Raviraj Apartments
PITTALA · Suryapet · RERA P01900002605
RAVIRAJ APARTMENTS is a residential apartment project in Huzurnagar Area Hospital, Huzurnagar, Huzurnagar mandal, Suryapet district. The registered promoter is Pittala Jhansi. The project has a registered site extent of 645.06 sq. m and one residential building with a stilt and five upper floors, containing 15 apartments: 10 2BHK units with RERA-filed saleable area of 75.97 sq. m and five 3BHK units with RERA-filed saleable area of 87.2 sq. m. Its TG-RERA registration number is P01900002605, and the proposed completion date is 27/08/2023.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | RAVIRAJ APARTMENTS RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase is not separately identified. The registration and building documents describe one residential building, Block 1 / Building A (PJ APT). |
| TG-RERA registration | P01900002605 |
| Registration validity | 23/02/2021 to 27/08/2023; the certificate states validity for two years unless extended by the Authority. The supplied certificate says “extended: false.” |
| Registered promoter | Pittala Jhansi is named on the TG-RERA certificate. A filed Form B identifies Mrs. Pittala Jhansi as authorized for M/s. RAVI RAJ CONSTRUCTIONS. The legal entity type of the registered promoter is not established in the supplied record. |
| RERA project status | The filing identifies the project as “New Project.” Registration validity is distinct from the completion deadline and from occupancy certification. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / address | Huzurnagar Area Hospital, Huzurnagar; Sai Baba Theater Road is also stated in the project address and municipal documents. RERA filing |
| Revenue village | The RERA record gives Huzurnagar Area Hospital; the building-plan document names Huzurnagar. The exact revenue-village identity is not verified in the supplied material. |
| Mandal / district / PIN | Huzurnagar / Suryapet / 508204 |
| Survey numbers and subdivisions | Survey Nos. 227/F, 228 and 234; no further subdivision is given in the project’s stated survey schedule. |
| Plot / block | Plot Nos. 7 & 8, Block No. 1 |
| Registered site extent | Total area 645.06 sq. m; net area 605.55 sq. m; road-affected area 39.51 sq. m. The municipal plan also records a 1.93 sq. m splay area and total deductions of 41.44 sq. m. RERA filing |
| Boundaries | East: Plot No. 6; west: road width 7; north: road width 12; south: road width 7. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Huzurnagar Municipality |
| Principal building permission | File/proceedings No. 3045/W3/2019/0487; municipal plan approval G1/44/2019, dated 19-08-2019. The building-permit order is dated 28 August, 2019. |
| Approved building form | One residential building, 1 Stilt + 5 upper floors. |
| Approved height | 14.25 m is recorded as building height; the plan also states 20.20 mt. Total Ht. |
| Built-up area | The plan records residential net BUA 1393.70 sq. m, built-up area 1408.78 sq. m, and proposed net built-up area 1447.37 sq. m as separately labelled figures. |
| Parking | 11 proposed parking spaces are recorded in the building plan. The building-permit order states that approved stilt/cellar parking must be used exclusively for vehicle parking; the supplied plan identifies a stilt, but does not establish a separate cellar level. |
| Unit count | 15 dwelling units in the municipal building plan and RERA unit record. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Unit configurations | 2BHK: 10 units; 3BHK: 5 units RERA unit table |
| RERA-filed saleable areas | 2BHK: 75.97 sq. m; 3BHK: 87.2 sq. m RERA unit table |
| Booked / available | Portal-derived counts show 2BHK 0 booked / 10 available and 3BHK 0 booked / 5 available. These counts have no supplied as-of date and are indicative, not a current availability confirmation. RERA unit table |
| Construction stage | The RERA record supplied here does not state a verified construction stage. A third-party vendor description calls it “completed,” but that is not a TG-RERA progress certification or independent site verification. Promoter website |
| Completion dates | RERA registration certificate: valid to 27/08/2023. Filed Form B undertaking: completion by 27/08/2023. An earlier Form B document separately states a thirty months completion period. |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is included in the supplied documents; certificate status is therefore not established. The municipal order requires a completion notice and occupancy certificate before occupation. |
2. The project story
RAVIRAJ APARTMENTS is registered as a residential apartment project in Huzurnagar, Suryapet, on Plot Nos. 7 and 8, Block 1, over Survey Nos. 227/F, 228 and 234. The municipal record describes a single building with a stilt and five upper floors, containing 15 dwelling units.
