Sri Chaitanya Nilayam
SRI CHAITANYARAM BUILDERS · Medchal-Malkajgiri · RERA P02200002303
SRI CHAITANYA NILAYAM is a residential apartment project in C.B.C.I.D COLONY, Kukatpally mandal, Medchal-Malkajgiri district, developed by registered promoter SRI CHAITANYARAM BUILDERS. The site area is 534.87 sq m, and the project comprises one proposed building with 1 Stilt + 5 upper floors and 10 3BHK apartments. Its TG-RERA registration number is P02200002303, and the project header records proposed completion as 30/11/2026.
More from Sri Chaitanyaram Builders · 16 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SRI CHAITANYA NILAYAM. RERA record |
| Project type / registered portion | Residential apartment project; phase or separately registered portion is not disclosed in the supplied record. RERA record RERA filing |
| TG-RERA registration | P02200002303; Form ‘C’ issued 31/10/2020, valid through 03/03/2026. This is the registration period, not the project completion deadline. RERA record Approvals record |
| Registered promoter | SRI CHAITANYARAM BUILDERS; the project declaration also names GALI NAGA JYOTHI as a promoter. RERA record Corporate record |
| RERA record status | Project status is recorded as New Project; no registration extension is recorded in the supplied certificate. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | C.B.C.I.D COLONY; revenue village is recorded as Hyder Nagar. The building permit describes the site as HYDERNAGAR. RERA record RERA filing |
| Mandal / district / PIN | Kukatpally / Medchal-Malkajgiri / 500072. RERA record |
| Project survey number(s) / subdivision(s) | 145/2; no project subdivision is specified in the supplied RERA identity. RERA record RERA filing |
| Plot identity | 16-2-67/21, Plot No 21 (Old No 17) & Plot No 22 (Old No 18). RERA filing |
| Site area | Total 534.87 sq m; net area 532.94 sq m. The RERA filing separately records 1.93 sq m affected in road widening/FTL of tanks/nala widening. RERA filing |
| Boundaries | East: PLOT NO 20; west: 40 FEET WIDE ROAD; north: 30 FEET WIDE ROAD; south: PLOT NO 26 AND 27. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | Building Permit Order 2/C23/03196/2020, approved 03 March, 2020; associated file number 2/C23/00357/2020. Approvals record |
| Approved built-up area | 1,283.65 m² for the residential building, as stated in the sanctioned parameters. RERA filing |
| Building and floors | One proposed building, PROPOSED-1 (BUILDING); approved configuration 1 Stilt + 5 upper floors; stated building height 14.99 m. No basement or podium is identified in the supplied approval extract. |
| Parking provision in approval | Stilt parking area 243.11 m²; a number of parking spaces is not stated in the supplied extract. |
| Units | The approved-plan extract records No. of units as sanctioned shall not be increased but does not state a numeric sanctioned unit count. The TG-RERA unit record lists 10 3BHK apartments. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Configuration | 3BHK apartments. RERA unit table |
| RERA saleable area | 165.83 m² per listed unit configuration. RERA unit table |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative. RERA unit table |
| Construction stage | No verified current construction-progress percentage or site-inspection status is supplied. RERA amenities |
| Completion deadline | The Form-B promoter declaration undertakes completion by 03 March 2026; the project header records proposed completion 30/11/2026. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied in the reviewed project records; the project’s OC status is therefore not established. GHMC’s permit states that an occupancy certificate is compulsory before occupation. Document index |
The project story
Sri Chaitanya Nilayam is recorded with TG-RERA as a residential apartment project on plots 21 and 22 (old plot numbers 17 and 18) in Survey No. 145/2, Hyder Nagar revenue village, at C.B.C.I.D Colony, Kukatpally. The RERA filing identifies a single building and lists ten 3BHK apartments. RERA record RERA filing RERA unit table
GHMC’s building permit approves one residential building with one stilt level and five upper floors. The permit also records a 14.99 m building height and 1,283.65 m² of residential built-up area. These are approval particulars; the supplied material does not establish the building’s present on-site construction stage or independently verify completion.
