Onellas Lakshmi Abode
ONELLA CONSTRUCTIONS · Rangareddy · RERA P02400009979
ONELLAS LAKSHMI ABODE is a residential apartment project in Rock Town Colony, Road No 2, Saroornagar mandal, Ranga Reddy District. The registered promoter is ONELLA CONSTRUCTIONS, developing the project on **445.93 sq. m** of land as 1 residential building with **1 Stilt + 5 upper floors** and 10 homes: 5 2BHK and 5 3BHK units. The 2BHK units have a saleable area of **104.63 sq. m** each, and the 3BHK units have a saleable area of **124.4 sq. m** each. Its TG-RERA registration is **P02400009979**, and the promoter’s declared completion date is **19.02.2027**.
More from Onella Constructions · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
13 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | ONELLAS LAKSHMI ABODE RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Registered project; phase designation not disclosed. The filing describes one building. RERA record |
| TG-RERA registration | P02400009979 RERA record |
| Registration validity | 19/02/2024 to 19/02/2027, unless extended by the Authority. This is the registration period, not the construction completion date. RERA record |
| Registered promoter | ONELLA CONSTRUCTIONS RERA record Corporate record |
| RERA status | The project is registered; no current status label beyond the supplied registration record is provided. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / site description | Road No 2, Rock Town Colony; Plot Nos. 46 and 47 RERA record |
| Revenue village names in project records | Saroornagar; the building-plan records also identify Tummabowli / Tumma Bowli |
| Mandal | Saroornagar RERA record |
| District | Ranga Reddy / Rangareddy RERA record |
| PIN | 500035 RERA record |
| Survey number and subdivision | Survey No. 13 (12 to 16) RERA record |
| Registered site extent | 445.93 sq. m in the project and building-permit records RERA record |
| Total / net land area | Total area 445.93 sq. m; net area 445.93 sq. m; affected area recorded as 0 sq. m. RERA filing |
| Boundaries | East: Plot No. 45; West: Plot No. 48; North: Plot Nos. 50 and 51; South: 40 FEET WIDE ROAD. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | 5635/GHMC/LBN/2024-BP, dated 19 February, 2024 Approvals record |
| Approved built-up area | 1234.55 sq. m is stated as proposed built-up area excluding parking and as net built-up area; the plan also states 1465.45 sq. m including parking and 1478.08 sq. m total built-up area. These are distinct figures as stated in the plan. |
| Building count and floors | 1 residential building; 1 Stilt + 5 upper floors. |
| Building height | 21.88mt. in the building-plan extraction; the permit-order extraction separately states Height of the Building 14.9 without a unit in that field. |
| Parking provision | Plan records 230.90 sq. m parking area; stilt is identified, and the permit conditions require approved stilt/parking areas to be used exclusively for parking. Parking-space counts are not supplied. |
| Unit counts | 10 total in the plan; the RERA filing lists 5 2BHK and 5 3BHK units. RERA unit table RERA unit details |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 5 units, saleable area 104.63 sq. m each as supplied. 3BHK: 5 units, saleable area 124.4 sq. m each as supplied. RERA unit table RERA unit details |
| Booked / available | Portal-derived figures show 0 booked / 5 available for each configuration, 10 available overall. The source gives no as-of date; treat these counts as indicative. RERA unit table RERA unit details |
| Construction stage | The filing identifies a proposed building; the permit is a building permit. The supplied records do not establish current on-site construction progress. |
| Completion date | Promoter’s Form B declaration states completion by 19.02.2027; the GHMC permit states construction to be completed before 19 February, 2027. |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is supplied. The building permit requires completion notice and an occupancy certificate; it states an occupancy certificate is compulsory before occupation. |
2. The project story
ONELLAS LAKSHMI ABODE is a registered residential apartment project on Plot Nos. 46 and 47 in Rock Town Colony, Road No. 2, identified in the project records with Survey No. 13 (12 to 16). The location is recorded as Saroornagar, Ranga Reddy District; the building-plan documents also name Tummabowli / Tumma Bowli village. RERA record
The filed development is a single residential building, with a stilt and five upper floors, and 10 homes: five 2BHK and five 3BHK. The GHMC building permit is dated 19 February, 2024. Although the project is described as new, under-construction, and proposed in the supplied records, there is no independently verified construction-progress information here. No occupancy or completion certificate is supplied, so the records do not establish that any portion is complete or certified for occupation. RERA record RERA unit table Promoter website RERA amenities
The promoter’s declared completion date is 19.02.2027, while the TG-RERA registration is valid through 19/02/2027 unless extended. These are separate recorded dates serving different purposes.
