Kshetra 2
INDO QATAR PROJECTS PRIVATE LIMITED · Khammam · RERA P00800009625
KSHETRA 2 is a plotted development at Ammapalem Revenue Village, Konijerla Mandal, Khammam District, developed by the registered promoter INDO QATAR PROJECTS PRIVATE LIMITED. The registered site extent is Ac. 39.561 cents, and the layout records 595 plots; plot sizes are software-read as 65.46–647.04 sq.m. The TG-RERA registration number is P00800009625, and the promoter’s proposed completion date is 28/03/2027.
More from Indo Qatar Projects Pvt Ltd · 7 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | KSHETRA 2 RERA record |
| Project type | Plotted development RERA record |
| Phase / registered portion | Registered project portion identified as KSHETRA 2; no further phase description disclosed. RERA record |
| TG-RERA registration number | P00800009625 RERA record |
| Registration validity | 29/03/2025–28/03/2027; this is the registration validity period, not the completion deadline. Approvals record |
| Registered promoter | INDO QATAR PROJECTS PRIVATE LIMITED, a private limited company RERA record Corporate record |
| RERA status | Registered; certificate conditions include quarterly updates. Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Ammapalem Revenue Village RERA record |
| Mandal | Konijerla Mandal RERA record |
| District | Khammam RERA record |
| PIN | 507305 RERA record |
| Project survey numbers and subdivisions, as recorded | 80/Part, 81/part, 82/part, 83full, 84/part, 90/part, 91/part, 92Full, 93/Part, 106/Part, 107/Part, 109/Part, 110, 111/Part, 112/part RERA record |
| Registered site extent | Ac. 39.561 cents; the SUDA approval extraction also states 191485.903 Sq.Yds. |
| Net layout area | 160105.27 sq.mt. in the 2015 DTCPO drawing extraction; layout drawing-derived record separately reports 160105.39 sq.m Layout record. |
| Boundaries stated in the RERA filing | East: 9 14 MT WIDE EXISTING 18 29 MT WIDE PROPOSED ROAD; West: agricultural land of others, Sy. Nos. 80 Part and 112 Part; North: agricultural land of others, Sy. Nos. 85 and 86; South: agricultural land of others, Sy. Nos. 106 Part and 107 Part. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority / principal approval | SUDA, Tentative Layout Plan 425801/LP/GP/202452/0025/2024, approved 29-03-2025 Approvals record |
| Other recorded plan reference | DTCPO, Khammam: CONFIRMED T.L.P. NO. 37/2015/W, dated 12/06/2015 Approvals record |
| Approved use and scale | Plotted layout; 595 plots |
| Approved built-up area / buildings / floors | Not applicable to the recorded plotted-layout offering; no building-count or floor-configuration figures are disclosed. RERA filing |
| Roads and land reserved for common/public uses | Roads: 23.98%; open space/park: approximately 9.00%; social infrastructure: approximately 2.50%; utilities: approximately 1.00% in the drawing/approval records. |
| Common parking area | The DTCPO drawing extraction records 0.00 common parking area. |
Offering and status
| Item | Project record |
|---|---|
| Offering | Plots; 595 plots are stated in the layout records. |
| Plot-size range | Software-read from the layout drawing: 65.46–647.04 sq.m (approximately 78.3–773.9 sq.yd); verify against the drawing. Layout record |
| Booked / available counts | Not disclosed in the supplied evidence. |
| Construction stage | No independently verified site-progress measurement is supplied. The approval requires infrastructure and development works; the amenities schedule shows 0% progress against the listed items. RERA amenities |
| Completion deadline | Promoter’s Form B undertaking: 28/03/2027. |
| Completion / occupancy certificate status | No completion certificate or occupancy certificate is supplied; the record is for a plotted layout. Document index |
2. The project story
KSHETRA 2 is a plotted-layout development at Ammapalem Revenue Village in Konijerla Mandal, Khammam District. Its registered survey identity covers 15 survey references, including the specified part-survey entries and full-survey references shown above. The TG-RERA certificate registers the project as plotted development, and the SUDA approval record describes a tentative layout of 595 plots. RERA record
The layout is organized around roads, plots, park/open space, social-infrastructure land and utility land. The approved conditions require roads and drainage, greenery, rainwater-harvesting pits, street lighting, electricity facilities, a protected water supply and a sewerage-disposal system. These are approval requirements, not evidence that the works have been completed.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey residential building scheme. The SUDA approval records 595 plots across a stated layout area of Ac. 39.561 cents (191485.903 Sq.Yds). The DTCPO drawing extraction records a net layout area of 160105.27 sq.mt.; the layout dataset, read from the drawing, reports 160105.39 sq.m as its net-area base. Layout record