The registered offering comprises ten 2BHK and five 3BHK apartments. RERA-filed saleable areas are 75.97 sq. m and 87.2 sq. m respectively. Portal booking counts show all 15 as available, but the record carries no as-of date. No current construction stage or independently verified site-completion status is supplied. The vendor’s “completed” description is a third-party claim only. RERA unit table Promoter website
The RERA registration and the filed completion undertaking both state 27/08/2023 as the end date, while the supplied registration certificate records no extension. These dates do not establish that construction was completed or that an occupancy certificate was issued.
3. Master plan, architecture & building design
The municipal plan identifies one residential building, A (PJ APT), in Block 1 on Plot Nos. 7 and 8. It records a site area of 645.06 sq. m, net plot area of 605.55 sq. m, road-affected area of 39.51 sq. m, splay area of 1.93 sq. m, total deductions of 41.44 sq. m, vacant plot area of 307.17 sq. m, and proposed coverage area of 298.38 sq. m (49.27 %). These are plan-stated figures.
The drawing describes a stilt plus first through fifth floors. It records residential net BUA 1393.70 sq. m, built-up area 1408.78 sq. m, proposed net built-up area 1447.37 sq. m, and mortgage area 149.71 sq. m; these labels are kept distinct because the plan does not treat them as interchangeable measures. The building-permit order records the upper-floors area as 1,393.70 m2, stilt area as 283.30 m2, and height as 14.25 m.
The plan names a lift and staircase, but the supplied material does not establish the number or capacity of lifts, the flats served per floor, detailed circulation, or separate residential/common-area schedules. It records a green strip, a tot-lot condition, rainwater harvesting, and a percolation pit. The RERA filing includes a “mortgage area” of 149.71 sq. m; this overview records the filed figure without determining its title or transaction effect. RERA filing
4. Homes, configurations & floor plans
RERA records 15 apartments across two configurations. The supplied drawing-measurement summary reports no measured flat designs for either RERA configuration, so no software-measured carpet areas or room dimensions can be reported. The drawing review also notes that one drawing remains pending scan review. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 75.97 sq. m | Not measured in supplied drawing analysis | Not supplied |
| 3BHK | 5 | 0 | 5 | 87.2 sq. m | Not measured in supplied drawing analysis | Not supplied |
Saleable area is the figure filed with RERA; no carpet-area figure is available here. The supplied measurement methodology distinguishes drawing-measured carpet area from saleable area, which also includes a share of common areas, but it provides no measured result for these units. Portal booking and availability counts are indicative because no as-of date is provided. RERA unit table RERA unit details
5. Parking & vehicle circulation
The municipal plan records 11 proposed parking spaces and shows a stilt level. The municipal building-permit order states that stilt/cellar parking shown in the sanctioned plan must be used exclusively for vehicle parking, without partitions or rolling shutters and without conversion to another use. The supplied record does not establish a separate cellar parking level, parking allocation to particular apartments, visitor or accessible spaces, two-wheeler provision, ramp arrangement, EV charging, or exclusive ownership of any bay.
6. Amenities, recreation & open spaces
The RERA amenity schedule lists facilities and reports 0% progress for every listed item. “YES” entries are filing declarations, not evidence of completion; no independent verification of delivery is supplied. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Plan requires a peripheral green strip and a fenced, maintained tot-lot; no size stated. | RERA amenities | RERA schedule: 0%; completion not independently verified. |
| Community buildings | Listed; no size or quantity stated. | RERA amenities | 0%; completion not independently verified. |
| Aggregate recreational open space | Listed; area not stated. | RERA amenities | 0%; completion not independently verified. |
7. Utilities, building services & safety
The municipal plan identifies a septic tank, overhead water tank, sump, rainwater harvesting and percolation pit; it also lists a lift, staircase and parking. The building-permit order requires a rainwater-harvesting structure and space for a transformer. These are plan or permit records, not evidence that the systems have been installed, commissioned or independently tested.
