NAKSHATRAS PV ELITE is a residential apartment project in HYDERA NAGAR, Kukatpally mandal, Medchal-Malkajgiri district, developed by the registered promoter NAKSHATRA INFRA. It is on a site of 459.56 sq. m and comprises one building with 1 Stilt + 5 upper floors. The TG-RERA filing lists 10 3BHK units, each with a saleable area of 152.35 sq. m. The project is registered under TG-RERA **P02200002919**, issued 14/05/2021, with proposed completion **25/07/2027**.

More from Nakshatra Infra · 4 projects →

01What we found

RegisteredTG-RERA - valid till 25 Mar 2027
11documents on file - each fact links to its page
2court cases on this project's land (survey 148, Hyder Nagar)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in

1. Project at a glance

Project identity

FieldRecord
Registered project nameNAKSHATRAS PV ELITE RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionPhase not separately identified; the certificate and filed survey description identify the registered project on Survey Nos. 148 TO 155.
TG-RERA registrationP02200002919, granted under section 5; issued 14/05/2021. Approvals record
Registration validity14/05/2021 to 25/03/2027; the certificate records no extension. This is the registration-validity period, not a construction-completion or occupancy date. Approvals record
Registered promoterNAKSHATRA INFRA; the registration certificate names “Nakshatra Infra.” RERA record Corporate record
RERA statusNew Project; registered. RERA record Approvals record

Land and geographic identity

FieldRecord
LocalityHYDERA NAGAR / Hyder Nagar RERA record RERA filing
Revenue villageHyder Nagar; the building permit also describes the site as Baghameer village. RERA record
Mandal / district / PINKukatpally / Medchal-Malkajgiri / 500072 RERA record
Project survey numbers148 TO 155 RERA filing
Plot identifiers19 AND 20P RERA filing
Site area459.56 sq. m is the site extent stated in the building permit and RERA land details. The permit separately records net area as 456.13 m². RERA filing
Boundaries (RERA-filed)East: ROAD WIDTH-12; West: PLOT NO 30P AND 31; North: PLOT NO -20; South: ROAD WIDTH-9. RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approval2/C23/04735/2021, approved 25 March, 2021; GHMC file no. 2/C23/00216/2021. Approvals record
Building configurationOne building, 1 Stilt + 5 upper floors, sanctioned as a residential building. The permit records height 14.95 m.
Approved areaThe building permit’s sanctioned parameters state residential upper-floor area 1,217.30 m². The RERA filing separately records approved built-up area 1,490.74 sq. m. These are the figures as labelled in their respective records; they are not interchangeable area measures. RERA filing
Parking levelStilt parking; the permit records 245.39 m² for stilt parking.
Approved versus RERA-declared homesThe permit says the sanctioned number of units must not be increased without GHMC approval, but the extracted permit data does not state a unit count. TG-RERA records 10 3BHK units. RERA unit table
Layout / subdivision identifierLRS31122019041019/LRS30122019024421 appears in the building permit.

Offering and status

FieldRecord
Unit type3BHK; TG-RERA records 10 units. RERA unit table
RERA-filed saleable area152.35 sq. m per 3BHK. RERA unit table
Booking availabilityPortal-derived record: 0 booked, 10 available; no as-of date is supplied, so counts are indicative. RERA unit table
Construction stageNo project construction-progress percentage or independently verified site stage is supplied. The permit is not a progress certificate. RERA amenities
Completion datesThe header records proposed completion 25/07/2027. The Form B completion-period field is blank. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied; the building permit makes an occupancy certificate compulsory before occupation. The certificate status here is therefore not evidenced as issued.

