Royal Pearl Valley Phase II
SAKO INFRA PRIVATE LIMITED · Sangareddy · RERA P01100010450
ROYAL PEARL VALLEY PHASE II is a plotted development in Lingampally village, Munpally mandal, Sangareddy district. The registered promoter is SAKO INFRA PRIVATE LIMITED. The registered site area is 8397.22 sq. m., and the layout approval records 28 plots; tower, block and floor counts are not stated. The TG-RERA registration is P01100010450, with proposed completion on 14/08/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | ROYAL PEARL VALLEY PHASE II RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Phase II; the RERA certificate identifies this registration, but the supplied record does not describe the relationship to any other phase RERA record |
| TG-RERA registration | P01100010450 RERA record |
| Registration validity | 15 April 2025–14 April 2027, unless extended by the Authority RERA record |
| Registered promoter | SAKO INFRA PRIVATE LIMITED, a company RERA record Corporate record |
| RERA status | Registered; status is recorded as “New Project” RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Lingampally / LINGAMPALLY; the RERA filing and approval records identify Lingampally village. No other project revenue village is identified in the supplied records. RERA record RERA filing |
| Mandal | MUNPALLY (also written Munipally in approval documents) RERA record |
| District / PIN | Sangareddy / 502345 RERA record RERA filing |
| Project survey number(s) | 101/P RERA record Land records |
| Subdivisions | No further subdivision is specified in the RERA project identity; the approval and registration records identify the site as 101/P. RERA record |
| Registered site extent | 8397.22 sq. m. in the RERA land details Land records |
| Approval-documented layout extent | Ac. 2.075 Cents; 10043.00 Sq. Yds. |
| RERA land-area fields | Total area 8397.22 sq. mts; net area 8397.22 sq. mts; area affected in road widening/FTL of tanks/nala widening 0 sq. mts RERA filing |
| Boundaries | North: EXISTING 33 WIDE ROAD; east, west and south: OTHERS LAND RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | District Town and Country Planning Officer, Sangareddy District; the layout proceedings are by Lingampally Grampanchayat under delegated authority Approvals record |
| Principal approval | Draft-TLP No.02/2025/DTCPO/SRD, dated 15.04.2025 Approvals record |
| Approved development | Draft technical layout pattern for 28 plots |
| Layout land-use split in approval | Layout area Ac. 2.075 Cents; 10043.00 Sq. Yds.; plotted area Ac. 1.2415 Cents; 6008.86 Sq. Yds. (59.84%); road area Ac. 0.626 Cents; 3029.84 Sq. Yds. (30.16%); open area Ac. 0.2075 Cents; 1004.30 Sq. Yds. (10.00%) |
| Approved built-up area | 5024.17 sq. mts is recorded in the RERA filing’s built-up-area field; the supplied material does not explain its application to this plotted development. RERA filing |
| Buildings, floors and parking levels | Not disclosed in the supplied RERA project records. The registered offering is plotted development, not an apartment building. RERA filing |
| Mortgage-area entry | RERA land details record 772.94 sq. mts; the layout approval identifies Plot Nos. 2 to 5 as the mortgage area, stated as Ac. 0.191 Cents; 924.44 Sq. Yds. RERA filing |
| Plot-count status | Approval records 28 plots. Booked/available plot counts are not supplied. |
Offering and status
| Field | Record |
|---|---|
| Offering | Plots in a plotted development; individual plot sizes, plot-number schedule and saleable-size range are not supplied in the reviewed data. RERA record |
| Booked / available | Not disclosed in the supplied records. |
| Development progress | The RERA filing records project completeness as 70%; this is a filed progress figure, not an independent site verification. RERA record |
| Completion date | RERA registration record: 14/08/2027 proposed completion; the Form-B declaration states r4t04t2027 as its completion undertaking. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied records. For this plotted layout, the available approval documents concern draft layout approval and its conditions. Document index |
2. The project story
- Project identity and site: ROYAL PEARL VALLEY PHASE II is registered with TG-RERA as a plotted development by SAKO INFRA PRIVATE LIMITED. The recorded site is in Lingampally village, Munpally mandal, Sangareddy district, on Survey No. 101/P; the RERA filing gives PIN 502345. The site’s north boundary is recorded as an existing 33-wide road. RERA record RERA filing RERA filing
- Layout and delivery conditions: The layout approval describes a 28-plot scheme and allocates land to plots, roads and open space. Its draft-layout conditions also require the developer to complete specified layout works and hand over the open and road areas by registered gift deed before final layout release. The supplied records do not provide plot-by-plot areas, a booking schedule, or independent site-progress verification.
