Sign in

Vr Enclave

K VISHNU VARDHAN REDDY · Rangareddy · RERA P02400000245

VR ENCLAVE is a residential apartment project in Mailardevpally, Rajendranagar, Ranga Reddy District. The registered promoter is K VISHNU VARDHAN REDDY. The project is on a 668.73 sq. m site and comprises one building, Building - A (RESI), with Stilt + 5 floors and 15 apartments in 2BHK and 3BHK configurations. Its TG-RERA registration is P02400000245, and the proposed and revised completion date is 06/06/2024.

01What we found

Period endedTG-RERA registration ran to 6 Jun 2024 - check its extension on TG-RERA
8documents on file - each fact links to its page
10court cases on this project's land (survey 160, 162, 163, 164, 165, Mailardevpally)
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from 99acres.com

1. Project at a glance

Project identity

FieldRecord
Registered project nameVR ENCLAVE RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified; the registration describes one building, Building - A (RESI) RERA record
TG-RERA registrationP02400000245 RERA record
Registration validity29/01/2019 to 06/06/2024, unless extended by the Authority; the supplied certificate records no extension
Registered promoterK VISHNU VARDHAN REDDY; the Form B declaration names VR CONSTRUCTIONS as promoter RERA record
RERA statusListed as On-Going Project in the project record RERA record

Land and geographic identity

FieldRecord
Locality / revenue villageMailardevpally; the certificate records locality as Mailardevpally RERA record
Mandal / district / PINRajendranagar / Ranga Reddy / 500005 RERA record
Project survey numbers160, 162, 163/1, 164 and 165/1 RERA record
SubdivisionsNo project subdivisions are specified in the project’s filed survey-number list
Plot identifier168/P
Registered site extent668.73 sq. m; the permit states site area and net area of 668.73 sq. m and road-affected area of 0
BoundariesEast: Plot No. 195; West: 30 Feet Road; North: Plot No. 165; South: Plot No. 168 P Land records

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approvalPermit No. 2/C11/09654/2018, dated 06 June, 2018; file No. 2/C6/03234/2018
Approved buildingBuilding - A (RESI), stated height 14.95 m
Sanctioned floorsStilt + 5
Approved built-up area1,540.30 sq. m for residential upper floors; the permit separately lists 491.28 sq. m for stilt
Building / tower countOne building/unit block in the project record RERA filing RERA unit table
Units15 units in the RERA unit record; the permit condition says sanctioned unit count must not be increased without GHMC approval RERA unit table
Parking levelsStilt is listed in the permit, which requires approved stilt parking to be used exclusively for vehicle parking; space count is not stated in the supplied permit extraction

Offering and status

FieldRecord
Configurations2BHK and 3BHK RERA unit table
RERA-filed saleable areas2BHK: 82.5 sq. m; 3BHK: 112.13 sq. m RERA unit table
Booked / available2BHK: 0 booked / 10 available; 3BHK: 0 booked / 5 available. Portal counts are indicative; the record has no as-of date RERA unit table
Construction stageNo independently verified construction-progress figure is supplied. The project record says “On-Going Project” RERA record
Completion datesProject record: proposed and revised completion 06/06/2024 RERA record. The Form B declaration states an undertaking to complete by 01.05.2024
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents; OC status is therefore not established here Document index

2. The project story

VR ENCLAVE is registered as a residential apartment project on a 668.73 sq. m site in Mailardevpally, Rajendranagar Mandal, Ranga Reddy District. The filed development comprises one residential building, Building - A, sanctioned as Stilt + 5 floors, with 15 apartments recorded as 2BHK and 3BHK configurations. RERA record Land records RERA unit table

The registration certificate identifies the project and promoter and gives a validity period ending 06/06/2024 unless extended by the Authority; the supplied certificate records no extension. The project record also gives 06/06/2024 as the proposed and revised completion date. These dates describe registration validity and the recorded completion timeline, not proof that construction was completed or that an OC was issued. No site-verified construction progress or OC is supplied. RERA record Document index

3. Master plan, architecture & building design

The GHMC building permit approves one residential building, Building - A, with a stated height of 14.95 m and configuration Stilt + 5. It lists 1,540.30 sq. m as residential upper-floor area and separately identifies 491.28 sq. m for stilt. These are the areas stated in the permit extraction; no carpet-area or FSI-counted-area figure is supplied.

The permit records a site area and net area of 668.73 sq. m, with 0 road-affected area and 0 tot-lot area in its area fields. Its conditions nevertheless require a fenced, maintained tot-lot before OC, a periphery greenery strip, a rainwater-harvesting percolation pit, transformer space, a garbage house and an ETP. These are permit conditions, not evidence that the facilities have been completed.