The promoter’s Form-B declaration gives 03 March 2026 as the undertaking completion date, while the project header records 30/11/2026 as the proposed completion date. The registration certificate separately states that registration runs through 03/03/2026. No OC is included in the supplied documents, so neither completion nor permission to occupy is established here. RERA record Document index
Master plan, architecture & building design
The GHMC permit describes a single proposed residential building, PROPOSED-1 (BUILDING), with 1 Stilt + 5 upper floors. It gives a building height of 14.99 m, residential built-up area of 1,283.65 m², and stilt parking area of 243.11 m². The site area is 534.87 sq m, with a stated net area of 532.94 sq m. RERA filing
The RERA filing identifies one building and lists ten apartments. The numeric sanctioned unit count is not stated in the permit extract, which instead says that the sanctioned number of units must not be increased without prior GHMC approval. RERA unit table
The supplied permit extract records six rainwater-harvesting structures, 25 trees and a transformer space. It records “Tot-lot (m²) 0”; the supplied materials do not provide a verified landscape plan, detailed floor-by-floor arrangement, number of apartments per floor, lift or stair details, or a complete site-circulation plan.
The drawing file identified as 132599 is described in the RERA upload list as a layout plan, but its drawing extraction was not available. The drawing stamp is recorded as 2/C23/03196/2020, dated 07-03-2020, and requires review. Document index Approvals record
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 165.83 m² | 104.6–131.1 m²; median 115.2 m² | 31% |
RERA-filed unit counts and saleable area are shown above; the booking and availability figures are portal data without an as-of date. Carpet-area figures and loading are software measurements from approved floor-plan drawing geometry, not RERA-filed disclosures, and the six measured flat designs are marked for review. RERA unit table RERA unit details Floor plans
The drawing-based measurements exclude the two marked balconies from carpet area. The measurement record describes RERA saleable area as including the home’s share of common areas; it should not be treated as carpet area. A sample first-floor plan extraction identifies bedrooms, kitchen, living/dining, wash and toilet areas, plus balconies marked 1.22 M. WIDE BALC and 1.20 M. WIDE BALC. Room dimensions are not presented as verified finished internal dimensions because the drawing measurements require review. RERA unit details Floor plans
Parking & vehicle circulation
The GHMC approval identifies stilt parking with an area of 243.11 m². The supplied approval extract does not state the number of car or two-wheeler spaces, visitor or accessible parking provision, or any mechanical or basement parking.
The RERA filing records a 128.87 m² mortgage area, and the GHMC permit says the mortgaged built-up area may be registered only after an Occupancy Certificate is produced. The supplied records do not establish parking-space allocation to individual apartments; a drawn parking provision does not itself establish exclusive ownership. RERA filing
Amenities, recreation & open spaces
The RERA amenity record lists the following facilities and infrastructure. Its progress fields are recorded as 0; that is a filing value, not independent verification of construction or delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip / TOT LOT / Park | Size not supplied; marked YES in the RERA amenity record. The GHMC approval records Tot-lot (m²) 0. | RERA amenities | RERA amenity progress 0; completion not independently verified. |
| Community buildings | No size or facility detail supplied. | RERA amenities | Progress 0; completion not independently verified. |
| Aggregate recreational open space | No area supplied. | RERA amenities | Progress 0; completion not independently verified. |
The permit also records 25 Trees. No RERA-filed clubhouse, indoor recreation facility or sports facility is evidenced in the supplied material. RERA amenities
Utilities, building services & safety
The GHMC permit requires a rainwater-harvesting structure and records No. of RWHPs 6; the RERA amenity list marks water conservation/rainwater harvesting as YES. It also requires space for a transformer and a garbage house within the premises, and the permit extract lists an ETP. These are recorded requirements or provisions; their installation and operational status are not independently established. RERA amenities
The RERA amenity schedule also lists water supply, sewerage, storm-water drains, street lighting, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection and fire safety, and an electrical meter room/sub-station/receiving station. Water supply and the electrical meter room/sub-station/receiving station are marked YES; progress entries shown for the listed infrastructure are 0. No capacities, system specifications or verified completion evidence are supplied. RERA amenities
GHMC’s permit requires a Fire NOC before issue of an Occupancy Certificate and says that an Occupancy Certificate is compulsory before occupation. It also requires construction-worker safety and insurance. The supplied record does not establish that the required Fire NOC or OC has been obtained.
