Central Vistas Yapral East Block
M/S. GVR CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200005282
CENTRAL VISTAS YAPRAL EAST BLOCK is a residential apartment project in Shaili Gardenia, Alwal mandal, Medchal-Malkajgiri district. The registered promoter is M/S. GVR CONSTRUCTIONS. The project covers 566.26 sq. m and comprises one residential building with 1 Stilt + 5 upper floors and 10 3BHK homes, each with a RERA-filed saleable area of 57.69 sq. m. It is registered under TG-RERA number P02200005282, with proposed completion on 13/06/2025.
More from Gvr Constructions · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | CENTRAL VISTAS YAPRAL EAST BLOCK RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | “EAST BLOCK”; the RERA record identifies one building. No separate phase number is stated. RERA record |
| TG-RERA registration | P02200005282, granted under section 5; issue/valid-from date 28/10/2022; recorded validity through 13/06/2025. The certificate states that it does not extend unless TG-RERA grants an extension; no extension is recorded in the supplied certificate. RERA record |
| Registered promoter | M/S. GVR CONSTRUCTIONS, recorded as a partnership RERA record RERA filing |
| RERA status in supplied record | New Project; the registration certificate’s stated validity has ended. Current registration status or any later extension is not established by the supplied record. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Shaili Gardenia; the building-permit order identifies SHAILI GARDEN (Circle 17). RERA record RERA filing |
| Revenue village | Shaili Gardenia in the project fields; the permit and registration certificate identify YAPRAL. RERA filing |
| Mandal / district / PIN | Alwal / Medchal-Malkajgiri / 500087 in the project record. The permit identifies MALKAJGIRI mandal and MEDCHAL district. RERA record RERA filing |
| Survey numbers | 164, 166, 167 and 168; no subdivision is supplied. RERA record Land records |
| Site plots and extent | Plot Nos. 5 and 6. RERA land details record total and net area of 566.26 sq. m; the permit records 566.26 plot area, 0.0 road-affected area, 0.0 nala-affected area and 558.03 Sq. Mtrs net plot area. RERA filing |
| Boundaries | East: Plot No. 7; west: 12 M wide road; north: Plot Nos. 12 and 13; south: 1 M wide road. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal approval | Building Permit Order 1847/GHMC/SEC/2022-BP, approved 13 June 2022; file No. 000606/GHMC/0308/SEC2/2022-BP. Approvals record |
| Approved built-up area | Residential built-up area: 1,285.75 (the permit’s sanctioned parameter; its entry does not state a unit). The project fields record approved built-up area as 1285.75 sq. m. RERA filing |
| Building count and configuration | One residential building, 1 Stilt + 5 upper floors; the permit states a building height of 14.95 (unit not stated in the supplied extraction). RERA filing |
| Parking | The permit records Total Parking Area 250.5 (unit not stated) and requires approved cellar/stilt parking, if shown in the plan, to be used exclusively for vehicle parking. A sanctioned parking-space count is not supplied. |
| Units | 10 approved-plan building units and 10 units in the RERA configuration record. RERA filing RERA unit table RERA unit details |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK; RERA-filed saleable area 57.69 sq. m per unit. RERA unit table RERA unit details |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; the portal record has no as-of date, so these counts are indicative, not a current availability confirmation. RERA unit table RERA unit details |
| Construction stage | No independently verified site-progress status is supplied. TG-RERA amenity fields report some items as available or at a stated percentage; those declarations are not independent site verification. RERA amenities |
| Completion dates | Promoter Form B declares completion within 30 Months; the project record gives proposed completion 13/06/2025. The supplied evidence does not establish a revised completion date. RERA record |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is included in the supplied project documents. The GHMC permit requires an occupancy certificate before occupation. Document index |
2. The project story
CENTRAL VISTAS YAPRAL EAST BLOCK is registered as a residential apartment project on Plot Nos. 5 and 6, associated in the project record with Shaili Gardenia and with Yapral village identifiers. Its land record names survey numbers 164, 166, 167 and 168. The project is organized as one residential building rather than a multi-tower development. RERA record RERA filing
GHMC’s building permit, dated 13 June 2022, permits 1 Stilt + 5 upper floors. The RERA unit record lists ten 3BHK units. The promoter’s Form B declares a 30-month completion undertaking, while the project record gives a proposed completion date of 13 June 2025. Neither that undertaking nor the portal’s amenity progress entries independently establishes the present construction stage. No occupancy or completion certificate is present in the supplied documents. RERA record RERA unit details RERA amenities
