Obedullah Central
VAJRA PROFESSIONALS · Hanamkonda · RERA P00300004533
OBEDULLAH CENTRAL is a commercial project in Mukarampura, KARIMNAGAR mandal, Warangal Urban district, developed by the registered promoter VAJRA PROFESSIONALS. It has a site area of 1154.89 sq. m, one building with 2 Cellar + 1 Ground + 4 upper floors, and 5 SHOP units. Its TG-RERA registration number is P00300004533, and the proposed completion date is 20/10/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
5 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | OBEDULLAH CENTRAL RERA record |
| Project type | Commercial project; TG-RERA unit schedule is filed as SHOP. RERA record RERA filing RERA unit table |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration covers the project at Survey No. 1103. |
| TG-RERA registration | P00300004533. |
| Registration validity | 14/05/2022 to 20/10/2027; certificate states five years, subject to its conditions. This is registration validity, not an occupancy certificate. |
| Registered promoter | VAJRA PROFESSIONALS; partnership. RERA record Corporate record |
| RERA status in supplied record | Registration certificate issued; captured on 2026-09-10 15:14:38. Approvals record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Mukarampura / Mukaram Pura, Karimnagar. |
| Revenue village | Karimnagar is the village recorded in the project identity and occupancy-certificate extraction. The building permit describes the site as Karimnagar Municipal Corporation. RERA record |
| Mandal | KARIMNAGAR in the occupancy-certificate extraction; not disclosed in the project land identity fields. Land records |
| District | Warangal Urban in the project registration identity; the occupancy-certificate extraction names Karimnagar as district. RERA record |
| PIN | 505001. RERA record |
| Survey number(s) | Survey No. 1103; no subdivision is supplied. Land records |
| Site extent | 1154.89 sq. m total site area; 44.48 sq. m road-affected area. The RERA land record gives 1110.41 sq. m net area. RERA filing |
| Boundaries | East: 21M ROAD; West: 6M ROAD; South: 9M ROAD; North: LAND OF OTHERS. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority and principal approval | Satavahana Urban Development Authority (Karimnagar), building permit 3145/Karimnagar Muni/2020/0753, approved 20 October, 2021. |
| Approved built-up / floor area | 2562.55 sq. m recorded as approved built-up area in the project fields and as floor area in the occupancy-certificate extraction. RERA filing |
| Building count | One building is recorded in the project filing. RERA filing |
| Sanctioned configuration | 2 Cellar + 1 Ground + 4 upper floors; the permit records height 15 m. |
| Parking area | 1255.96 sq. m as per sanctioned plan in the occupancy-certificate extraction; the permit lists cellar parking area as 1255.98 sq. m. |
| Units | The filing records 1 total building unit; the RERA unit schedule lists 5 SHOP units. RERA filing RERA unit table |
| Mortgaged area | 261.89 sq. m is recorded as mortgage area. RERA filing |
Offering and status
| Field | Project record |
|---|---|
| Unit type and filed saleable area | SHOP; the RERA unit schedule gives saleable area 512.51 sq. m for each listed configuration. RERA unit table RERA unit details |
| Booked / available | 0 booked; 5 available, as last read from the TG-RERA portal; the portal record supplied has no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | No independently verified current construction-stage report is supplied. The promoter-facing project description says construction is in progress; this is not an independently verified site update. Promoter website |
| Completion date | The promoter’s Form B declaration undertakes completion by 20/10/2027; the TG-RERA certificate is valid through that date. |
| Occupancy certificate | The supplied occupancy-certificate document identifies 0045/OC/3011/2024, issued 03 May, 2024, for the commercial building at Survey No. 1103. |
2. The project story
OBEDULLAH CENTRAL is registered as a commercial project on Survey No. 1103 in the Mukarampura locality of Karimnagar. The building permit authorizes a commercial building with two cellar levels, a ground floor and four upper floors. The TG-RERA unit schedule identifies five shop units. RERA record RERA unit table
The promoter’s Form B declaration gives 20/10/2027 as the undertaking completion date. Separately, an occupancy-certificate document in the supplied filing identifies the building as fit for occupation under certificate 0045/OC/3011/2024, dated 03 May, 2024. No independently verified present-day site-progress report is supplied, so the project’s current construction stage cannot be established from this evidence alone.
