Janapriya Projects Lakefront - C1
JANAPRIYA PROJECTS · Medchal-Malkajgiri · RERA P02200000901
JANAPRIYA PROJECTS LAKEFRONT - C1 is a residential apartment project in YELLAREDDYGUDA, Keesara Mandal, Medchal-Malkajgiri District, developed by the registered promoter Janapriya Projects. The RERA-filed land area is 51,536.02 sq.mts, with a net area of 49,917.02 sq.mts; C1 is one building with 2 cellars, a ground floor and 9 upper floors. It has 219 units: 110 2BHK and 109 3BHK. Its TG-RERA registration number is P02200000901, and its proposed completion date is 20/08/2024.
More from Janapriya Projects · 8 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | JANAPRIYA PROJECTS LAKEFRONT - C1 RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | C1; the RERA registration and the occupancy record identify Block C1 |
| TG-RERA registration number | P02200000901 |
| Registration validity | Certificate states validity from 17/06/2019 to 20/08/2024; extension is recorded as not granted in the supplied certificate |
| Registered promoter | Janapriya Projects |
| Entity type | Partnership RERA filing |
| RERA status | Listed as On-Going Project in the supplied project record RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / village naming in records | Locality: YELLAREDDYGUDA; the building-permit and OC documents identify Kapra Village RERA record |
| Revenue village | Keesara in the project identity and registration certificate; Kapra in the building-permit and OC documents RERA record |
| Mandal | Keesara; the building-permit extraction spells it “Kesara(M)” RERA record |
| District | Medchal-Malkajgiri in the project identity and registration certificate; the OC extraction says MEDCHAL RERA record |
| PIN | 500062 RERA record |
| Project survey numbers / subdivisions | 663 PART / 663/P, 667, 668 and 671/P |
| RERA-filed land area | Total area 51,536.02 sq.mts; road-widening/FTL-affected area 1,619 sq.mts; net area 49,917.02 sq.mts RERA filing |
| OC-recorded site area | 49,917.02 m2; road-widening area 1,619.00; the OC extraction also records net area as 49,917.02 m2 |
| Boundaries in RERA filing | East: OPEN SPACE AND BLOCK B; West: OPEN SPACE AND PARK; North: OPEN SPACE AND BOCK A3; South: OPEN SPACE AND STP RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building permit | 53506/HO/EZ/Cir-1/2016, approved 20-08-2018 |
| RERA-filed plan approval number | 53506/HO/EZ/Cir-1/20 RERA record |
| C1 sanctioned configuration | 2 cellars for parking, ground + 9 upper floors |
| C1 occupancy-recorded configuration | 2 cellar, ground floor + 9 upper floors |
| Overall permission context | The building-permit extraction describes a larger multi-block development; the C1 registration is for the C1 phase/portion, not the whole development |
| Approved built-up area | Not separately identified for C1 in the supplied records. The OC records floor area of 20,981.7 m2 as per both sanctioned plan and site building plan |
| Building count in project filing | 1 proposed building unit RERA filing |
| Sanctioned unit count for C1 | Not identified in the supplied C1-specific sanction extraction. The building permit’s broader development schedule lists 1268 residential units + 37 LIG + 63 EWS across its listed blocks; this is not a C1-only count |
| RERA-filed unit count | 219 units RERA unit table |
Offering and status
| Field | Record |
|---|---|
| Configurations | 2BHK: 110 units; 3BHK: 109 units RERA unit table |
| Booked / available | 154 booked / 65 available as last read from the TG-RERA portal; the supplied record has no as-of date, so counts are indicative RERA unit table |
| RERA-filed saleable area | 2BHK: 30.47 sq.m; 3BHK: 24.74 sq.m RERA unit table |
| Construction stage | Project record lists it as On-Going Project; a GHMC occupancy certificate and architect’s completion certificate for C1 are also supplied RERA record |
| Original / revised completion date in RERA record | 20/08/2024 / 20/08/2024 RERA record |
| Occupancy certificate status and scope | GHMC occupancy certificate 4281/GHMC/LBN/2025-OC, dated 09 January, 2025, identifies Residential Apartment (Block C1) |
2. The project story
JANAPRIYA PROJECTS LAKEFRONT - C1 is the registered C1 portion of a residential apartment development. The project filing identifies its land as Survey Nos. 663 PART, 667, 668 and 671/P, with Keesara used in the RERA identity and Kapra Village used in the building-permit and occupancy records. The supplied records also identify YELLAREDDYGUDA as the locality RERA record.
