Sai Maruthi Constructions
M/S SAI MARUTHI CONSTRUCTIONS · Rangareddy · RERA P02400003751
SAI MARUTHI CONSTRUCTIONS is a residential apartment project in VANASTHALIPURAM, Hayathnagar mandal, Ranga Reddy district, developed by M/S SAI MARUTHI CONSTRUCTIONS. The RERA land record lists a site area of 401.30 sq.m, and the sanctioned development is one residential building, Building - A-1, with 1 Stilt + 5 upper floors and 10 units: 5 2BHK and 5 3BHK. The project is registered with TG-RERA under P02400003751, and its proposed completion date is 27/08/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SAI MARUTHI CONSTRUCTIONS RERA record |
| Project type / phase | Residential apartment project; phase or separately named registered portion not disclosed RERA record RERA filing |
| TG-RERA registration | P02400003751; Form C registration issued 20/12/2021, valid through 27/04/2027. This is registration validity, not the project completion date. Approvals record |
| Registered promoter | M/S SAI MARUTHI CONSTRUCTIONS, recorded as a partnership Parties record RERA filing |
| RERA status | TG-RERA filing labels the project “New Project”; registration certificate is recorded. Current construction progress is not established by the supplied record. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / recorded project location | VANASTHALIPURAM; the building-permit extraction identifies the site as Commercial Tax Colony, Anmagal Hayathnagar, and the RERA certificate identifies the locality as Hayathnagar. RERA record RERA filing |
| Revenue village(s) | TG-RERA land fields name Vanasthalipuram; the building-permit extraction names Anmagal Hayathnagar and the title report recites “Commercial Tax Colony, Anmagal Hayathnagar and Khalsa Hayathnagar village.” The supplied records do not resolve these as a single revenue-village identity. Land records |
| Mandal / district / PIN | Hayathnagar / Ranga Reddy / 501505 RERA record |
| Project survey identity | Sy No 7,19A,19AA PLOT NO b-14 in the RERA land record; the permit and title report specify Sy. Nos. 7, 19/A and 19/AA, Plot B-14. Land records |
| Site extent | RERA land record: total and net area 401.30 sq.m. Building-permit extraction: site area 401.37 m². Title report: 480 Sq. yards or 401.3 Sq. Mtrs. Land records |
| Boundaries in RERA land record | East: PLOT NO B-15; West: 30 WIDE ROAD OF THE SOCIETY; North: 50 WIDE ROAD OF THE SOCIETY; South: NEIGHBOURS LAND. Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 2/C3/06088/2021, approved 27 April, 2021; associated file 2/C3/04669/2021 Approvals record |
| Approved built-up area | 1,231.37 sq.m in RERA project fields RERA filing |
| Sanctioned building | One residential building, Building - A-1; the permit states 1 Stilt + 5 upper floors and height 15.00 m. |
| Unit count | 10 units in the RERA record: 5 2BHK and 5 3BHK. The permit extraction does not supply a separate total sanctioned unit count. RERA unit table RERA unit details |
| Parking / floor configuration detail | Stilt is recorded in the sanctioned floor configuration; permit conditions also refer to cellar and stilt parking. A cellar level, parking-space count and floor-by-floor layout are not established in the supplied extracts. |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configurations | 2BHK: 5 units; 3BHK: 5 units. Each configuration is filed at 201.56 sq.m saleable area. RERA unit table RERA unit details |
| Booked / available | Portal-derived count: 0 booked and 5 available for each configuration. The record has no as-of date; treat these counts as indicative. RERA unit table RERA unit details |
| Completion dates | Form B promoter declaration undertakes completion by 27/April/2027. The header lists proposed completion 27/08/2027. These dates are reproduced as recorded; the supplied evidence does not establish a revised completion approval. RERA record |
| Occupancy / completion certificate | The building-permit extraction records completion_certified: false and requires an Occupancy Certificate before occupation. No OC or completion certificate is supplied. |
| Construction stage | Not established by the supplied project evidence; no independently verified site-progress report is provided. Document index RERA amenities |
