Konathams IV Residency
BALAJI HOMES · Suryapet · RERA P01900005509
KONATHAMS IV RESIDENCY is a residential apartment project at Huzurnagar Area Hospital, Huzurnagar, Huzurnagar mandal, Suryapet district, developed by registered promoter Balaji Homes. The project occupies 1693.93 sq m and has one approved residential building, Building - A (CHAITANYA), with 1 Stilt + 5 upper floors and 30 2BHK apartments, each with a RERA-filed saleable area of 104.05 sqm. Its TG-RERA registration number is P01900005509, and its proposed completion date is 07/09/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | KONATHAMS IV RESIDENCY RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified. The registration covers the project on Survey No. 201/A5; the filed building approval identifies plots 12, 13 and 14. |
| TG-RERA registration | P01900005509 |
| Registration validity | 14/12/2022 to 07/09/2024; the certificate says “1 years.” No extension is recorded in the supplied certificate. Registration validity is separate from the construction deadline. |
| Registered promoter | Balaji Homes, identified as a proprietorship Parties record RERA filing |
| RERA status in supplied record | New Project; registration certificate records the validity dates above. Current registration status is not established by the supplied record. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / registered address | Huzurnagar Area Hospital, Huzurnagar RERA record |
| Revenue village | Huzurnagar Area Hospital is the village name in the RERA project record; the filed approval documents refer to Huzurnagar. RERA record RERA filing |
| Mandal / district / PIN | Huzurnagar / Suryapet / 508204 RERA record RERA filing |
| Project survey number | 201/A5 RERA filing |
| Plots / extent | Plots 12, 13, 14; registered site extent 1693.93 sq m. The filing records total area and net area as 1693.93 sq m, with road-affected area 0. RERA filing |
| Boundaries | North: Plot No. 11; South: Plot No. 15; East: 40 WIDE ROAD; West: land of Shaik Shajima. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Building-sanctioning authority | Huzurnagar Municipality/Municipal Corporation |
| Principal building approval | 0001/BP/3045/2021, approved 07 September, 2021 |
| Approved building | Building - A (CHAITANYA), residential; sanctioned configuration 1 Stilt + 5 upper floors; recorded height 14.95 m |
| Approved area figures | Site area and net area: 1693.93 m2; stilt: 871.79 m2; upper floors: 3,809.85 m2; tot-lot: 171.36 m2. These are the figures as labelled in the building approval; the supplied record does not identify them as carpet or saleable area. |
| Building / tower count | One approved building is identified in the supplied building-approval extraction. |
| Approved vs. RERA-declared units | Approved-plan unit count is recorded as 1 in the project filing; the RERA unit inventory lists 30 2BHK units. The supplied material does not explain the filed approved-plan count label. RERA filing RERA unit table |
| Parking levels | The building approval lists a stilt floor and says the approved cellar/stilt parking is to be used exclusively for vehicle parking. No parking-space count is supplied. |
Offering and status
| Item | Project record |
|---|---|
| Unit type | 2BHK RERA unit table |
| RERA-filed saleable area | 104.05 sqm RERA unit table |
| Booked / available | 0 booked / 30 available, as last read from the TG-RERA portal; the record has no as-of date, so treat these counts as indicative. RERA unit table |
| Construction stage | No independently verified or current site-progress evidence is supplied. Document index |
| Original completion date | 07/09/2024, as stated in the registration record and promoter’s Form-B declaration. RERA record |
| Revised completion date | Not disclosed in the supplied record. Document index |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents; certificate status is not established here. The building approval says possession is not to be delivered before an occupancy certificate is obtained. Document index |
2. The project story
KONATHAMS IV RESIDENCY is registered as a residential apartment project on plots 12, 13 and 14 in Survey No. 201/A5, at Huzurnagar. The building approval describes one residential building, Building - A (CHAITANYA), with a sanctioned configuration of one stilt level and five upper floors. The RERA inventory records 30 two-bedroom apartments. RERA record RERA filing RERA unit table
The RERA filing gives a proposed completion date of 07/09/2024. That date is a promoter-declared deadline, not evidence that construction was completed by then. The supplied material does not include a current site inspection, verified construction-progress report or occupancy/completion certificate. Document index
3. Master plan, architecture & building design
The building approval identifies a single residential building on a 1693.93 m2 site, with 1 Stilt + 5 upper floors and a recorded height of 14.95 m. The approval lists 871.79 m2 for the stilt and 3,809.85 m2 for upper floors; these figures are reproduced as labelled and should not be treated as carpet or saleable area. It also records a 171.36 m2 tot-lot.
