MONARCHs Sri Sai Sadan
MONARCH INFRA & DEVELOPERS · Medchal-Malkajgiri · RERA P02200000190
MONARCHs Sri Sai Sadan is a residential apartment project in Hyder Nagar, Malkajgiri Mandal, Medchal-Malkajgiri District. It is being developed by the registered promoter, MONARCH INFRA & DEVELOPERS. The registered site extent is 672.13 sq. m, and the permit identifies one residential building, Building - A, with a “Stilt + 5” configuration; the RERA filing lists 15 homes: 10 2BHK units and 5 3BHK units. The project is registered under TG-RERA number P02200000190, granted on 21 January 2019, with a proposed completion date of 31 March 2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | MONARCHs Sri Sai Sadan RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase is not identified in the supplied record. The registration concerns the project; the GHMC permit identifies Building - A. RERA record |
| TG-RERA registration | P02200000190, granted on 21 January 2019; valid through 31 March 2024. No extension is recorded in the supplied certificate. |
| Registered promoter | MONARCH INFRA & DEVELOPERS RERA record |
| RERA status | Recorded as “On-Going Project”; the registered completion date is 31 March 2024. Current registration validity after that date is not established by the supplied record. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / PIN | Hyder Nagar; PIN 500072 RERA record |
| Revenue village | Hyder Nagar / Hydernagar Village, as stated in the project and building-permit records RERA record |
| Mandal / district | Malkajgiri / Medchal-Malkajgiri RERA record |
| Project survey numbers | 55 and 55PART RERA record |
| Plot reference | 16/PART RERA filing |
| Registered site extent | 672.13 sq. m in the RERA land details RERA filing |
| GHMC-sanctioned site area | 1,672.13 m²; net area 1,672.13 m²; road-affected area 0.00 m², as stated in the building-permit extraction |
| Boundaries filed with RERA | North: 30 ft Wide Road; South: Plot No 16 Part; East: Neighbors House; West: Plot No 24 n 17 part RERA filing |
The RERA filing’s “Net Area” is recorded as “1”; its unit and meaning are not clarified in the supplied data, so it is not treated as a verified site-area figure. RERA filing
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal approval | Building Permit Order 2/C22/06244/2018, approved 11 April 2018 |
| Other file reference | /2/C22/14166/2017 |
| Building identified in permit | Building - A, residential; “Stilt + 5” |
| Approved height | 14.95 m |
| Approved built-up area | The supplied permit extraction lists 1,477.40 m² upper floors and 296.66 m² stilt; the record does not label these as a single aggregate approved built-up-area figure. |
| Building / tower count | One building is identified in the supplied permit extraction. |
| Parking | The permit conditions refer to cellar and stilt areas approved for parking, but no parking-space count or parking-level schedule is supplied. |
| Unit count | 15 units in the RERA filing; the supplied sanctioned permit extraction does not state an approved unit count. RERA unit table |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configurations | 2BHK: 10 units, filed as “DOUBLE”; 3BHK: 5 units, filed as “THREE” and “THREE BEDROOM” RERA unit table |
| RERA-filed saleable areas | 2BHK: 108.0 m²; 3BHK: 148.64 m² RERA unit table |
| Booked / available | Portal-derived counts indicate 0 booked and 10 available 2BHK units; 0 booked and 5 available 3BHK units. These counts have no supplied as-of date and are indicative. RERA unit table |
| Construction stage | The RERA header records “On-Going Project” and 90% completeness; this is a filed/portal status, not an independent site inspection. RERA record |
| Completion dates | RERA proposed and revised proposed completion dates: 31 March 2024. Form B declares a completion undertaking of 25 August 2022. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. The permit says an occupancy certificate is compulsory before occupation. |
Registration validity, the declared completion date and certificate status are separate matters: the certificate records registration through 31 March 2024, the RERA header gives that same date as the revised completion date, and no OC/CC is supplied here. RERA record
2. The project story
MONARCHs Sri Sai Sadan is registered as a residential apartment project at Hyder Nagar, Hydernagar Village, on Survey Nos. 55 and 55PART, with Plot No. 16/PART appearing in the RERA record. The supplied GHMC building-permit extraction describes one residential building, Building - A, at Nizampet Road, with a “Stilt + 5” configuration and a sanctioned height of 14.95 m. RERA record RERA filing
The RERA filing lists 15 homes: ten 2BHK and five 3BHK units, all shown as available in the portal-derived counts, which lack an as-of date. The project is recorded as ongoing and 90% complete, but that percentage is a RERA/portal declaration rather than independently verified construction progress. No occupancy or completion certificate was supplied, so the record does not establish that the building is certified for occupation. RERA unit table RERA record
3. Master plan, architecture & building design
The GHMC permit extraction identifies Building - A as a residential building with “Stilt + 5” floors, height 14.95 m, and a site area and net area of 1,672.13 m². It lists 1,477.40 m² for upper floors and 296.66 m² for the stilt; no separate FSI-counted area, gross built-up total, floor-by-floor plan, or building-footprint measurement is supplied.