2. The project story
This is a small residential apartment development registered with TG-RERA under the name SAI MARUTHI CONSTRUCTIONS. The filing describes a site in the Vanasthalipuram/Hayathnagar area of Ranga Reddy district, associated with Sy. Nos. 7, 19/A and 19/AA, Plot B-14. The records use more than one village/location description; the village identity should therefore be checked against the underlying land and revenue records rather than inferred from the locality label. RERA record Land records
GHMC’s building permit provides for one residential building, Building A-1, with a stilt and five upper floors. The RERA unit record lists ten apartments—five 2BHK and five 3BHK. The supplied material does not establish construction progress, completed portions, or current site conditions, and it contains no occupancy certificate. The permit makes an OC a condition before occupation. RERA unit table RERA amenities
3. Master plan, architecture & building design
The RERA land record gives a site area of 401.30 sq.m and the GHMC permit extraction gives 401.37 m². RERA records approved built-up area of 1,231.37 sq.m. The permit describes one residential building, 1 Stilt + 5 upper floors, with a stated height of 15.00 m. Land records RERA filing
The supplied floor-plan record identifies typical plans for floors 1, 3, 4 and 5, but does not provide a reliable extracted building-wide description of flats per floor, lifts, stairs, entrances, circulation or ground-floor arrangement. The plan document is recorded as an uploaded layout/floor-plan item, but its extraction is incomplete; no drawing-derived account of site landscaping, open-space area or internal circulation can be established here. Floor plans
The permit records 20 trees, a periphery greenery strip, and a tot-lot to be fenced and maintained as greenery. These are sanctioned conditions, not evidence that the work has been completed.
4. Homes, configurations & floor plans
The RERA filing lists five units of each configuration, with a saleable area of 201.56 sq.m per unit in both categories. Carpet-area figures below are software measurements from the supplied floor-plan drawings, not RERA-filed carpet-area disclosures. They are subject to review against the drawings. Saleable area and carpet area are different measures; the floor-plan record notes that saleable area also includes the home’s share of common areas. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available* | RERA saleable area | Measured carpet area** | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 201.56 sq.m | 82.3 sq.m (886 sq.ft) | 59% |
| 3BHK | 5 | 0 | 5 | 201.56 sq.m | 84.0–86.6 sq.m; median 85.3 sq.m (904–932 sq.ft; median 918 sq.ft) | 58% |
\* Portal-derived counts have no supplied as-of date and are indicative. Software-measured from drawings; not a RERA disclosure. RERA unit details Floor plans
The measured 2BHK plan includes a kitchen, two bedrooms, a living/dining area, a toilet and a balcony. The measured 3BHK plan includes a kitchen, three bedrooms, a living/dining area and two toilets. Room dimensions are software-extracted from the typical floor-plan drawing and should be checked against that drawing: examples include a 2BHK kitchen of 2.0 × 3.0 m and bedroom of 3.65 × 4.4 m, and a 3BHK kitchen of 2.2 × 2.96 m and bedroom of 3.0 × 3.4 m. The 2BHK drawing also shows a 1.2 × 3.0 m balcony, excluded from the measured carpet area. RERA unit details
5. Parking & vehicle circulation
The permit’s floor description includes a stilt and its conditions refer to cellar and stilt areas approved for parking, requiring those areas to be used exclusively for vehicle parking without partition walls or rolling shutters. However, the supplied material does not establish a sanctioned parking-space count, a cellar level in the extracted floor configuration, or separate resident, visitor or accessible parking provisions.
No parking allocation to individual apartments, mechanical parking, EV charging, ramp arrangement or pedestrian–vehicle separation is documented in the supplied evidence. A drawn parking bay, if present in the plan, would not by itself establish exclusive ownership or allocation.
