Sg Central
M/S SHREE GANESH ASSOCIATES · Mahabubabad · RERA P00700003261
SG CENTRAL is a commercial project in MAHABUBABAD, Mahabubabad mandal, Mahabubabad district, being developed by M/S SHREE GANESH ASSOCIATES. It covers 1542.92 sq.m. and comprises one approved commercial building with 2 Cellar + 1 Ground + 4 upper floors, with 5 shops—one on each of the ground, first, second, third and fourth floors—each listed at 705.3 sq.m. saleable area. Its TG-RERA registration number is P00700003261, and its proposed completion date is 30/04/2029.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SG CENTRAL RERA record |
| Project type | Commercial; the RERA filing lists shops across five floors. RERA record RERA unit table |
| Phase / registered portion | Phase not separately identified in the supplied record. RERA record |
| TG-RERA registration | P00700003261; registered from 25/08/2021 to 31/12/2028. Registration validity is distinct from the project completion date and from occupancy certification. RERA record |
| Registered promoter | M/S SHREE GANESH ASSOCIATES. RERA record Corporate record |
| RERA status | The supplied certificate records registration under section 5; it does not state that the project has an occupancy certificate. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | RERA record: MAHABUBABAD locality; the building permit identifies WARD 28 and Bus Stand Road Area (Part) W28. The revenue-village field is not disclosed in the supplied project record. RERA record RERA filing |
| Mandal / district / PIN | Mahabubabad / Mahabubabad / 506101. RERA record |
| Survey number | 684; no subdivision is specified in the RERA certificate. RERA filing |
| RERA-listed plot / house numbers | 2-2-8/C, 2-2-8/3/A & 2-2-9/1 PART. RERA filing |
| Site area | 1542.92 sq.m. total; 64.68 sq.m. road-affected; 1478.24 sq.m. net area, as recorded in the building permit and RERA land details. RERA filing |
| Boundaries | East: 30 MTS WIDE ROAD; west: GOVT GIRLS JUNIOR COLLEGE; north: MD LIYAKHATHULLAH AND NARSAIAH; south: GOVT GIRLS JUNIOR COLLEGE AND RAMCHANDAR. RERA filing |
| Location point | Supplied cadastral parcel centroid: 17.599424229781206, 80.00172334640813; this is a parcel-centroid location, not a surveyed project entrance. Cadastral map |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Mahabubabad Municipality; the filing identifies DTCP as authority name. Approvals record |
| Principal building approval | 3003/W28/2020/1871, approved 23 June, 2021. Approvals record |
| Approved built-up area | 3251.91 sq.m. as recorded in RERA project information. The permit separately states Ground commercial area 592.22 m2, Upper floors commercial area 2,575.32 m2, and Cellar parking area 1,360.95 m2; these are separate permit figures and are not interchangeable area measures. RERA filing |
| Building count and configuration | One approved commercial building: 2 Cellar + 1 Ground + 4 upper floors; permit-stated height 14.85 m. RERA filing |
| Parking levels / provision | Two cellar levels are approved for parking; the permit says cellar and stilt areas approved for parking must be used exclusively for vehicle parking. It records no stilt floor. A parking-space count is not supplied. |
| Unit counts | 1 total building unit as per approved plan and 1 proposed building unit as per RERA land details; the filing separately lists 5 shop units across the ground, first, second, third and fourth floors. RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed offering | 5 shops: ground, first, second, third and fourth floors; each listed at 705.3 sq.m. saleable area. RERA unit table RERA unit details |
| Booked / available | 0 booked; 5 available, as last read from the TG-RERA portal. The portal extract gives no as-of date, so availability is indicative. RERA unit table |
| Construction stage | No independently verified site-progress record is supplied. RERA amenity entries show 0% progress for the listed items; this is a portal declaration, not an independent site inspection. RERA amenities |
| Completion date | RERA project header gives proposed completion 30/04/2029. The Form B affidavit declares a completion undertaking of 31st Dec 2028. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The building permit requires an occupancy certificate before occupation. |
2. The project story
SG CENTRAL is registered as a commercial development on Survey No. 684 in Mahabubabad. The RERA-filed offering comprises five shop units, one on each of the ground, first, second, third and fourth floors. The building permit describes one commercial building with two cellar levels and four upper floors above ground. RERA record RERA filing RERA unit table
The permit records a site area of 1542.92 sq.m., including 64.68 sq.m. road-affected area, and a net area of 1478.24 sq.m. It identifies the location as Bus Stand Road Area (Part) W28, Mahabubabad.