The approval requires construction in accordance with the sanctioned plan and says no construction is permitted beyond the sanctioned floor configuration. It calls for 11 rain water harvesting pits, a transformer space and a garbage house. The supplied drawing data contains two drawing records, but neither was measured and both are marked as having no flats; it therefore does not support room-by-room or floor-plan description. Floor plans
A separate municipal layout proceeding concerns a residential plotted layout in Survey No. 201/A5, with an open-space reservation and road provisions. The available evidence does not establish that this broader layout proceeding is a building-level apartment plan.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 30 | 0 | 30 | 104.05 sqm | Not measured in the supplied drawing records | Not supplied |
The unit counts, booking figures and saleable area are RERA filing data; booking and availability counts have no recorded as-of date. The supplied floor-plan records contain no measured flats, so no software-measured carpet area or room dimensions can be reported. Saleable area is the filed unit area; the supplied evidence does not provide a carpet-area figure or a loading calculation. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The building approval identifies stilt parking and requires the approved cellar/stilt parking areas to be used exclusively for vehicle parking, without partition walls or rolling shutters. The RERA unit record marks the 2BHK inventory as mortgaged; this does not identify an individual parking allocation. No sanctioned parking-space count, resident/visitor breakdown, accessible-space count, two-wheeler provision, mechanical parking arrangement or unit-wise parking allocation is available in the supplied material. RERA unit table
6. Amenities, recreation & open spaces
| Description / size | 171.36 m2 |
|---|---|
| Evidence source | Building approval |
| Declared progress / verified status | Approved-plan provision; completion is not independently verified. |
| Description / size | 11 |
|---|---|
| Evidence source | Building approval |
| Declared progress / verified status | Approval condition; installation is not independently verified. |
| Description / size | The building approval records an open-space percentage of 5%; it also lists the tot-lot separately. |
|---|---|
| Evidence source | Building approval |
| Declared progress / verified status | Approval record; delivered status is not established. |
| Description / size | Space required within the site |
|---|---|
| Evidence source | Building approval |
| Declared progress / verified status | Approval condition; completion is not independently verified. |
| Description / size | Required within the premises, with dry/wet waste segregation |
|---|---|
| Evidence source | Building approval |
| Declared progress / verified status | Approval condition; completion is not independently verified. |
| Description / size | Listed in the RERA amenity record with “YES” and 100% for each of these entries |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | Portal-declared figures; independent completion is not verified. |
| Description / size | Internal roads and footpaths, green strip/tot-lot/park, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection/fire safety, and aggregate recreational open space are listed with 0% in the supplied RERA amenity record. |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | Portal-recorded percentages; no independent site verification is supplied. |
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as available at 100%. These are portal-recorded declarations, not independently inspected completion findings. RERA amenities
The building approval calls for 11 rainwater-harvesting pits, a transformer space, a garbage house with dry/wet segregation, and the execution of sanitation, plumbing, fire-safety and electrical services under qualified technical supervision. It also states that the approval requires fire-fighting installations and structural-safety measures, but the supplied documents do not establish that these systems are installed or that a fire clearance has been issued.
No supplied record establishes water source or storage capacity, an STP design or capacity, treated-water reuse, backup power, lift count or capacity, security/CCTV arrangements, accessible circulation or an occupancy certificate. The building approval states that public water and electricity connections are to be provided only on production of an occupancy certificate.