- Progress and certification: The RERA filing’s 70% completeness figure is a promoter-filed status figure. It should not be read as an independently measured construction or delivery milestone. No occupancy or completion certificate is present in the supplied project documents. RERA record Document index
3. Master plan, architecture & building design
The project is a land layout, not a documented multi-storey building scheme. The DTCP approval describes a draft layout over Ac. 2.075 Cents; 10043.00 Sq. Yds., with 28 plots, a plotted area of Ac. 1.2415 Cents; 6008.86 Sq. Yds., roads of Ac. 0.626 Cents; 3029.84 Sq. Yds., and open area of Ac. 0.2075 Cents; 1004.30 Sq. Yds.
- Mortgage area: The approval identifies Plot Nos. 2 to 5 as the 15.38% mortgage area, stated as Ac. 0.191 Cents; 924.44 Sq. Yds. The RERA land-details form separately records a mortgage area of 772.94 sq. mts. RERA filing
- Approval requirements: The approval conditions call for road formation and drainage, storm-water run-off arrangements, greenery and avenue planting, rainwater-harvesting pits, fencing of open spaces, street lighting, electricity, sewerage disposal and protected water supply. These are approval requirements; the supplied record does not establish that each item has been completed.
- Building information and plans: No building footprint, plot-by-plot arrangement drawing, floor configuration, tower count, apartment layout or measured building area is available in the supplied drawing-derived records. The two floor-plan scans are pending and none has been measured. The RERA-filed approved built-up area is 5024.17 sq. mts; its relationship to the plotted layout is not explained in the supplied records. RERA filing Floor plans
4. Homes, configurations & floor plans
This is a plotted development. The approval records 28 plots, but the supplied records do not give plot numbers with corresponding areas, size bands, booked or available counts, or a saleable-size range.
| Offering | Units / plots | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Plots | 28 approved plots | Not disclosed | Not disclosed | Not disclosed by individual plot or range | Not applicable | Not supplied |
No plot-level floor plans or measurements are available. The filed approved built-up-area figure of 5024.17 sq. mts is not a plot-size figure, and the supplied documents do not explain its scope. RERA filing Floor plans
5. Parking & vehicle circulation
The supplied project records do not establish a sanctioned parking-space count, plot-level parking arrangements, visitor or accessible parking, or parking allocation to buyers. No parking levels, ramps, EV charging provision or pedestrian-vehicle separation details are available. RERA amenities
The layout approval requires roads to be opened for access to neighbouring sites and specifies road formation works. It does not, in the supplied material, document parking bays or exclusive parking rights.
6. Amenities, recreation & open spaces
| Facility | Open area |
|---|---|
| Description / size | Ac. 0.2075 Cents; 1004.30 Sq. Yds. (10.00%) |
| Declared progress / verified status | Shown in the draft layout approval; handover by registered gift deed is required before final layout release. Completion is not established. |
| Facility | Greenery, avenue plantation, rainwater-harvesting pits and fencing of open spaces |
|---|---|
| Description / size | Sizes and quantities not supplied |
| Declared progress / verified status | Approval conditions; completion not independently verified. |
| Facility | Roads |
|---|---|
| Description / size | Ac. 0.626 Cents; 3029.84 Sq. Yds. (30.16%) |
| Declared progress / verified status | Shown in the draft layout approval; handover by registered gift deed is required before final layout release. The approval also requires road formation and access to neighbouring sites. |
| Facility | Street lighting and electricity facilities |
|---|---|
| Description / size | Size, capacity and quantity not supplied |
| Declared progress / verified status | Required by the approval conditions; completion not established. |
| Facility | Sewerage disposal and protected water supply |
|---|---|
| Description / size | Capacity and system details not supplied |
| Declared progress / verified status | Required by the approval conditions; completion not established. |
| Facility | Storm-water drainage and nala channelization |
|---|---|
| Description / size | Capacity and system details not supplied |
| Declared progress / verified status | Required by the approval conditions; completion not established. |
The RERA amenity record also lists internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/park, street lighting, rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES”; it records 0% against the listed amenity entries. These are filing entries, not independent confirmation of delivery. RERA amenities
7. Utilities, building services & safety
The layout approval requires protected water supply, sewerage disposal, underground or side drains, nala channelization for storm-water run-off, street lighting and electricity facilities, and rainwater-harvesting pits. The supplied documents do not provide capacities, engineering designs, commissioning records or independent confirmation that these systems are complete.