3. Master plan, architecture & building design
The GHMC building-plan record describes a proposed residential apartment building on a site of 445.93 sq. m, with one building and a stilt plus five upper floors. The plan identifies a 2.50 M. WIDE PASSAGE and records a 12.0M WIDE road; the building permit lists setbacks as Front 3.05, Rear 2.5, Side I 2.5, and Side II 2.5. Units for the setback figures are not stated in the extracted fields.
The plan records these separate area figures: TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 1234.55, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 1465.45, TOTAL BUILT UP AREA 1478.08, TOTAL DEDUCTIONS 28.62, NET BUILT UP AREA 1234.55, and PARKING AREA 230.90. The supplied extracts do not identify these as carpet area or provide an FSI-counted area.
The plan and permit refer to one residential use and do not provide a detailed account of lifts, stairs, floor-by-floor unit distribution, or common-area and open-space measurements. The building-plan conditions refer to tree plantation along the periphery, a tot-lot to be maintained as greenery, and a strip of greenery on the periphery; no delivered status is established.
4. Homes, configurations & floor plans
RERA-filed unit counts and saleable areas are set out below. The 3BHK drawing measurements are software-measured from the filed plan and are not RERA-filed carpet-area disclosures; they require review against the drawing geometry. No measured carpet-area figure is supplied for the 2BHK. RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 104.63 sq. m | Not supplied | Not supplied |
| 3BHK | 5 | 0 | 5 | 124.4 sq. m | Software-measured: 82.2–98.7 sq. m; median 91.0 sq. m (979 sq. ft) | 27% |
The source identifies four 3BHK flat designs measured from the drawing. One first-floor plan example (FF-2) labels three bedrooms, living/dining, kitchen, toilets and a utility area; the utility is excluded from the supplied carpet-area measurement. For that example, the drawing labels dimensions including living/dining 7.26 × 3.35 m, kitchen 3.28 × 2.61 m, and utility 3.28 × 1.25 m. These are drawing-derived measurements, not RERA disclosures. RERA unit details Floor plans
Saleable area is the RERA-filed unit figure shown above; the drawing-based carpet estimate is a separate measurement. The supplied data does not separately quantify balcony area or common-area loading components beyond the stated 3BHK loading percentage. RERA unit details Floor plans
5. Parking & vehicle circulation
The building-plan extraction records a parking area of 230.90 sq. m and the permit identifies a stilt level. The plan conditions require cellar and stilt areas approved for parking to be used exclusively for vehicle parking and not partitioned or converted to other uses.
No sanctioned car or two-wheeler space count, visitor or accessible-space provision, parking allocation by unit, ramp arrangement, or EV-charging provision is established by the supplied project records. A stated parking area does not establish exclusive ownership or allocation of individual bays.
