Sign in

Medellins New Castle

MEDELLIN INFRA PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200011354

MEDELLINS NEW CASTLE is a residential apartment project in Gundlapochampally, Medchal Mandal, Medchal-Malkajgiri District, developed by registered promoter MEDELLIN INFRA PRIVATE LIMITED. It is on a registered land area of 520.12 sq. m and consists of one building with Stilt + 5 Upper Floors and 10 homes, configured as 3BHK. The project is registered with TG-RERA under P02200011354, and the proposed completion date is 20/06/2029.

More from Medellin Infra Pvt Ltd · 2 projects →

01What we found

RegisteredTG-RERA - valid till 20 Jun 2029
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameMEDELLINS NEW CASTLE RERA record
Project type / categoryResidential apartment project RERA record RERA filing
Phase / registered portionThe registration is for the project on Plot Nos. 64 & 65; no separate phase name is disclosed.
TG-RERA registrationP02200011354
Registration validity20/06/2026 to 20/06/2029; the certificate records a three-year validity. This is the registration period, not a statement of construction progress or OC status.
Registered promoterMEDELLIN INFRA PRIVATE LIMITED Corporate record
RERA status in the supplied recordRegistration certificate issued under section 5; certificate issue date 26/10/2026.

Land and geographic identity

ItemProject record
Locality / revenue villageGundlapochampally; also rendered as GUNDLA POCHAMPALLY VILLAGE in the building permit. RERA record
MandalMedchal RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500100 RERA record
Project survey numbers and subdivisions393 PART, 394 PART, 395 RERA record
Plot numbers64 & 65 RERA filing
Registered/site extentThe RERA-filed land record states total and net area of 520.12 sq. m. The building permit also records plot area and net plot area as 520.12 Sq. Mtrs, with road-affected and NALA-affected areas each recorded as 0. RERA filing
BoundariesEast: 15m Road; West: 3m Pathway; North: Plot 63; South: Plot 66. RERA filing
Cadastral location pointParcel-centroid coordinate supplied: 17.57201, 78.95026. Location record

Development identity

ItemProject record
Sanctioning authorityCyberabad Municipal Corporation, as named in the supplied building permit.
Principal building-permit number / date4026/GHMC/SWBP/QTB2/2026, approved 20/06/2026. The permit also records file number 013119/GHMC/05874/SWBP/QTB2/2026. Approvals record
BuildingMEDELLIN INFRA RESI APARTMENT; one building is recorded. RERA filing
Sanctioned configurationStilt + 5 Upper Floors; building height 14.99 m.
Approved residential upper-floor area1201.25 Sq. Mtrs. This is the permit’s stated residential upper-floor area, not a carpet-area figure.
Parking area stated in permit240.42 Sq. Mtrs. A parking-space count is not supplied.
Approved / RERA-filed unitsThe permit records 10 dwelling units; the RERA unit record also lists 10 units. RERA unit table

Offering and status

ItemProject record
RERA-filed configuration3BHK, 10 units. RERA unit table RERA unit details
RERA-filed saleable area160.72 sq. m for the filed 3BHK configuration. RERA unit table RERA unit details
Booked / availablePortal-derived counts show 0 booked and 10 available; the portal record has no as-of date, so these are indicative rather than a dated inventory confirmation. RERA unit table RERA unit details
Construction stageNo independently verified site-progress percentage or construction-stage update is supplied. The permit specifies that construction is to commence before 17/12/2026 and be completed before 20/06/2029.
Completion dateThe permit records completion before 20/06/2029; the RERA certificate is valid through 20/06/2029.
OC statusNo occupancy certificate is included in the supplied project documents. The permit says an OC is compulsory before occupation; this is not evidence that an OC has been issued.
Phase / tower scope of OCOne building is recorded; no phase-wise or tower-wise OC status is supplied. RERA filing

2. The project story

MEDELLINS NEW CASTLE is registered as a residential apartment project by MEDELLIN INFRA PRIVATE LIMITED on Plot Nos. 64 & 65 in Gundlapochampally, Medchal Mandal, Medchal-Malkajgiri District. The project land is identified in the record as portions of Survey Nos. 393 PART, 394 PART and 395. RERA record

The building permit describes a single residential apartment building, MEDELLIN INFRA RESI APARTMENT, with Stilt + 5 Upper Floors and 10 dwelling units. TG-RERA’s filed inventory identifies ten 3BHK units. The available record does not establish a construction-progress percentage or independently verified on-site stage; the permit sets a commencement-before date of 17/12/2026 and completion-before date of 20/06/2029. RERA unit table

The supplied file includes no occupancy certificate. The building permit requires an OC before occupation and before public amenity services are provided, so registration validity and the permit’s completion deadline should not be read as confirmation of completion or permission to occupy.