GHMC’s building permit describes a larger multi-block development, while the C1-specific records identify one residential building with two cellar parking levels, a ground floor and nine upper floors. The C1 occupancy certificate records the building as inspected and fit for occupation; the accompanying architect’s Form 1A certifies completion in all aspects. These are documentary certifications, not an independent site inspection for this report.
The RERA filing lists 219 apartments across 2BHK and 3BHK configurations. Portal booking counts are indicative because the supplied capture has no as-of date. No drawing-based unit or room measurements are available in the supplied floor-plan review: all 10 drawings are recorded as scans pending RERA unit table RERA unit details Floor plans.
3. Master plan, architecture & building design
The supplied GHMC permit is for a multi-storied residential development and includes C1 among its listed blocks. For C1, the permit specifies 2 cellars for parking, ground + 9 upper floors. The C1 occupancy record likewise identifies two cellar levels, a ground floor and nine upper floors; it records a building height of 29.95 m and floor area of 20,981.7 m2 as both sanctioned and as built.
The project filing gives 51,536.02 sq.mts total site area, 1,619 sq.mts affected area and 49,917.02 sq.mts net area. The occupancy record gives 49,917.02 m2 as site area and repeats 1,619.00 as road-widening area RERA filing. The permit also describes a separate amenities block, but that block is part of the larger development and is not established here as a C1-only facility.
The supplied material does not include readable C1 floor-plan geometry or sufficient drawing detail to describe the building footprint, flats per floor, lift/stair layout, entries, internal circulation or residential/common-area distribution. The permit’s broader development schedule lists an amenities block with cellar parking, ground and six upper floors; this is not a C1 building configuration Floor plans.
4. Homes, configurations & floor plans
TG-RERA’s unit data records two configurations. The recorded saleable areas are presented as filed; no software-measured carpet areas are available because the supplied floor-plan review has 10 drawings pending scan and 0 measured RERA unit details Floor plans.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 110 | 79 | 31 | 30.47 sq.m | Not available | Not supplied |
| 3BHK | 109 | 75 | 34 | 24.74 sq.m | Not available | Not supplied |
Booked and available counts are as last read from the TG-RERA portal; no as-of date is supplied, so they should be treated as indicative RERA unit table. The supplied drawings have not been measured, so room dimensions, balconies, utilities and typical floor arrangements cannot be described from this evidence Floor plans.
5. Parking & vehicle circulation
The GHMC permit specifies two cellar levels for parking in C1 and states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking. It also records parking-area figures for the C1 occupancy record as 43,063.6 m2 under both sanctioned plan and site building plan.
The supplied records do not establish the number of parking spaces, visitor or accessible spaces, parking allocation to individual apartments, or a C1-specific parking ramp and driveway arrangement. A recorded parking area does not by itself establish exclusive parking rights for a particular unit.
6. Amenities, recreation & open spaces
The GHMC permit requires or identifies several facilities for the larger development, including a tot-lot, STP, rainwater-harvesting percolation pit, transformer space and garbage house. The occupancy extraction records a tot-lot area of 5,548.59 m2; the supplied extraction’s “amenities_utilities” labels appear transposed, so no separate parking or tot-lot interpretation is made from those labels beyond the clearly identified sanctioned-parameter entries.