8. Location, access & connectivity
The registered project location is Huzurnagar Area Hospital, Huzurnagar, Huzurnagar mandal, Suryapet district, PIN 508204. The building-approval record identifies the site as KONATHAM IV ESTATES/KONATHAMS IV RESIDENCY in Huzurnagar and gives an adjoining 40'-0" road in its approval materials; the RERA land record identifies the eastern boundary as 40 WIDE ROAD. RERA record RERA filing RERA filing
The supplied location data gives the nearest sampled Outer Ring Road interchange at 140.9 km. No public-transport details or other measured landmark distances are provided. Location record
9. Developer & development status
The registered promoter is BALAJI HOMES, identified in the RERA filing as a proprietorship. The filing names ARVAPALLY CHAITANYA as authorized signatory. No verified company registration number, official website or separate official contact details are supplied. Parties record RERA filing
The promoter’s Form-B declaration states that the project is to be completed by 07/09/2024 and includes declarations concerning title, encumbrances, project funds, audits and pending approvals. These are promoter declarations, not independent verification of completion or construction progress.
10. Approvals, official records & documents
| Identifier / date | P01900005509; issued 14/12/2022; valid through 07/09/2024 |
|---|---|
| What the supplied document establishes | FORM C registration for KONATHAMS IV RESIDENCY on Survey No. 201/A5. |
| Identifier / date | 0001/BP/3045/2021; 07 September, 2021 |
|---|---|
| What the supplied document establishes | Huzurnagar Municipality/Municipal Corporation approval for Building - A (CHAITANYA), 1 Stilt + 5 upper floors. |
| Identifier / date | Proc.No. G1/1030/2019; approval T. L.P.NO. 47/2019/H.; dated .04.2019 in the supplied extraction |
|---|---|
| What the supplied document establishes | Huzurnagar Municipality proceedings for a residential plotted layout in Survey No. 201/A5. |
| Identifier / date | Filed project document |
|---|---|
| What the supplied document establishes | Promoter’s declarations on proposed title basis, encumbrances, project funding and completion deadline. |
| Identifier / date | Not present in supplied documents |
|---|---|
| What the supplied document establishes | Certificate status is not established by this evidence set. Document index |
| Identifier / date | Two records; neither measured; no flats recorded in the drawing extraction |
|---|---|
| What the supplied document establishes | No measured carpet area, room dimensions or floor-level unit arrangement can be reported. Floor plans |
The supplied document set also includes a title report, a development agreement/GPA and a municipal mortgage deed; detailed title and mortgage analysis is addressed in the Land & Title section. Document index
1. Project at a glance
Project identity
Registered name: KONATHAMS IV RESIDENCY
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified. The registration covers the project on Survey No. 201/A5; the filed building approval identifies plots 12, 13 and 14.
TG-RERA registration: P01900005509
Registration validity: 14/12/2022 to 07/09/2024; the certificate says “1 years.” No extension is recorded in the supplied certificate. Registration validity is separate from the construction deadline.
Registered promoter: Balaji Homes, identified as a proprietorship
RERA status in supplied record: New Project; registration certificate records the validity dates above. Current registration status is not established by the supplied record.
Land and geographic identity
Locality / registered address: Huzurnagar Area Hospital, Huzurnagar
Revenue village: Huzurnagar Area Hospital is the village name in the RERA project record; the filed approval documents refer to Huzurnagar.
Mandal / district / PIN: Huzurnagar / Suryapet / 508204
Project survey number: 201/A5
Plots / extent: Plots 12, 13, 14; registered site extent 1693.93 sq m. The filing records total area and net area as 1693.93 sq m, with road-affected area 0.
Boundaries: North: Plot No. 11; South: Plot No. 15; East: 40 WIDE ROAD; West: land of Shaik Shajima.
Development identity
Building-sanctioning authority: Huzurnagar Municipality/Municipal Corporation
Principal building approval: 0001/BP/3045/2021, approved 07 September, 2021
Approved building: Building - A (CHAITANYA), residential; sanctioned configuration 1 Stilt + 5 upper floors; recorded height 14.95 m
Approved area figures: Site area and net area: 1693.93 m2; stilt: 871.79 m2; upper floors: 3,809.85 m2; tot-lot: 171.36 m2. These are the figures as labelled in the building approval; the supplied record does not identify them as carpet or saleable area.
Building / tower count: One approved building is identified in the supplied building-approval extraction.