Location, access & connectivity
The registered location is C.B.C.I.D COLONY, Hyder Nagar revenue village, Kukatpally mandal, Medchal-Malkajgiri district, PIN 500072. The RERA land record gives the site boundaries as Plot No. 20 to the east, a 40-foot-wide road to the west, a 30-foot-wide road to the north, and Plots 26 and 27 to the south. RERA record RERA filing
The GHMC permit identifies an 18 mt. road width in its approval extract. The supplied location data records HITEC City — 6.5 km as a connectivity distance. No public-transport route, travel time or independently verified access measurement is supplied. Location record
Developer & development status
The registered legal promoter is SRI CHAITANYARAM BUILDERS, identified in the RERA record as a Partnership. Its supplied GSTIN is 36ADHFS3993A1ZY. The RERA record lists the promoter address as Plot No. 84, Venkataramana Colony, C.B.C.I.D Officers Co-Operative Housing Society Ltd, C.B.C.I.D Colony, Kukatpally, Medchal-Malkajgiri, PIN 500072. Corporate record RERA filing Parties record
The RERA party record also identifies GALI NAGA JYOTHI as a project landowner/promoter under an AreaShare arrangement. The promoter’s Form-B declaration is signed by G. Ramakoti Reddy as authorized signatory and Gali Naga Jyothi as promoter; it records the promoter’s completion undertaking as 03 March 2026. No current, independently verified construction-progress report is supplied. Parties record
Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form ‘C’ for SRI CHAITANYA NILAYAM, registration P02200002303, dated 31/10/2020, valid through 03/03/2026. |
| GHMC building permit | Building Permit Order 2/C23/03196/2020, dated 03 March, 2020, file 2/C23/00357/2020, for Survey No. 145/2, Hydernagar. |
| Approved-drawing record | RERA filing lists layout-plan document 132599; extracted drawing details are unavailable. The drawing stamp is recorded as 2/C23/03196/2020, dated 07-03-2020, and flagged for review. Document index Approvals record |
| Promoter declaration | Form-B declaration for the project, dated 22 September 2020, including the promoter’s stated completion undertaking and project declarations. |
| Occupancy / completion certificate | No OC or completion certificate is included in the supplied project documents. Document index |
The GHMC permit requires strict adherence to the sanctioned plan, submission of a commencement notice, a completion notice and an occupancy certificate, and separate prior approval for modifications. Its listed conditions also include rainwater harvesting, transformer space, a garbage house and an ETP. This overview reports those recorded conditions; it does not establish their current compliance or fulfillment.
Project at a glance
Project identity
Registered project name: SRI CHAITANYA NILAYAM.
Project type / registered portion: Residential apartment project; phase or separately registered portion is not disclosed in the supplied record.
TG-RERA registration: P02200002303; Form ‘C’ issued 31/10/2020, valid through 03/03/2026. This is the registration period, not the project completion deadline.
Registered promoter: SRI CHAITANYARAM BUILDERS; the project declaration also names GALI NAGA JYOTHI as a promoter.
RERA record status: Project status is recorded as New Project; no registration extension is recorded in the supplied certificate.
Land and geographic identity
Locality / revenue village: C.B.C.I.D COLONY; revenue village is recorded as Hyder Nagar. The building permit describes the site as HYDERNAGAR.
Mandal / district / PIN: Kukatpally / Medchal-Malkajgiri / 500072.
Project survey number(s) / subdivision(s): 145/2; no project subdivision is specified in the supplied RERA identity.
Plot identity: 16-2-67/21, Plot No 21 (Old No 17) & Plot No 22 (Old No 18).
Site area: Total 534.87 sq m; net area 532.94 sq m. The RERA filing separately records 1.93 sq m affected in road widening/FTL of tanks/nala widening.
Boundaries: East: PLOT NO 20; west: 40 FEET WIDE ROAD; north: 30 FEET WIDE ROAD; south: PLOT NO 26 AND 27.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Building Permit Order 2/C23/03196/2020, approved 03 March, 2020; associated file number 2/C23/00357/2020.
Approved built-up area: 1,283.65 m² for the residential building, as stated in the sanctioned parameters.
Building and floors: One proposed building, PROPOSED-1 (BUILDING); approved configuration 1 Stilt + 5 upper floors; stated building height 14.99 m. No basement or podium is identified in the supplied approval extract.
Parking provision in approval: Stilt parking area 243.11 m²; a number of parking spaces is not stated in the supplied extract.