| Description / size | Permit requires it to be fenced and maintained as greenery; OC record lists 5,548.59 m2 |
|---|---|
| Evidence source | GHMC permit and OC record |
| Declared progress / verified status | Permit condition; OC record provides area, but no separate independent site verification supplied |
| Description / size | Required by permit; RERA amenity record lists sewerage/STP at 40% RERA amenities |
|---|---|
| Evidence source | GHMC permit and RERA amenity record |
| Declared progress / verified status | RERA-declared progress; completion not independently verified |
| Description / size | Permit requires a percolation pit; RERA amenity record lists water conservation/rainwater harvesting RERA amenities |
|---|---|
| Evidence source | GHMC permit and RERA amenity record |
| Declared progress / verified status | Declared/required; completion not independently verified |
| Description / size | Listed as available in the RERA amenity record RERA amenities |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress shown as 0% in supplied record |
| Description / size | Listed in RERA amenity record RERA amenities |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress shown as 0% in supplied record |
| Description / size | Listed in RERA amenity record; permit refers to organized open spaces and roads RERA amenities |
|---|---|
| Evidence source | RERA amenity record and GHMC permit |
| Declared progress / verified status | Progress shown as 0% in supplied record; no independent completion verification |
| Description / size | Listed in RERA amenity record; permit requires a garbage house within the premises RERA amenities |
|---|---|
| Evidence source | RERA amenity record and GHMC permit |
| Declared progress / verified status | Progress shown as 0% in supplied record; no independent completion verification |
The supplied records do not establish C1-specific clubhouse, swimming pool, gym, library or sports-facility delivery. Such facilities appear only in third-party vendor data and are not relied upon here.
7. Utilities, building services & safety
The GHMC permit requires a rainwater-harvesting structure, transformer space and garbage house, and requires an STP. Its sanctioned parameters specify a separate underground static water-storage tank of 25,000 litres and a separate terrace tank of 25,000 litres for residential buildings.
The permit requires compliance with conditions insisted on by the Fire Services Department and Airport Authority of India, and assigns structural and fire-safety requirements to the owner, builder/developer, architect and structural engineer. The OC document also requires compliance with the fire-NOC conditions. These records do not supply equipment capacities or establish an independent inspection of operational fire systems.
The RERA amenity record lists water supply, sewerage/STP, storm-water drains, rainwater harvesting, energy management, fire protection, an electrical meter room/substation/receiving station and solid-waste management. Except for the STP entry shown at 40%, the supplied progress entries are 0%; these are portal-reported figures, not independent completion checks RERA amenities. Lift quantities, capacities, backup-power capacity, CCTV, access-control and accessibility provisions are not established in the supplied project documents.
8. Location, access & connectivity
The registered project record identifies the location as YELLAREDDYGUDA, Keesara Mandal, Medchal-Malkajgiri District, PIN 500062. The building permit and OC identify Kapra Village. A cadastral-parcel centroid is recorded at 17.53066, 78.65797 RERA record Location record.
The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 9.3 km Location record. No other approach-road, public-transport or landmark distances are available from the project-location record.
9. Developer & development status
The registered promoter is Janapriya Projects, a partnership RERA filing. The supplied RERA record names authorized signatory Nanda Nandan Reddy Nareddy and lists partners including Sarojini Devi M, Gopal Reddy A, Priyamvada Reddy K, Ujjwal Reddy K, Sujatha Reddy B, Lakshmi B and Janapriya Engineers Syndicate Limited represented by Ravinder Reddy K Parties record.
The RERA certificate states registration validity through 20/08/2024 and no extension is recorded in that certificate. Separately, GHMC issued C1 occupancy certificate 4281/GHMC/LBN/2025-OC on 09 January, 2025, and the architect’s Form 1A dated 31.03.2025 certifies overall completion of the registered C1 project.