The supplied drawing record identifies a layout-plan document, but it is not extracted into usable drawing details. The available evidence does not establish floor-by-floor flat distribution, footprint, lift or stair arrangement, entrances, internal circulation, landscaping dimensions, or the project’s common-area distribution. Document index Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001082.5 sq. mNot measured from supplied drawingsNot supplied
3BHK505112.13 sq. mNot measured from supplied drawingsNot supplied

RERA saleable areas and unit counts are filing-derived; the booked and available counts are indicative portal figures without an as-of date. The drawing review reports two drawings, neither with measured flats, so no software-measured carpet area or room dimensions can be reported. Saleable area and carpet area are different measures; no project-specific loading figure is supplied. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The building permit identifies stilt area of 491.28 sq. m and requires approved stilt parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a parking-space count, visitor or accessible-space provision, two-wheeler count, ramp arrangement, or unit-by-unit parking allocation in the supplied extraction. A stilt parking provision does not, by itself, establish an exclusive parking right for any apartment.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lotArea recorded as 0 sq. m in the permit area fields; permit condition requires it to be fenced and maintained as greenery before OCGHMC permitRequired by permit; completion not verified
Periphery greenery stripSize not stated; permit requires maintenance as per rulesGHMC permitRequired by permit; completion not verified
Water conservation / rainwater harvestingPercolation pit required; size and capacity not statedGHMC permit; RERA amenity recordListed/required; completion not verified RERA amenities
Internal roads and footpathsNo dimensions suppliedRERA amenity recordProgress shown as 0%; independent completion status not supplied RERA amenities
Green strip / tot-lot / parkNo additional dimensions suppliedRERA amenity recordAvailability marked “YES”; progress shown as 0% RERA amenities
Community buildingsNo description or size suppliedRERA amenity recordProgress shown as 0% RERA amenities

No specific clubhouse or indoor recreational facility is established by the supplied RERA amenity record or permit extraction. Facilities listed on a third-party vendor record are not treated here as RERA-filed or verified project amenities. RERA amenities Promoter website

7. Utilities, building services & safety

The GHMC permit requires a rainwater-harvesting percolation pit, space for a transformer, a garbage house and an ETP. It also requires fire/life-safety provisions to meet applicable requirements, but the supplied permit extraction does not detail systems, equipment, capacities, or completion.

The RERA amenity record marks water supply, sewerage and fire protection/fire safety requirements as available; it shows progress as 0% for the listed facilities. No water source or storage capacity, STP/ETP capacity, treated-water reuse arrangement, storm-water design, electrical backup, lift count or capacity, fire-system specification, CCTV/security system, or accessibility design is established in the supplied project documents. RERA amenities

8. Location, access & connectivity

The registered project location is Mailardevpally, Rajendranagar Mandal, Ranga Reddy District, PIN 500005, on land recorded in Survey Nos. 160, 162, 163/1, 164 and 165/1. The recorded west boundary is a 30 Feet Road; the permit also refers to an 18 m road-width condition for sites abutting roads of that width, but the supplied record does not establish that this particular site abuts such a road. RERA record Land records

A location record identifies Falaknuma Terminal (u/c) as the nearest metro anchor at 2.9 km. No other independently supported approach-road, public-transport or landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is K VISHNU VARDHAN REDDY, identified in the RERA record as a proprietorship. The named proprietor and authorized signatory is VISHNU VARDHAN REDDY KUMBUM. The Form B affidavit is made for VR CONSTRUCTIONS by its proprietor, K Vishnu Vardhan Reddy, and declares a completion undertaking of 01.05.2024. RERA record Corporate record Parties record

The project record lists one building and 15 units. It states a proposed and revised completion date of 06/06/2024, while the registration certificate states validity through that date unless extended. No extension, construction-progress certification, completion certificate or OC is included in the supplied material; project completion and possession status are therefore not established by this overview. RERA unit table RERA record Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Evidence availableForm C, registration P02400000245, issued 29/01/2019, valid through 06/06/2024 unless extended
Scope / noteNames VR ENCLAVE and promoter K Vishnu Vardhan Reddy; no extension is recorded on the certificate
GHMC building permit
Evidence availablePermit No. 2/C11/09654/2018, dated 06 June, 2018; file No. 2/C6/03234/2018
Scope / noteBuilding - A (RESI), Stilt + 5; conditional approval
Form B affidavit-cum-declaration
Evidence availableDeclaration for VR ENCLAVE by VR CONSTRUCTIONS, signed by its proprietor
Scope / noteIncludes promoter declarations on title basis, encumbrances, project accounts and completion undertaking
Layout-plan filing
Evidence availableLayout-plan document is listed, but the supplied record does not provide an extractable plan description Document index
Scope / noteDetailed layout features are not established here
Occupancy / completion certificate
Evidence availableNot present in the supplied document set Document index
Scope / noteIssuance and status not established
HMDA master-plan / layout records
Evidence availableHMDA sheet is image-only and not read at survey level; public DPMS layout lookup is unavailable in the supplied record HMDA
Scope / noteNo project-specific zoning or layout verification is stated here

Frequently asked questions

Is VR ENCLAVE registered with Telangana RERA?

Yes. VR ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02400000245; the registration status is On-Going Project.

Who is the developer of VR ENCLAVE?

The promoter named in the RERA registration is K VISHNU VARDHAN REDDY.

Where is VR ENCLAVE located?

VR ENCLAVE is in MAILARDEVPALLY, Rajendranagar, Rangareddy, Telangana (500005).

When will VR ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 06/06/2024. This is the promoter's declaration, not a guarantee.

More projects in Mailardevpally