Units: The approved-plan extract records No. of units as sanctioned shall not be increased but does not state a numeric sanctioned unit count. The TG-RERA unit record lists 10 3BHK apartments.
Offering and status
Configuration: 3BHK apartments.
RERA saleable area: 165.83 m² per listed unit configuration.
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative.
Construction stage: No verified current construction-progress percentage or site-inspection status is supplied.
Completion deadline: The Form-B promoter declaration undertakes completion by 03 March 2026; the project header records proposed completion 30/11/2026.
Occupancy / completion certificate: No occupancy or completion certificate is supplied in the reviewed project records; the project’s OC status is therefore not established. GHMC’s permit states that an occupancy certificate is compulsory before occupation.
The project story
Sri Chaitanya Nilayam is recorded with TG-RERA as a residential apartment project on plots 21 and 22 (old plot numbers 17 and 18) in Survey No. 145/2, Hyder Nagar revenue village, at C.B.C.I.D Colony, Kukatpally. The RERA filing identifies a single building and lists ten 3BHK apartments.
GHMC’s building permit approves one residential building with one stilt level and five upper floors. The permit also records a 14.99 m building height and 1,283.65 m² of residential built-up area. These are approval particulars; the supplied material does not establish the building’s present on-site construction stage or independently verify completion.
The promoter’s Form-B declaration gives 03 March 2026 as the undertaking completion date, while the project header records 30/11/2026 as the proposed completion date. The registration certificate separately states that registration runs through 03/03/2026. No OC is included in the supplied documents, so neither completion nor permission to occupy is established here.
Master plan, architecture & building design
The GHMC permit describes a single proposed residential building, PROPOSED-1 (BUILDING), with 1 Stilt + 5 upper floors. It gives a building height of 14.99 m, residential built-up area of 1,283.65 m², and stilt parking area of 243.11 m². The site area is 534.87 sq m, with a stated net area of 532.94 sq m.
The RERA filing identifies one building and lists ten apartments. The numeric sanctioned unit count is not stated in the permit extract, which instead says that the sanctioned number of units must not be increased without prior GHMC approval.
The supplied permit extract records six rainwater-harvesting structures, 25 trees and a transformer space. It records “Tot-lot (m²) 0”; the supplied materials do not provide a verified landscape plan, detailed floor-by-floor arrangement, number of apartments per floor, lift or stair details, or a complete site-circulation plan.
The drawing file identified as 132599 is described in the RERA upload list as a layout plan, but its drawing extraction was not available. The drawing stamp is recorded as 2/C23/03196/2020, dated 07-03-2020, and requires review.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 165.83 m² | 104.6–131.1 m²; median 115.2 m² | 31% |
RERA-filed unit counts and saleable area are shown above; the booking and availability figures are portal data without an as-of date. Carpet-area figures and loading are software measurements from approved floor-plan drawing geometry, not RERA-filed disclosures, and the six measured flat designs are marked for review.
The drawing-based measurements exclude the two marked balconies from carpet area. The measurement record describes RERA saleable area as including the home’s share of common areas; it should not be treated as carpet area. A sample first-floor plan extraction identifies bedrooms, kitchen, living/dining, wash and toilet areas, plus balconies marked 1.22 M. WIDE BALC and 1.20 M. WIDE BALC. Room dimensions are not presented as verified finished internal dimensions because the drawing measurements require review.
Parking & vehicle circulation
The GHMC approval identifies stilt parking with an area of 243.11 m². The supplied approval extract does not state the number of car or two-wheeler spaces, visitor or accessible parking provision, or any mechanical or basement parking.
The RERA filing records a 128.87 m² mortgage area, and the GHMC permit says the mortgaged built-up area may be registered only after an Occupancy Certificate is produced. The supplied records do not establish parking-space allocation to individual apartments; a drawn parking provision does not itself establish exclusive ownership.
Amenities, recreation & open spaces
The RERA amenity record lists the following facilities and infrastructure. Its progress fields are recorded as 0; that is a filing value, not independent verification of construction or delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip / TOT LOT / Park | Size not supplied; marked YES in the RERA amenity record. The GHMC approval records Tot-lot (m²) 0. | RERA amenity progress 0; completion not independently verified. | |
| Community buildings | No size or facility detail supplied. | Progress 0; completion not independently verified. | |
| Aggregate recreational open space | No area supplied. | Progress 0; completion not independently verified. |
The permit also records 25 Trees. No RERA-filed clubhouse, indoor recreation facility or sports facility is evidenced in the supplied material.