10. Approvals, official records & documents
| Identifier / date | P02200000901; issued 17/06/2019; valid through 20/08/2024 |
|---|---|
| Scope and evidence | Registered project JANAPRIYA PROJECTS LAKEFRONT - C1; certificate includes the separate-account condition |
| Identifier / date | 53506/HO/EZ/Cir-1/2016; 20-08-2018 |
|---|---|
| Scope and evidence | Conditional permit for the multi-block residential development, including C1; C1 configuration is two cellar parking levels, ground + nine upper floors |
| Identifier / date | 53506/HO/EZ/Cir-1/20 |
|---|---|
| Scope and evidence | Approval number as recorded in the project filing RERA record |
| Identifier / date | 4281/GHMC/LBN/2025-OC; 09 January, 2025; application 013603/GHMC/6220/LBN1/2024-OC |
|---|---|
| Scope and evidence | Identifies Residential Apartment (Block C1) and records inspection/fitness for occupation |
| Identifier / date | Dated 31.03.2025; references OC 4281/GHMC/LBN/2025-OC |
|---|---|
| Scope and evidence | Certifies completion in all aspects of the registered C1 project |
| Identifier / date | 10 drawings; none measured; scans pending |
|---|---|
| Scope and evidence | Drawing-derived room and carpet measurements are unavailable in the supplied review Floor plans |
1. Project at a glance
Project identity
Registered project name: JANAPRIYA PROJECTS LAKEFRONT - C1
Project type: Residential apartment project
Phase / registered portion: C1; the RERA registration and the occupancy record identify Block C1
TG-RERA registration number: P02200000901
Registration validity: Certificate states validity from 17/06/2019 to 20/08/2024; extension is recorded as not granted in the supplied certificate
Registered promoter: Janapriya Projects
Entity type: Partnership
RERA status: Listed as On-Going Project in the supplied project record
Land and geographic identity
Locality / village naming in records: Locality: YELLAREDDYGUDA; the building-permit and OC documents identify Kapra Village
Revenue village: Keesara in the project identity and registration certificate; Kapra in the building-permit and OC documents
Mandal: Keesara; the building-permit extraction spells it “Kesara(M)”
District: Medchal-Malkajgiri in the project identity and registration certificate; the OC extraction says MEDCHAL
PIN: 500062
Project survey numbers / subdivisions: 663 PART / 663/P, 667, 668 and 671/P
RERA-filed land area: Total area 51,536.02 sq.mts; road-widening/FTL-affected area 1,619 sq.mts; net area 49,917.02 sq.mts
OC-recorded site area: 49,917.02 m2; road-widening area 1,619.00; the OC extraction also records net area as 49,917.02 m2
Boundaries in RERA filing: East: OPEN SPACE AND BLOCK B; West: OPEN SPACE AND PARK; North: OPEN SPACE AND BOCK A3; South: OPEN SPACE AND STP
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: 53506/HO/EZ/Cir-1/2016, approved 20-08-2018
RERA-filed plan approval number: 53506/HO/EZ/Cir-1/20
C1 sanctioned configuration: 2 cellars for parking, ground + 9 upper floors
C1 occupancy-recorded configuration: 2 cellar, ground floor + 9 upper floors
Overall permission context: The building-permit extraction describes a larger multi-block development; the C1 registration is for the C1 phase/portion, not the whole development
Approved built-up area: Not separately identified for C1 in the supplied records. The OC records floor area of 20,981.7 m2 as per both sanctioned plan and site building plan
Building count in project filing: 1 proposed building unit
Sanctioned unit count for C1: Not identified in the supplied C1-specific sanction extraction. The building permit’s broader development schedule lists 1268 residential units + 37 LIG + 63 EWS across its listed blocks; this is not a C1-only count
RERA-filed unit count: 219 units
Offering and status
Configurations: 2BHK: 110 units; 3BHK: 109 units
Booked / available: 154 booked / 65 available as last read from the TG-RERA portal; the supplied record has no as-of date, so counts are indicative
RERA-filed saleable area: 2BHK: 30.47 sq.m; 3BHK: 24.74 sq.m
Construction stage: Project record lists it as On-Going Project; a GHMC occupancy certificate and architect’s completion certificate for C1 are also supplied
Original / revised completion date in RERA record: 20/08/2024 / 20/08/2024
Occupancy certificate status and scope: GHMC occupancy certificate 4281/GHMC/LBN/2025-OC, dated 09 January, 2025, identifies Residential Apartment (Block C1)
2. The project story
JANAPRIYA PROJECTS LAKEFRONT - C1 is the registered C1 portion of a residential apartment development. The project filing identifies its land as Survey Nos. 663 PART, 667, 668 and 671/P, with Keesara used in the RERA identity and Kapra Village used in the building-permit and occupancy records. The supplied records also identify YELLAREDDYGUDA as the locality.
GHMC’s building permit describes a larger multi-block development, while the C1-specific records identify one residential building with two cellar parking levels, a ground floor and nine upper floors. The C1 occupancy certificate records the building as inspected and fit for occupation; the accompanying architect’s Form 1A certifies completion in all aspects. These are documentary certifications, not an independent site inspection for this report.
The RERA filing lists 219 apartments across 2BHK and 3BHK configurations. Portal booking counts are indicative because the supplied capture has no as-of date. No drawing-based unit or room measurements are available in the supplied floor-plan review: all 10 drawings are recorded as scans pending.