6. Amenities, recreation & open spaces
The RERA amenities record contains 14 listed development components. The GHMC permit separately imposes conditions for a tot-lot, tree planting and a periphery greenery strip. The supplied records do not establish completion of these facilities; the progress figures shown in the RERA amenities data are 0 where recorded. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Tot-lot and periphery greenery strip; no size supplied | RERA amenities; GHMC permit RERA amenities | RERA progress 0%; permit condition, not independently verified complete |
| Aggregate recreational open space | No area supplied | RERA amenities RERA amenities | Progress 0%; completion not established |
| Community buildings | No building or area details supplied | RERA amenities RERA amenities | Progress 0%; completion not established |
| Internal roads and footpaths | No dimensions supplied | RERA amenities RERA amenities | Progress 0%; completion not established |
No clubhouse, indoor recreation or sports facility is established in the supplied RERA project record. RERA amenities
7. Utilities, building services & safety
| Evidence in the project record | RERA amenities mark Water Supply “YES”; the permit states public water supply connections are to be provided only on production of an OC. No source, storage or capacity is stated. RERA amenities |
|---|---|
| Status shown | Declared in RERA; no completion evidence |
| Evidence in the project record | RERA lists “Sewerage (Chamber, Lines, Septic Tank, STP),” storm-water drains, and treatment/disposal of sewage and sullage water. No treatment capacity or design details are supplied. RERA amenities |
|---|---|
| Status shown | Listed; progress 0% where recorded |
| Evidence in the project record | RERA lists water conservation/rainwater harvesting; the permit requires a rainwater-harvesting percolation pit. RERA amenities |
|---|---|
| Status shown | RERA-listed and permit-required; completion not established |
| Evidence in the project record | RERA marks electrical meter room/sub-station/receiving station “YES”; the permit requires space for a transformer. No electrical capacity or backup provision is stated. RERA amenities |
|---|---|
| Status shown | Declared/required; no completion evidence |
| Evidence in the project record | RERA marks fire protection and fire-safety requirements “YES.” The permit requires an Occupancy Fire NOC from the Director (EV&DM) before issue of OC. No issued fire NOC is supplied. RERA amenities |
|---|---|
| Status shown | Listed/required; no clearance or completion evidence |
| Evidence in the project record | RERA lists solid-waste management and disposal; the permit requires a garbage house within the premises. RERA amenities |
|---|---|
| Status shown | Listed/required; completion not established |
| Evidence in the project record | The permit refers to lifts and requires services to be executed under qualified professional supervision. No lift count, capacity or accessible-circulation details are supplied. |
|---|---|
| Status shown | Details not disclosed |
8. Location, access & connectivity
The project is recorded in Vanasthalipuram, Hayathnagar mandal, Ranga Reddy district, PIN 501505. The RERA land record gives boundaries including a 30 WIDE ROAD OF THE SOCIETY on the west and a 50 WIDE ROAD OF THE SOCIETY on the north. The building-permit extraction places the site at Commercial Tax Colony, Anmagal Hayathnagar. RERA record Land records
The supplied location data provides a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. No additional verified approach-road, public-transport or landmark details are supplied. Location record
9. Developer & development status
The registered promoter is M/S SAI MARUTHI CONSTRUCTIONS, recorded as a partnership, with GSTIN 36ACXFS0318L3ZI. RERA lists Beeram Shankar Reddy as authorized signatory and Beeram Srilatha as partner. The promoter address recorded in the filing is in Prashanth Nagar, Vanasthalipuram, Hayathnagar, Ranga Reddy district, PIN 501505. Parties record Corporate record RERA filing
The supplied evidence does not provide an official promoter website or contact details. No phase-wise development or independently verified construction-progress information is supplied. The Form B affidavit dated 20/08/2021 declares a completion undertaking of 27/April/2027; the project header separately records a proposed completion date of 27/08/2027. No supplied document establishes a revised completion approval. RERA record
10. Approvals, official records & documents
| Identifier / date | P02400003751; issued 20/12/2021; valid through 27/04/2027 |
|---|---|
| What the supplied record establishes | Form C registration for SAI MARUTHI CONSTRUCTIONS; includes a condition concerning the separate account for 70% of amounts realised. |
| Identifier / date | Approval 2/C3/06088/2021; file 2/C3/04669/2021; approved 27 April, 2021 |
|---|---|
| What the supplied record establishes | Building permission for one residential building, with the extracted configuration and conditions described above. |
| Identifier / date | Dated 20/08/2021 |
|---|---|
| What the supplied record establishes | Promoter declaration regarding title basis, encumbrances, project funds, pending approvals and completion by 27/April/2027. |
| Identifier / date | 19-08-2021 |
|---|---|
| What the supplied record establishes | Advocate’s title opinion concerning Plot B-14, Sy. Nos. 7, 19/A and 19/AA; the document recites the title chain. |
| Identifier / date | Statement 61962477 |
|---|---|
| What the supplied record establishes | Project-filed encumbrance statement; it is not a current fresh certificate. |
| Identifier / date | 184626 |
|---|---|
| What the supplied record establishes | Floor-plan record supplied for drawing-based measurements; extraction is incomplete. |
No occupancy or completion certificate is supplied. The GHMC permit states that an Occupancy Certificate is compulsory before occupation and specifies additional conditions, including an Occupancy Fire NOC before OC.
