CHAITANYA RUBY is a residential apartment project in Hyder Nagar, Kukatpally Mandal, Medchal-Malkajgiri District, developed by registered promoter Sri Chaitanyaram Builders. The project covers 376.23 sq. m and comprises one building with 1 stilt + 5 upper floors and 10 apartments: five 2BHK and five 3BHK. TG-RERA registration number P02200006272 was issued 07/07/2023, and the proposed completion date is 30/11/2026.

More from Sri Chaitanyaram Builders · 16 projects →

01What we found

Period endedTG-RERA registration ran to 3 Jun 2026 - check its extension on TG-RERA
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameCHAITANYA RUBY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase designation not disclosed; registration covers the project at the stated site
TG-RERA registrationP02200006272, issued 07/07/2023; certificate states validity from 07/07/2023 to 03/06/2026
TG-RERA statusRegistered; the available certificate records the stated validity period. No extension is recorded in the supplied certificate
Registered promoterSri Chaitanyaram Builders, a partnership RERA record Corporate record

Land and geographic identity

ItemProject record
Locality / address as filedUnder Kukatpally GHMC Circle; project site identified as Hyder Nagar, Kukatpally RERA record RERA filing
Revenue villageHyder Nagar (also rendered “Hydernagar” in project documents) RERA record RERA filing
MandalKukatpally in the project identity record; building permit identifies Balanagar Mandal RERA record
DistrictMedchal-Malkajgiri in project identity and RERA certificate; building permit renders this as Medchal RERA record
PIN500072 RERA record
Project survey identifiers148 TO 155, M.C.K. BLOCK NO.2; the RERA certificate lists “148 TO 155” and “M.C.K. BLOCK NO.2” RERA filing
Plot identifiers686 (WESTERN PART) & 687 RERA filing
Site extent376.23 sq. m; the land record gives total area and net area as 376.23 sq. m, with 0 sq. m reported as affected by road widening/FTL/Nala widening RERA filing
BoundariesEast: eastern part of Plot No. 686; west: Plot No. 688; north: Plot Nos. 642 and 643; south: 30 feet wide road RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approvalBuilding Permit Order 1737/GHMC/KPL/2023-BP, approved 03 June 2023; file no. 005669/GHMC/2818/KPL2/2023-BP Approvals record
Approved built-up area1,101.10 sq. m for the residential building RERA filing
Building countOne building / one block RERA filing RERA unit table
Sanctioned configuration1 stilt + 5 upper floors; building height stated as 14.99 in the permit’s sanctioned parameters
Parking provision in permitStilt parking area stated as 220.2 sq. m; total parking area also stated as 220.2
Unit countThe project record lists 10 units; the permit states that the sanctioned number of units must not be increased without prior GHMC approval RERA unit table

Offering and status

ItemProject record
RERA-filed configurations2BHK and 3BHK apartments RERA unit table
RERA-filed saleable area2BHK: 113.8 sq. m; 3BHK: 148.64 sq. m RERA unit table
Units / booking snapshot10 total: 5 2BHK and 5 3BHK; portal-derived counts show 0 booked and 10 available. The portal record provides no as-of date, so counts are indicative RERA unit table
Promoter-declared completion undertaking03 June 2026 in the Form B declaration
RERA proposed completion date30/11/2026 in the project information record RERA filing
Permit completion datePermit records construction to be completed before 03 June 2026
Construction stageCurrent construction progress is not established by the supplied material Document index
Occupancy / completion certificateNo completion certification is recorded in the supplied building-permit extraction; the permit requires completion notice and an occupancy certificate before occupation

2. The project story

CHAITANYA RUBY is a registered residential apartment project on a 376.23 sq. m site identified with Plot No. 686 (western part) & 687, in Hyder Nagar, Kukatpally. Its registered survey description is 148 TO 155, M.C.K. BLOCK NO.2. The GHMC permit describes one residential building with a stilt and five upper floors. RERA record RERA filing