The RERA amenity form marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting and electrical meter room/sub-station/receiving station as available (“YES”), while recording 0% progress for listed amenities. It does not specify water sources or storage capacity, sewage-treatment configuration or capacity, power-backup capacity, fire-system details, waste-processing arrangements, CCTV or access-control specifications. RERA amenities
No building-level lift, fire-escape, accessibility or life-safety details are supplied for this plotted layout. Vendor-listed services such as power backup, security, CCTV and fire sprinklers are not established by the project’s supplied approval documents. Promoter website
8. Location, access & connectivity
- Site identity and boundaries: The official project identity places the layout at Lingampally village, Munpally mandal, Sangareddy district, PIN 502345, on Survey No. 101/P. The site’s recorded north boundary is an existing 33-wide road; the other three boundaries are recorded as “OTHERS LAND.” RERA record RERA filing RERA filing
- Sampled connectivity: The location data provides one sampled connectivity distance: Outer Ring Road (nearest sampled interchange, approx) — 51.5 km. This is the supplied approximate measured distance; no travel time or public-transport information is provided. Location record
9. Developer & development status
- Promoter and project registration: The registered legal promoter is SAKO INFRA PRIVATE LIMITED, identified as a company. The RERA certificate identifies the project as ROYAL PEARL VALLEY PHASE II, registration P01100010450. Mohammed Suleman is identified in the project documents as an authorized signatory; Mohammed Obaid Ur Rahman is listed as a director. Corporate record Parties record
- Completion and progress: The RERA filing records a proposed completion date of 14/08/2027 and completeness of 70%. The Form-B declaration, signed by Mohammed Suleman for the company in JUL 2025, gives a completion undertaking transcribed as r4t04t2027. The supplied material does not include independent construction-progress verification or a completion/occupancy certificate. RERA record Document index
10. Approvals, official records & documents
| Identifier / date | P01100010450; valid 15/04/2025–14/04/2027 |
|---|---|
| What the supplied record establishes | Form-C certificate for ROYAL PEARL VALLEY PHASE II, identifying SAKO INFRA PRIVATE LIMITED as promoter and the project site in Lingampally, Munpally, Sangareddy. |
| Identifier / date | Draft-TLP No.02/2025/DTCPO/SRD; 15.04.2025; application 16249/1010 |
|---|---|
| What the supplied record establishes | Draft technical layout approval for 28 plots on Survey No. 101/P, subject to stated conditions. |
| Identifier / date | TLP No.02/2025/DTCPO/SRD; date transcribed as 2108/25 |
|---|---|
| What the supplied record establishes | Proceedings releasing the draft technical layout pattern, with a condition to hand over the open space before final layout release. |
| Identifier / date | TLP NO. 02 / 2025/DTCPO/SRD; file C.No.77 / 2024/E.P./DTCPO/SRD |
|---|---|
| What the supplied record establishes | “Extract of Lingampally Map” filed with the RERA record. |
| Identifier / date | JUL 2025 |
|---|---|
| What the supplied record establishes | Promoter declaration by Mohammed Suleman on behalf of SAKO INFRA PRIVATE LIMITED, including statements about title, encumbrances, funds and completion. These are promoter declarations. |
| Identifier / date | Dated 21-12-2025 |
|---|---|
| What the supplied record establishes | Advocate U. Bhaskar Rao’s report concerning land described as 10043.00 Sq.Yards or 3788.66 S.Mtrs in Sy No. 101/P; it records a title opinion and notes that originals should replace photocopies and that a search report is to be taken by the company. |
No occupancy or completion certificate is identified in the supplied documents. The available layout approval is expressly a draft layout approval and includes conditions for development works and final layout release.