The drawing-derived land-use schedule reports 101686.75 sq.m for plots, 38393.43 sq.m for roads, 14415.94 sq.m for parks/open space, 1602.01 sq.m for utilities and 4007.14 sq.m for social infrastructure. It lists amenity area as 0.00. The layout dataset identifies two drawing sheets and says its plot schedule contains 595 plots; plot sizes were software-read from the drawing and should be verified against it. Layout record
The SUDA approval calls for a final layout submission supported by a work-completion certificate from a Licensed Technical Person. Its conditions also specify development works and handover of designated public-use areas. No final layout approval or work-completion certificate is supplied here.
4. Homes, configurations & floor plans
The project offering is plots, not apartments. The available layout data reports 595 plots and gives software-read plot-size bands:
| Plot-size band | Number of plots |
|---|---|
| 0–100 sq.yd (0–84 sq.m) | 1 |
| 100–150 sq.yd (84–125 sq.m) | 22 |
| 150–200 sq.yd (125–167 sq.m) | 136 |
| 200–250 sq.yd (167–209 sq.m) | 360 |
| 250–300 sq.yd (209–251 sq.m) | 44 |
| 300–400 sq.yd (251–334 sq.m) | 31 |
| 500–1000 sq.yd (418–836 sq.m) | 1 |
Layout record
The software-read smallest, median and largest plot areas are 65.46 sq.m, 167.23 sq.m and 647.04 sq.m respectively. The dataset says plot counts and sizes were read from the drawing and should be checked against it; these are not stated as RERA-filed carpet or apartment saleable areas. Layout record
No booked/available plot inventory, plot-specific saleable-area schedule, or purchaser-specific plot allocation is provided. The supplied floor-plan record has two layout sheets and no apartment plans or measured apartment carpet areas. Floor plans Layout record
5. Parking & vehicle circulation
The DTCPO drawing extraction lists 0.00 common parking area. The promoter-vendor record lists “Open Parking,” but supplies no count, allocation plan or evidence of an exclusive parking entitlement for a purchaser. Promoter website
The SUDA layout approval requires roads to be opened for access to neighbouring sites and lists proposed roads of 9.14m and 12.19m in the DTCPO drawing extraction. The RERA filing’s boundary text also refers to existing and proposed roads. No parking levels, vehicle-space counts, ramps, EV-charging provision or plot-specific parking arrangements are established by the supplied evidence. RERA filing
6. Amenities, recreation & open spaces
| Description / size | Drawing extraction: 14415.94 sq.m and 9.00%; SUDA extraction describes open space (park) as Ac3.562 cents 17241.464 Sq.Yds. |
|---|---|
| Declared progress / verified status | Required/reserved in the layout record; completion not verified. |
| Description / size | Drawing extraction: 4007.14 sq.m and 2.50%; SUDA extraction describes Ac 0.99 cents 4792.539 Sq.Yds. |
|---|---|
| Declared progress / verified status | Reserved in the layout record; completion not verified. |
| Description / size | Drawing extraction: 1602.01 sq.m and 1.00%; SUDA extraction describes Ac 0.396 cents 1916.004 Sq.Yds. |
|---|---|
| Declared progress / verified status | Reserved in the layout record; completion not verified. |
| Description / size | Listed in the RERA amenities schedule; no area or facility description supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Schedule shows 0% progress; completion not verified. |
| Description / size | Named in the SUDA approval extraction as amenities associated with the approval record; no individual areas or capacities supplied. |
|---|---|
| Declared progress / verified status | Approval text lists these uses; no delivery or completion evidence supplied. |
The amenities schedule marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/park, street lighting, rainwater harvesting, and electrical meter/substation/receiving station as “YES,” while showing 0% progress. This is a RERA-schedule entry, not independent confirmation of completed facilities. RERA amenities
7. Utilities, building services & safety
The SUDA approval conditions require the developer to undertake roads and drains, nala channelization for storm-water runoff, avenue planting, rainwater-harvesting pits, open-space fencing, street lighting, electricity facilities, sewerage disposal and protected water supply. The approval extraction also identifies a water reservoir, septic tank, sewerage treatment plant, electric transformer and solid-waste management among utility provisions. These are listed requirements or provisions; the record does not establish their capacity or completed operational status.