The supplied material does not establish construction progress through an independent site inspection, nor does it include an occupancy or completion certificate. The portal’s amenity progress entries are recorded at 0%; this is portal information rather than verified physical status. RERA amenities
3. Master plan, architecture & building design
The RERA land details identify one building unit, with an approved built-up area of 3251.91 sq.m. The building permit describes a commercial building of 2 Cellar + 1 Ground + 4 upper floors and a height of 14.85 m. RERA filing RERA filing
The permit records 592.22 m2 as ground commercial area, 2,575.32 m2 as upper-floor commercial area and 1,360.95 m2 as cellar parking area. It records no stilt floor and shows a land-use entry of 0.00 for residential use. The permit lists setbacks as Front 6.5, Rear 5.5, Side I 2.75 and Side II 2.85.
The available floor-plan drawing set contains two drawings, neither measured by the supplied software record; there are no measured unit plans available to describe room dimensions or internal circulation. The supplied documents do not establish lifts, stairs, entrances, exits, internal roads, landscaping quantities or a phase-wise building arrangement. Floor plans
4. Homes, configurations & floor plans
This is a commercial shop offering, not a residential-home configuration. The filing lists one shop unit on each of five floors. The filed saleable area is 705.3 sq.m. per listed unit. No measured carpet area or loading figure is supplied. RERA unit details RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Shops: ground, first, second, third and fourth floors | 5 | 0 | 5 | 705.3 sq.m. each | Not supplied | Not supplied |
The supplied floor-plan set has no measured plans. Accordingly, no drawing-based carpet area, room layout or unit dimensions can be reported. Saleable area is the RERA-filed figure; it should not be treated as a measured carpet-area figure. Floor plans RERA unit details
5. Parking & vehicle circulation
The approved permit provides two cellar levels and records 1,360.95 m2 of cellar parking area. It states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned, shuttered or put to another use. The permit records no stilt floor.
No number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by shop, driveway or ramp design, or EV-charging provision is established by the supplied material. A RERA unit entry identifies the second-floor shop as mortgaged; it does not document a parking allocation. RERA unit table
6. Amenities, recreation & open spaces
The following reflects RERA portal amenity entries and building-permit conditions. Portal progress is shown as recorded; it is not independently verified completion.
| Description / size | Listed as available: YES; no source, storage or capacity stated |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal progress 0%; not independently verified |
| Description / size | Sewerage (chamber, lines, septic tank, STP) and treatment/disposal of sewage and sullage are listed; no system specification or capacity stated |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal progress 0%; not independently verified |
| Description / size | Listed as available: YES |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal progress 0%; not independently verified |
| Description / size | Listed as available: YES; permit requires a rainwater-harvesting structure (percolation pit) and records No. of RWHPs 11 |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal progress 0%; installation not independently verified |
| Description / size | Listed in RERA amenities; permit records Tot-lot (m2) 0 and requires tree planting and greenery-strip maintenance |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal progress 0%; completion not independently verified |
| Description / size | Listed in RERA amenities; no quantity or specification stated |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal progress 0%; not independently verified |
| Description / size | Listed in RERA amenities; no building or area specified |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal progress 0%; not independently verified |
| Description / size | Listed in RERA amenities; permit requires a garbage house within the premises |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal progress 0%; not independently verified |
| Description / size | Listed as available: YES; no system details supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal progress 0%; not independently verified |
| Description / size | Listed as available: YES; permit requires space for a transformer |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal progress 0%; not independently verified |
| Description / size | Vendor-supplied amenity listing; not a parking-space count or allocation |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Marketing/vendor detail; delivery status not verified |
The permit also requires tree planting along the site periphery and in front of the premises, and maintenance of a greenery strip. These are permit conditions, not evidence that the work has been completed.