1. Project at a glance
Project identity
Registered project name: ROYAL PEARL VALLEY PHASE II
Project type: Plotted development
Phase / registered portion: Phase II; the RERA certificate identifies this registration, but the supplied record does not describe the relationship to any other phase
TG-RERA registration: P01100010450
Registration validity: 15 April 2025–14 April 2027, unless extended by the Authority
Registered promoter: SAKO INFRA PRIVATE LIMITED, a company
RERA status: Registered; status is recorded as “New Project”
Land and geographic identity
Locality / revenue village: Lingampally / LINGAMPALLY; the RERA filing and approval records identify Lingampally village. No other project revenue village is identified in the supplied records.
Mandal: MUNPALLY (also written Munipally in approval documents)
District / PIN: Sangareddy / 502345
Project survey number(s): 101/P
Subdivisions: No further subdivision is specified in the RERA project identity; the approval and registration records identify the site as 101/P.
Registered site extent: 8397.22 sq. m. in the RERA land details
Approval-documented layout extent: Ac. 2.075 Cents; 10043.00 Sq. Yds.
RERA land-area fields: Total area 8397.22 sq. mts; net area 8397.22 sq. mts; area affected in road widening/FTL of tanks/nala widening 0 sq. mts
Boundaries: North: EXISTING 33 WIDE ROAD; east, west and south: OTHERS LAND
Development identity
Sanctioning authority: District Town and Country Planning Officer, Sangareddy District; the layout proceedings are by Lingampally Grampanchayat under delegated authority
Principal approval: Draft-TLP No.02/2025/DTCPO/SRD, dated 15.04.2025
Approved development: Draft technical layout pattern for 28 plots
Layout land-use split in approval: Layout area Ac. 2.075 Cents; 10043.00 Sq. Yds.; plotted area Ac. 1.2415 Cents; 6008.86 Sq. Yds. (59.84%); road area Ac. 0.626 Cents; 3029.84 Sq. Yds. (30.16%); open area Ac. 0.2075 Cents; 1004.30 Sq. Yds. (10.00%)
Approved built-up area: 5024.17 sq. mts is recorded in the RERA filing’s built-up-area field; the supplied material does not explain its application to this plotted development.
Buildings, floors and parking levels: Not disclosed in the supplied RERA project records. The registered offering is plotted development, not an apartment building.
Mortgage-area entry: RERA land details record 772.94 sq. mts; the layout approval identifies Plot Nos. 2 to 5 as the mortgage area, stated as Ac. 0.191 Cents; 924.44 Sq. Yds.
Plot-count status: Approval records 28 plots. Booked/available plot counts are not supplied.
Offering and status
Offering: Plots in a plotted development; individual plot sizes, plot-number schedule and saleable-size range are not supplied in the reviewed data.
Booked / available: Not disclosed in the supplied records.
Development progress: The RERA filing records project completeness as 70%; this is a filed progress figure, not an independent site verification.
Completion date: RERA registration record: 14/08/2027 proposed completion; the Form-B declaration states r4t04t2027 as its completion undertaking.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied records. For this plotted layout, the available approval documents concern draft layout approval and its conditions.
2. The project story
- Project identity and site: ROYAL PEARL VALLEY PHASE II is registered with TG-RERA as a plotted development by SAKO INFRA PRIVATE LIMITED. The recorded site is in Lingampally village, Munpally mandal, Sangareddy district, on Survey No. 101/P; the RERA filing gives PIN 502345. The site’s north boundary is recorded as an existing 33-wide road.
- Layout and delivery conditions: The layout approval describes a 28-plot scheme and allocates land to plots, roads and open space. Its draft-layout conditions also require the developer to complete specified layout works and hand over the open and road areas by registered gift deed before final layout release. The supplied records do not provide plot-by-plot areas, a booking schedule, or independent site-progress verification.
- Progress and certification: The RERA filing’s 70% completeness figure is a promoter-filed status figure. It should not be read as an independently measured construction or delivery milestone. No occupancy or completion certificate is present in the supplied project documents.