1. Project at a glance
Project identity
Registered project name: SAI MARUTHI CONSTRUCTIONS
Project type / phase: Residential apartment project; phase or separately named registered portion not disclosed
TG-RERA registration: P02400003751; Form C registration issued 20/12/2021, valid through 27/04/2027. This is registration validity, not the project completion date.
Registered promoter: M/S SAI MARUTHI CONSTRUCTIONS, recorded as a partnership
RERA status: TG-RERA filing labels the project “New Project”; registration certificate is recorded. Current construction progress is not established by the supplied record.
Land and geographic identity
Locality / recorded project location: VANASTHALIPURAM; the building-permit extraction identifies the site as Commercial Tax Colony, Anmagal Hayathnagar, and the RERA certificate identifies the locality as Hayathnagar.
Revenue village(s): TG-RERA land fields name Vanasthalipuram; the building-permit extraction names Anmagal Hayathnagar and the title report recites “Commercial Tax Colony, Anmagal Hayathnagar and Khalsa Hayathnagar village.” The supplied records do not resolve these as a single revenue-village identity.
Mandal / district / PIN: Hayathnagar / Ranga Reddy / 501505
Project survey identity: Sy No 7,19A,19AA PLOT NO b-14 in the RERA land record; the permit and title report specify Sy. Nos. 7, 19/A and 19/AA, Plot B-14.
Site extent: RERA land record: total and net area 401.30 sq.m. Building-permit extraction: site area 401.37 m². Title report: 480 Sq. yards or 401.3 Sq. Mtrs.
Boundaries in RERA land record: East: PLOT NO B-15; West: 30 WIDE ROAD OF THE SOCIETY; North: 50 WIDE ROAD OF THE SOCIETY; South: NEIGHBOURS LAND.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 2/C3/06088/2021, approved 27 April, 2021; associated file 2/C3/04669/2021
Approved built-up area: 1,231.37 sq.m in RERA project fields
Sanctioned building: One residential building, Building - A-1; the permit states 1 Stilt + 5 upper floors and height 15.00 m.
Unit count: 10 units in the RERA record: 5 2BHK and 5 3BHK. The permit extraction does not supply a separate total sanctioned unit count.
Parking / floor configuration detail: Stilt is recorded in the sanctioned floor configuration; permit conditions also refer to cellar and stilt parking. A cellar level, parking-space count and floor-by-floor layout are not established in the supplied extracts.
Offering and status
RERA-filed configurations: 2BHK: 5 units; 3BHK: 5 units. Each configuration is filed at 201.56 sq.m saleable area.
Booked / available: Portal-derived count: 0 booked and 5 available for each configuration. The record has no as-of date; treat these counts as indicative.
Completion dates: Form B promoter declaration undertakes completion by 27/April/2027. The header lists proposed completion 27/08/2027. These dates are reproduced as recorded; the supplied evidence does not establish a revised completion approval.
Occupancy / completion certificate: The building-permit extraction records completion_certified: false and requires an Occupancy Certificate before occupation. No OC or completion certificate is supplied.
Construction stage: Not established by the supplied project evidence; no independently verified site-progress report is provided.
2. The project story
This is a small residential apartment development registered with TG-RERA under the name SAI MARUTHI CONSTRUCTIONS. The filing describes a site in the Vanasthalipuram/Hayathnagar area of Ranga Reddy district, associated with Sy. Nos. 7, 19/A and 19/AA, Plot B-14. The records use more than one village/location description; the village identity should therefore be checked against the underlying land and revenue records rather than inferred from the locality label.
GHMC’s building permit provides for one residential building, Building A-1, with a stilt and five upper floors. The RERA unit record lists ten apartments—five 2BHK and five 3BHK. The supplied material does not establish construction progress, completed portions, or current site conditions, and it contains no occupancy certificate. The permit makes an OC a condition before occupation.
3. Master plan, architecture & building design
The RERA land record gives a site area of 401.30 sq.m and the GHMC permit extraction gives 401.37 m². RERA records approved built-up area of 1,231.37 sq.m. The permit describes one residential building, 1 Stilt + 5 upper floors, with a stated height of 15.00 m.