7. Utilities, building services & safety
RERA portal entries list water supply, sewerage, storm-water drainage, rainwater harvesting, fire protection and an electrical meter room/substation/receiving station; the supplied entries do not give capacities or detailed system designs. The building permit requires a rainwater-harvesting structure and provides for transformer space and a garbage house. RERA amenities
The permit makes an occupancy certificate compulsory before occupation and states that public water-supply and electricity connections will be provided only on production of that certificate. It also requires submission of a commencement notice before construction and a completion notice after completion. These are stated permit conditions; the supplied record does not establish that the relevant works or certifications have been completed.
No lift count or capacity, backup-power arrangement, fire-system specification, escape-stair details, CCTV/access-control system, or accessible circulation features are established in the supplied project records. Document index RERA amenities
8. Location, access & connectivity
The registered project location is Mahabubabad, Mahabubabad mandal and district, PIN 506101. The building permit identifies Bus Stand Road Area (Part) W28; the RERA land record lists Survey No. 684 and plot/house numbers 2-2-8/C, 2-2-8/3/A & 2-2-9/1 PART. RERA record RERA filing
The permit records an 18M road width and identifies the east boundary as 30 MTS WIDE ROAD. A supplied location dataset gives the Outer Ring Road nearest sampled interchange at 141.1 km (approx.); this is a dataset distance, not a travel-time estimate. Location record
9. Developer & development status
The registered promoter is M/S SHREE GANESH ASSOCIATES, identified in the RERA record as a Partnership. Its GSTIN is 36ADOFS0024K1ZY. The RERA project record lists authorized signatories SUNIL REDDY PAIDI and SUJITH KUMAR REDDY GADDAM, and partner PRAVEEN REDDY ALETI. Corporate record Parties record
The registration certificate gives the promoter office as “Village: Mandal: Balanagar, District: Medchal-Malkajgiri, Pin: 500011.” The project record separately lists the promoter address as APIE, BALANAGAR, NEAR RAILWAY STATION ROAD, MAHABUBABAD, Mahabubabad, Mahabubabad, 506101. Parties record
The Form B affidavit dated 28th day of Jul 2021, signed by P. Sunil Reddy as authorized signatory, declares a completion undertaking of 31st Dec 2028. The project header gives 30/04/2029 as proposed completion. These are reported as separately recorded completion dates; neither should be confused with the registration validity ending 31/12/2028. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | FORM ‘C’ registration certificate for SG CENTRAL, registration no. P00700003261, issued 25/08/2021, valid through 31/12/2028. |
| Building permit / principal sanction | Building Permit Order 3003/W28/2020/1871, Mahabubabad Municipality, approved 23 June, 2021; the permit records validity up to 23 June, 2027. |
| Permit locality and land particulars | Bus Stand Road Area (Part) W28; Survey No. 684; site area 1542.92 m2, road-affected area 64.68 m2, net area 1478.24 m2. |
| Permit building scope | Commercial building, 2 Cellar + 1 Ground + 4 upper floors, height 14.85 m. |
| Form B promoter declaration | Affidavit-cum-declaration by P. Sunil Reddy & others, dated 28th day of Jul 2021, including title and encumbrance assertions, funding-account disclosures and completion undertaking. |
| Occupancy / completion certificate | Not present in the supplied documents. The building permit states that an occupancy certificate is compulsory before occupation. |
The supplied material does not include a separately extracted approved-layout drawing or an occupancy/completion certificate. The building permit and registration certificate are the principal approval and registration records available for this overview. Document index
1. Project at a glance
Project identity
Registered project name: SG CENTRAL
Project type: Commercial; the RERA filing lists shops across five floors.