3. Master plan, architecture & building design

The approved permit describes a single building on a 520.12 Sq. Mtrs net plot, configured as Stilt + 5 Upper Floors, with a stated height of 14.99 m. It records 1201.25 Sq. Mtrs of residential upper-floor area and 240.42 Sq. Mtrs of total parking area. These are permit figures; the supplied evidence does not provide a separate FSI-counted area, gross built-up area, floor-by-floor unit schedule, footprint, lift or stair details, or a detailed circulation plan.

The site record identifies boundaries along a 15m Road to the east, a 3m Pathway to the west, Plot 63 to the north and Plot 66 to the south. The permit lists four setbacks: front 4.0 m, rear 3.5 m, Side I 3.5 m and Side II 3.5 m. RERA filing

The permit names a tot-lot, one rainwater-harvesting pit and 20 trees, and includes conditions concerning a transformer space, garbage house and a greenery strip around the site. These are permit-listed requirements or provisions, not confirmation of installation or completion. No landscaping plan, open-space area, internal-road plan or detailed floor plans are available in the supplied overview evidence.

4. Homes, configurations & floor plans

TG-RERA’s filed inventory identifies ten 3BHK units, with a filed saleable area of 160.72 sq. m per unit. The portal-derived booking record shows 0 booked / 10 available, but provides no as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010160.72 sq. m71.2 sq. m (software-measured)56% (software-measured)

The 3BHK carpet-area estimate is software-measured from the approved floor-plan drawing, not a RERA-filed carpet-area disclosure; the measurement is marked as needing review. The drawing record also identifies a living room, pooja area, wash area, kitchen and dining area, bedrooms, toilets and an open-to-air balcony. The drawing measurement excludes the balcony from carpet area. Verify room dimensions and measured area against the drawing before relying on them. Floor plans RERA unit details

Carpet area, balcony/utility area and saleable area are different measures. The supplied note explains that the software-measured carpet area is smaller than the RERA saleable area, which also includes the home’s share of common areas. The evidence does not provide a RERA-filed loading figure. Floor plans RERA unit details

5. Parking & vehicle circulation

The building permit records 240.42 Sq. Mtrs of total parking area and requires the stilt/cellar parking shown in the plan to be used exclusively for vehicle parking. The supplied permit summary describes the building as Stilt + 5 Upper Floors; it does not provide a separate parking-space count, parking allocation by unit, visitor or accessible parking count, two-wheeler provision, ramp arrangement, or EV-charging count.

The permit includes an EV-charging-infrastructure condition for parking places, but the supplied record does not verify installation or state the number of chargers. No unit-specific parking allocation or exclusive parking ownership document is supplied.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lotListed as a permit condition; the permit requires fencing and maintenance as greenery before OC. No size is supplied.Permit-listed requirement; completion not verified.
Greenery strip / trees20 trees are recorded; the permit also requires a greenery strip around the site.Permit-recorded provision; planting and maintenance not independently verified.
Rainwater harvesting1 rainwater-harvesting pit recorded.Permit-recorded provision; installation not independently verified.
Community buildingsListed in the RERA amenities record; no size or description supplied.RERA amenitiesProgress recorded as 0%.
Recreational open spaceListed in the RERA amenities record; area not supplied.RERA amenitiesProgress recorded as 0%.
Internal roads and footpathsListed in the RERA amenities record; no dimensions supplied.RERA amenitiesProgress recorded as 0%.
Street lightingListed in the RERA amenities record; no quantity supplied.RERA amenitiesProgress recorded as 0%.

