YULA SUJANA is a residential apartment project in Gopanpally, Serilingampally Mandal, Ranga Reddy District, developed by registered promoter Yula Constructions LLP. The project has a registered site extent of 446.08 m² and one proposed residential building with 1 Stilt + 5 upper floors and 10 3BHK units. It is registered with TG-RERA under P02400003332, and the promoter’s declaration undertakes completion before 31sr December, 2026.

More from Yula Constructions LLP · 6 projects →

01What we found

RegisteredTG-RERA - valid till 4 Mar 2027
11documents on file - each fact links to its page
10court cases on this project's land (survey 74, Gopanpally)
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameYULA SUJANA RERA record
Project type / statusResidential apartment project; RERA record labels it “New Project” RERA record RERA filing
Phase / registered portionNo separate phase name is disclosed. Registration is for the project on survey 74 PART
TG-RERA registrationP02400003332; granted under section 5
Registration validity25/08/2021–04/03/2027; the certificate states five years
Registered promoterYula Constructions LLP RERA record Corporate record
RERA statusRegistration certificate records the registration. Its validity period is separate from the completion undertaking and the occupancy-certificate record below

Land and geographic identity

ItemRecord
LocalityGopanpally / GOPANPALLY RERA record RERA filing
Revenue villageGopanpally; the building permit spells it “GOPANPALLE” RERA record
Mandal / districtSerilingampally / Ranga Reddy RERA record
PIN500046 RERA record
Project survey number(s) and subdivision(s)Sy. No. 74 PART; the RERA filing also identifies plots 374 & 375 Land records
Registered site extent446.08 m²
Total / net / road-affected areaTotal 446.08 m²; net 446.08 m²; road-affected area 0 m² in the permit record
Boundaries in the RERA filingNorth: Plot 373; South: Plot 376; East: Plots 364 and 365; West: road width 9 RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approvalPermit No. 2/C20/03572/2021, approved 04 March, 2021; file No. 2/C20/00738/2021 Approvals record
Approved built-up areaThe permit lists residential area of 1,213.90 m² and stilt parking of 227.05 m². These are the stated permit figures; the filing also has an extracted “Proposed Covered builtup area” figure of 58,160.25 without a unit clearly established in the extract, so it is not used here as an area measure
Building count and formOne proposed residential building: 1 Stilt + 5 upper floors; stated height 14.75 m
Basement / podium / parking levelsNo basement or podium is stated; the permit identifies one stilt parking level
Unit count10 units in the RERA filing; the permit condition says the sanctioned unit count must not be increased without GHMC approval RERA unit table
Layout approval referenceLayout / Sub Divn. No. 6338/MP2/H/1995 is cited in the building permit

Offering and status

ItemRecord
Configuration and RERA saleable area3BHK, 1,475.0 m² as recorded for the configuration in the RERA data RERA unit table
Booked / available5 booked / 5 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative RERA unit table
Construction stageA RERA-filed Form–1A architect certificate states the project was completed in all aspects; it is dated 14-10-2023
Completion dateThe Form B declaration undertakes completion before 31sr December, 2026
Occupancy certificateThe architect certificate identifies GHMC OC 2225/GHMC/SLP/2022-OC, dated 20 February, 2022, and certifies completion
OC scopeThe available certificate is described as covering the YULA SUJANA registered project; the supplied extract does not separately identify a tower or phase beyond that project scope

2. The project story

YULA SUJANA is recorded with TG-RERA as a residential apartment project in Gopanpally, Serilingampally Mandal, on Sy. No. 74 PART, covering plots 374 and 375 in the filing. The GHMC permit describes a single proposed residential building with stilt parking and five upper floors. RERA record Land records

The RERA unit record lists ten 3BHK units, with five booked and five available when the portal information was last read; that snapshot has no stated as-of date. A Form–1A architect certificate dated 14-10-2023 certifies the registered project as complete and cites the GHMC occupancy certificate dated 20 February, 2022. These are document-recorded completion statements, not an independent site inspection by this review. RERA unit table

3. Master plan, architecture & building design

The GHMC building permit describes one residential building, 1 Stilt + 5 upper floors, with a stated height of 14.75 m. It records a site area and net area of 446.08 m², no road-affected area, residential area of 1,213.90 m², and stilt parking of 227.05 m². The supplied extract does not establish a basement, podium, floor-by-floor unit arrangement, building footprint, lifts, stairs, internal circulation plan, or detailed open-space distribution.