The RERA amenities schedule marks water supply, sewerage (including chambers, lines, septic tank and STP), storm-water drains, street lighting, rainwater harvesting and an electrical meter room/substation/receiving station as available in the schedule, with 0% progress recorded. It does not provide water-source details, storage capacity, STP capacity, electrical backup, fire-system specifications, accessibility arrangements, security systems or waste-management operating details. RERA amenities
8. Location, access & connectivity
The registered location is Ammapalem Revenue Village, Konijerla Mandal, Khammam District, Telangana, PIN 507305. The cadastral parcel centroid supplied for the location is 17.22183, 80.26236. RERA record Cadastral map
The layout records proposed roads, including 9.14m and 12.19m widths in the DTCPO drawing extraction; the RERA filing boundary description refers to a 9 14 MT WIDE EXISTING 18 29 MT WIDE PROPOSED ROAD. The supplied connectivity data gives the nearest sampled Outer Ring Road interchange as approximately 169.9 km away. No public-transport details or other verified nearby landmarks are provided. RERA filing Location record
9. Developer & development status
The registered promoter is INDO QATAR PROJECTS PRIVATE LIMITED, identified as a company, with GSTIN 36AADCI5445H1ZJ. The supplied company address record lists Vijay Co-operative House Building Society, MLA and MOP Colony, Ammapalem Grampanchayat, Konijerla Mandal, Khammam, 507305. The registration certificate separately prints the promoter address as Hyderabad, PIN 500034. Corporate record Parties record
The Form B declaration is dated 8 April 2025 and states that the promoter undertakes completion by 28/03/2027. The registration certificate remains valid through 28/03/2027; these are distinct record items. No independent site-progress report or final completion/occupancy certificate is supplied.
The supplied promoter website is https://indoqatar.in/projects/kshetra. No official project contact number or email is provided in the available evidence. Parties record
10. Approvals, official records & documents
| Identifier / date | P00800009625; valid 29/03/2025–28/03/2027 |
|---|---|
| Scope and source | Form C certificate for KSHETRA 2 and the registered survey identity. |
| Identifier / date | 425801/LP/GP/202452/0025/2024; 29-03-2025 |
|---|---|
| Scope and source | Approval extraction describes a tentative 595-plot layout at Ammapalem, Konijerla Mandal, Khammam, subject to conditions. |
| Identifier / date | CONFIRMED T.L.P. NO. 37/2015/W; 12/06/2015; file C.NO.2169/2015/W |
|---|---|
| Scope and source | Drawing extraction records 595 plots, land-use areas and proposed road widths. |
| Identifier / date | Form B, dated 8 April 2025 |
|---|---|
| Scope and source | Promoter’s completion undertaking, separate-account and audit declarations. |
| Identifier / date | Two layout sheets recorded; drawing-derived plot schedule reports 595 plots. |
|---|---|
| Scope and source | Software-read layout dataset; verify plot sizes and schedule against the drawing. Layout record |
| Identifier / date | Not supplied |
|---|---|
| Scope and source | No completion certificate, occupancy certificate or final-layout work-completion certificate is present in the supplied evidence. Document index |
1. Project at a glance
Project identity
Registered name: KSHETRA 2
Project type: Plotted development
Phase / registered portion: Registered project portion identified as KSHETRA 2; no further phase description disclosed.