3. Master plan, architecture & building design
The building permit records a single commercial building on a site of 1154.89 sq. m, with 44.48 sq. m road-affected and 1110.41 sq. m net area in the RERA land details. The permit authorizes 2 Cellar + 1 Ground + 4 upper floors, with a stated height of 15 m. The occupancy-certificate extraction records floor area of 2562.55 sq. m and parking area of 1255.96 sq. m as per sanctioned plan. These figures describe different aspects of the approved record and should not be treated as interchangeable area measures. RERA filing
The permit lists a tot-lot, transformer space, garbage house and rainwater-harvesting percolation pit; it also specifies six rainwater-harvesting structures. The occupancy-certificate extraction records tot-lot area as 0 in both the sanctioned-plan and site-plan fields.
The supplied floor-plan set contains two drawings, neither measured as a unit plan; the record reports no flats in those drawings. Consequently, there is no drawing-derived carpet-area or room-layout measurement to report. Floor plans
4. Homes, configurations & floor plans
The RERA unit schedule lists five SHOP units, with no units booked and five available in the portal snapshot; the booking record has no as-of date. The listed RERA saleable area is 512.51 sq. m. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| SHOP | 5 | 0 | 5 | 512.51 sq. m | Not measured from supplied drawings | Not supplied |
The saleable area is the RERA-filed figure. The drawing records supplied do not provide measured carpet area, room dimensions or a basis to quantify common-area loading. RERA unit table Floor plans
5. Parking & vehicle circulation
The occupancy-certificate extraction records 1255.96 sq. m parking area in the sanctioned plan. The building permit lists 1255.98 sq. m cellar area, while the vendor description mentions open parking and covered parking and claims 20 covered spaces. The supplied documents do not establish the number or legal allocation of parking spaces to individual shop units, nor do they describe visitor, accessible or EV spaces, ramps, or pedestrian/vehicle separation. Promoter website
6. Amenities, recreation & open spaces
| Description / size | Listed in the building permit; recorded as 0 area in the occupancy-certificate extraction. |
|---|---|
| Declared progress / verified status | Permit-listed; no supplied evidence establishing delivery as a usable facility. |
| Description / size | Listed in the building permit. |
|---|---|
| Declared progress / verified status | Permit-listed; completion status not established here. |
| Description / size | Listed in the building permit. |
|---|---|
| Declared progress / verified status | Permit-listed; completion status not established here. |
| Description / size | Building permit specifies 6; occupancy-certificate extraction also notes rainwater harvesting. |
|---|---|
| Declared progress / verified status | Permit-listed and noted in the occupancy-certificate extraction; no independent operational verification supplied. |
| Description / size | Vendor description lists both; it states Open Parking (1256 sqm), Covered Parking (20 numbers). |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Vendor-reported; not established as an allocation or independently verified provision. |
No clubhouse, indoor recreation or sports facility is evidenced in the supplied project records. The permit also lists Internal Roads & Footpaths, a green strip/tot-lot/park, and aggregate recreational open space as RERA amenity fields; the supplied data does not provide facility dimensions or independent completion verification. RERA amenities
7. Utilities, building services & safety
The permit specifies rainwater-harvesting structures and lists transformer space and a garbage house. The RERA amenity record marks water supply, sewerage, storm-water drains, street lighting, electrical meter room/sub-station/receiving station and water conservation/rainwater harvesting as provided, with 100% shown for those listed fields; this is a project-record status, not independent operational verification. RERA amenities
The RERA amenity record shows 0% for treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements. No capacities, water source or storage details, STP specification, backup-power details, lift information, fire-system details, accessibility provisions, or security-system specifications are supplied. RERA amenities
8. Location, access & connectivity
The project is identified as being in Mukarampura, Karimnagar, with site boundaries adjoining a 21M ROAD to the east, 6M ROAD to the west and 9M ROAD to the south; the north boundary is land of others. RERA filing
The location dataset supplies a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. The supplied evidence does not establish a route, travel time or public-transport connection for that distance. Location record
9. Developer & development status
The registered promoter is VAJRA PROFESSIONALS, identified in the filing as a partnership. The supplied corporate identifier is GSTIN 36AAOFV2201Q1ZQ. The registered office is recorded as SRI NILAYAM, BHAGATH NAGAR, MUKARAMPURA, KARIMNAGAR, Warangal Urban, 505001. Corporate record Parties record
The registration record lists NARAYANA REDDY DAVU and HARI KRISHNA GADDAM as authorized signatories, and AMJAD ALI SAYED, MADAN MOHAN REDDY MADA and JAYASENA REDDY NARRA as partners. Parties record
The promoter’s Form B declaration undertakes completion by 20/10/2027. Although the supplied record includes an occupancy certificate for the building, there is no independently verified current site-progress report.