3. Master plan, architecture & building design
The supplied GHMC permit is for a multi-storied residential development and includes C1 among its listed blocks. For C1, the permit specifies 2 cellars for parking, ground + 9 upper floors. The C1 occupancy record likewise identifies two cellar levels, a ground floor and nine upper floors; it records a building height of 29.95 m and floor area of 20,981.7 m2 as both sanctioned and as built.
The project filing gives 51,536.02 sq.mts total site area, 1,619 sq.mts affected area and 49,917.02 sq.mts net area. The occupancy record gives 49,917.02 m2 as site area and repeats 1,619.00 as road-widening area. The permit also describes a separate amenities block, but that block is part of the larger development and is not established here as a C1-only facility.
The supplied material does not include readable C1 floor-plan geometry or sufficient drawing detail to describe the building footprint, flats per floor, lift/stair layout, entries, internal circulation or residential/common-area distribution. The permit’s broader development schedule lists an amenities block with cellar parking, ground and six upper floors; this is not a C1 building configuration.
4. Homes, configurations & floor plans
TG-RERA’s unit data records two configurations. The recorded saleable areas are presented as filed; no software-measured carpet areas are available because the supplied floor-plan review has 10 drawings pending scan and 0 measured.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 110 | 79 | 31 | 30.47 sq.m | Not available | Not supplied |
| 3BHK | 109 | 75 | 34 | 24.74 sq.m | Not available | Not supplied |
Booked and available counts are as last read from the TG-RERA portal; no as-of date is supplied, so they should be treated as indicative. The supplied drawings have not been measured, so room dimensions, balconies, utilities and typical floor arrangements cannot be described from this evidence.
5. Parking & vehicle circulation
The GHMC permit specifies two cellar levels for parking in C1 and states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking. It also records parking-area figures for the C1 occupancy record as 43,063.6 m2 under both sanctioned plan and site building plan.
The supplied records do not establish the number of parking spaces, visitor or accessible spaces, parking allocation to individual apartments, or a C1-specific parking ramp and driveway arrangement. A recorded parking area does not by itself establish exclusive parking rights for a particular unit.
6. Amenities, recreation & open spaces
The GHMC permit requires or identifies several facilities for the larger development, including a tot-lot, STP, rainwater-harvesting percolation pit, transformer space and garbage house. The occupancy extraction records a tot-lot area of 5,548.59 m2; the supplied extraction’s “amenities_utilities” labels appear transposed, so no separate parking or tot-lot interpretation is made from those labels beyond the clearly identified sanctioned-parameter entries.
| Description / size | Permit requires it to be fenced and maintained as greenery; OC record lists 5,548.59 m2 |
|---|---|
| Evidence source | GHMC permit and OC record |
| Declared progress / verified status | Permit condition; OC record provides area, but no separate independent site verification supplied |
| Description / size | Required by permit; RERA amenity record lists sewerage/STP at 40% |
|---|---|
| Evidence source | GHMC permit and RERA amenity record |
| Declared progress / verified status | RERA-declared progress; completion not independently verified |
| Description / size | Permit requires a percolation pit; RERA amenity record lists water conservation/rainwater harvesting |
|---|---|
| Evidence source | GHMC permit and RERA amenity record |
| Declared progress / verified status | Declared/required; completion not independently verified |
| Description / size | Listed as available in the RERA amenity record |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress shown as 0% in supplied record |
| Description / size | Listed in RERA amenity record |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress shown as 0% in supplied record |
| Description / size | Listed in RERA amenity record; permit refers to organized open spaces and roads |
|---|---|
| Evidence source | RERA amenity record and GHMC permit |
| Declared progress / verified status | Progress shown as 0% in supplied record; no independent completion verification |
| Description / size | Listed in RERA amenity record; permit requires a garbage house within the premises |
|---|---|
| Evidence source | RERA amenity record and GHMC permit |
| Declared progress / verified status | Progress shown as 0% in supplied record; no independent completion verification |
The supplied records do not establish C1-specific clubhouse, swimming pool, gym, library or sports-facility delivery. Such facilities appear only in third-party vendor data and are not relied upon here.