The permit records setbacks of Front 5, Rear 3.51, Side I 3.5 and Side II 3.5, without units in the extracted fields. The document’s conditions identify a tot-lot and require it to be fenced and maintained as greenery; they also specify space for a transformer and a garbage house. Detailed arrangements for flats per floor, lifts, stairs, entrances, internal circulation, landscaping extent and phase organization are not available in the supplied drawing records.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK (filed as “DOUBLE”) | 10 | 0 | 10 | 108.0 m² | Not measured | Not supplied |
| 3BHK (filed as “THREE” / “THREE BEDROOM”) | 5 | 0 | 5 | 148.64 m² | Not measured | Not supplied |
Unit counts, bookings and saleable areas are from the TG-RERA filing; booking counts have no supplied as-of date and are indicative. RERA unit table
Two floor-plan drawings are recorded, but neither has been measured: both are scans pending review. Consequently, no software-measured carpet areas, room dimensions, balcony or utility measurements, or typical-floor arrangement can be reported from the supplied material. RERA saleable area is the filed figure; it should not be read as a measured carpet area. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit conditions state that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted permit gives a stilt area of 296.66 m² but does not provide a parking-space count, vehicle-type allocation, visitor or accessible spaces, parking plan, or parking-allotment terms.
Ramps, vehicle entries and exits, internal driveways, pedestrian separation and EV charging are not evidenced in the supplied sanctioned or RERA records. No parking allocation to an individual unit is established here. RERA unit table
6. Amenities, recreation & open spaces
| Description / size | Permit condition requires it to be fenced and maintained as greenery; no area or capacity stated |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Required by permit condition; completion not independently verified |
| Description / size | 30 trees listed |
|---|---|
| Evidence source | GHMC building-permit extraction |
| Declared progress / verified status | Listed in permit record; planting not independently verified |
| Description / size | RERA amenities record: available “YES”; 50% |
|---|---|
| Evidence source | RERA amenities filing |
| Declared progress / verified status | Declared progress 50%; not independently verified RERA amenities |
| Description / size | RERA amenities record: available “YES”; 40% |
|---|---|
| Evidence source | RERA amenities filing |
| Declared progress / verified status | Declared progress 40%; not independently verified RERA amenities |
| Description / size | Percolation pit listed in permit; RERA amenities record lists water conservation/rainwater harvesting at 0% |
|---|---|
| Evidence source | GHMC permit and RERA amenities filing |
| Declared progress / verified status | Permit-listed provision; completion not independently verified RERA amenities |
| Description / size | Listed in RERA amenities record; 0% |
|---|---|
| Evidence source | RERA amenities filing |
| Declared progress / verified status | Declared progress 0% RERA amenities |
| Description / size | Aggregate area listed at 0%; permit separately refers to a tot-lot |
|---|---|
| Evidence source | RERA amenities filing and GHMC permit |
| Declared progress / verified status | Area not supplied; completion not independently verified RERA amenities |
No clubhouse or indoor facility, sports facility, or further community/convenience amenity is established by the supplied RERA amenity schedule and permit extraction. RERA amenities
7. Utilities, building services & safety
The GHMC permit extraction lists a transformer space, garbage house and rainwater-harvesting percolation pit. The RERA amenity schedule records water supply at 50% and sewerage at 40%; storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection and electrical meter/substation/receiving facilities are each listed at 0%. These percentages are portal declarations, not independent verification of installed or operating services. RERA amenities
The permit requires an occupancy certificate before occupation and requires a completion notice after construction. It also requires the first-floor completion report and subsequent roof reports to be submitted to GHMC. The supplied evidence does not specify water source or storage capacity, STP capacity or reuse, electrical supply or backup, lift count or capacity, fire-system details, CCTV, access control, or accessibility provisions.