The supplied floor-plan record identifies typical plans for floors 1, 3, 4 and 5, but does not provide a reliable extracted building-wide description of flats per floor, lifts, stairs, entrances, circulation or ground-floor arrangement. The plan document is recorded as an uploaded layout/floor-plan item, but its extraction is incomplete; no drawing-derived account of site landscaping, open-space area or internal circulation can be established here.
The permit records 20 trees, a periphery greenery strip, and a tot-lot to be fenced and maintained as greenery. These are sanctioned conditions, not evidence that the work has been completed.
4. Homes, configurations & floor plans
The RERA filing lists five units of each configuration, with a saleable area of 201.56 sq.m per unit in both categories. Carpet-area figures below are software measurements from the supplied floor-plan drawings, not RERA-filed carpet-area disclosures. They are subject to review against the drawings. Saleable area and carpet area are different measures; the floor-plan record notes that saleable area also includes the home’s share of common areas.
| Configuration | Units | Booked | Available* | RERA saleable area | Measured carpet area** | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 201.56 sq.m | 82.3 sq.m (886 sq.ft) | 59% |
| 3BHK | 5 | 0 | 5 | 201.56 sq.m | 84.0–86.6 sq.m; median 85.3 sq.m (904–932 sq.ft; median 918 sq.ft) | 58% |
\* Portal-derived counts have no supplied as-of date and are indicative. Software-measured from drawings; not a RERA disclosure.
The measured 2BHK plan includes a kitchen, two bedrooms, a living/dining area, a toilet and a balcony. The measured 3BHK plan includes a kitchen, three bedrooms, a living/dining area and two toilets. Room dimensions are software-extracted from the typical floor-plan drawing and should be checked against that drawing: examples include a 2BHK kitchen of 2.0 × 3.0 m and bedroom of 3.65 × 4.4 m, and a 3BHK kitchen of 2.2 × 2.96 m and bedroom of 3.0 × 3.4 m. The 2BHK drawing also shows a 1.2 × 3.0 m balcony, excluded from the measured carpet area.
5. Parking & vehicle circulation
The permit’s floor description includes a stilt and its conditions refer to cellar and stilt areas approved for parking, requiring those areas to be used exclusively for vehicle parking without partition walls or rolling shutters. However, the supplied material does not establish a sanctioned parking-space count, a cellar level in the extracted floor configuration, or separate resident, visitor or accessible parking provisions.
No parking allocation to individual apartments, mechanical parking, EV charging, ramp arrangement or pedestrian–vehicle separation is documented in the supplied evidence. A drawn parking bay, if present in the plan, would not by itself establish exclusive ownership or allocation.
6. Amenities, recreation & open spaces
The RERA amenities record contains 14 listed development components. The GHMC permit separately imposes conditions for a tot-lot, tree planting and a periphery greenery strip. The supplied records do not establish completion of these facilities; the progress figures shown in the RERA amenities data are 0 where recorded.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Tot-lot and periphery greenery strip; no size supplied | RERA amenities; GHMC permit | RERA progress 0%; permit condition, not independently verified complete |
| Aggregate recreational open space | No area supplied | RERA amenities | Progress 0%; completion not established |
| Community buildings | No building or area details supplied | RERA amenities | Progress 0%; completion not established |
| Internal roads and footpaths | No dimensions supplied | RERA amenities | Progress 0%; completion not established |
No clubhouse, indoor recreation or sports facility is established in the supplied RERA project record.