The RERA amenity schedule lists water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, water conservation/rainwater harvesting, fire protection and fire safety, and an electrical meter room/sub-station/receiving station. Each has 0% recorded progress; the schedule does not provide capacities or establish completion. The supplied record does not establish water source or treatment capacity, STP installation or reuse, electrical backup, lift capacity, detailed fire systems, CCTV/security, waste segregation, or accessible circulation. RERA amenities
8. Location, access & connectivity
The registered project location is Huzurnagar Area Hospital, Huzurnagar, Suryapet, Telangana 508204. The filed address and municipal documents associate the site with Sai Baba Theater Road / Sai Baba Theatre Road Area. RERA filing
The building plan identifies Plot Nos. 7 and 8, Block 1, and records road widths of 7.30MT and 12.0 MT; it also refers to a 12.0 MT existing/proposed road in the drawing extraction. The filing’s boundary descriptions state roads on the west, north and south sides. No measured distances to landmarks, public-transport details, or travel times are supplied. RERA filing
9. Developer & development status
The TG-RERA certificate names Pittala Jhansi as promoter. A filed Form B identifies Mrs. Pittala Jhansi as authorized for M/s. RAVI RAJ CONSTRUCTIONS. The registered legal entity type, corporate identifier, registered office, official contacts and official website are not established in the supplied evidence. Corporate record
A Form B dated 03 day of Noverper. 2020 declares a thirty-month completion period; another filed Form B undertakes completion by 27/08/2023. The RERA certificate records registration from 23/02/2021 to 27/08/2023, and the supplied certificate states that it was not extended. The evidence supplied does not establish current construction progress or issue of an occupancy/completion certificate.
10. Approvals, official records & documents
| Evidence in the supplied file | Form C, registration P01900002605, issued 23/02/2021, valid to 27/08/2023 |
|---|---|
| Scope / note | RAVIRAJ APARTMENTS; Survey Nos. 227/F, 228 and 234. |
| Evidence in the supplied file | Huzurnagar Municipality, File No. 3045/W3/2019/0487, dated 28 August, 2019 |
|---|---|
| Scope / note | Conditional permission for one stilt plus five-upper-floor residential building; permit states it does not confer ownership rights. |
| Evidence in the supplied file | Approval G1/44/2019, proceedings 3045/W3/2019/0487, dated 19-08-2019 |
|---|---|
| Scope / note | One 15-unit residential building on Plot Nos. 7 and 8, Survey Nos. 227/F, 228 and 234. |
| Evidence in the supplied file | Promoter declarations concerning title, encumbrances, completion and project obligations |
|---|---|
| Scope / note | Promoter declarations; not independent title verification. |
| Evidence in the supplied file | Not present in supplied documents |
|---|---|
| Scope / note | Municipal order requires completion notice and occupancy certificate before occupation; issuance is not established. |
| Evidence in the supplied file | Layout sketch in LUZUR NAGAR, NALGONDA (DT.), stating 22 plots and plot/road area figures |
|---|---|
| Scope / note | The document does not identify an issuing authority, permit number, applicant or owner; it is not established as an approval for this project site. |
1. Project at a glance
Project identity
Registered project name: RAVIRAJ APARTMENTS
Project type: Residential apartment project
Phase / registered portion: Phase is not separately identified. The registration and building documents describe one residential building, Block 1 / Building A (PJ APT).
TG-RERA registration: P01900002605
Registration validity: 23/02/2021 to 27/08/2023; the certificate states validity for two years unless extended by the Authority. The supplied certificate says “extended: false.”
Registered promoter: Pittala Jhansi is named on the TG-RERA certificate. A filed Form B identifies Mrs. Pittala Jhansi as authorized for M/s. RAVI RAJ CONSTRUCTIONS. The legal entity type of the registered promoter is not established in the supplied record.
RERA project status: The filing identifies the project as “New Project.” Registration validity is distinct from the completion deadline and from occupancy certification.
Land and geographic identity
Locality / address: Huzurnagar Area Hospital, Huzurnagar; Sai Baba Theater Road is also stated in the project address and municipal documents.
Revenue village: The RERA record gives Huzurnagar Area Hospital; the building-plan document names Huzurnagar. The exact revenue-village identity is not verified in the supplied material.
Mandal / district / PIN: Huzurnagar / Suryapet / 508204
Survey numbers and subdivisions: Survey Nos. 227/F, 228 and 234; no further subdivision is given in the project’s stated survey schedule.
Plot / block: Plot Nos. 7 & 8, Block No. 1
Registered site extent: Total area 645.06 sq. m; net area 605.55 sq. m; road-affected area 39.51 sq. m. The municipal plan also records a 1.93 sq. m splay area and total deductions of 41.44 sq. m.
Boundaries: East: Plot No. 6; west: road width 7; north: road width 12; south: road width 7.
Development identity
Sanctioning authority: Huzurnagar Municipality
Principal building permission: File/proceedings No. 3045/W3/2019/0487; municipal plan approval G1/44/2019, dated 19-08-2019. The building-permit order is dated 28 August, 2019.
Approved building form: One residential building, 1 Stilt + 5 upper floors.
Approved height: 14.25 m is recorded as building height; the plan also states 20.20 mt. Total Ht.
Built-up area: The plan records residential net BUA 1393.70 sq. m, built-up area 1408.78 sq. m, and proposed net built-up area 1447.37 sq. m as separately labelled figures.