7. Utilities, building services & safety
The GHMC permit requires a rainwater-harvesting structure, transformer space and garbage house, and requires an STP. Its sanctioned parameters specify a separate underground static water-storage tank of 25,000 litres and a separate terrace tank of 25,000 litres for residential buildings.
The permit requires compliance with conditions insisted on by the Fire Services Department and Airport Authority of India, and assigns structural and fire-safety requirements to the owner, builder/developer, architect and structural engineer. The OC document also requires compliance with the fire-NOC conditions. These records do not supply equipment capacities or establish an independent inspection of operational fire systems.
The RERA amenity record lists water supply, sewerage/STP, storm-water drains, rainwater harvesting, energy management, fire protection, an electrical meter room/substation/receiving station and solid-waste management. Except for the STP entry shown at 40%, the supplied progress entries are 0%; these are portal-reported figures, not independent completion checks. Lift quantities, capacities, backup-power capacity, CCTV, access-control and accessibility provisions are not established in the supplied project documents.
8. Location, access & connectivity
The registered project record identifies the location as YELLAREDDYGUDA, Keesara Mandal, Medchal-Malkajgiri District, PIN 500062. The building permit and OC identify Kapra Village. A cadastral-parcel centroid is recorded at 17.53066, 78.65797.
The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 9.3 km. No other approach-road, public-transport or landmark distances are available from the project-location record.
9. Developer & development status
The registered promoter is Janapriya Projects, a partnership. The supplied RERA record names authorized signatory Nanda Nandan Reddy Nareddy and lists partners including Sarojini Devi M, Gopal Reddy A, Priyamvada Reddy K, Ujjwal Reddy K, Sujatha Reddy B, Lakshmi B and Janapriya Engineers Syndicate Limited represented by Ravinder Reddy K.
The RERA certificate states registration validity through 20/08/2024 and no extension is recorded in that certificate. Separately, GHMC issued C1 occupancy certificate 4281/GHMC/LBN/2025-OC on 09 January, 2025, and the architect’s Form 1A dated 31.03.2025 certifies overall completion of the registered C1 project.
10. Approvals, official records & documents
| Identifier / date | P02200000901; issued 17/06/2019; valid through 20/08/2024 |
|---|---|
| Scope and evidence | Registered project JANAPRIYA PROJECTS LAKEFRONT - C1; certificate includes the separate-account condition |
| Identifier / date | 53506/HO/EZ/Cir-1/2016; 20-08-2018 |
|---|---|
| Scope and evidence | Conditional permit for the multi-block residential development, including C1; C1 configuration is two cellar parking levels, ground + nine upper floors |
| Identifier / date | 53506/HO/EZ/Cir-1/20 |
|---|---|
| Scope and evidence | Approval number as recorded in the project filing |
| Identifier / date | 4281/GHMC/LBN/2025-OC; 09 January, 2025; application 013603/GHMC/6220/LBN1/2024-OC |
|---|---|
| Scope and evidence | Identifies Residential Apartment (Block C1) and records inspection/fitness for occupation |
| Identifier / date | Dated 31.03.2025; references OC 4281/GHMC/LBN/2025-OC |
|---|---|
| Scope and evidence | Certifies completion in all aspects of the registered C1 project |
| Identifier / date | 10 drawings; none measured; scans pending |
|---|---|
| Scope and evidence | Drawing-derived room and carpet measurements are unavailable in the supplied review |
Frequently asked questions
Is JANAPRIYA PROJECTS LAKEFRONT - C1 registered with Telangana RERA?
Yes. JANAPRIYA PROJECTS LAKEFRONT - C1 is registered with the Telangana Real Estate Regulatory Authority as P02200000901; the registration status is On-Going Project.
Who is the developer of JANAPRIYA PROJECTS LAKEFRONT - C1?
The promoter named in the RERA registration is JANAPRIYA PROJECTS.
Where is JANAPRIYA PROJECTS LAKEFRONT - C1 located?
JANAPRIYA PROJECTS LAKEFRONT - C1 is in YELLAREDDYGUDA, Keesara, Medchal-Malkajgiri, Telangana (500062).
When will JANAPRIYA PROJECTS LAKEFRONT - C1 be completed?
The promoter's proposed date of completion filed with RERA is 20/08/2024. This is the promoter's declaration, not a guarantee.