3. Master plan, architecture & building design
The GHMC permit identifies Building Name - A (GVR CONSTRUCTIONS 5 AND 6) for residential use and sanctions 1 Stilt + 5 upper floors. It records residential built-up area of 1,285.75 and total parking area of 250.5; the supplied permit extraction does not state units for these figures. The project fields separately label the approved built-up area as 1285.75 sq. m. RERA filing
RERA land details report one building and a site area of 566.26 sq. m. The building permit records net plot area of 558.03 Sq. Mtrs. The supplied material does not provide a sufficiently detailed drawing extraction to establish floor-by-floor flat arrangements, building footprint, lifts, staircases, entrances, circulation, or a measured open-space area. RERA filing
GHMC’s permit lists a tot-lot, peripheral greenery, two rainwater-harvesting pits, transformer space and a garbage house among its conditions or site provisions. These are permit requirements/provisions, not confirmation that the facilities are complete.
4. Homes, configurations & floor plans
The TG-RERA configuration record lists ten 3BHK units, with saleable area of 57.69 sq. m each. Its portal-read counts show zero booked and ten available, but provide no as-of date. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 57.69 sq. m | No measured value supplied | Not supplied |
The floor-plan review record says the drawings are measured from approved floor-plan drawings and are not a RERA disclosure. Of two drawings, one is measured and one scan is pending, but no 3BHK flat design was measured; therefore, no drawing-based carpet area or room dimensions are available here. Carpet area, if measured from a drawing, is distinct from RERA saleable area, which may include a share of common areas. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit records Total Parking Area 250.5 (unit not stated), and its conditions specify that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied evidence does not establish the sanctioned number of parking bays, resident or visitor allocations, accessible spaces, two-wheeler provision, ramps, EV charging, or unit-specific parking allotments. A parking area shown or stated in approval material does not by itself establish exclusive ownership or allocation to a buyer. RERA filing
6. Amenities, recreation & open spaces
The following are TG-RERA portal amenity entries. Percentages and “YES” values are recorded declarations; they are not independent verification of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No source, storage capacity or treatment detail supplied | TG-RERA amenity record | Available: YES; 100% declared; not independently verified RERA amenities |
| Sewerage (chamber, lines, septic tank, STP) | Specific system or capacity not identified | TG-RERA amenity record | Available: YES; 100% declared; not independently verified RERA amenities |
| Green strip / tot-lot / park | GHMC permit also requires a tot-lot and peripheral greenery; no size supplied | TG-RERA amenity record; GHMC permit | 90% declared; not independently verified RERA amenities |
| Water conservation / rainwater harvesting | GHMC permit specifies two rainwater-harvesting pits | TG-RERA amenity record; GHMC permit | 90% declared; not independently verified RERA amenities |
| Electrical meter room / sub-station / receiving station | No capacity supplied; permit requires space for a transformer | TG-RERA amenity record; GHMC permit | 90% declared; not independently verified RERA amenities |
| Internal roads and footpaths | No size or layout details supplied | TG-RERA amenity record | 0% recorded RERA amenities |
| Storm-water drains | No system details supplied | TG-RERA amenity record | 0% recorded RERA amenities |
| Street lighting | No details supplied | TG-RERA amenity record | 0% recorded RERA amenities |
| Community buildings | No facility details supplied | TG-RERA amenity record | 0% recorded RERA amenities |
| Treatment and disposal of sewage and sullage water | No process or capacity supplied | TG-RERA amenity record | 0% recorded RERA amenities |
| Solid-waste management and disposal | GHMC permit requires a garbage house within the premises | TG-RERA amenity record; GHMC permit | 0% recorded in RERA amenity entry; permit requirement is not proof of completion RERA amenities |
| Energy management | No details supplied | TG-RERA amenity record | 0% recorded RERA amenities |
| Fire protection and fire-safety requirements | No system details supplied | TG-RERA amenity record; GHMC permit | 0% recorded; permit requires an Occupancy Fire NOC before issue of an occupancy certificate RERA amenities |
| Aggregate recreational open space | No area supplied | TG-RERA amenity record | 0% recorded RERA amenities |
No clubhouse, indoor recreation facility, or sports facility is identified in the supplied project evidence.