2. The project story

NAKSHATRAS PV ELITE is a TG-RERA-registered residential apartment project in Hyder Nagar, Kukatpally mandal, Medchal-Malkajgiri district. Its registered land description identifies Plot Nos. 19 and 20P in Survey Nos. 148 TO 155, with a site extent of 459.56 sq. m. The GHMC building permit describes one residential building, RESI-1, with a stilt level and five upper floors. RERA record RERA filing

The RERA filing lists ten 3BHK homes, all shown as available in the portal-derived counts supplied for this review. These counts have no stated as-of date. The evidence provided does not establish a verified construction stage or an issued occupancy certificate, so the project’s declared completion date and its actual delivery status should be treated as separate matters. RERA unit table RERA record

3. Master plan, architecture & building design

The GHMC building permit identifies Building - RESI-1 (BUILDING) as residential, with 1 Stilt + 5 upper floors, a recorded height of 14.95 m, and stilt parking of 245.39 m². It records site area of 459.56 m², net area of 456.13 m², road-affected area of 0 m², nala-affected area of 0 m², tot-lot area of 0 m², 5 rainwater-harvesting pits and 20 Trees. These are sanctioned-plan entries, not evidence that the works have been completed.

The RERA filing records approved built-up area as 1,490.74 sq. m; the permit’s extracted parameters separately label 1,217.30 m² as residential upper-floor area. No supplied floor-plan measurement establishes the building footprint, flats per floor, lift or stair configuration, detailed circulation, or internal apartment/common-area breakdown. The two drawing records supplied are not extracted as floor plans with measured flats. RERA filing Floor plans

4. Homes, configurations & floor plans

TG-RERA lists ten 3BHK units with a saleable area of 152.35 sq. m each. The supplied drawing record contains no measured flat plans, so no software-measured carpet area or room dimensions can be reported. Saleable area is the RERA-filed measure; the supplied data does not provide a RERA-filed carpet area. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010152.35 sq. mNot availableNot supplied

The booked and available figures are portal-derived and have no supplied as-of date. No dimensions, orientations, balcony or utility measurements, or typical-floor arrangement are available in the supplied drawing-derived records. RERA unit table Floor plans

5. Parking & vehicle circulation

The GHMC permit records 245.39 m² of stilt parking. The supplied RERA data does not establish a sanctioned car-space or two-wheeler-space count, visitor or accessible bays, parking allocation to individual homes, parking ramps, or EV charging. A marketed parking description is not used here as evidence of sanctioned provision or an individual buyer’s allocation. RERA unit table

6. Amenities, recreation & open spaces

The building permit records 5 rainwater-harvesting pits, 20 Trees, space for a transformer and a garbage house as plan entries or conditions. The RERA amenities record includes declared infrastructure categories, but its supplied progress values are 0%; those entries do not establish completed facilities. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lot / parkPermit records tot-lot area 0 m²; no other supplied size is stated.RERA amenitiesRERA amenities progress 0%; completion not verified.
Trees20 Trees recorded in the permit.Plan entry; planting or establishment not verified.
Community buildingsNo size or specific facility stated.RERA amenitiesRERA amenities progress 0%; completion not verified.

No evidence supplied for this section substantiates a clubhouse, gym, pool, children’s play area or other recreational facility as sanctioned or delivered.

7. Utilities, building services & safety

The permit requires a rainwater-harvesting structure (percolation pit), specifies space for a transformer and a garbage house, and requires an occupancy fire NOC from the Director (EV&DM) before an occupancy certificate. The permit also states that an occupancy certificate is compulsory before occupation and requires construction-worker safety and insurance. These are recorded requirements or plan provisions, not confirmation that the facilities, clearances or works have been completed.