Utilities, building services & safety
The GHMC permit requires a rainwater-harvesting structure and records No. of RWHPs 6; the RERA amenity list marks water conservation/rainwater harvesting as YES. It also requires space for a transformer and a garbage house within the premises, and the permit extract lists an ETP. These are recorded requirements or provisions; their installation and operational status are not independently established.
The RERA amenity schedule also lists water supply, sewerage, storm-water drains, street lighting, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection and fire safety, and an electrical meter room/sub-station/receiving station. Water supply and the electrical meter room/sub-station/receiving station are marked YES; progress entries shown for the listed infrastructure are 0. No capacities, system specifications or verified completion evidence are supplied.
GHMC’s permit requires a Fire NOC before issue of an Occupancy Certificate and says that an Occupancy Certificate is compulsory before occupation. It also requires construction-worker safety and insurance. The supplied record does not establish that the required Fire NOC or OC has been obtained.
Location, access & connectivity
The registered location is C.B.C.I.D COLONY, Hyder Nagar revenue village, Kukatpally mandal, Medchal-Malkajgiri district, PIN 500072. The RERA land record gives the site boundaries as Plot No. 20 to the east, a 40-foot-wide road to the west, a 30-foot-wide road to the north, and Plots 26 and 27 to the south.
The GHMC permit identifies an 18 mt. road width in its approval extract. The supplied location data records HITEC City — 6.5 km as a connectivity distance. No public-transport route, travel time or independently verified access measurement is supplied.
Developer & development status
The registered legal promoter is SRI CHAITANYARAM BUILDERS, identified in the RERA record as a Partnership. Its supplied GSTIN is 36ADHFS3993A1ZY. The RERA record lists the promoter address as Plot No. 84, Venkataramana Colony, C.B.C.I.D Officers Co-Operative Housing Society Ltd, C.B.C.I.D Colony, Kukatpally, Medchal-Malkajgiri, PIN 500072.
The RERA party record also identifies GALI NAGA JYOTHI as a project landowner/promoter under an AreaShare arrangement. The promoter’s Form-B declaration is signed by G. Ramakoti Reddy as authorized signatory and Gali Naga Jyothi as promoter; it records the promoter’s completion undertaking as 03 March 2026. No current, independently verified construction-progress report is supplied.
Approvals, official records & documents
TG-RERA registration: Form ‘C’ for SRI CHAITANYA NILAYAM, registration P02200002303, dated 31/10/2020, valid through 03/03/2026.
GHMC building permit: Building Permit Order 2/C23/03196/2020, dated 03 March, 2020, file 2/C23/00357/2020, for Survey No. 145/2, Hydernagar.
Approved-drawing record: RERA filing lists layout-plan document 132599; extracted drawing details are unavailable. The drawing stamp is recorded as 2/C23/03196/2020, dated 07-03-2020, and flagged for review.
Promoter declaration: Form-B declaration for the project, dated 22 September 2020, including the promoter’s stated completion undertaking and project declarations.
Occupancy / completion certificate: No OC or completion certificate is included in the supplied project documents.
The GHMC permit requires strict adherence to the sanctioned plan, submission of a commencement notice, a completion notice and an occupancy certificate, and separate prior approval for modifications. Its listed conditions also include rainwater harvesting, transformer space, a garbage house and an ETP. This overview reports those recorded conditions; it does not establish their current compliance or fulfillment.
Frequently asked questions
Is SRI CHAITANYA NILAYAM registered with Telangana RERA?
Yes. SRI CHAITANYA NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02200002303; the registration status is New Project.
Who is the developer of SRI CHAITANYA NILAYAM?
The promoter named in the RERA registration is SRI CHAITANYARAM BUILDERS.
Where is SRI CHAITANYA NILAYAM located?
SRI CHAITANYA NILAYAM is in C.B.C.I.D COLONY, Hyder Nagar, Kukatpally, Medchal-Malkajgiri, Telangana (500072).
When will SRI CHAITANYA NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.
More projects in Hyder Nagar