10. Approvals, official records & documents
| Identifier / date | P00300004533; issued 14/05/2022; valid to 20/10/2027 |
|---|---|
| Scope and source | Form C for OBEDULLAH CENTRAL; |
| Identifier / date | 3145/Karimnagar Muni/2020/0753; approved 20 October, 2021 |
|---|---|
| Scope and source | Satavahana Urban Development Authority (Karimnagar); Survey No. 1103; |
| Identifier / date | 0045/OC/3011/2024; issued 03 May, 2024 |
|---|---|
| Scope and source | Karimnagar Municipal Corporation; commercial building OBEDULLAH CENTRAL, Survey No. 1103; |
| Identifier / date | 0045/OC/3011/2024; dated 3/05/2024 |
|---|---|
| Scope and source | Architect’s Form 1A identifies the occupancy certificate and certifies completion; |
| Identifier / date | Completion undertaking 20/10/2027 |
|---|---|
| Scope and source | Promoter-declared project obligations; |
| Identifier / date | Record 225677 |
|---|---|
| Scope and source | Project-filed encumbrance document; |
The supplied record identifies a building permit, TG-RERA registration and occupancy-certificate document for the project. It does not include an extracted approved layout drawing or a current independent site-inspection report. Approvals record Document index
1. Project at a glance
Project identity
Registered project name: OBEDULLAH CENTRAL
Project type: Commercial project; TG-RERA unit schedule is filed as SHOP.
Phase / registered portion: Phase not separately identified in the supplied record; the registration covers the project at Survey No. 1103.
TG-RERA registration: P00300004533.
Registration validity: 14/05/2022 to 20/10/2027; certificate states five years, subject to its conditions. This is registration validity, not an occupancy certificate.
Registered promoter: VAJRA PROFESSIONALS; partnership.
RERA status in supplied record: Registration certificate issued; captured on 2026-09-10 15:14:38.
Land and geographic identity
Locality: Mukarampura / Mukaram Pura, Karimnagar.
Revenue village: Karimnagar is the village recorded in the project identity and occupancy-certificate extraction. The building permit describes the site as Karimnagar Municipal Corporation.
Mandal: KARIMNAGAR in the occupancy-certificate extraction; not disclosed in the project land identity fields.
District: Warangal Urban in the project registration identity; the occupancy-certificate extraction names Karimnagar as district.
PIN: 505001.
Survey number(s): Survey No. 1103; no subdivision is supplied.
Site extent: 1154.89 sq. m total site area; 44.48 sq. m road-affected area. The RERA land record gives 1110.41 sq. m net area.
Boundaries: East: 21M ROAD; West: 6M ROAD; South: 9M ROAD; North: LAND OF OTHERS.
Development identity
Sanctioning authority and principal approval: Satavahana Urban Development Authority (Karimnagar), building permit 3145/Karimnagar Muni/2020/0753, approved 20 October, 2021.
Approved built-up / floor area: 2562.55 sq. m recorded as approved built-up area in the project fields and as floor area in the occupancy-certificate extraction.
Building count: One building is recorded in the project filing.
Sanctioned configuration: 2 Cellar + 1 Ground + 4 upper floors; the permit records height 15 m.