Phase / registered portion: Phase not separately identified in the supplied record.
TG-RERA registration: P00700003261; registered from 25/08/2021 to 31/12/2028. Registration validity is distinct from the project completion date and from occupancy certification.
Registered promoter: M/S SHREE GANESH ASSOCIATES.
RERA status: The supplied certificate records registration under section 5; it does not state that the project has an occupancy certificate.
Land and geographic identity
Locality / revenue village: RERA record: MAHABUBABAD locality; the building permit identifies WARD 28 and Bus Stand Road Area (Part) W28. The revenue-village field is not disclosed in the supplied project record.
Mandal / district / PIN: Mahabubabad / Mahabubabad / 506101.
Survey number: 684; no subdivision is specified in the RERA certificate.
RERA-listed plot / house numbers: 2-2-8/C, 2-2-8/3/A & 2-2-9/1 PART.
Site area: 1542.92 sq.m. total; 64.68 sq.m. road-affected; 1478.24 sq.m. net area, as recorded in the building permit and RERA land details.
Boundaries: East: 30 MTS WIDE ROAD; west: GOVT GIRLS JUNIOR COLLEGE; north: MD LIYAKHATHULLAH AND NARSAIAH; south: GOVT GIRLS JUNIOR COLLEGE AND RAMCHANDAR.
Location point: Supplied cadastral parcel centroid: 17.599424229781206, 80.00172334640813; this is a parcel-centroid location, not a surveyed project entrance.
Development identity
Sanctioning authority: Mahabubabad Municipality; the filing identifies DTCP as authority name.
Principal building approval: 3003/W28/2020/1871, approved 23 June, 2021.
Approved built-up area: 3251.91 sq.m. as recorded in RERA project information. The permit separately states Ground commercial area 592.22 m2, Upper floors commercial area 2,575.32 m2, and Cellar parking area 1,360.95 m2; these are separate permit figures and are not interchangeable area measures.
Building count and configuration: One approved commercial building: 2 Cellar + 1 Ground + 4 upper floors; permit-stated height 14.85 m.
Parking levels / provision: Two cellar levels are approved for parking; the permit says cellar and stilt areas approved for parking must be used exclusively for vehicle parking. It records no stilt floor. A parking-space count is not supplied.
Unit counts: 1 total building unit as per approved plan and 1 proposed building unit as per RERA land details; the filing separately lists 5 shop units across the ground, first, second, third and fourth floors.
Offering and status
RERA-filed offering: 5 shops: ground, first, second, third and fourth floors; each listed at 705.3 sq.m. saleable area.
Booked / available: 0 booked; 5 available, as last read from the TG-RERA portal. The portal extract gives no as-of date, so availability is indicative.
Construction stage: No independently verified site-progress record is supplied. RERA amenity entries show 0% progress for the listed items; this is a portal declaration, not an independent site inspection.
Completion date: RERA project header gives proposed completion 30/04/2029. The Form B affidavit declares a completion undertaking of 31st Dec 2028.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The building permit requires an occupancy certificate before occupation.
2. The project story
SG CENTRAL is registered as a commercial development on Survey No. 684 in Mahabubabad. The RERA-filed offering comprises five shop units, one on each of the ground, first, second, third and fourth floors. The building permit describes one commercial building with two cellar levels and four upper floors above ground.
The permit records a site area of 1542.92 sq.m., including 64.68 sq.m. road-affected area, and a net area of 1478.24 sq.m. It identifies the location as Bus Stand Road Area (Part) W28, Mahabubabad.