TG-RERA registration number: P00800009625
Registration validity: 29/03/2025–28/03/2027; this is the registration validity period, not the completion deadline.
Registered promoter: INDO QATAR PROJECTS PRIVATE LIMITED, a private limited company
RERA status: Registered; certificate conditions include quarterly updates.
Land and geographic identity
Locality / revenue village: Ammapalem Revenue Village
Mandal: Konijerla Mandal
District: Khammam
PIN: 507305
Project survey numbers and subdivisions, as recorded: 80/Part, 81/part, 82/part, 83full, 84/part, 90/part, 91/part, 92Full, 93/Part, 106/Part, 107/Part, 109/Part, 110, 111/Part, 112/part
Registered site extent: Ac. 39.561 cents; the SUDA approval extraction also states 191485.903 Sq.Yds.
Net layout area: 160105.27 sq.mt. in the 2015 DTCPO drawing extraction; layout drawing-derived record separately reports 160105.39 sq.m.
Boundaries stated in the RERA filing: East: 9 14 MT WIDE EXISTING 18 29 MT WIDE PROPOSED ROAD; West: agricultural land of others, Sy. Nos. 80 Part and 112 Part; North: agricultural land of others, Sy. Nos. 85 and 86; South: agricultural land of others, Sy. Nos. 106 Part and 107 Part.
Development identity
Sanctioning authority / principal approval: SUDA, Tentative Layout Plan 425801/LP/GP/202452/0025/2024, approved 29-03-2025
Other recorded plan reference: DTCPO, Khammam: CONFIRMED T.L.P. NO. 37/2015/W, dated 12/06/2015
Approved use and scale: Plotted layout; 595 plots
Approved built-up area / buildings / floors: Not applicable to the recorded plotted-layout offering; no building-count or floor-configuration figures are disclosed.
Roads and land reserved for common/public uses: Roads: 23.98%; open space/park: approximately 9.00%; social infrastructure: approximately 2.50%; utilities: approximately 1.00% in the drawing/approval records.
Common parking area: The DTCPO drawing extraction records 0.00 common parking area.
Offering and status
Offering: Plots; 595 plots are stated in the layout records.
Plot-size range: Software-read from the layout drawing: 65.46–647.04 sq.m (approximately 78.3–773.9 sq.yd); verify against the drawing.
Booked / available counts: Not disclosed in the supplied evidence.
Construction stage: No independently verified site-progress measurement is supplied. The approval requires infrastructure and development works; the amenities schedule shows 0% progress against the listed items.
Completion deadline: Promoter’s Form B undertaking: 28/03/2027.
Completion / occupancy certificate status: No completion certificate or occupancy certificate is supplied; the record is for a plotted layout.
2. The project story
KSHETRA 2 is a plotted-layout development at Ammapalem Revenue Village in Konijerla Mandal, Khammam District. Its registered survey identity covers 15 survey references, including the specified part-survey entries and full-survey references shown above. The TG-RERA certificate registers the project as plotted development, and the SUDA approval record describes a tentative layout of 595 plots.
The layout is organized around roads, plots, park/open space, social-infrastructure land and utility land. The approved conditions require roads and drainage, greenery, rainwater-harvesting pits, street lighting, electricity facilities, a protected water supply and a sewerage-disposal system. These are approval requirements, not evidence that the works have been completed.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey residential building scheme. The SUDA approval records 595 plots across a stated layout area of Ac. 39.561 cents (191485.903 Sq.Yds). The DTCPO drawing extraction records a net layout area of 160105.27 sq.mt.; the layout dataset, read from the drawing, reports 160105.39 sq.m as its net-area base.