The RERA unit schedule records ten apartments—five 2BHK and five 3BHK. The registration certificate is valid through 03/06/2026 as stated in that certificate; this is separate from the project’s completion dates, which are stated differently in the permit, Form B declaration and project-information record. No current construction-progress evidence or occupancy certificate is supplied, so the present stage and any completed or occupied portion cannot be confirmed here. RERA unit table RERA filing

3. Master plan, architecture & building design

The sanctioned building permit describes one residential building on a 376.23 sq. m site, with 1 stilt + 5 upper floors and 1,101.10 sq. m of residential area in the permit’s sanctioned parameters. The permit also lists a building height of 14.99 (unit not stated in the extracted parameter). These are permit figures; they should not be read as carpet or saleable area.

The supplied record does not establish a detailed building footprint, flats per floor, lift or stair count, floor-by-floor common-area arrangement, or internal circulation design. A layout-plan document is listed in the RERA file, but its extraction is unavailable. Document index

The permit lists a greenery strip on the site periphery, transformer space, a garbage house and rainwater-harvesting structures among its conditions or project parameters. The RERA amenity schedule marks a green strip/tot lot/park and rainwater harvesting as available, but records 0% progress against those listed items; it does not establish completion. RERA amenities

4. Homes, configurations & floor plans

The RERA unit schedule records ten apartments in two configurations. The floor-plan drawing measurements below are software-measured from the approved-plan drawing geometry, not RERA-filed carpet-area disclosures; they require review against the drawing. RERA saleable area is reported separately and includes an area basis distinct from the software-measured carpet area. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailable*RERA saleable areaMeasured carpet area**Loading (if supplied)
2BHK505113.8 sq. m61.3 sq. m (660 sq. ft)46%
3BHK505148.64 sq. m95.8 sq. m (1,031 sq. ft)36%

\* Booked/available counts are indicative portal figures; no as-of date is provided. \ Software-measured from drawing geometry in document 335848**; not a RERA-filed carpet-area figure. RERA unit table

The supplied typical floor-plan measurement identifies a living/dining room, bedrooms, kitchen and toilets for the measured 3BHK design; the measured 2BHK plan identifies living space, bedrooms, kitchen and toilets. The records do not establish balcony or utility-area measurements. RERA unit details

5. Parking & vehicle circulation

The GHMC permit records 220.2 sq. m of stilt parking area and states that the stilt approved for parking is to be used exclusively for vehicle parking, without partition walls or rolling shutters. This is an area figure, not a count of parking bays. The supplied evidence does not establish car or two-wheeler space counts, visitor or accessible parking, parking allocations to individual apartments, ramp or driveway arrangements, or EV charging. A drawn or sanctioned parking provision does not itself establish exclusive ownership or allotment.

6. Amenities, recreation & open spaces

The RERA amenity schedule lists project infrastructure and community provisions. The recorded percentages are 0% for the listed items; that is a filing status, not independent verification of on-site completion. No facility dimensions, capacities or quantities are supplied except where noted. RERA amenities

Landscape / open space
FacilityGreen Strip/TOT LOT/Park
Description / sizeSize not stated
Evidence sourceRERA amenities
Declared progress / verified statusMarked “YES”; recorded progress 0%; completion not independently verified
Convenience / community
FacilityCommunity Buildings
Description / sizeSize or facility details not stated
Evidence sourceRERA amenities
Declared progress / verified statusRecorded progress 0%; completion not independently verified
Site infrastructure
FacilityInternal Roads & Footpaths
Description / sizeDetails not stated
Evidence sourceRERA amenities
Declared progress / verified statusRecorded progress 0%; completion not independently verified
Site infrastructure
FacilityStreet Lighting
Description / sizeDetails not stated
Evidence sourceRERA amenities
Declared progress / verified statusRecorded progress 0%; completion not independently verified

The supplied vendor material lists additional amenities, but those are not treated here as RERA-declared or delivered facilities. Promoter website

7. Utilities, building services & safety

The RERA amenity schedule marks Water Supply, Water Conservation, Rain water Harvesting, and Electrical Meter Room, Sub-Station, Receiving Station as “YES”; it does not specify sources, capacities, storage, treatment, backup systems or completion status. It also lists sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management and fire-protection/fire-safety requirements, each with 0% recorded progress. RERA amenities

The building permit requires 5 rainwater-harvesting pits, provision of transformer space, and a garbage house within the premises. It also requires a fire NOC from the Director (EV&DM) before issue of an occupancy certificate. The permit’s conditions do not establish that these works or approvals have been completed.