The supplied material does not establish construction progress through an independent site inspection, nor does it include an occupancy or completion certificate. The portal’s amenity progress entries are recorded at 0%; this is portal information rather than verified physical status.
3. Master plan, architecture & building design
The RERA land details identify one building unit, with an approved built-up area of 3251.91 sq.m. The building permit describes a commercial building of 2 Cellar + 1 Ground + 4 upper floors and a height of 14.85 m.
The permit records 592.22 m2 as ground commercial area, 2,575.32 m2 as upper-floor commercial area and 1,360.95 m2 as cellar parking area. It records no stilt floor and shows a land-use entry of 0.00 for residential use. The permit lists setbacks as Front 6.5, Rear 5.5, Side I 2.75 and Side II 2.85.
The available floor-plan drawing set contains two drawings, neither measured by the supplied software record; there are no measured unit plans available to describe room dimensions or internal circulation. The supplied documents do not establish lifts, stairs, entrances, exits, internal roads, landscaping quantities or a phase-wise building arrangement.
4. Homes, configurations & floor plans
This is a commercial shop offering, not a residential-home configuration. The filing lists one shop unit on each of five floors. The filed saleable area is 705.3 sq.m. per listed unit. No measured carpet area or loading figure is supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Shops: ground, first, second, third and fourth floors | 5 | 0 | 5 | 705.3 sq.m. each | Not supplied | Not supplied |
The supplied floor-plan set has no measured plans. Accordingly, no drawing-based carpet area, room layout or unit dimensions can be reported. Saleable area is the RERA-filed figure; it should not be treated as a measured carpet-area figure.
5. Parking & vehicle circulation
The approved permit provides two cellar levels and records 1,360.95 m2 of cellar parking area. It states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned, shuttered or put to another use. The permit records no stilt floor.
No number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by shop, driveway or ramp design, or EV-charging provision is established by the supplied material. A RERA unit entry identifies the second-floor shop as mortgaged; it does not document a parking allocation.
6. Amenities, recreation & open spaces
The following reflects RERA portal amenity entries and building-permit conditions. Portal progress is shown as recorded; it is not independently verified completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | Listed as available: YES; no source, storage or capacity stated | Portal progress 0%; not independently verified | |
| Sewerage / sewage treatment | Sewerage (chamber, lines, septic tank, STP) and treatment/disposal of sewage and sullage are listed; no system specification or capacity stated | Portal progress 0%; not independently verified | |
| Storm-water drains | Listed as available: YES | Portal progress 0%; not independently verified | |
| Water conservation / rainwater harvesting | Listed as available: YES; permit requires a rainwater-harvesting structure (percolation pit) and records No. of RWHPs 11 | Portal progress 0%; installation not independently verified | |
| Green strip / tot-lot / park | Listed in RERA amenities; permit records Tot-lot (m2) 0 and requires tree planting and greenery-strip maintenance | Portal progress 0%; completion not independently verified | |
| Street lighting | Listed in RERA amenities; no quantity or specification stated | Portal progress 0%; not independently verified | |
| Community buildings | Listed in RERA amenities; no building or area specified | Portal progress 0%; not independently verified | |
| Solid-waste management / disposal | Listed in RERA amenities; permit requires a garbage house within the premises | Portal progress 0%; not independently verified | |
| Fire protection and fire safety | Listed as available: YES; no system details supplied | Portal progress 0%; not independently verified | |
| Electrical meter room / substation / receiving station | Listed as available: YES; permit requires space for a transformer | Portal progress 0%; not independently verified | |
| Open parking | Vendor-supplied amenity listing; not a parking-space count or allocation | Marketing/vendor detail; delivery status not verified |
The permit also requires tree planting along the site periphery and in front of the premises, and maintenance of a greenery strip. These are permit conditions, not evidence that the work has been completed.
7. Utilities, building services & safety
RERA portal entries list water supply, sewerage, storm-water drainage, rainwater harvesting, fire protection and an electrical meter room/substation/receiving station; the supplied entries do not give capacities or detailed system designs. The building permit requires a rainwater-harvesting structure and provides for transformer space and a garbage house.