Parking: 11 proposed parking spaces are recorded in the building plan. The building-permit order states that approved stilt/cellar parking must be used exclusively for vehicle parking; the supplied plan identifies a stilt, but does not establish a separate cellar level.
Unit count: 15 dwelling units in the municipal building plan and RERA unit record.
Offering and status
Unit configurations: 2BHK: 10 units; 3BHK: 5 units
RERA-filed saleable areas: 2BHK: 75.97 sq. m; 3BHK: 87.2 sq. m
Booked / available: Portal-derived counts show 2BHK 0 booked / 10 available and 3BHK 0 booked / 5 available. These counts have no supplied as-of date and are indicative, not a current availability confirmation.
Construction stage: The RERA record supplied here does not state a verified construction stage. A third-party vendor description calls it “completed,” but that is not a TG-RERA progress certification or independent site verification.
Completion dates: RERA registration certificate: valid to 27/08/2023. Filed Form B undertaking: completion by 27/08/2023. An earlier Form B document separately states a thirty months completion period.
Occupancy / completion certificate: No occupancy certificate or completion certificate is included in the supplied documents; certificate status is therefore not established. The municipal order requires a completion notice and occupancy certificate before occupation.
2. The project story
RAVIRAJ APARTMENTS is registered as a residential apartment project in Huzurnagar, Suryapet, on Plot Nos. 7 and 8, Block 1, over Survey Nos. 227/F, 228 and 234. The municipal record describes a single building with a stilt and five upper floors, containing 15 dwelling units.
The registered offering comprises ten 2BHK and five 3BHK apartments. RERA-filed saleable areas are 75.97 sq. m and 87.2 sq. m respectively. Portal booking counts show all 15 as available, but the record carries no as-of date. No current construction stage or independently verified site-completion status is supplied. The vendor’s “completed” description is a third-party claim only.
The RERA registration and the filed completion undertaking both state 27/08/2023 as the end date, while the supplied registration certificate records no extension. These dates do not establish that construction was completed or that an occupancy certificate was issued.
3. Master plan, architecture & building design
The municipal plan identifies one residential building, A (PJ APT), in Block 1 on Plot Nos. 7 and 8. It records a site area of 645.06 sq. m, net plot area of 605.55 sq. m, road-affected area of 39.51 sq. m, splay area of 1.93 sq. m, total deductions of 41.44 sq. m, vacant plot area of 307.17 sq. m, and proposed coverage area of 298.38 sq. m (49.27 %). These are plan-stated figures.
The drawing describes a stilt plus first through fifth floors. It records residential net BUA 1393.70 sq. m, built-up area 1408.78 sq. m, proposed net built-up area 1447.37 sq. m, and mortgage area 149.71 sq. m; these labels are kept distinct because the plan does not treat them as interchangeable measures. The building-permit order records the upper-floors area as 1,393.70 m2, stilt area as 283.30 m2, and height as 14.25 m.
The plan names a lift and staircase, but the supplied material does not establish the number or capacity of lifts, the flats served per floor, detailed circulation, or separate residential/common-area schedules. It records a green strip, a tot-lot condition, rainwater harvesting, and a percolation pit. The RERA filing includes a “mortgage area” of 149.71 sq. m; this overview records the filed figure without determining its title or transaction effect.
4. Homes, configurations & floor plans
RERA records 15 apartments across two configurations. The supplied drawing-measurement summary reports no measured flat designs for either RERA configuration, so no software-measured carpet areas or room dimensions can be reported. The drawing review also notes that one drawing remains pending scan review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 75.97 sq. m | Not measured in supplied drawing analysis | Not supplied |
| 3BHK | 5 | 0 | 5 | 87.2 sq. m | Not measured in supplied drawing analysis | Not supplied |
Saleable area is the figure filed with RERA; no carpet-area figure is available here. The supplied measurement methodology distinguishes drawing-measured carpet area from saleable area, which also includes a share of common areas, but it provides no measured result for these units. Portal booking and availability counts are indicative because no as-of date is provided.
5. Parking & vehicle circulation
The municipal plan records 11 proposed parking spaces and shows a stilt level. The municipal building-permit order states that stilt/cellar parking shown in the sanctioned plan must be used exclusively for vehicle parking, without partitions or rolling shutters and without conversion to another use. The supplied record does not establish a separate cellar parking level, parking allocation to particular apartments, visitor or accessible spaces, two-wheeler provision, ramp arrangement, EV charging, or exclusive ownership of any bay.