6. Amenities, recreation & open spaces
The GHMC plan identifies a tot-lot, transformer space, garbage house, rainwater-harvesting structure, sump and overhead water tank. The permit specifies 2 rainwater-harvesting pits and calls for transformer space and a garbage house. The RERA amenities record marks several facilities as available, but records 0% progress for each listed item; this is not evidence that they have been completed. RERA amenities
| Description / size | Tot-lot and greenery are specified in plan conditions; no size supplied. |
|---|---|
| Evidence source | GHMC plan and RERA amenities RERA amenities |
| Declared progress / verified status | RERA amenities record: 0%; completion not independently verified. |
| Description / size | Listed in RERA amenities; no dimensions supplied. |
|---|---|
| Evidence source | RERA amenities RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed as “YES” in RERA amenities; no source or capacity stated there. |
|---|---|
| Evidence source | RERA amenities RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | “Sewerage (Chamber, Lines, Septic Tank, STP)” listed as “YES”; treatment and disposal also listed. |
|---|---|
| Evidence source | RERA amenities RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed in RERA amenities; no design details supplied. |
|---|---|
| Evidence source | RERA amenities RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Plan calls for a percolation pit; permit states 2 rainwater-harvesting pits. |
|---|---|
| Evidence source | GHMC plan and permit |
| Declared progress / verified status | RERA amenities record: 0%; completion not independently verified. |
| Description / size | Plan requires transformer space; RERA amenities lists electrical meter room, sub-station and receiving station. |
|---|---|
| Evidence source | GHMC plan and RERA amenities RERA amenities |
| Declared progress / verified status | RERA amenities record: 0%; completion not independently verified. |
| Description / size | Plan requires a garbage house; solid-waste management and disposal are also listed in RERA amenities. |
|---|---|
| Evidence source | GHMC plan and RERA amenities RERA amenities |
| Declared progress / verified status | RERA amenities record: 0%; completion not independently verified. |
| Description / size | Street lighting, community buildings, energy management, fire protection and aggregate recreational open space appear in the RERA amenities list. |
|---|---|
| Evidence source | RERA amenities RERA amenities |
| Declared progress / verified status | 0% where recorded; no independent completion verification. |
The supplied project records do not establish a clubhouse, swimming pool, gym, or other indoor or sports facility as a sanctioned or delivered project amenity. RERA amenities
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, storm-water drains, rainwater harvesting, energy management, and electrical meter room/sub-station/receiving station as available, while showing 0% progress for the listed facilities. The building-plan extract specifies a SUMP 3.00X2.00 X 2.00 and an O.H WATER TANK; capacities are not provided. RERA amenities
The permit requires a transformer space and a garbage house, and specifies 2 rainwater-harvesting pits. It also states that an Occupancy FIRE NOC shall be obtained from the Director (EV&DM) before issue of the Occupancy Certificate. The records supplied do not include that NOC or an occupancy certificate.
The plan conditions state that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. They do not establish the number or capacity of lifts, fire-system details, escape-stair arrangement, backup-power capacity, water source for this project, STP capacity, or accessibility features.
8. Location, access & connectivity
The registered project location is Plot Nos. 46 and 47, Road No. 2, Rock Town Colony, Saroornagar, Ranga Reddy District, PIN 500035. The project records identify Survey No. 13 (12 to 16); the building-plan material also names Tummabowli / Tumma Bowli village. RERA record
The building-permit extraction records an 18 mt. road width, while the land-boundary record describes the southern boundary as a 40 FEET WIDE ROAD. RERA filing
The supplied location data gives an approximate 8.4 km distance to the nearest sampled Outer Ring Road interchange. No project-verified public-transport routes or landmark distances are supplied in the official project records used for this overview. Location record
9. Developer & development status
The registered promoter is ONELLA CONSTRUCTIONS, identified in the RERA filing as a partnership. Its supplied GSTIN is 36AAHFO5502G1ZF. The project record names Anitha Rao Sunkineni as authorized signatory and Sasikala Ambati as partner. A promoter office address is listed as Plot No. 142/2, Phase 1, Tummabowli, Road No. 2, Rock Town Colony, Saroornagar, Ranga Reddy, 500035. Corporate record Parties record RERA filing RERA filing
The project is registered as one building with 10 homes. The permit identifies a stilt plus five upper floors and requires a completion notice and occupancy certificate before occupation. The supplied evidence does not establish current construction progress, completed works, or an issued occupancy certificate. RERA amenities
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for ONELLAS LAKSHMI ABODE, registration P02400009979, valid 19/02/2024–19/02/2027 unless extended. |
| GHMC building permit | Building Permit Order 5635/GHMC/LBN/2024-BP, dated 19 February, 2024, for a residential building on Plot Nos. 46 and 47. |
| Building plan | GHMC building-plan record describing one proposed residential building, stilt plus five upper floors, 10 units, and site extent 445.93 sq. m. |
| Permit-related identifiers | File No. 011185/GHMC/5502/LBN2/2023-BP; LRS proceeding LRS27022018021638; DRC No. 02360/TDR/2023. |
| Promoter declaration | Form B affidavit by ONELLA CONSTRUCTIONS, dated 4th on April day of 2025, declaring a completion date of 19.02.2027. |
| Completion / occupancy records | No completion certificate, occupancy certificate, or occupancy fire NOC is supplied in the reviewed project documents. The permit identifies these as required steps before occupation. |
1. Project at a glance
Project identity
Registered project name: ONELLAS LAKSHMI ABODE
Project type: Residential apartment project
Phase / registered portion: Registered project; phase designation not disclosed. The filing describes one building.