7. Utilities, building services & safety
The TG-RERA amenity record declares water supply and sewerage as available at 100%, and rainwater harvesting at 90%. It does not specify water sources, storage or treatment capacity, sewage-treatment capacity, reuse arrangements, or storm-water drainage status. The GHMC permit requires rainwater-harvesting structures and space for a transformer; it does not establish that these are installed or operating. RERA amenities
For building safety, the GHMC permit requires an Occupancy Fire NOC before issue of an occupancy certificate and requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. The supplied documents do not establish lift numbers or capacities, fire-system specifications, backup power, CCTV, access control, waste-segregation arrangements, or accessible circulation. These should not be treated as completed or compliant solely from the permit conditions.
8. Location, access & connectivity
The project’s official record locates it in Shaili Gardenia, with Yapral also appearing as the revenue village in the permit and registration certificate. The supplied site record gives the mandal as Alwal and the district as Medchal-Malkajgiri, PIN 500087. The cadastral parcel centroid is recorded as 17.41528, 78.35459. RERA record RERA filing Location record
The supplied location dataset lists these measured distances from the cadastral parcel centroid: Financial District (Nanakramguda) — 1.2 km; IndusInd Bank — 0.4 km; unnamed bus station — 2.2 km; Manuu Polytechnic Hyderabad — 1.6 km; Sankaraya Eye Hospital — 1.6 km; ADP — 0.0 km; South india shopping mall — 2.6 km; unnamed park — 1.2 km; Nanakramguda Govt primary school — 0.5 km. No travel times or approach-route details are supplied. Location record
9. Developer & development status
The registered promoter is M/S. GVR CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AAXFG3812D1ZC. The project record lists its address as GVR, Eshwaripuri Colony, CBR Krishnaveni Estates, Shaili Gardenia, Alwal, Medchal-Malkajgiri, PIN 500087. RERA filing Corporate record Parties record
Form B is a promoter declaration: it states a title basis, declares the land free from encumbrances, and undertakes completion within 30 Months. The RERA record gives a proposed completion date of 13/06/2025. These are declarations and a recorded project timeline, not independent confirmation of construction progress. The supplied documents do not establish an updated completion date or an occupancy certificate. RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for CENTRAL VISTAS YAPRAL EAST BLOCK, registration P02200005282, issued 28/10/2022, with stated validity through 13/06/2025; no extension is recorded in the supplied certificate. |
| GHMC building permit | Building Permit Order 1847/GHMC/SEC/2022-BP, file No. 000606/GHMC/0308/SEC2/2022-BP, approved 13 June 2022; permits residential construction of 1 Stilt + 5 upper floors. |
| Layout reference | The permit lists 10961/MP2/HUDA/2001 as the approved-layout/LRS/subdivision reference. A separate authenticated approved-layout drawing is not supplied in this evidence set. |
| Commencement / occupancy / completion | The supplied permit is a building permit order. No separate commencement notice, occupancy certificate, or completion certificate is included in the supplied documents. The permit requires an occupancy certificate before occupation. Document index |
| Promoter declarations | Form B declarations dated 15 June 2022 are supplied under document IDs 244606, 254262 and 260591. |
| Title-related records | RERA-filed title-report documents include IDs 244596–244600, 244726 and 244727; these are indexed here as project records, with detailed title analysis addressed elsewhere in the report. Document index |
| Floor-plan evidence | Two drawings are recorded: one measured and one scan pending; no flat design was measured for the 3BHK configuration. Floor plans |
| HMDA layout lookup | The supplied record says the public HMDA DPMS approved-layout lookup was unavailable; this is an access limitation, not evidence of refusal or absence of approval. HMDA |
The GHMC permit lists conditions including display of the sanctioned plan at the site, a commencement notice, a completion notice, an occupancy certificate before occupation, and an Occupancy Fire NOC before issue of the occupancy certificate. This overview records those conditions without determining whether each has been met.