7. Utilities, building services & safety
| Evidence in the project record | RERA amenities mark Water Supply “YES”; the permit states public water supply connections are to be provided only on production of an OC. No source, storage or capacity is stated. |
|---|---|
| Status shown | Declared in RERA; no completion evidence |
| Evidence in the project record | RERA lists “Sewerage (Chamber, Lines, Septic Tank, STP),” storm-water drains, and treatment/disposal of sewage and sullage water. No treatment capacity or design details are supplied. |
|---|---|
| Status shown | Listed; progress 0% where recorded |
| Evidence in the project record | RERA lists water conservation/rainwater harvesting; the permit requires a rainwater-harvesting percolation pit. |
|---|---|
| Status shown | RERA-listed and permit-required; completion not established |
| Evidence in the project record | RERA marks electrical meter room/sub-station/receiving station “YES”; the permit requires space for a transformer. No electrical capacity or backup provision is stated. |
|---|---|
| Status shown | Declared/required; no completion evidence |
| Evidence in the project record | RERA marks fire protection and fire-safety requirements “YES.” The permit requires an Occupancy Fire NOC from the Director (EV&DM) before issue of OC. No issued fire NOC is supplied. |
|---|---|
| Status shown | Listed/required; no clearance or completion evidence |
| Evidence in the project record | RERA lists solid-waste management and disposal; the permit requires a garbage house within the premises. |
|---|---|
| Status shown | Listed/required; completion not established |
| Evidence in the project record | The permit refers to lifts and requires services to be executed under qualified professional supervision. No lift count, capacity or accessible-circulation details are supplied. |
|---|---|
| Status shown | Details not disclosed |
8. Location, access & connectivity
The project is recorded in Vanasthalipuram, Hayathnagar mandal, Ranga Reddy district, PIN 501505. The RERA land record gives boundaries including a 30 WIDE ROAD OF THE SOCIETY on the west and a 50 WIDE ROAD OF THE SOCIETY on the north. The building-permit extraction places the site at Commercial Tax Colony, Anmagal Hayathnagar.
The supplied location data provides a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. No additional verified approach-road, public-transport or landmark details are supplied.
9. Developer & development status
The registered promoter is M/S SAI MARUTHI CONSTRUCTIONS, recorded as a partnership, with GSTIN 36ACXFS0318L3ZI. RERA lists Beeram Shankar Reddy as authorized signatory and Beeram Srilatha as partner. The promoter address recorded in the filing is in Prashanth Nagar, Vanasthalipuram, Hayathnagar, Ranga Reddy district, PIN 501505.
The supplied evidence does not provide an official promoter website or contact details. No phase-wise development or independently verified construction-progress information is supplied. The Form B affidavit dated 20/08/2021 declares a completion undertaking of 27/April/2027; the project header separately records a proposed completion date of 27/08/2027. No supplied document establishes a revised completion approval.
10. Approvals, official records & documents
| Identifier / date | P02400003751; issued 20/12/2021; valid through 27/04/2027 |
|---|---|
| What the supplied record establishes | Form C registration for SAI MARUTHI CONSTRUCTIONS; includes a condition concerning the separate account for 70% of amounts realised. |
| Identifier / date | Approval 2/C3/06088/2021; file 2/C3/04669/2021; approved 27 April, 2021 |
|---|---|
| What the supplied record establishes | Building permission for one residential building, with the extracted configuration and conditions described above. |
| Identifier / date | Dated 20/08/2021 |
|---|---|
| What the supplied record establishes | Promoter declaration regarding title basis, encumbrances, project funds, pending approvals and completion by 27/April/2027. |
| Identifier / date | 19-08-2021 |
|---|---|
| What the supplied record establishes | Advocate’s title opinion concerning Plot B-14, Sy. Nos. 7, 19/A and 19/AA; the document recites the title chain. |
| Identifier / date | Statement 61962477 |
|---|---|
| What the supplied record establishes | Project-filed encumbrance statement; it is not a current fresh certificate. |
| Identifier / date | 184626 |
|---|---|
| What the supplied record establishes | Floor-plan record supplied for drawing-based measurements; extraction is incomplete. |
No occupancy or completion certificate is supplied. The GHMC permit states that an Occupancy Certificate is compulsory before occupation and specifies additional conditions, including an Occupancy Fire NOC before OC.
Frequently asked questions
Is SAI MARUTHI CONSTRUCTIONS registered with Telangana RERA?
Yes. SAI MARUTHI CONSTRUCTIONS is registered with the Telangana Real Estate Regulatory Authority as P02400003751; the registration status is New Project.
Who is the developer of SAI MARUTHI CONSTRUCTIONS?
The promoter named in the RERA registration is M/S SAI MARUTHI CONSTRUCTIONS.
Where is SAI MARUTHI CONSTRUCTIONS located?
SAI MARUTHI CONSTRUCTIONS is in VANASTHALIPURAM, Hayathnagar, Rangareddy, Telangana (501505).
When will SAI MARUTHI CONSTRUCTIONS be completed?
The promoter's proposed date of completion filed with RERA is 27/08/2027. This is the promoter's declaration, not a guarantee.
More projects in Vanasthalipuram