The supplied records do not establish lift numbers or capacities, a service lift, power-backup capacity, water-storage or treatment capacity, STP capacity, reuse arrangements, fire-system specifications, escape-stair details, CCTV/security provision, or accessible circulation. Document index RERA amenities

8. Location, access & connectivity

The registered project location is Hyder Nagar, under Kukatpally GHMC Circle, Kukatpally Mandal, Medchal-Malkajgiri District, PIN 500072. The site boundary description identifies a 30 feet wide road along the south. RERA record RERA filing RERA filing

A supplied location record places HITEC City at 5.0 km from the project’s cadastral parcel-centroid location. No other independently measured distances, public-transport details, approach-road routes or travel times are provided in the project-location record. Location record

9. Developer & development status

The registered promoter is Sri Chaitanyaram Builders, identified as a partnership, with GSTIN 36ADHFS3993A1ZY. Its RERA-filed address is Plot No. 84, Venkataramana Colony, Gopal Nagar Co-operative House Building Society Limited, under Kukatpally GHMC Circle, Kukatpally, Medchal-Malkajgiri, Telangana, PIN 500072. The supplied record does not establish a separate official project website or contact details. Corporate record Parties record RERA filing

The GHMC permit names M/s. R.S. Builders & Developers as developer. The project has one building and one registered project schedule; no separate phase-wise construction or completion status is documented. Current construction progress and occupancy status are not independently verified in the supplied evidence. RERA unit table Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200006272, issued 07/07/2023; valid through 03/06/2026 as stated
Scope and evidenceProject registration and conditions, including the separate-account requirement
GHMC Building Permit Order
Identifier / date1737/GHMC/KPL/2023-BP, 03 June 2023; file no. 005669/GHMC/2818/KPL2/2023-BP
Scope and evidenceResidential building permit for one building on a 376.23 sq. m site
Commencement / building-permit document
Identifier / dateRERA-filed as “Commencement Certificates for each building in each phase”
Scope and evidenceExtracted document is a GHMC building permit order; it requires commencement notice and later completion notice and OC
Form B declaration
Identifier / dateJune 2023
Scope and evidenceAuthorized signatory G. Ramakoti Reddy declares title, no encumbrances and a completion undertaking of 03 June 2026; these are promoter declarations
Layout-plan document
Identifier / dateDocument 335848
Scope and evidenceListed in the RERA file; extraction unavailable Document index
Title-report and land documents
Identifier / dateDocuments 335830–335846
Scope and evidenceRERA-filed title and supporting deed materials; detailed title assessment belongs in the Land & Title section Document index

The supplied building-permit extraction states that the permission does not confer ownership rights, requires compliance with the sanctioned plan, and requires an occupancy certificate before occupation. No occupancy or completion certificate is present in the supplied project documents.

Frequently asked questions

Is CHAITANYA RUBY registered with Telangana RERA?

Yes. CHAITANYA RUBY is registered with the Telangana Real Estate Regulatory Authority as P02200006272; the registration status is New Project.

Who is the developer of CHAITANYA RUBY?

The promoter named in the RERA registration is SRI CHAITANYARAM BUILDERS.

Where is CHAITANYA RUBY located?

CHAITANYA RUBY is in UNDER KUKATPALLY GHMC CIRCLE, Hyder Nagar, Kukatpally, Medchal-Malkajgiri, Telangana (500072).

When will CHAITANYA RUBY be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.