TG-RERA registration: P02400009979
Registration validity: 19/02/2024 to 19/02/2027, unless extended by the Authority. This is the registration period, not the construction completion date.
Registered promoter: ONELLA CONSTRUCTIONS
RERA status: The project is registered; no current status label beyond the supplied registration record is provided.
Land and geographic identity
Locality / site description: Road No 2, Rock Town Colony; Plot Nos. 46 and 47
Revenue village names in project records: Saroornagar; the building-plan records also identify Tummabowli / Tumma Bowli
Mandal: Saroornagar
District: Ranga Reddy / Rangareddy
PIN: 500035
Survey number and subdivision: Survey No. 13 (12 to 16)
Registered site extent: 445.93 sq. m in the project and building-permit records
Total / net land area: Total area 445.93 sq. m; net area 445.93 sq. m; affected area recorded as 0 sq. m.
Boundaries: East: Plot No. 45; West: Plot No. 48; North: Plot Nos. 50 and 51; South: 40 FEET WIDE ROAD.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: 5635/GHMC/LBN/2024-BP, dated 19 February, 2024
Approved built-up area: 1234.55 sq. m is stated as proposed built-up area excluding parking and as net built-up area; the plan also states 1465.45 sq. m including parking and 1478.08 sq. m total built-up area. These are distinct figures as stated in the plan.
Building count and floors: 1 residential building; 1 Stilt + 5 upper floors.
Building height: 21.88mt. in the building-plan extraction; the permit-order extraction separately states Height of the Building 14.9 without a unit in that field.
Parking provision: Plan records 230.90 sq. m parking area; stilt is identified, and the permit conditions require approved stilt/parking areas to be used exclusively for parking. Parking-space counts are not supplied.
Unit counts: 10 total in the plan; the RERA filing lists 5 2BHK and 5 3BHK units.
Offering and status
RERA-filed configurations: 2BHK: 5 units, saleable area 104.63 sq. m each as supplied. 3BHK: 5 units, saleable area 124.4 sq. m each as supplied.
Booked / available: Portal-derived figures show 0 booked / 5 available for each configuration, 10 available overall. The source gives no as-of date; treat these counts as indicative.
Construction stage: The filing identifies a proposed building; the permit is a building permit. The supplied records do not establish current on-site construction progress.
Completion date: Promoter’s Form B declaration states completion by 19.02.2027; the GHMC permit states construction to be completed before 19 February, 2027.
Occupancy / completion certificate: No occupancy certificate or completion certificate is supplied. The building permit requires completion notice and an occupancy certificate; it states an occupancy certificate is compulsory before occupation.
2. The project story
ONELLAS LAKSHMI ABODE is a registered residential apartment project on Plot Nos. 46 and 47 in Rock Town Colony, Road No. 2, identified in the project records with Survey No. 13 (12 to 16). The location is recorded as Saroornagar, Ranga Reddy District; the building-plan documents also name Tummabowli / Tumma Bowli village.
The filed development is a single residential building, with a stilt and five upper floors, and 10 homes: five 2BHK and five 3BHK. The GHMC building permit is dated 19 February, 2024. Although the project is described as new, under-construction, and proposed in the supplied records, there is no independently verified construction-progress information here. No occupancy or completion certificate is supplied, so the records do not establish that any portion is complete or certified for occupation.
The promoter’s declared completion date is 19.02.2027, while the TG-RERA registration is valid through 19/02/2027 unless extended. These are separate recorded dates serving different purposes.