8. Location, access & connectivity
The RERA identity places the project in Hyder Nagar, Hydernagar Village, Malkajgiri Mandal, Medchal-Malkajgiri District, PIN 500072. The RERA-filed boundaries identify a 30 ft Wide Road on the north; the GHMC permit extraction identifies Nizampet Road as the locality. RERA record RERA filing
The supplied location record lists HITEC City at 6.5 km. No other measured distances, public-transport details, or project approach-road description are provided. Location record
9. Developer & development status
The registered promoter is MONARCH INFRA & DEVELOPERS, recorded as a partnership. The RERA record names Murali Krishna Parvataneni and Himabindu P as landowners with AreaShare agreements; Jagata Venkata Rao is identified as a partner and authorized signatory. RERA record Corporate record Parties record
The Form B declaration dated 30 November 2018, signed by Jagata Venkata Rao for the promoter, states a completion undertaking of 25 August 2022 and includes a declaration that the land is free from encumbrances. The RERA record later gives 31 March 2024 as both the proposed and revised completion date, and records 90% completeness. These are promoter/RERA-recorded statements; no independent construction inspection or OC/CC is supplied. RERA record
The promoter’s registered office address and official contact details are not established in the supplied material. The RERA project record identifies the legal promoter; third-party vendor material is not used to establish the project’s registered identity or specifications. Corporate record RERA record
10. Approvals, official records & documents
| Record | Reference and scope | Evidence |
|---|---|---|
| TG-RERA registration certificate | Form C; registration P02200000190, granted 21 January 2019, valid through 31 March 2024 | |
| GHMC building permission | Building Permit Order 2/C22/06244/2018, approved 11 April 2018; Building - A, residential, Survey Nos. 55 and 55PART | |
| GHMC file reference | /2/C22/14166/2017 | |
| Promoter Form B declaration | Dated 30 November 2018; includes the promoter’s title-basis, encumbrance and completion declarations | |
| Approved floor-plan drawings | Two drawings recorded; both scans pending measurement/review | Floor plans |
| Occupancy / completion certificate | Not present in the supplied documents | Document index |
The building-permit extraction states that its permission does not confer ownership rights and lists conditions including adherence to the sanctioned plan, submission of commencement and completion notices, and obtaining an occupancy certificate before occupation. This overview identifies the supplied records; it does not establish whether all permit conditions have been satisfied.
1. Project at a glance
Project identity
Registered project name: MONARCHs Sri Sai Sadan
Project type: Residential apartment project
Phase / registered portion: Phase is not identified in the supplied record. The registration concerns the project; the GHMC permit identifies Building - A.
TG-RERA registration: P02200000190, granted on 21 January 2019; valid through 31 March 2024. No extension is recorded in the supplied certificate.
Registered promoter: MONARCH INFRA & DEVELOPERS
RERA status: Recorded as “On-Going Project”; the registered completion date is 31 March 2024. Current registration validity after that date is not established by the supplied record.
Land and geographic identity
Locality / PIN: Hyder Nagar; PIN 500072
Revenue village: Hyder Nagar / Hydernagar Village, as stated in the project and building-permit records
Mandal / district: Malkajgiri / Medchal-Malkajgiri
Project survey numbers: 55 and 55PART
Plot reference: 16/PART
Registered site extent: 672.13 sq. m in the RERA land details
GHMC-sanctioned site area: 1,672.13 m²; net area 1,672.13 m²; road-affected area 0.00 m², as stated in the building-permit extraction
Boundaries filed with RERA: North: 30 ft Wide Road; South: Plot No 16 Part; East: Neighbors House; West: Plot No 24 n 17 part
The RERA filing’s “Net Area” is recorded as “1”; its unit and meaning are not clarified in the supplied data, so it is not treated as a verified site-area figure.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal approval: Building Permit Order 2/C22/06244/2018, approved 11 April 2018
Other file reference: /2/C22/14166/2017
Building identified in permit: Building - A, residential; “Stilt + 5”
Approved height: 14.95 m
Approved built-up area: The supplied permit extraction lists 1,477.40 m² upper floors and 296.66 m² stilt; the record does not label these as a single aggregate approved built-up-area figure.