1. Project at a glance
Project identity
Registered project name: CENTRAL VISTAS YAPRAL EAST BLOCK
Project type: Residential apartment project
Phase / registered portion: “EAST BLOCK”; the RERA record identifies one building. No separate phase number is stated.
TG-RERA registration: P02200005282, granted under section 5; issue/valid-from date 28/10/2022; recorded validity through 13/06/2025. The certificate states that it does not extend unless TG-RERA grants an extension; no extension is recorded in the supplied certificate.
Registered promoter: M/S. GVR CONSTRUCTIONS, recorded as a partnership
RERA status in supplied record: New Project; the registration certificate’s stated validity has ended. Current registration status or any later extension is not established by the supplied record.
Land and geographic identity
Locality: Shaili Gardenia; the building-permit order identifies SHAILI GARDEN (Circle 17).
Revenue village: Shaili Gardenia in the project fields; the permit and registration certificate identify YAPRAL.
Mandal / district / PIN: Alwal / Medchal-Malkajgiri / 500087 in the project record. The permit identifies MALKAJGIRI mandal and MEDCHAL district.
Survey numbers: 164, 166, 167 and 168; no subdivision is supplied.
Site plots and extent: Plot Nos. 5 and 6. RERA land details record total and net area of 566.26 sq. m; the permit records 566.26 plot area, 0.0 road-affected area, 0.0 nala-affected area and 558.03 Sq. Mtrs net plot area.
Boundaries: East: Plot No. 7; west: 12 M wide road; north: Plot Nos. 12 and 13; south: 1 M wide road.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal approval: Building Permit Order 1847/GHMC/SEC/2022-BP, approved 13 June 2022; file No. 000606/GHMC/0308/SEC2/2022-BP.
Approved built-up area: Residential built-up area: 1,285.75 (the permit’s sanctioned parameter; its entry does not state a unit). The project fields record approved built-up area as 1285.75 sq. m.
Building count and configuration: One residential building, 1 Stilt + 5 upper floors; the permit states a building height of 14.95 (unit not stated in the supplied extraction).
Parking: The permit records Total Parking Area 250.5 (unit not stated) and requires approved cellar/stilt parking, if shown in the plan, to be used exclusively for vehicle parking. A sanctioned parking-space count is not supplied.
Units: 10 approved-plan building units and 10 units in the RERA configuration record.
Offering and status
RERA-filed configuration: 3BHK; RERA-filed saleable area 57.69 sq. m per unit.
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; the portal record has no as-of date, so these counts are indicative, not a current availability confirmation.
Construction stage: No independently verified site-progress status is supplied. TG-RERA amenity fields report some items as available or at a stated percentage; those declarations are not independent site verification.
Completion dates: Promoter Form B declares completion within 30 Months; the project record gives proposed completion 13/06/2025. The supplied evidence does not establish a revised completion date.
Occupancy / completion certificate: No occupancy certificate or completion certificate is included in the supplied project documents. The GHMC permit requires an occupancy certificate before occupation.
2. The project story
CENTRAL VISTAS YAPRAL EAST BLOCK is registered as a residential apartment project on Plot Nos. 5 and 6, associated in the project record with Shaili Gardenia and with Yapral village identifiers. Its land record names survey numbers 164, 166, 167 and 168. The project is organized as one residential building rather than a multi-tower development.
GHMC’s building permit, dated 13 June 2022, permits 1 Stilt + 5 upper floors. The RERA unit record lists ten 3BHK units. The promoter’s Form B declares a 30-month completion undertaking, while the project record gives a proposed completion date of 13 June 2025. Neither that undertaking nor the portal’s amenity progress entries independently establishes the present construction stage. No occupancy or completion certificate is present in the supplied documents.
3. Master plan, architecture & building design
The GHMC permit identifies Building Name - A (GVR CONSTRUCTIONS 5 AND 6) for residential use and sanctions 1 Stilt + 5 upper floors. It records residential built-up area of 1,285.75 and total parking area of 250.5; the supplied permit extraction does not state units for these figures. The project fields separately label the approved built-up area as 1285.75 sq. m.