Parking area: 1255.96 sq. m as per sanctioned plan in the occupancy-certificate extraction; the permit lists cellar parking area as 1255.98 sq. m.
Units: The filing records 1 total building unit; the RERA unit schedule lists 5 SHOP units.
Mortgaged area: 261.89 sq. m is recorded as mortgage area.
Offering and status
Unit type and filed saleable area: SHOP; the RERA unit schedule gives saleable area 512.51 sq. m for each listed configuration.
Booked / available: 0 booked; 5 available, as last read from the TG-RERA portal; the portal record supplied has no as-of date, so these counts are indicative.
Construction stage: No independently verified current construction-stage report is supplied. The promoter-facing project description says construction is in progress; this is not an independently verified site update.
Completion date: The promoter’s Form B declaration undertakes completion by 20/10/2027; the TG-RERA certificate is valid through that date.
Occupancy certificate: The supplied occupancy-certificate document identifies 0045/OC/3011/2024, issued 03 May, 2024, for the commercial building at Survey No. 1103.
2. The project story
OBEDULLAH CENTRAL is registered as a commercial project on Survey No. 1103 in the Mukarampura locality of Karimnagar. The building permit authorizes a commercial building with two cellar levels, a ground floor and four upper floors. The TG-RERA unit schedule identifies five shop units.
The promoter’s Form B declaration gives 20/10/2027 as the undertaking completion date. Separately, an occupancy-certificate document in the supplied filing identifies the building as fit for occupation under certificate 0045/OC/3011/2024, dated 03 May, 2024. No independently verified present-day site-progress report is supplied, so the project’s current construction stage cannot be established from this evidence alone.
3. Master plan, architecture & building design
The building permit records a single commercial building on a site of 1154.89 sq. m, with 44.48 sq. m road-affected and 1110.41 sq. m net area in the RERA land details. The permit authorizes 2 Cellar + 1 Ground + 4 upper floors, with a stated height of 15 m. The occupancy-certificate extraction records floor area of 2562.55 sq. m and parking area of 1255.96 sq. m as per sanctioned plan. These figures describe different aspects of the approved record and should not be treated as interchangeable area measures.
The permit lists a tot-lot, transformer space, garbage house and rainwater-harvesting percolation pit; it also specifies six rainwater-harvesting structures. The occupancy-certificate extraction records tot-lot area as 0 in both the sanctioned-plan and site-plan fields.
The supplied floor-plan set contains two drawings, neither measured as a unit plan; the record reports no flats in those drawings. Consequently, there is no drawing-derived carpet-area or room-layout measurement to report.
4. Homes, configurations & floor plans
The RERA unit schedule lists five SHOP units, with no units booked and five available in the portal snapshot; the booking record has no as-of date. The listed RERA saleable area is 512.51 sq. m.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| SHOP | 5 | 0 | 5 | 512.51 sq. m | Not measured from supplied drawings | Not supplied |
The saleable area is the RERA-filed figure. The drawing records supplied do not provide measured carpet area, room dimensions or a basis to quantify common-area loading.
5. Parking & vehicle circulation
The occupancy-certificate extraction records 1255.96 sq. m parking area in the sanctioned plan. The building permit lists 1255.98 sq. m cellar area, while the vendor description mentions open parking and covered parking and claims 20 covered spaces. The supplied documents do not establish the number or legal allocation of parking spaces to individual shop units, nor do they describe visitor, accessible or EV spaces, ramps, or pedestrian/vehicle separation.
6. Amenities, recreation & open spaces
| Description / size | Listed in the building permit; recorded as 0 area in the occupancy-certificate extraction. |
|---|---|
| Declared progress / verified status | Permit-listed; no supplied evidence establishing delivery as a usable facility. |
| Description / size | Listed in the building permit. |
|---|---|
| Declared progress / verified status | Permit-listed; completion status not established here. |
| Description / size | Listed in the building permit. |
|---|---|
| Declared progress / verified status | Permit-listed; completion status not established here. |
| Description / size | Building permit specifies 6; occupancy-certificate extraction also notes rainwater harvesting. |
|---|---|
| Declared progress / verified status | Permit-listed and noted in the occupancy-certificate extraction; no independent operational verification supplied. |
| Description / size | Vendor description lists both; it states Open Parking (1256 sqm), Covered Parking (20 numbers). |
|---|---|
| Declared progress / verified status | Vendor-reported; not established as an allocation or independently verified provision. |
No clubhouse, indoor recreation or sports facility is evidenced in the supplied project records. The permit also lists Internal Roads & Footpaths, a green strip/tot-lot/park, and aggregate recreational open space as RERA amenity fields; the supplied data does not provide facility dimensions or independent completion verification.