The permit makes an occupancy certificate compulsory before occupation and states that public water-supply and electricity connections will be provided only on production of that certificate. It also requires submission of a commencement notice before construction and a completion notice after completion. These are stated permit conditions; the supplied record does not establish that the relevant works or certifications have been completed.
No lift count or capacity, backup-power arrangement, fire-system specification, escape-stair details, CCTV/access-control system, or accessible circulation features are established in the supplied project records.
8. Location, access & connectivity
The registered project location is Mahabubabad, Mahabubabad mandal and district, PIN 506101. The building permit identifies Bus Stand Road Area (Part) W28; the RERA land record lists Survey No. 684 and plot/house numbers 2-2-8/C, 2-2-8/3/A & 2-2-9/1 PART.
The permit records an 18M road width and identifies the east boundary as 30 MTS WIDE ROAD. A supplied location dataset gives the Outer Ring Road nearest sampled interchange at 141.1 km (approx.); this is a dataset distance, not a travel-time estimate.
9. Developer & development status
The registered promoter is M/S SHREE GANESH ASSOCIATES, identified in the RERA record as a Partnership. Its GSTIN is 36ADOFS0024K1ZY. The RERA project record lists authorized signatories SUNIL REDDY PAIDI and SUJITH KUMAR REDDY GADDAM, and partner PRAVEEN REDDY ALETI.
The registration certificate gives the promoter office as “Village: Mandal: Balanagar, District: Medchal-Malkajgiri, Pin: 500011.” The project record separately lists the promoter address as APIE, BALANAGAR, NEAR RAILWAY STATION ROAD, MAHABUBABAD, Mahabubabad, Mahabubabad, 506101.
The Form B affidavit dated 28th day of Jul 2021, signed by P. Sunil Reddy as authorized signatory, declares a completion undertaking of 31st Dec 2028. The project header gives 30/04/2029 as proposed completion. These are reported as separately recorded completion dates; neither should be confused with the registration validity ending 31/12/2028.
10. Approvals, official records & documents
TG-RERA registration: FORM ‘C’ registration certificate for SG CENTRAL, registration no. P00700003261, issued 25/08/2021, valid through 31/12/2028.
Building permit / principal sanction: Building Permit Order 3003/W28/2020/1871, Mahabubabad Municipality, approved 23 June, 2021; the permit records validity up to 23 June, 2027.
Permit locality and land particulars: Bus Stand Road Area (Part) W28; Survey No. 684; site area 1542.92 m2, road-affected area 64.68 m2, net area 1478.24 m2.
Permit building scope: Commercial building, 2 Cellar + 1 Ground + 4 upper floors, height 14.85 m.
Form B promoter declaration: Affidavit-cum-declaration by P. Sunil Reddy & others, dated 28th day of Jul 2021, including title and encumbrance assertions, funding-account disclosures and completion undertaking.
Occupancy / completion certificate: Not present in the supplied documents. The building permit states that an occupancy certificate is compulsory before occupation.
The supplied material does not include a separately extracted approved-layout drawing or an occupancy/completion certificate. The building permit and registration certificate are the principal approval and registration records available for this overview.
Frequently asked questions
Is SG CENTRAL registered with Telangana RERA?
Yes. SG CENTRAL is registered with the Telangana Real Estate Regulatory Authority as P00700003261; the registration status is New Project.
Who is the developer of SG CENTRAL?
The promoter named in the RERA registration is M/S SHREE GANESH ASSOCIATES.
Where is SG CENTRAL located?
SG CENTRAL is in MAHABUBABAD, Telangana (506101).
When will SG CENTRAL be completed?
The promoter's proposed date of completion filed with RERA is 30/04/2029. This is the promoter's declaration, not a guarantee.
More projects in Mahabubabad