3. Master plan, architecture & building design
The project is a land layout, not a documented multi-storey building scheme. The DTCP approval describes a draft layout over Ac. 2.075 Cents; 10043.00 Sq. Yds., with 28 plots, a plotted area of Ac. 1.2415 Cents; 6008.86 Sq. Yds., roads of Ac. 0.626 Cents; 3029.84 Sq. Yds., and open area of Ac. 0.2075 Cents; 1004.30 Sq. Yds.
- Mortgage area: The approval identifies Plot Nos. 2 to 5 as the 15.38% mortgage area, stated as Ac. 0.191 Cents; 924.44 Sq. Yds. The RERA land-details form separately records a mortgage area of 772.94 sq. mts.
- Approval requirements: The approval conditions call for road formation and drainage, storm-water run-off arrangements, greenery and avenue planting, rainwater-harvesting pits, fencing of open spaces, street lighting, electricity, sewerage disposal and protected water supply. These are approval requirements; the supplied record does not establish that each item has been completed.
- Building information and plans: No building footprint, plot-by-plot arrangement drawing, floor configuration, tower count, apartment layout or measured building area is available in the supplied drawing-derived records. The two floor-plan scans are pending and none has been measured. The RERA-filed approved built-up area is 5024.17 sq. mts; its relationship to the plotted layout is not explained in the supplied records.
4. Homes, configurations & floor plans
This is a plotted development. The approval records 28 plots, but the supplied records do not give plot numbers with corresponding areas, size bands, booked or available counts, or a saleable-size range.
| Offering | Units / plots | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Plots | 28 approved plots | Not disclosed | Not disclosed | Not disclosed by individual plot or range | Not applicable | Not supplied |
No plot-level floor plans or measurements are available. The filed approved built-up-area figure of 5024.17 sq. mts is not a plot-size figure, and the supplied documents do not explain its scope.
5. Parking & vehicle circulation
The supplied project records do not establish a sanctioned parking-space count, plot-level parking arrangements, visitor or accessible parking, or parking allocation to buyers. No parking levels, ramps, EV charging provision or pedestrian-vehicle separation details are available.
The layout approval requires roads to be opened for access to neighbouring sites and specifies road formation works. It does not, in the supplied material, document parking bays or exclusive parking rights.
6. Amenities, recreation & open spaces
| Facility | Open area |
|---|---|
| Description / size | Ac. 0.2075 Cents; 1004.30 Sq. Yds. (10.00%) |
| Declared progress / verified status | Shown in the draft layout approval; handover by registered gift deed is required before final layout release. Completion is not established. |
| Facility | Greenery, avenue plantation, rainwater-harvesting pits and fencing of open spaces |
|---|---|
| Description / size | Sizes and quantities not supplied |
| Declared progress / verified status | Approval conditions; completion not independently verified. |
| Facility | Roads |
|---|---|
| Description / size | Ac. 0.626 Cents; 3029.84 Sq. Yds. (30.16%) |
| Declared progress / verified status | Shown in the draft layout approval; handover by registered gift deed is required before final layout release. The approval also requires road formation and access to neighbouring sites. |
| Facility | Street lighting and electricity facilities |
|---|---|
| Description / size | Size, capacity and quantity not supplied |
| Declared progress / verified status | Required by the approval conditions; completion not established. |
| Facility | Sewerage disposal and protected water supply |
|---|---|
| Description / size | Capacity and system details not supplied |
| Declared progress / verified status | Required by the approval conditions; completion not established. |
| Facility | Storm-water drainage and nala channelization |
|---|---|
| Description / size | Capacity and system details not supplied |
| Declared progress / verified status | Required by the approval conditions; completion not established. |
The RERA amenity record also lists internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/park, street lighting, rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES”; it records 0% against the listed amenity entries. These are filing entries, not independent confirmation of delivery.
7. Utilities, building services & safety
The layout approval requires protected water supply, sewerage disposal, underground or side drains, nala channelization for storm-water run-off, street lighting and electricity facilities, and rainwater-harvesting pits. The supplied documents do not provide capacities, engineering designs, commissioning records or independent confirmation that these systems are complete.
The RERA amenity form marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting and electrical meter room/sub-station/receiving station as available (“YES”), while recording 0% progress for listed amenities. It does not specify water sources or storage capacity, sewage-treatment configuration or capacity, power-backup capacity, fire-system details, waste-processing arrangements, CCTV or access-control specifications.
