations:

Layout componentArea / share stated in final-layout record
Total layout areaAc. 9.79 Cents; 47383.60 Sq. Yds.
Open spaceAc. 0.979 Cents; 4738.36 Sq. Yds. (10.00 %)
Road areaAc. 2.20 Cents; 10648.00 Sq. Yds. (22.47 %)
Plotted areaAc. 6.61 Cents; 31992.40 Sq. Yds. (67.53 %)
Plot count86

The approval describes roads and open spaces as transferred by registered deed and includes layout conditions addressing roads, open space, drainage, rainwater harvesting, greenery, water supply, sewerage and street lighting. It also states that individual building permissions are to be considered separately. No building footprint, floor plan, building heights, plot-by-plot dimensions, FSI-counted area or approved built-up area is disclosed in the supplied evidence.

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plot86 plots in the final-layout approvalNot suppliedNot suppliedPlot-wise area schedule not suppliedNot applicable / not suppliedNot supplied

The 86 figure is the number of plots in the final-layout record; it is not a count of apartments or verified available inventory. The supplied drawing review reports 9 drawings, all scans pending measurement; it contains no software-measured carpet areas. Floor plans The vendor record lists “Plot” with “built-up 1,503 - 2,700 sq ft,” but this is a third-party listing rather than a TG-RERA plot-area schedule and does not establish the size of any particular plot. Promoter website

Parking & vehicle circulation

The supplied final-layout record identifies a 22.47 % road allocation of Ac. 2.20 Cents; 10648.00 Sq. Yds. and states that internal roads are to remain open to provide access to neighbouring lands. It does not provide a parking-space count, dedicated visitor or accessible parking, parking allotments, or vehicle-entry and exit details. No exclusive parking right can be established from the supplied project record.

Amenities, recreation & open spaces

The final-layout record identifies open space and certain layout infrastructure; the project evidence does not establish delivered facility status by independent inspection.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open spaceAc. 0.979 Cents; 4738.36 Sq. Yds. (10.00 %)Final-layout approvalAllocated in the approved layout; current condition not independently verified.
RoadsAc. 2.20 Cents; 10648.00 Sq. Yds. (22.47 %)Final-layout approvalAllocated in the approved layout; current condition not independently verified.
Greenery / avenue plantationNo size or quantity statedDraft-layout conditionsRequired or contemplated by the layout conditions; completion not independently verified.
Community buildingsNo facility or size specified in the supplied project dataTG-RERA amenity record RERA amenitiesRecord shows 0%; no completion evidence supplied.

The vendor lists a common garden, swimming pool, gym, children’s play area and clubhouse, among other items; these are third-party listing claims, not facilities confirmed in the supplied TG-RERA layout record. Promoter website

Utilities, building services & safety

The final-layout approval lists water supply, sewerage, drainage disposal systems, street lighting, rain water harvesting structure and other civic amenities. It also places responsibilities for service maintenance on the local body and contains conditions about development and maintenance. These are approval-record descriptions and conditions; the supplied evidence does not independently verify installation, operation or capacity.

Water supply
Evidence in the supplied recordWater supply / protected water supply is specified in the layout records.
Status established by supplied evidenceSpecified; source, storage, treatment and capacity are not disclosed.
Sewerage and drainage
Evidence in the supplied recordSewerage and drainage disposal systems are specified.
Status established by supplied evidenceSpecified; treatment capacity, reuse and current operation are not established.
Storm water / rainwater
Evidence in the supplied recordDrain/channelization and rainwater-harvesting structures are addressed in the layout conditions.
Status established by supplied evidenceSpecified; installed condition is not independently verified.
Electrical and lighting
Evidence in the supplied recordStreet lighting and electricity facilities are specified in the layout conditions.
Status established by supplied evidenceSpecified; supply capacity, backup and current operation are not disclosed.
Fire and life safety
Evidence in the supplied recordNo project-specific fire-system design, clearance or installed provision is documented in the supplied project evidence. Document index
Waste, security and accessibility
Evidence in the supplied recordNo project-specific waste-system, security or accessible-circulation details are supplied. Document index

Location, access & connectivity

The registered project location is BUDHERA VILLAGE, MUNPALLY, Sangareddy, PIN 502345. The filed southern boundary is NATIONAL HIGHWAY NO 9. RERA record RERA filing

A sampled connectivity record identifies the nearest sampled Outer Ring Road interchange at approximately 45.1 km; this is a software-supplied approximate distance, not a promoter travel-time claim. Location record No public-transport details or measured distances to schools, healthcare, retail or other landmarks are supplied in the project record. Location record RERA record

Developer & development status

The registered promoter is NR INFRA PROJECTS, identified in the RERA filing as a Proprietorship. GADDAM RADHA CHARAN REDDY is named as proprietor and authorized signatory. RERA filing Parties record The supplied Form B is a promoter declaration verified at Hyderabad on 15th February, 2021; it records the promoter’s completion undertaking and other declarations.

The registration certificate lists a promoter office address as Village: Mandal: District: Hyderabad, Pin: 500082. The project filing separately gives the promoter address as 101, 6-3-901/1, 1ST FLOOR, ZAMRUD RESIDENCY, RAJ BHAVAN RAOD, BUDHERA VILLAGE, MUNPALLY, Sangareddy, 502345. RERA filing No official contact details or promoter website are supplied. RERA filing

The supplied Form 1A architect’s certificate reports overall project completion and an occupancy certificate dated 01-04-2023. No separate phase, tower or plot-wise completion schedule is supplied.

Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate for HIGHWAY PARADISE, P01100002855, dated 30/04/2021, valid through 21/04/2023.
Draft layout approvalDraft Technical Layout Pattern for Survey Nos. 71/P and 72/P, Draft - TLP.No. 95 /2020/ H, issued by the Director of Town and Country Planning; supplied document identifies the proposed 86-plot layout and development conditions.
Final layout approvalFinal Technical Layout Pattern, TLP.No.95/2020/H, issued by the Director of Town and Country Planning for Survey Nos. 71/P and 72/P; the supplied record identifies 86 plots and layout allocations.
Roads and open-space deeds referenced in the final-layout recordGift deed for roads and open spaces, Document No. 7630/2020, dated 30.12.2020; relinquishment deed 10606/2022, dated 01.11.2022.
Occupancy certificate / completion evidenceArchitect’s Form 1A dated 30/06/2023 reports occupancy certificate 10049/542/2020/H/e-Panchayath, dated 01-04-2023, issued by DTCPO, and certifies project completion in all aspects.
Promoter declarationForm B affidavit-cum-declaration by Gaddam Radha Charan Reddy for NR Infra Projects, verified 15th February, 2021.

The supplied project record does not include a plot-by-plot approved drawing schedule or an individual building-permission schedule. The layout approval record states that individual building permissions are to be considered separately.

Frequently asked questions

Is HIGHWAY PARADISE registered with Telangana RERA?

Yes. HIGHWAY PARADISE is registered with the Telangana Real Estate Regulatory Authority as P01100002855; the registration status is New Project.

Who is the developer of HIGHWAY PARADISE?

The promoter named in the RERA registration is NR INFRA PROJECTS.

Where is HIGHWAY PARADISE located?

HIGHWAY PARADISE is in BUDHERA VILLAGE, BUDHERA, MUNPALLY, Sangareddy, Telangana (502345).

When will HIGHWAY PARADISE be completed?

The promoter's proposed date of completion filed with RERA is 21/04/2023. This is the promoter's declaration, not a guarantee.

More projects in Budhera