The drawing-derived land-use schedule reports 101686.75 sq.m for plots, 38393.43 sq.m for roads, 14415.94 sq.m for parks/open space, 1602.01 sq.m for utilities and 4007.14 sq.m for social infrastructure. It lists amenity area as 0.00. The layout dataset identifies two drawing sheets and says its plot schedule contains 595 plots; plot sizes were software-read from the drawing and should be verified against it.
The SUDA approval calls for a final layout submission supported by a work-completion certificate from a Licensed Technical Person. Its conditions also specify development works and handover of designated public-use areas. No final layout approval or work-completion certificate is supplied here.
4. Homes, configurations & floor plans
The project offering is plots, not apartments. The available layout data reports 595 plots and gives software-read plot-size bands:
0–100 sq.yd (0–84 sq.m): 1
100–150 sq.yd (84–125 sq.m): 22
150–200 sq.yd (125–167 sq.m): 136
200–250 sq.yd (167–209 sq.m): 360
250–300 sq.yd (209–251 sq.m): 44
300–400 sq.yd (251–334 sq.m): 31
500–1000 sq.yd (418–836 sq.m): 1
The software-read smallest, median and largest plot areas are 65.46 sq.m, 167.23 sq.m and 647.04 sq.m respectively. The dataset says plot counts and sizes were read from the drawing and should be checked against it; these are not stated as RERA-filed carpet or apartment saleable areas.
No booked/available plot inventory, plot-specific saleable-area schedule, or purchaser-specific plot allocation is provided. The supplied floor-plan record has two layout sheets and no apartment plans or measured apartment carpet areas.
5. Parking & vehicle circulation
The DTCPO drawing extraction lists 0.00 common parking area. The promoter-vendor record lists “Open Parking,” but supplies no count, allocation plan or evidence of an exclusive parking entitlement for a purchaser.
The SUDA layout approval requires roads to be opened for access to neighbouring sites and lists proposed roads of 9.14m and 12.19m in the DTCPO drawing extraction. The RERA filing’s boundary text also refers to existing and proposed roads. No parking levels, vehicle-space counts, ramps, EV-charging provision or plot-specific parking arrangements are established by the supplied evidence.
6. Amenities, recreation & open spaces
| Description / size | Drawing extraction: 14415.94 sq.m and 9.00%; SUDA extraction describes open space (park) as Ac3.562 cents 17241.464 Sq.Yds. |
|---|---|
| Declared progress / verified status | Required/reserved in the layout record; completion not verified. |
| Description / size | Drawing extraction: 4007.14 sq.m and 2.50%; SUDA extraction describes Ac 0.99 cents 4792.539 Sq.Yds. |
|---|---|
| Declared progress / verified status | Reserved in the layout record; completion not verified. |
| Description / size | Drawing extraction: 1602.01 sq.m and 1.00%; SUDA extraction describes Ac 0.396 cents 1916.004 Sq.Yds. |
|---|---|
| Declared progress / verified status | Reserved in the layout record; completion not verified. |
| Description / size | Listed in the RERA amenities schedule; no area or facility description supplied. |
|---|---|
| Declared progress / verified status | Schedule shows 0% progress; completion not verified. |
| Description / size | Named in the SUDA approval extraction as amenities associated with the approval record; no individual areas or capacities supplied. |
|---|---|
| Declared progress / verified status | Approval text lists these uses; no delivery or completion evidence supplied. |
The amenities schedule marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/park, street lighting, rainwater harvesting, and electrical meter/substation/receiving station as “YES,” while showing 0% progress. This is a RERA-schedule entry, not independent confirmation of completed facilities.