Approved vs. RERA-declared units: Approved-plan unit count is recorded as 1 in the project filing; the RERA unit inventory lists 30 2BHK units. The supplied material does not explain the filed approved-plan count label.
Parking levels: The building approval lists a stilt floor and says the approved cellar/stilt parking is to be used exclusively for vehicle parking. No parking-space count is supplied.
Offering and status
Unit type: 2BHK
RERA-filed saleable area: 104.05 sqm
Booked / available: 0 booked / 30 available, as last read from the TG-RERA portal; the record has no as-of date, so treat these counts as indicative.
Construction stage: No independently verified or current site-progress evidence is supplied.
Original completion date: 07/09/2024, as stated in the registration record and promoter’s Form-B declaration.
Revised completion date: Not disclosed in the supplied record.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents; certificate status is not established here. The building approval says possession is not to be delivered before an occupancy certificate is obtained.
2. The project story
KONATHAMS IV RESIDENCY is registered as a residential apartment project on plots 12, 13 and 14 in Survey No. 201/A5, at Huzurnagar. The building approval describes one residential building, Building - A (CHAITANYA), with a sanctioned configuration of one stilt level and five upper floors. The RERA inventory records 30 two-bedroom apartments.
The RERA filing gives a proposed completion date of 07/09/2024. That date is a promoter-declared deadline, not evidence that construction was completed by then. The supplied material does not include a current site inspection, verified construction-progress report or occupancy/completion certificate.
3. Master plan, architecture & building design
The building approval identifies a single residential building on a 1693.93 m2 site, with 1 Stilt + 5 upper floors and a recorded height of 14.95 m. The approval lists 871.79 m2 for the stilt and 3,809.85 m2 for upper floors; these figures are reproduced as labelled and should not be treated as carpet or saleable area. It also records a 171.36 m2 tot-lot.
The approval requires construction in accordance with the sanctioned plan and says no construction is permitted beyond the sanctioned floor configuration. It calls for 11 rain water harvesting pits, a transformer space and a garbage house. The supplied drawing data contains two drawing records, but neither was measured and both are marked as having no flats; it therefore does not support room-by-room or floor-plan description.
A separate municipal layout proceeding concerns a residential plotted layout in Survey No. 201/A5, with an open-space reservation and road provisions. The available evidence does not establish that this broader layout proceeding is a building-level apartment plan.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 30 | 0 | 30 | 104.05 sqm | Not measured in the supplied drawing records | Not supplied |
The unit counts, booking figures and saleable area are RERA filing data; booking and availability counts have no recorded as-of date. The supplied floor-plan records contain no measured flats, so no software-measured carpet area or room dimensions can be reported. Saleable area is the filed unit area; the supplied evidence does not provide a carpet-area figure or a loading calculation.
5. Parking & vehicle circulation
The building approval identifies stilt parking and requires the approved cellar/stilt parking areas to be used exclusively for vehicle parking, without partition walls or rolling shutters. The RERA unit record marks the 2BHK inventory as mortgaged; this does not identify an individual parking allocation. No sanctioned parking-space count, resident/visitor breakdown, accessible-space count, two-wheeler provision, mechanical parking arrangement or unit-wise parking allocation is available in the supplied material.
6. Amenities, recreation & open spaces
| Description / size | 171.36 m2 |
|---|---|
| Evidence source | Building approval |
| Declared progress / verified status | Approved-plan provision; completion is not independently verified. |
| Description / size | 11 |
|---|---|
| Evidence source | Building approval |
| Declared progress / verified status | Approval condition; installation is not independently verified. |
| Description / size | The building approval records an open-space percentage of 5%; it also lists the tot-lot separately. |
|---|---|
| Evidence source | Building approval |
| Declared progress / verified status | Approval record; delivered status is not established. |
| Description / size | Space required within the site |
|---|---|
| Evidence source | Building approval |
| Declared progress / verified status | Approval condition; completion is not independently verified. |
| Description / size | Required within the premises, with dry/wet waste segregation |
|---|---|
| Evidence source | Building approval |
| Declared progress / verified status | Approval condition; completion is not independently verified. |
| Description / size | Listed in the RERA amenity record with “YES” and 100% for each of these entries |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Portal-declared figures; independent completion is not verified. |
| Description / size | Internal roads and footpaths, green strip/tot-lot/park, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection/fire safety, and aggregate recreational open space are listed with 0% in the supplied RERA amenity record. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Portal-recorded percentages; no independent site verification is supplied. |
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as available at 100%. These are portal-recorded declarations, not independently inspected completion findings.