RERA land details report one building and a site area of 566.26 sq. m. The building permit records net plot area of 558.03 Sq. Mtrs. The supplied material does not provide a sufficiently detailed drawing extraction to establish floor-by-floor flat arrangements, building footprint, lifts, staircases, entrances, circulation, or a measured open-space area.
GHMC’s permit lists a tot-lot, peripheral greenery, two rainwater-harvesting pits, transformer space and a garbage house among its conditions or site provisions. These are permit requirements/provisions, not confirmation that the facilities are complete.
4. Homes, configurations & floor plans
The TG-RERA configuration record lists ten 3BHK units, with saleable area of 57.69 sq. m each. Its portal-read counts show zero booked and ten available, but provide no as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 57.69 sq. m | No measured value supplied | Not supplied |
The floor-plan review record says the drawings are measured from approved floor-plan drawings and are not a RERA disclosure. Of two drawings, one is measured and one scan is pending, but no 3BHK flat design was measured; therefore, no drawing-based carpet area or room dimensions are available here. Carpet area, if measured from a drawing, is distinct from RERA saleable area, which may include a share of common areas.
5. Parking & vehicle circulation
The GHMC permit records Total Parking Area 250.5 (unit not stated), and its conditions specify that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied evidence does not establish the sanctioned number of parking bays, resident or visitor allocations, accessible spaces, two-wheeler provision, ramps, EV charging, or unit-specific parking allotments. A parking area shown or stated in approval material does not by itself establish exclusive ownership or allocation to a buyer.
6. Amenities, recreation & open spaces
The following are TG-RERA portal amenity entries. Percentages and “YES” values are recorded declarations; they are not independent verification of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No source, storage capacity or treatment detail supplied | TG-RERA amenity record | Available: YES; 100% declared; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | Specific system or capacity not identified | TG-RERA amenity record | Available: YES; 100% declared; not independently verified |
| Green strip / tot-lot / park | GHMC permit also requires a tot-lot and peripheral greenery; no size supplied | TG-RERA amenity record; GHMC permit | 90% declared; not independently verified |
| Water conservation / rainwater harvesting | GHMC permit specifies two rainwater-harvesting pits | TG-RERA amenity record; GHMC permit | 90% declared; not independently verified |
| Electrical meter room / sub-station / receiving station | No capacity supplied; permit requires space for a transformer | TG-RERA amenity record; GHMC permit | 90% declared; not independently verified |
| Internal roads and footpaths | No size or layout details supplied | TG-RERA amenity record | 0% recorded |
| Storm-water drains | No system details supplied | TG-RERA amenity record | 0% recorded |
| Street lighting | No details supplied | TG-RERA amenity record | 0% recorded |
| Community buildings | No facility details supplied | TG-RERA amenity record | 0% recorded |
| Treatment and disposal of sewage and sullage water | No process or capacity supplied | TG-RERA amenity record | 0% recorded |
| Solid-waste management and disposal | GHMC permit requires a garbage house within the premises | TG-RERA amenity record; GHMC permit | 0% recorded in RERA amenity entry; permit requirement is not proof of completion |
| Energy management | No details supplied | TG-RERA amenity record | 0% recorded |
| Fire protection and fire-safety requirements | No system details supplied | TG-RERA amenity record; GHMC permit | 0% recorded; permit requires an Occupancy Fire NOC before issue of an occupancy certificate |
| Aggregate recreational open space | No area supplied | TG-RERA amenity record | 0% recorded |
No clubhouse, indoor recreation facility, or sports facility is identified in the supplied project evidence.
7. Utilities, building services & safety
The TG-RERA amenity record declares water supply and sewerage as available at 100%, and rainwater harvesting at 90%. It does not specify water sources, storage or treatment capacity, sewage-treatment capacity, reuse arrangements, or storm-water drainage status. The GHMC permit requires rainwater-harvesting structures and space for a transformer; it does not establish that these are installed or operating.