Building / tower count: One building is identified in the supplied permit extraction.
Parking: The permit conditions refer to cellar and stilt areas approved for parking, but no parking-space count or parking-level schedule is supplied.
Unit count: 15 units in the RERA filing; the supplied sanctioned permit extraction does not state an approved unit count.
Offering and status
RERA-filed configurations: 2BHK: 10 units, filed as “DOUBLE”; 3BHK: 5 units, filed as “THREE” and “THREE BEDROOM”
RERA-filed saleable areas: 2BHK: 108.0 m²; 3BHK: 148.64 m²
Booked / available: Portal-derived counts indicate 0 booked and 10 available 2BHK units; 0 booked and 5 available 3BHK units. These counts have no supplied as-of date and are indicative.
Construction stage: The RERA header records “On-Going Project” and 90% completeness; this is a filed/portal status, not an independent site inspection.
Completion dates: RERA proposed and revised proposed completion dates: 31 March 2024. Form B declares a completion undertaking of 25 August 2022.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. The permit says an occupancy certificate is compulsory before occupation.
Registration validity, the declared completion date and certificate status are separate matters: the certificate records registration through 31 March 2024, the RERA header gives that same date as the revised completion date, and no OC/CC is supplied here.
2. The project story
MONARCHs Sri Sai Sadan is registered as a residential apartment project at Hyder Nagar, Hydernagar Village, on Survey Nos. 55 and 55PART, with Plot No. 16/PART appearing in the RERA record. The supplied GHMC building-permit extraction describes one residential building, Building - A, at Nizampet Road, with a “Stilt + 5” configuration and a sanctioned height of 14.95 m.
The RERA filing lists 15 homes: ten 2BHK and five 3BHK units, all shown as available in the portal-derived counts, which lack an as-of date. The project is recorded as ongoing and 90% complete, but that percentage is a RERA/portal declaration rather than independently verified construction progress. No occupancy or completion certificate was supplied, so the record does not establish that the building is certified for occupation.
3. Master plan, architecture & building design
The GHMC permit extraction identifies Building - A as a residential building with “Stilt + 5” floors, height 14.95 m, and a site area and net area of 1,672.13 m². It lists 1,477.40 m² for upper floors and 296.66 m² for the stilt; no separate FSI-counted area, gross built-up total, floor-by-floor plan, or building-footprint measurement is supplied.
The permit records setbacks of Front 5, Rear 3.51, Side I 3.5 and Side II 3.5, without units in the extracted fields. The document’s conditions identify a tot-lot and require it to be fenced and maintained as greenery; they also specify space for a transformer and a garbage house. Detailed arrangements for flats per floor, lifts, stairs, entrances, internal circulation, landscaping extent and phase organization are not available in the supplied drawing records.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK (filed as “DOUBLE”) | 10 | 0 | 10 | 108.0 m² | Not measured | Not supplied |
| 3BHK (filed as “THREE” / “THREE BEDROOM”) | 5 | 0 | 5 | 148.64 m² | Not measured | Not supplied |
Unit counts, bookings and saleable areas are from the TG-RERA filing; booking counts have no supplied as-of date and are indicative.
Two floor-plan drawings are recorded, but neither has been measured: both are scans pending review. Consequently, no software-measured carpet areas, room dimensions, balcony or utility measurements, or typical-floor arrangement can be reported from the supplied material. RERA saleable area is the filed figure; it should not be read as a measured carpet area.
5. Parking & vehicle circulation
The GHMC permit conditions state that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted permit gives a stilt area of 296.66 m² but does not provide a parking-space count, vehicle-type allocation, visitor or accessible spaces, parking plan, or parking-allotment terms.
Ramps, vehicle entries and exits, internal driveways, pedestrian separation and EV charging are not evidenced in the supplied sanctioned or RERA records. No parking allocation to an individual unit is established here.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green area | Permit condition requires it to be fenced and maintained as greenery; no area or capacity stated | GHMC building permit | Required by permit condition; completion not independently verified |
| Trees | 30 trees listed | GHMC building-permit extraction | Listed in permit record; planting not independently verified |
| Water supply | RERA amenities record: available “YES”; 50% | RERA amenities filing | Declared progress 50%; not independently verified |
| Sewerage | RERA amenities record: available “YES”; 40% | RERA amenities filing | Declared progress 40%; not independently verified |
| Rainwater harvesting | Percolation pit listed in permit; RERA amenities record lists water conservation/rainwater harvesting at 0% | GHMC permit and RERA amenities filing | Permit-listed provision; completion not independently verified |
| Community buildings | Listed in RERA amenities record; 0% | RERA amenities filing | Declared progress 0% |
| Recreational open space | Aggregate area listed at 0%; permit separately refers to a tot-lot | RERA amenities filing and GHMC permit | Area not supplied; completion not independently verified |
No clubhouse or indoor facility, sports facility, or further community/convenience amenity is established by the supplied RERA amenity schedule and permit extraction.