The building approval calls for 11 rainwater-harvesting pits, a transformer space, a garbage house with dry/wet segregation, and the execution of sanitation, plumbing, fire-safety and electrical services under qualified technical supervision. It also states that the approval requires fire-fighting installations and structural-safety measures, but the supplied documents do not establish that these systems are installed or that a fire clearance has been issued.
No supplied record establishes water source or storage capacity, an STP design or capacity, treated-water reuse, backup power, lift count or capacity, security/CCTV arrangements, accessible circulation or an occupancy certificate. The building approval states that public water and electricity connections are to be provided only on production of an occupancy certificate.
8. Location, access & connectivity
The registered project location is Huzurnagar Area Hospital, Huzurnagar, Huzurnagar mandal, Suryapet district, PIN 508204. The building-approval record identifies the site as KONATHAM IV ESTATES/KONATHAMS IV RESIDENCY in Huzurnagar and gives an adjoining 40'-0" road in its approval materials; the RERA land record identifies the eastern boundary as 40 WIDE ROAD.
The supplied location data gives the nearest sampled Outer Ring Road interchange at 140.9 km. No public-transport details or other measured landmark distances are provided.
9. Developer & development status
The registered promoter is BALAJI HOMES, identified in the RERA filing as a proprietorship. The filing names ARVAPALLY CHAITANYA as authorized signatory. No verified company registration number, official website or separate official contact details are supplied.
The promoter’s Form-B declaration states that the project is to be completed by 07/09/2024 and includes declarations concerning title, encumbrances, project funds, audits and pending approvals. These are promoter declarations, not independent verification of completion or construction progress.
10. Approvals, official records & documents
| Identifier / date | P01900005509; issued 14/12/2022; valid through 07/09/2024 |
|---|---|
| What the supplied document establishes | FORM C registration for KONATHAMS IV RESIDENCY on Survey No. 201/A5. |
| Identifier / date | 0001/BP/3045/2021; 07 September, 2021 |
|---|---|
| What the supplied document establishes | Huzurnagar Municipality/Municipal Corporation approval for Building - A (CHAITANYA), 1 Stilt + 5 upper floors. |
| Identifier / date | Proc.No. G1/1030/2019; approval T. L.P.NO. 47/2019/H.; dated .04.2019 in the supplied extraction |
|---|---|
| What the supplied document establishes | Huzurnagar Municipality proceedings for a residential plotted layout in Survey No. 201/A5. |
| Identifier / date | Filed project document |
|---|---|
| What the supplied document establishes | Promoter’s declarations on proposed title basis, encumbrances, project funding and completion deadline. |
| Identifier / date | Not present in supplied documents |
|---|---|
| What the supplied document establishes | Certificate status is not established by this evidence set. |
| Identifier / date | Two records; neither measured; no flats recorded in the drawing extraction |
|---|---|
| What the supplied document establishes | No measured carpet area, room dimensions or floor-level unit arrangement can be reported. |
The supplied document set also includes a title report, a development agreement/GPA and a municipal mortgage deed; detailed title and mortgage analysis is addressed in the Land & Title section.
Frequently asked questions
Is KONATHAMS IV RESIDENCY registered with Telangana RERA?
Yes. KONATHAMS IV RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P01900005509; the registration status is New Project.
Who is the developer of KONATHAMS IV RESIDENCY?
The promoter named in the RERA registration is BALAJI HOMES.
Where is KONATHAMS IV RESIDENCY located?
KONATHAMS IV RESIDENCY is in HUZURNAGAR, Huzurnagar Area Hospital, Suryapet, Telangana (508204).
When will KONATHAMS IV RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 07/09/2024. This is the promoter's declaration, not a guarantee.