The permit lists 20 Trees, a transformer space, a garbage house and a rainwater-harvesting structure (percolation pit). It also requires a tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate; the extracted permit lists the tot-lot area as 0 m². These are permit-record items and conditions, not a separate confirmation of delivery.

The permit identifies 126.95 m² of mortgaged built-up area, described as the first floor. This is a filed approval detail, not a statement of unit allocation.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10551,475.0 m²Not established from the supplied approved drawingsNot supplied

The configuration, unit count, booking count and saleable area are from the RERA record. Booked and available counts are indicative because the portal extract carries no as-of date. RERA unit table RERA unit details

Two floor-plan drawings were recorded as reviewed, but no 3BHK flat design was measured from them in the supplied floor-plan data. Accordingly, no software-measured carpet area or room dimensions can be reported. RERA saleable area is not presented as carpet area; the supplied data does not provide a measured carpet-area figure. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit records one stilt parking level, with 227.05 m² stated for stilt parking, and requires the approved stilt parking area to be used exclusively for vehicle parking without partition walls or rolling shutters. The supplied records do not establish the number of sanctioned car or two-wheeler spaces, visitor or accessible bays, parking allocations to individual units, ramps, or EV charging provision. A vendor listing mentions covered car parking, but the supplied record does not establish a documented unit allocation or parking count. Promoter website

6. Amenities, recreation & open spaces

Tot-lot / greenery
Description / sizePermit lists tot-lot area as 0 m² and requires it to be fenced and maintained as greenery before OC
Evidence sourceGHMC building permit
Declared progress / verified statusPermit condition; delivery not independently verified
Trees / avenue plantation
Description / sizePermit lists 20 Trees and requires avenue plantation inside the perimeter of at least 2 m height
Evidence sourceGHMC building permit
Declared progress / verified statusPermit-recorded provision / condition; delivery not independently verified
Rainwater harvesting
Description / sizeRain Water Harvesting Structure (percolation pit); permit also specifies a piped connection from the terrace and all sides
Evidence sourceGHMC building permit
Declared progress / verified statusPermit-recorded provision; delivery not independently verified
Transformer space
Description / sizeSpace for transformer to be provided on site
Evidence sourceGHMC building permit
Declared progress / verified statusPermit condition; delivery not independently verified
Garbage house
Description / sizeListed in permit amenities/utilities
Evidence sourceGHMC building permit
Declared progress / verified statusPermit-recorded provision; delivery not independently verified
Landscaped garden, seating area, swimming pool, gym, children’s play area, clubhouse
Description / sizeNo sizes or quantities supplied
Evidence sourceVendor listings
Declared progress / verified statusMarketing/listing claims only; not established as sanctioned or delivered Promoter website
Lift, security, visitor parking, sewage treatment plant, fire safety, waste management, power backup, CCTV, EV charging and other listed features
Description / sizeNo capacity, count or project drawing detail supplied
Evidence sourceVendor listings
Declared progress / verified statusMarketing/listing claims only; not established as sanctioned or delivered Promoter website

7. Utilities, building services & safety

The GHMC permit records a transformer space, rainwater-harvesting structure, garbage house and a requirement for twin bins for each tenement under the cited solid-waste rules. It also requires zero ramp onto the road slope. The permit extract does not specify water source or storage capacity, STP capacity or reuse arrangements, storm-water system, electrical backup, lift count or capacity, or accessible circulation.