3. Master plan, architecture & building design
The GHMC building-plan record describes a proposed residential apartment building on a site of 445.93 sq. m, with one building and a stilt plus five upper floors. The plan identifies a 2.50 M. WIDE PASSAGE and records a 12.0M WIDE road; the building permit lists setbacks as Front 3.05, Rear 2.5, Side I 2.5, and Side II 2.5. Units for the setback figures are not stated in the extracted fields.
The plan records these separate area figures: TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 1234.55, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 1465.45, TOTAL BUILT UP AREA 1478.08, TOTAL DEDUCTIONS 28.62, NET BUILT UP AREA 1234.55, and PARKING AREA 230.90. The supplied extracts do not identify these as carpet area or provide an FSI-counted area.
The plan and permit refer to one residential use and do not provide a detailed account of lifts, stairs, floor-by-floor unit distribution, or common-area and open-space measurements. The building-plan conditions refer to tree plantation along the periphery, a tot-lot to be maintained as greenery, and a strip of greenery on the periphery; no delivered status is established.
4. Homes, configurations & floor plans
RERA-filed unit counts and saleable areas are set out below. The 3BHK drawing measurements are software-measured from the filed plan and are not RERA-filed carpet-area disclosures; they require review against the drawing geometry. No measured carpet-area figure is supplied for the 2BHK.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 104.63 sq. m | Not supplied | Not supplied |
| 3BHK | 5 | 0 | 5 | 124.4 sq. m | Software-measured: 82.2–98.7 sq. m; median 91.0 sq. m (979 sq. ft) | 27% |
The source identifies four 3BHK flat designs measured from the drawing. One first-floor plan example (FF-2) labels three bedrooms, living/dining, kitchen, toilets and a utility area; the utility is excluded from the supplied carpet-area measurement. For that example, the drawing labels dimensions including living/dining 7.26 × 3.35 m, kitchen 3.28 × 2.61 m, and utility 3.28 × 1.25 m. These are drawing-derived measurements, not RERA disclosures.
Saleable area is the RERA-filed unit figure shown above; the drawing-based carpet estimate is a separate measurement. The supplied data does not separately quantify balcony area or common-area loading components beyond the stated 3BHK loading percentage.
5. Parking & vehicle circulation
The building-plan extraction records a parking area of 230.90 sq. m and the permit identifies a stilt level. The plan conditions require cellar and stilt areas approved for parking to be used exclusively for vehicle parking and not partitioned or converted to other uses.
No sanctioned car or two-wheeler space count, visitor or accessible-space provision, parking allocation by unit, ramp arrangement, or EV-charging provision is established by the supplied project records. A stated parking area does not establish exclusive ownership or allocation of individual bays.
6. Amenities, recreation & open spaces
The GHMC plan identifies a tot-lot, transformer space, garbage house, rainwater-harvesting structure, sump and overhead water tank. The permit specifies 2 rainwater-harvesting pits and calls for transformer space and a garbage house. The RERA amenities record marks several facilities as available, but records 0% progress for each listed item; this is not evidence that they have been completed.
| Description / size | Tot-lot and greenery are specified in plan conditions; no size supplied. |
|---|---|
| Evidence source | GHMC plan and RERA amenities |
| Declared progress / verified status | RERA amenities record: 0%; completion not independently verified. |
| Description / size | Listed in RERA amenities; no dimensions supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed as “YES” in RERA amenities; no source or capacity stated there. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | “Sewerage (Chamber, Lines, Septic Tank, STP)” listed as “YES”; treatment and disposal also listed. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed in RERA amenities; no design details supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Plan calls for a percolation pit; permit states 2 rainwater-harvesting pits. |
|---|---|
| Evidence source | GHMC plan and permit |
| Declared progress / verified status | RERA amenities record: 0%; completion not independently verified. |
| Description / size | Plan requires transformer space; RERA amenities lists electrical meter room, sub-station and receiving station. |
|---|---|
| Evidence source | GHMC plan and RERA amenities |
| Declared progress / verified status | RERA amenities record: 0%; completion not independently verified. |
| Description / size | Plan requires a garbage house; solid-waste management and disposal are also listed in RERA amenities. |
|---|---|
| Evidence source | GHMC plan and RERA amenities |
| Declared progress / verified status | RERA amenities record: 0%; completion not independently verified. |
| Description / size | Street lighting, community buildings, energy management, fire protection and aggregate recreational open space appear in the RERA amenities list. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% where recorded; no independent completion verification. |
The supplied project records do not establish a clubhouse, swimming pool, gym, or other indoor or sports facility as a sanctioned or delivered project amenity.