For building safety, the GHMC permit requires an Occupancy Fire NOC before issue of an occupancy certificate and requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. The supplied documents do not establish lift numbers or capacities, fire-system specifications, backup power, CCTV, access control, waste-segregation arrangements, or accessible circulation. These should not be treated as completed or compliant solely from the permit conditions.
8. Location, access & connectivity
The project’s official record locates it in Shaili Gardenia, with Yapral also appearing as the revenue village in the permit and registration certificate. The supplied site record gives the mandal as Alwal and the district as Medchal-Malkajgiri, PIN 500087. The cadastral parcel centroid is recorded as 17.41528, 78.35459.
The supplied location dataset lists these measured distances from the cadastral parcel centroid: Financial District (Nanakramguda) — 1.2 km; IndusInd Bank — 0.4 km; unnamed bus station — 2.2 km; Manuu Polytechnic Hyderabad — 1.6 km; Sankaraya Eye Hospital — 1.6 km; ADP — 0.0 km; South india shopping mall — 2.6 km; unnamed park — 1.2 km; Nanakramguda Govt primary school — 0.5 km. No travel times or approach-route details are supplied.
9. Developer & development status
The registered promoter is M/S. GVR CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AAXFG3812D1ZC. The project record lists its address as GVR, Eshwaripuri Colony, CBR Krishnaveni Estates, Shaili Gardenia, Alwal, Medchal-Malkajgiri, PIN 500087.
Form B is a promoter declaration: it states a title basis, declares the land free from encumbrances, and undertakes completion within 30 Months. The RERA record gives a proposed completion date of 13/06/2025. These are declarations and a recorded project timeline, not independent confirmation of construction progress. The supplied documents do not establish an updated completion date or an occupancy certificate.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for CENTRAL VISTAS YAPRAL EAST BLOCK, registration P02200005282, issued 28/10/2022, with stated validity through 13/06/2025; no extension is recorded in the supplied certificate.
GHMC building permit: Building Permit Order 1847/GHMC/SEC/2022-BP, file No. 000606/GHMC/0308/SEC2/2022-BP, approved 13 June 2022; permits residential construction of 1 Stilt + 5 upper floors.
Layout reference: The permit lists 10961/MP2/HUDA/2001 as the approved-layout/LRS/subdivision reference. A separate authenticated approved-layout drawing is not supplied in this evidence set.
Commencement / occupancy / completion: The supplied permit is a building permit order. No separate commencement notice, occupancy certificate, or completion certificate is included in the supplied documents. The permit requires an occupancy certificate before occupation.
Promoter declarations: Form B declarations dated 15 June 2022 are supplied under document IDs 244606, 254262 and 260591.
Title-related records: RERA-filed title-report documents include IDs 244596–244600, 244726 and 244727; these are indexed here as project records, with detailed title analysis addressed elsewhere in the report.
Floor-plan evidence: Two drawings are recorded: one measured and one scan pending; no flat design was measured for the 3BHK configuration.
HMDA layout lookup: The supplied record says the public HMDA DPMS approved-layout lookup was unavailable; this is an access limitation, not evidence of refusal or absence of approval.
The GHMC permit lists conditions including display of the sanctioned plan at the site, a commencement notice, a completion notice, an occupancy certificate before occupation, and an Occupancy Fire NOC before issue of the occupancy certificate. This overview records those conditions without determining whether each has been met.
Frequently asked questions
Is CENTRAL VISTAS YAPRAL EAST BLOCK registered with Telangana RERA?
Yes. CENTRAL VISTAS YAPRAL EAST BLOCK is registered with the Telangana Real Estate Regulatory Authority as P02200005282; the registration status is New Project.
Who is the developer of CENTRAL VISTAS YAPRAL EAST BLOCK?
The promoter named in the RERA registration is M/S. GVR CONSTRUCTIONS.
Where is CENTRAL VISTAS YAPRAL EAST BLOCK located?
CENTRAL VISTAS YAPRAL EAST BLOCK is in SHAILI GARDENIA, Alwal, Medchal-Malkajgiri, Telangana (500087).
When will CENTRAL VISTAS YAPRAL EAST BLOCK be completed?
The promoter's proposed date of completion filed with RERA is 13/06/2025. This is the promoter's declaration, not a guarantee.
More projects in Shaili Gardenia