7. Utilities, building services & safety
The SUDA approval conditions require the developer to undertake roads and drains, nala channelization for storm-water runoff, avenue planting, rainwater-harvesting pits, open-space fencing, street lighting, electricity facilities, sewerage disposal and protected water supply. The approval extraction also identifies a water reservoir, septic tank, sewerage treatment plant, electric transformer and solid-waste management among utility provisions. These are listed requirements or provisions; the record does not establish their capacity or completed operational status.
The RERA amenities schedule marks water supply, sewerage (including chambers, lines, septic tank and STP), storm-water drains, street lighting, rainwater harvesting and an electrical meter room/substation/receiving station as available in the schedule, with 0% progress recorded. It does not provide water-source details, storage capacity, STP capacity, electrical backup, fire-system specifications, accessibility arrangements, security systems or waste-management operating details.
8. Location, access & connectivity
The registered location is Ammapalem Revenue Village, Konijerla Mandal, Khammam District, Telangana, PIN 507305. The cadastral parcel centroid supplied for the location is 17.22183, 80.26236.
The layout records proposed roads, including 9.14m and 12.19m widths in the DTCPO drawing extraction; the RERA filing boundary description refers to a 9 14 MT WIDE EXISTING 18 29 MT WIDE PROPOSED ROAD. The supplied connectivity data gives the nearest sampled Outer Ring Road interchange as approximately 169.9 km away. No public-transport details or other verified nearby landmarks are provided.
9. Developer & development status
The registered promoter is INDO QATAR PROJECTS PRIVATE LIMITED, identified as a company, with GSTIN 36AADCI5445H1ZJ. The supplied company address record lists Vijay Co-operative House Building Society, MLA and MOP Colony, Ammapalem Grampanchayat, Konijerla Mandal, Khammam, 507305. The registration certificate separately prints the promoter address as Hyderabad, PIN 500034.
The Form B declaration is dated 8 April 2025 and states that the promoter undertakes completion by 28/03/2027. The registration certificate remains valid through 28/03/2027; these are distinct record items. No independent site-progress report or final completion/occupancy certificate is supplied.
The supplied promoter website is https://indoqatar.in/projects/kshetra. No official project contact number or email is provided in the available evidence.
10. Approvals, official records & documents
| Identifier / date | P00800009625; valid 29/03/2025–28/03/2027 |
|---|---|
| Scope and source | Form C certificate for KSHETRA 2 and the registered survey identity. |
| Identifier / date | 425801/LP/GP/202452/0025/2024; 29-03-2025 |
|---|---|
| Scope and source | Approval extraction describes a tentative 595-plot layout at Ammapalem, Konijerla Mandal, Khammam, subject to conditions. |
| Identifier / date | CONFIRMED T.L.P. NO. 37/2015/W; 12/06/2015; file C.NO.2169/2015/W |
|---|---|
| Scope and source | Drawing extraction records 595 plots, land-use areas and proposed road widths. |
| Identifier / date | Form B, dated 8 April 2025 |
|---|---|
| Scope and source | Promoter’s completion undertaking, separate-account and audit declarations. |
| Identifier / date | Two layout sheets recorded; drawing-derived plot schedule reports 595 plots. |
|---|---|
| Scope and source | Software-read layout dataset; verify plot sizes and schedule against the drawing. |
| Identifier / date | Not supplied |
|---|---|
| Scope and source | No completion certificate, occupancy certificate or final-layout work-completion certificate is present in the supplied evidence. |
Frequently asked questions
Is KSHETRA 2 registered with Telangana RERA?
Yes. KSHETRA 2 is registered with the Telangana Real Estate Regulatory Authority as P00800009625; the registration status is New Project.
Who is the developer of KSHETRA 2?
The promoter named in the RERA registration is INDO QATAR PROJECTS PRIVATE LIMITED.
Where is KSHETRA 2 located?
KSHETRA 2 is in KONIJERLA MANDAL, Ammapalem, Khammam, Telangana (507305).
When will KSHETRA 2 be completed?
The promoter's proposed date of completion filed with RERA is 28/07/2027. This is the promoter's declaration, not a guarantee.