Water conservation
Evidence in the project record5 rainwater-harvesting pits in the sanctioned parameters; permit requires a rainwater-harvesting structure (percolation pit).
Status evidencedSanction/requirement recorded; completion not verified.
Sewerage, storm water and sewage treatment
Evidence in the project recordRERA amenities list sewerage and storm-water categories; no capacities or detailed system design are supplied.
Status evidencedListed in RERA amenities with progress 0%; completion not verified. RERA amenities
Electrical
Evidence in the project recordPermit records space for a transformer; RERA amenities lists electrical meter room, sub-station and receiving-station category.
Status evidencedPermit provision / RERA category; installation and operation not verified. RERA amenities
Solid waste
Evidence in the project recordPermit requires a garbage house within the premises; RERA amenities lists solid-waste management and disposal.
Status evidencedRequirement/category recorded; completion not verified. RERA amenities
Fire and life safety
Evidence in the project recordPermit requires an occupancy fire NOC before issue of the occupancy certificate. RERA amenities lists fire protection and fire-safety requirements.
Status evidencedRequirement/category recorded; no fire NOC or completed-system evidence supplied. RERA amenities
Lifts, backup, security and accessibility
Evidence in the project recordNo project-specific capacities or design details supplied.
Status evidencedNot established in the supplied records. Document index

8. Location, access & connectivity

The official project record places the site in Hyder Nagar, Kukatpally mandal, Medchal-Malkajgiri district, PIN 500072, and the building permit further describes it as Baghameer village. RERA-filed boundaries identify roads on the east and south, while the GHMC permit records road widths of 18 mt. No supplied record identifies a named approach road, public-transport service or measured distance to a landmark. RERA record RERA filing

9. Developer & development status

The registered promoter is NAKSHATRA INFRA, identified in the RERA filing as a partnership. The supplied promoter record names LINGAM RAJU as authorized signatory, with MUNNANGI SRINIVASA RAO, NIMMAGADDA TILAK KUMAR and GOUNI RAJ KUMAR listed as partners. The Form B declaration is represented as signed by LINGAM RAJU for the promoter. Corporate record Parties record

The project is registered through 25/03/2027, and the header records proposed completion as 25/07/2027. The supplied record does not provide a construction-progress certification, revised completion-date order, or occupancy certificate. The Form B completion-period field is blank. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02200002919; issued 14/05/2021; valid to 25/03/2027
What it establishesRegistration of NAKSHATRAS PV ELITE under section 5, subject to certificate conditions.
GHMC Building Permit Order
Identifier / dateApproval 2/C23/04735/2021; file 2/C23/00216/2021; approved 25 March, 2021
What it establishesConditional building permission for a residential building at HYDER NAGAR, Baghameer village, Survey Nos. 148 TO 155. The permit says permission does not confer ownership rights.
RERA-filed layout / subdivision identifier
Identifier / dateLRS31122019041019/LRS30122019024421
What it establishesIdentifier appearing in the GHMC building-permit record; no separate approved-layout drawing extraction is supplied here.
Form B declaration
Identifier / dateDated 09-04 - 2021; declarant LINGAM RAJU for NAKSHATRA INFRA
What it establishesPromoter declaration and undertakings; the completion-period field is blank.
Advocate’s land-title search report
Identifier / dateDocument 161772
What it establishesFiled title scrutiny report; the supplied overview evidence does not substitute for the underlying title instruments or the full title review.
Title documents filed with RERA
Identifier / dateDocuments 161475, 161476, 161477
What it establishesFiled gift-settlement, sale-deed and development-agreement material.
Occupancy / completion certificate
Identifier / dateNot supplied
What it establishesNo issued certificate is evidenced in the supplied documents. Document index

Frequently asked questions

Is NAKSHATRAS PV ELITE registered with Telangana RERA?

Yes. NAKSHATRAS PV ELITE is registered with the Telangana Real Estate Regulatory Authority as P02200002919; the registration status is New Project.

Who is the developer of NAKSHATRAS PV ELITE?

The promoter named in the RERA registration is NAKSHATRA INFRA.

Where is NAKSHATRAS PV ELITE located?

NAKSHATRAS PV ELITE is in HYDERA NAGAR, Hyder Nagar, Kukatpally, Medchal-Malkajgiri, Telangana (500072).

When will NAKSHATRAS PV ELITE be completed?

The promoter's proposed date of completion filed with RERA is 25/07/2027. This is the promoter's declaration, not a guarantee.

More projects in Hyder Nagar