The permit requires an occupancy fire NOC from the Director (EV&DM) before issue of the occupancy certificate, and requires an occupancy certificate before occupation. The supplied documents do not include the fire NOC itself. Vendor listings mention fire safety, CCTV and power backup, but do not establish their design, capacity or installed status. Promoter website

8. Location, access & connectivity

The registered project location is Gopanpally, Serilingampally Mandal, Ranga Reddy District, Telangana, PIN 500046; the RERA land record identifies Sy. No. 74 PART. RERA record

The location data gives an approximate distance of 5.6 km to the nearest sampled Outer Ring Road interchange. The building permit records road widths of 18 mt.; the RERA boundary description identifies the west boundary as “ROAD WIDTH 9.” These are distinct entries in the supplied records and are not treated as travel-time claims. No public-transport details or other measured landmark distances are supplied. Location record RERA filing

9. Developer & development status

The registered promoter is Yula Constructions LLP, an LLP; the supplied corporate identifier is GSTIN 36AACFY3480C1Z9. The promoter’s RERA filing lists Kondaiah Ravuru as an authorized signatory and partner, alongside Chakravarthy Chanci Rangam and Venkata Tirumala Devi Ravuru as partners. The supplied promoter address record identifies Huda Tecno Enclave, Madhapur, and the Journalists Co-operative Housing Society, Phase III, Gopanpally, Serilingampally, Ranga Reddy, PIN 500046. Corporate record Parties record

The Form B declaration, made by Kondaiah Ravuru for the LLP in January 2021, undertakes completion before 31sr December, 2026 and records a declaration that the land is free from encumbrances. The architect’s Form–1A certificate dated 14-10-2023 states the project was completed in all aspects and cites the GHMC occupancy certificate dated 20 February, 2022.

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02400003332; issued 25/08/2021; valid through 04/03/2027
Scope and evidenceYULA SUJANA; survey 74 PART; plots 374 & 375
GHMC building permit
Identifier / date2/C20/03572/2021; approved 04 March, 2021; file No. 2/C20/00738/2021
Scope and evidenceProposed residential building on survey 74 PART, Gopanpally; permit records 1 Stilt + 5 upper floors
Layout / subdivision reference
Identifier / date6338/MP2/H/1995
Scope and evidenceCited in the GHMC building permit
GHMC occupancy certificate, cited in architect certificate
Identifier / date2225/GHMC/SLP/2022-OC; dated 20 February, 2022
Scope and evidenceThe Form–1A certificate identifies this OC and certifies project completion; the OC document itself is not separately listed in the supplied document set
Form–1A architect completion certificate
Identifier / dateDated 14-10-2023
Scope and evidenceCertifies YULA SUJANA as completed in all aspects
Form B promoter declaration
Identifier / dateJanuary 2021 (day not supplied)
Scope and evidenceIncludes completion undertaking, title-basis declaration, encumbrance declaration and separate-account commitments
Development agreement / title-related filing
Identifier / dateDocument No. 5175/2020; dated December 2020 in the extraction
Scope and evidenceDevelopment agreement-cum-irrevocable GPA for plots 374 and 375, survey 74(P), Gopanpally; the supplied document extraction states it authorizes development and is not a conveyance of title

Frequently asked questions

Is YULA SUJANA registered with Telangana RERA?

Yes. YULA SUJANA is registered with the Telangana Real Estate Regulatory Authority as P02400003332; the registration status is New Project.

Who is the developer of YULA SUJANA?

The promoter named in the RERA registration is Yula Constructions LLP.

Where is YULA SUJANA located?

YULA SUJANA is in GOPANPALLY, Serilingampally, Rangareddy, Telangana (500046).

When will YULA SUJANA be completed?

The promoter's proposed date of completion filed with RERA is 04/03/2027. This is the promoter's declaration, not a guarantee.

More projects in Gopanpally