6. Amenities, recreation & open spaces
The RERA amenity schedule lists facilities and reports 0% progress for every listed item. “YES” entries are filing declarations, not evidence of completion; no independent verification of delivery is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Plan requires a peripheral green strip and a fenced, maintained tot-lot; no size stated. | RERA schedule: 0%; completion not independently verified. | |
| Community buildings | Listed; no size or quantity stated. | 0%; completion not independently verified. | |
| Aggregate recreational open space | Listed; area not stated. | 0%; completion not independently verified. |
7. Utilities, building services & safety
The municipal plan identifies a septic tank, overhead water tank, sump, rainwater harvesting and percolation pit; it also lists a lift, staircase and parking. The building-permit order requires a rainwater-harvesting structure and space for a transformer. These are plan or permit records, not evidence that the systems have been installed, commissioned or independently tested.
The RERA amenity schedule lists water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, water conservation/rainwater harvesting, fire protection and fire safety, and an electrical meter room/sub-station/receiving station. Each has 0% recorded progress; the schedule does not provide capacities or establish completion. The supplied record does not establish water source or treatment capacity, STP installation or reuse, electrical backup, lift capacity, detailed fire systems, CCTV/security, waste segregation, or accessible circulation.
8. Location, access & connectivity
The registered project location is Huzurnagar Area Hospital, Huzurnagar, Suryapet, Telangana 508204. The filed address and municipal documents associate the site with Sai Baba Theater Road / Sai Baba Theatre Road Area.
The building plan identifies Plot Nos. 7 and 8, Block 1, and records road widths of 7.30MT and 12.0 MT; it also refers to a 12.0 MT existing/proposed road in the drawing extraction. The filing’s boundary descriptions state roads on the west, north and south sides. No measured distances to landmarks, public-transport details, or travel times are supplied.
9. Developer & development status
The TG-RERA certificate names Pittala Jhansi as promoter. A filed Form B identifies Mrs. Pittala Jhansi as authorized for M/s. RAVI RAJ CONSTRUCTIONS. The registered legal entity type, corporate identifier, registered office, official contacts and official website are not established in the supplied evidence.
A Form B dated 03 day of Noverper. 2020 declares a thirty-month completion period; another filed Form B undertakes completion by 27/08/2023. The RERA certificate records registration from 23/02/2021 to 27/08/2023, and the supplied certificate states that it was not extended. The evidence supplied does not establish current construction progress or issue of an occupancy/completion certificate.
10. Approvals, official records & documents
| Evidence in the supplied file | Form C, registration P01900002605, issued 23/02/2021, valid to 27/08/2023 |
|---|---|
| Scope / note | RAVIRAJ APARTMENTS; Survey Nos. 227/F, 228 and 234. |
| Evidence in the supplied file | Huzurnagar Municipality, File No. 3045/W3/2019/0487, dated 28 August, 2019 |
|---|---|
| Scope / note | Conditional permission for one stilt plus five-upper-floor residential building; permit states it does not confer ownership rights. |
| Evidence in the supplied file | Approval G1/44/2019, proceedings 3045/W3/2019/0487, dated 19-08-2019 |
|---|---|
| Scope / note | One 15-unit residential building on Plot Nos. 7 and 8, Survey Nos. 227/F, 228 and 234. |
| Evidence in the supplied file | Promoter declarations concerning title, encumbrances, completion and project obligations |
|---|---|
| Scope / note | Promoter declarations; not independent title verification. |
| Evidence in the supplied file | Not present in supplied documents |
|---|---|
| Scope / note | Municipal order requires completion notice and occupancy certificate before occupation; issuance is not established. |
| Evidence in the supplied file | Layout sketch in LUZUR NAGAR, NALGONDA (DT.), stating 22 plots and plot/road area figures |
|---|---|
| Scope / note | The document does not identify an issuing authority, permit number, applicant or owner; it is not established as an approval for this project site. |
Frequently asked questions
Is RAVIRAJ APARTMENTS registered with Telangana RERA?
Yes. RAVIRAJ APARTMENTS is registered with the Telangana Real Estate Regulatory Authority as P01900002605; the registration status is New Project.
Who is the developer of RAVIRAJ APARTMENTS?
The promoter named in the RERA registration is PITTALA.
Where is RAVIRAJ APARTMENTS located?
RAVIRAJ APARTMENTS is in HUZURNAGAR, Huzurnagar Area Hospital, Suryapet, Telangana (508204).
When will RAVIRAJ APARTMENTS be completed?
The promoter's proposed date of completion filed with RERA is 27/08/2023. This is the promoter's declaration, not a guarantee.