7. Utilities, building services & safety
The permit specifies rainwater-harvesting structures and lists transformer space and a garbage house. The RERA amenity record marks water supply, sewerage, storm-water drains, street lighting, electrical meter room/sub-station/receiving station and water conservation/rainwater harvesting as provided, with 100% shown for those listed fields; this is a project-record status, not independent operational verification.
The RERA amenity record shows 0% for treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements. No capacities, water source or storage details, STP specification, backup-power details, lift information, fire-system details, accessibility provisions, or security-system specifications are supplied.
8. Location, access & connectivity
The project is identified as being in Mukarampura, Karimnagar, with site boundaries adjoining a 21M ROAD to the east, 6M ROAD to the west and 9M ROAD to the south; the north boundary is land of others.
The location dataset supplies a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. The supplied evidence does not establish a route, travel time or public-transport connection for that distance.
9. Developer & development status
The registered promoter is VAJRA PROFESSIONALS, identified in the filing as a partnership. The supplied corporate identifier is GSTIN 36AAOFV2201Q1ZQ. The registered office is recorded as SRI NILAYAM, BHAGATH NAGAR, MUKARAMPURA, KARIMNAGAR, Warangal Urban, 505001.
The registration record lists NARAYANA REDDY DAVU and HARI KRISHNA GADDAM as authorized signatories, and AMJAD ALI SAYED, MADAN MOHAN REDDY MADA and JAYASENA REDDY NARRA as partners.
The promoter’s Form B declaration undertakes completion by 20/10/2027. Although the supplied record includes an occupancy certificate for the building, there is no independently verified current site-progress report.
10. Approvals, official records & documents
| Identifier / date | P00300004533; issued 14/05/2022; valid to 20/10/2027 |
|---|---|
| Scope and source | Form C for OBEDULLAH CENTRAL; |
| Identifier / date | 3145/Karimnagar Muni/2020/0753; approved 20 October, 2021 |
|---|---|
| Scope and source | Satavahana Urban Development Authority (Karimnagar); Survey No. 1103; |
| Identifier / date | 0045/OC/3011/2024; issued 03 May, 2024 |
|---|---|
| Scope and source | Karimnagar Municipal Corporation; commercial building OBEDULLAH CENTRAL, Survey No. 1103; |
| Identifier / date | 0045/OC/3011/2024; dated 3/05/2024 |
|---|---|
| Scope and source | Architect’s Form 1A identifies the occupancy certificate and certifies completion; |
| Identifier / date | Completion undertaking 20/10/2027 |
|---|---|
| Scope and source | Promoter-declared project obligations; |
| Identifier / date | Record 225677 |
|---|---|
| Scope and source | Project-filed encumbrance document; |
The supplied record identifies a building permit, TG-RERA registration and occupancy-certificate document for the project. It does not include an extracted approved layout drawing or a current independent site-inspection report.
Frequently asked questions
Is OBEDULLAH CENTRAL registered with Telangana RERA?
Yes. OBEDULLAH CENTRAL is registered with the Telangana Real Estate Regulatory Authority as P00300004533; the registration status is New Project.
Who is the developer of OBEDULLAH CENTRAL?
The promoter named in the RERA registration is VAJRA PROFESSIONALS.
Where is OBEDULLAH CENTRAL located?
OBEDULLAH CENTRAL is in KARIMNAGAR, Hanamkonda, Telangana (505001).
When will OBEDULLAH CENTRAL be completed?
The promoter's proposed date of completion filed with RERA is 20/10/2027. This is the promoter's declaration, not a guarantee.
More projects in Hanamkonda