7. Utilities, building services & safety
The GHMC permit extraction lists a transformer space, garbage house and rainwater-harvesting percolation pit. The RERA amenity schedule records water supply at 50% and sewerage at 40%; storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection and electrical meter/substation/receiving facilities are each listed at 0%. These percentages are portal declarations, not independent verification of installed or operating services.
The permit requires an occupancy certificate before occupation and requires a completion notice after construction. It also requires the first-floor completion report and subsequent roof reports to be submitted to GHMC. The supplied evidence does not specify water source or storage capacity, STP capacity or reuse, electrical supply or backup, lift count or capacity, fire-system details, CCTV, access control, or accessibility provisions.
8. Location, access & connectivity
The RERA identity places the project in Hyder Nagar, Hydernagar Village, Malkajgiri Mandal, Medchal-Malkajgiri District, PIN 500072. The RERA-filed boundaries identify a 30 ft Wide Road on the north; the GHMC permit extraction identifies Nizampet Road as the locality.
The supplied location record lists HITEC City at 6.5 km. No other measured distances, public-transport details, or project approach-road description are provided.
9. Developer & development status
The registered promoter is MONARCH INFRA & DEVELOPERS, recorded as a partnership. The RERA record names Murali Krishna Parvataneni and Himabindu P as landowners with AreaShare agreements; Jagata Venkata Rao is identified as a partner and authorized signatory.
The Form B declaration dated 30 November 2018, signed by Jagata Venkata Rao for the promoter, states a completion undertaking of 25 August 2022 and includes a declaration that the land is free from encumbrances. The RERA record later gives 31 March 2024 as both the proposed and revised completion date, and records 90% completeness. These are promoter/RERA-recorded statements; no independent construction inspection or OC/CC is supplied.
The promoter’s registered office address and official contact details are not established in the supplied material. The RERA project record identifies the legal promoter; third-party vendor material is not used to establish the project’s registered identity or specifications.
10. Approvals, official records & documents
| Record | Reference and scope | Evidence |
|---|---|---|
| TG-RERA registration certificate | Form C; registration P02200000190, granted 21 January 2019, valid through 31 March 2024 | |
| GHMC building permission | Building Permit Order 2/C22/06244/2018, approved 11 April 2018; Building - A, residential, Survey Nos. 55 and 55PART | |
| GHMC file reference | /2/C22/14166/2017 | |
| Promoter Form B declaration | Dated 30 November 2018; includes the promoter’s title-basis, encumbrance and completion declarations | |
| Approved floor-plan drawings | Two drawings recorded; both scans pending measurement/review | |
| Occupancy / completion certificate | Not present in the supplied documents |
The building-permit extraction states that its permission does not confer ownership rights and lists conditions including adherence to the sanctioned plan, submission of commencement and completion notices, and obtaining an occupancy certificate before occupation. This overview identifies the supplied records; it does not establish whether all permit conditions have been satisfied.
Frequently asked questions
Is MONARCHs Sri Sai Sadan registered with Telangana RERA?
Yes. MONARCHs Sri Sai Sadan is registered with the Telangana Real Estate Regulatory Authority as P02200000190; the registration status is On-Going Project.
Who is the developer of MONARCHs Sri Sai Sadan?
The promoter named in the RERA registration is MONARCH INFRA & DEVELOPERS.
Where is MONARCHs Sri Sai Sadan located?
MONARCHs Sri Sai Sadan is in Hyder Nagar, Malkajgiri, Medchal-Malkajgiri, Telangana (500072).
When will MONARCHs Sri Sai Sadan be completed?
The promoter's proposed date of completion filed with RERA is 31/03/2024. This is the promoter's declaration, not a guarantee.
More projects in Malkajgiri