The RERA amenities record lists 14 items. Its supplied progress values are 0% for the listed amenities; the record does not independently verify completion. Water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station are marked “YES” in the availability field, which is a filing entry rather than evidence of completed service. RERA amenities

7. Utilities, building services & safety

ServiceSupplied project evidence
WaterThe RERA amenities record marks “Water Supply” as “YES”; source, storage and treatment capacity are not supplied. The permit states public water connections will be provided only on production of an OC. RERA amenities
Sewerage, drainage and reuseThe RERA amenities record marks sewerage and storm-water drains as “YES” and lists treatment/disposal of sewage and sullage. No STP capacity, reuse arrangement or completion status is supplied. RERA amenities
Rainwater harvestingOne rainwater-harvesting pit is listed in the permit; installation is not verified.
ElectricalAn electrical meter room/sub-station/receiving station is marked “YES” in the RERA amenities record. The permit requires transformer space and includes an EV-charging-infrastructure condition for parking places; capacity and installation status are not supplied. RERA amenities
Lifts and vertical circulationThe permit refers to lift requirements among building services, but the supplied record does not state lift count, type or capacity.
Fire and life safetyThe permit assigns responsibility for structural safety, means of escape and fire-fighting installations and says an Occupancy Fire NOC is to be obtained before OC. No Fire NOC or completed-system evidence is supplied.
WasteThe permit requires a garbage house; the RERA amenities record lists solid-waste management and disposal. Size, operating arrangements and completion status are not supplied. RERA amenities
AccessibilityThe permit includes a general condition for facilities for physically handicapped persons in public and semi-public buildings above 300 Sq.mts. The supplied material does not establish the project’s accessibility design or installations.

These are permit conditions or RERA-filed amenity entries. They do not, by themselves, establish that systems are installed, operational or accepted by the relevant authority. RERA amenities

8. Location, access & connectivity

The registered site is at Gundlapochampally, Medchal Mandal, Medchal-Malkajgiri District, PIN 500100, on Plot Nos. 64 & 65 in Survey Nos. 393 PART, 394 PART and 395. The site boundaries identify a 15m Road on the east and a 3m Pathway on the west. RERA record RERA filing

The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 31.7 km. No other measured distances, public-transport details, approach-road names or travel-time estimates are supplied. Location record

9. Developer & development status

The registered promoter is MEDELLIN INFRA PRIVATE LIMITED, identified as a company/private limited entity. The supplied corporate identifier is GSTIN 36AATCM3624N1ZT. Corporate record RERA filing

The RERA record gives the promoter address as Tirumalgiri, Bahadurpalle, Gundlapochampally, Medchal, Medchal-Malkajgiri, PIN 500100. The registration certificate’s promoter-office field separately records PIN 500043; this overview does not infer which address is current. Parties record

The building permit and RERA certificate record the completion deadline as 20/06/2029. The supplied evidence does not include an independently verified construction-progress report or an OC. The RERA inventory shows ten 3BHK units, with portal-derived availability of ten and no recorded bookings; that inventory has no as-of date. RERA unit table

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationCertificate for MEDELLINS NEW CASTLE, registration P02200011354, issued 26/10/2026, valid 20/06/2026–20/06/2029.
Building permit4026/GHMC/SWBP/QTB2/2026, dated 20/06/2026, for the residential apartment building on Plot Nos. 64 & 65, Survey Nos. 393PART, 394PART and 395. The permit identifies Cyberabad Municipal Corporation as issuing authority.
Permit file number013119/GHMC/05874/SWBP/QTB2/2026.
Approved-layout references in permit03/MP2/Plg/HUDA/2005 and file 11090/MP2/Plg/H/04.
Title and development documents in project fileThe supplied document register includes a sale deed for Plot No. 64, a development agreement-cum-irrevocable GPA for Plot Nos. 64 & 65, and a mortgage deed.
Form B declarationPromoter-filed declaration for the project, dated 10 July 2026; it states a completion undertaking of June 2029.
Occupancy / completion certificateNo OC or completion certificate is included in the supplied project documents. Document index

The approval document records conditions including commencement notice, completion notice, OC before occupation, and obtaining an Occupancy Fire NOC before OC. This table identifies the supplied records; the detailed conditions and their application are addressed in the approvals review.

Frequently asked questions

Is MEDELLINS NEW CASTLE registered with Telangana RERA?

Yes. MEDELLINS NEW CASTLE is registered with the Telangana Real Estate Regulatory Authority as P02200011354; the registration status is New Project.

Who is the developer of MEDELLINS NEW CASTLE?

The promoter named in the RERA registration is MEDELLIN INFRA PRIVATE LIMITED.

Where is MEDELLINS NEW CASTLE located?

MEDELLINS NEW CASTLE is in Gundlapochampally, Medchal, Medchal-Malkajgiri, Telangana (500100).

When will MEDELLINS NEW CASTLE be completed?

The promoter's proposed date of completion filed with RERA is 20/06/2029. This is the promoter's declaration, not a guarantee.

More projects in Gundlapochampally