No building-level lift, fire-escape, accessibility or life-safety details are supplied for this plotted layout. Vendor-listed services such as power backup, security, CCTV and fire sprinklers are not established by the project’s supplied approval documents.
8. Location, access & connectivity
- Site identity and boundaries: The official project identity places the layout at Lingampally village, Munpally mandal, Sangareddy district, PIN 502345, on Survey No. 101/P. The site’s recorded north boundary is an existing 33-wide road; the other three boundaries are recorded as “OTHERS LAND.”
- Sampled connectivity: The location data provides one sampled connectivity distance: Outer Ring Road (nearest sampled interchange, approx) — 51.5 km. This is the supplied approximate measured distance; no travel time or public-transport information is provided.
9. Developer & development status
- Promoter and project registration: The registered legal promoter is SAKO INFRA PRIVATE LIMITED, identified as a company. The RERA certificate identifies the project as ROYAL PEARL VALLEY PHASE II, registration P01100010450. Mohammed Suleman is identified in the project documents as an authorized signatory; Mohammed Obaid Ur Rahman is listed as a director.
- Completion and progress: The RERA filing records a proposed completion date of 14/08/2027 and completeness of 70%. The Form-B declaration, signed by Mohammed Suleman for the company in JUL 2025, gives a completion undertaking transcribed as r4t04t2027. The supplied material does not include independent construction-progress verification or a completion/occupancy certificate.
10. Approvals, official records & documents
| Identifier / date | P01100010450; valid 15/04/2025–14/04/2027 |
|---|---|
| What the supplied record establishes | Form-C certificate for ROYAL PEARL VALLEY PHASE II, identifying SAKO INFRA PRIVATE LIMITED as promoter and the project site in Lingampally, Munpally, Sangareddy. |
| Identifier / date | Draft-TLP No.02/2025/DTCPO/SRD; 15.04.2025; application 16249/1010 |
|---|---|
| What the supplied record establishes | Draft technical layout approval for 28 plots on Survey No. 101/P, subject to stated conditions. |
| Identifier / date | TLP No.02/2025/DTCPO/SRD; date transcribed as 2108/25 |
|---|---|
| What the supplied record establishes | Proceedings releasing the draft technical layout pattern, with a condition to hand over the open space before final layout release. |
| Identifier / date | TLP NO. 02 / 2025/DTCPO/SRD; file C.No.77 / 2024/E.P./DTCPO/SRD |
|---|---|
| What the supplied record establishes | “Extract of Lingampally Map” filed with the RERA record. |
| Identifier / date | JUL 2025 |
|---|---|
| What the supplied record establishes | Promoter declaration by Mohammed Suleman on behalf of SAKO INFRA PRIVATE LIMITED, including statements about title, encumbrances, funds and completion. These are promoter declarations. |
| Identifier / date | Dated 21-12-2025 |
|---|---|
| What the supplied record establishes | Advocate U. Bhaskar Rao’s report concerning land described as 10043.00 Sq.Yards or 3788.66 S.Mtrs in Sy No. 101/P; it records a title opinion and notes that originals should replace photocopies and that a search report is to be taken by the company. |
No occupancy or completion certificate is identified in the supplied documents. The available layout approval is expressly a draft layout approval and includes conditions for development works and final layout release.
Frequently asked questions
Is ROYAL PEARL VALLEY PHASE II registered with Telangana RERA?
Yes. ROYAL PEARL VALLEY PHASE II is registered with the Telangana Real Estate Regulatory Authority as P01100010450; the registration status is New Project.
Who is the developer of ROYAL PEARL VALLEY PHASE II?
The promoter named in the RERA registration is SAKO INFRA PRIVATE LIMITED.
Where is ROYAL PEARL VALLEY PHASE II located?
ROYAL PEARL VALLEY PHASE II is in MUNIPALLY MANDAL, LINGAMPALLY, MUNPALLY, Sangareddy, Telangana (502345).
When will ROYAL PEARL VALLEY PHASE II be completed?
The promoter's proposed date of completion filed with RERA is 14/08/2027. This is the promoter's declaration, not a guarantee.