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, storm-water drains, rainwater harvesting, energy management, and electrical meter room/sub-station/receiving station as available, while showing 0% progress for the listed facilities. The building-plan extract specifies a SUMP 3.00X2.00 X 2.00 and an O.H WATER TANK; capacities are not provided.
The permit requires a transformer space and a garbage house, and specifies 2 rainwater-harvesting pits. It also states that an Occupancy FIRE NOC shall be obtained from the Director (EV&DM) before issue of the Occupancy Certificate. The records supplied do not include that NOC or an occupancy certificate.
The plan conditions state that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. They do not establish the number or capacity of lifts, fire-system details, escape-stair arrangement, backup-power capacity, water source for this project, STP capacity, or accessibility features.
8. Location, access & connectivity
The registered project location is Plot Nos. 46 and 47, Road No. 2, Rock Town Colony, Saroornagar, Ranga Reddy District, PIN 500035. The project records identify Survey No. 13 (12 to 16); the building-plan material also names Tummabowli / Tumma Bowli village.
The building-permit extraction records an 18 mt. road width, while the land-boundary record describes the southern boundary as a 40 FEET WIDE ROAD.
The supplied location data gives an approximate 8.4 km distance to the nearest sampled Outer Ring Road interchange. No project-verified public-transport routes or landmark distances are supplied in the official project records used for this overview.
9. Developer & development status
The registered promoter is ONELLA CONSTRUCTIONS, identified in the RERA filing as a partnership. Its supplied GSTIN is 36AAHFO5502G1ZF. The project record names Anitha Rao Sunkineni as authorized signatory and Sasikala Ambati as partner. A promoter office address is listed as Plot No. 142/2, Phase 1, Tummabowli, Road No. 2, Rock Town Colony, Saroornagar, Ranga Reddy, 500035.
The project is registered as one building with 10 homes. The permit identifies a stilt plus five upper floors and requires a completion notice and occupancy certificate before occupation. The supplied evidence does not establish current construction progress, completed works, or an issued occupancy certificate.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for ONELLAS LAKSHMI ABODE, registration P02400009979, valid 19/02/2024–19/02/2027 unless extended.
GHMC building permit: Building Permit Order 5635/GHMC/LBN/2024-BP, dated 19 February, 2024, for a residential building on Plot Nos. 46 and 47.
Building plan: GHMC building-plan record describing one proposed residential building, stilt plus five upper floors, 10 units, and site extent 445.93 sq. m.
Permit-related identifiers: File No. 011185/GHMC/5502/LBN2/2023-BP; LRS proceeding LRS27022018021638; DRC No. 02360/TDR/2023.
Promoter declaration: Form B affidavit by ONELLA CONSTRUCTIONS, dated 4th on April day of 2025, declaring a completion date of 19.02.2027.
Completion / occupancy records: No completion certificate, occupancy certificate, or occupancy fire NOC is supplied in the reviewed project documents. The permit identifies these as required steps before occupation.
Frequently asked questions
Is ONELLAS LAKSHMI ABODE registered with Telangana RERA?
Yes. ONELLAS LAKSHMI ABODE is registered with the Telangana Real Estate Regulatory Authority as P02400009979; the registration status is New Project.
Who is the developer of ONELLAS LAKSHMI ABODE?
The promoter named in the RERA registration is ONELLA CONSTRUCTIONS.
Where is ONELLAS LAKSHMI ABODE located?
ONELLAS LAKSHMI ABODE is in Road No 2, Rock Town Colony, Saroornagar, Rangareddy, Telangana (500035).
When will ONELLAS LAKSHMI ABODE be completed?
The promoter's proposed date of completion filed with RERA is 19/06/2027. This is the promoter's declaration, not a guarantee.