Sign in

Highgarden

URBAN SPACES · Rangareddy · RERA P02400005531

HIGHGARDEN is a plotted development at ALOOR, Chevella Mandal, Ranga Reddy District. The registered promoter is URBAN SPACES, described as a partnership. The project covers 124924.14 sq.m and is a single registered plotted layout, with plots numbered 1 to 174 on the layout drawing; no building count, floor configuration or plot configurations are stated. It is registered under TG-RERA **P02400005531**, issued 14/12/2022, and the promoter-declared completion date is **01/09/2025**.

01What we found

Period endedTG-RERA registration ran to 1 Sep 2025 - check its extension on TG-RERA
27documents on file - each fact links to its page
2court cases on this project's land (survey 310, 311, 312, 315, Aloor)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered projectHIGHGARDEN RERA record
Project typePlotted development / open-plot layout RERA record
Phase or registered portionThe registration and layout records describe the project as a single registered plotted layout; no phase identifier is disclosed. RERA record
TG-RERA registrationP02400005531, issued 14/12/2022; registration certificate states validity from 14/12/2022 to 01/09/2025. This is the registration period, not a statement of current validity or project completion. Approvals record
Registered promoterURBAN SPACES, described in the project records as a partnership. RERA record RERA filing
RERA status in supplied recordRegistration certificate supplied; no extension is recorded in that certificate.

Land and geographic identity

ItemProject record
LocalityALOOR RERA record
Revenue villageAloor / Aloor I Village RERA record
Mandal / district / PINChevella / Ranga Reddy / 501503 RERA record
Project survey numbers310, 311, 312, 314/P, 315/P RERA record
Total site area124924.14 sq.m RERA filing
Road-affected area4716.57 sq.m RERA filing
Net layout area120207.57 sq.m RERA filing
Boundaries filed with RERAEast: SY NO 309; West: ROAD WIDTH 12; North: ROAD WIDTH 9; South: SY NO 314P AND 315P. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal layout approvalDraft Layout Permit 000188/LO/Plg/HMDA/2022, approved 23 September 2022. Approvals record
Plan number shown in RERA project information1605/MSB/SKP/Plg/HMDA/2022 RERA filing
Approved built-up area74807.38 sq.m, recorded in the RERA filing; for this plotted layout, the layout drawing labels the same figure as plotted area. RERA filing Layout record
Buildings / floorsNot disclosed as an apartment or building development. The evidence describes a plotted layout; no building count or floor configuration is stated.
Layout plotsThe layout drawing shows plot numbers 1 to 174; software extraction reports 174 plots, with sizes available for 173. These are drawing-derived figures, not RERA unit-count disclosures. Layout record
HMDA-mortgaged plotsPlots 19 TO 31, 100 TO 104 AND 107 TO 111, stated area 11408.35 Sq.mtrs.

Offering and status

ItemProject record
OfferingPlots; RERA unit details by plot, including RERA-filed saleable areas and booking/availability counts, are not supplied here. RERA record RERA unit table
Promoter-declared completion date01/09/2025, stated in Form B.
RERA registration end date01/09/2025; this is separate from evidence of completion or occupancy certification.
Construction / development stageA RERA-filed architect certificate states overall project completion; independent site verification is not supplied.
Completion / occupancy certificateThe supplied architect certificate’s occupancy-certificate details table is blank; no issuing authority or OC number is stated in that certificate.

2. The project story

HIGHGARDEN is registered as a plotted development at Aloor in Chevella Mandal, Ranga Reddy District. Its approved layout covers survey numbers 310, 311, 312, 314/P and 315/P, with a filed total site area of 124924.14 sq.m and net layout area of 120207.57 sq.m. RERA record RERA filing

The layout drawing identifies plots numbered 1 to 174, alongside internal roads, parks/open space, social-infrastructure land and amenity land. The individual plots are the project’s purchase offering; the supplied materials do not provide a current plot-by-plot inventory or booking schedule. Layout record RERA unit table

The promoter’s Form B declares a completion period ending 01/09/2025. Separately, the RERA-filed architect certificate says the overall project is completed, but the supplied record does not include a completed occupancy-certificate entry or independent verification of site condition.

3. Master plan, architecture & building design

The development is a plotted layout, not a multi-storey residential building scheme in the supplied project-specific approval. HMDA’s draft layout approval identifies a net site area of 120207.57 sq.m and a total site area of 124924.14 sq.m. The layout drawing’s area statement records 74807.38 sq.m as plotted area. Layout record

The drawing-derived land-use figures are:

Layout useAreaShare of net layout area
Plots74807.38 sq.m62.2%
Roads23191.41 sq.m19.3%
Parks / open space14125.63 sq.m11.8%
Social infrastructure3240.13 sq.m2.7%
Amenities4842.85 sq.m4.0%

Layout record

The software extraction identifies 174 numbered plots and sizes for 173 plots; it cautions that plot count and sizes were read from drawing text and should be checked against the drawing. The extracted size range is 37.0–818.09 sq.m (approximately 44.3–978.4 sq.yd as shown in the extraction); the median is 418.14 sq.m (500.1 sq.yd). Layout record

HMDA’s draft approval identifies plots mortgaged to HMDA as part of the layout approval condition (see Project at a glance above). The approval describes development works and conditions for later final layout release; the supplied evidence does not establish the current completion status of those works or final layout release.

4. Homes, configurations & floor plans

This is a plotted project, so apartment configurations and apartment carpet areas are not applicable. The supplied materials do not provide RERA-filed plot-wise saleable areas, booked plots or available plots. RERA record RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading
Plots174 shown by plot numbering on the layout drawing; software-extracted sizes available for 173Not suppliedNot suppliedNot suppliedNot applicableNot supplied

Layout record RERA unit table

The drawing extraction reports plot sizes from 37.0 sq.m to 818.09 sq.m, with a median of 418.14 sq.m; it also groups the extracted plots into size bands: 1 at 0–100 sq.yd, 1 at 100–150 sq.yd, 7 at 150–200 sq.yd, 8 at 300–400 sq.yd, 65 at 400–500 sq.yd and 91 at 500–1000 sq.yd. These are software-measured drawing figures, not a RERA-filed plot inventory, and the extraction says they should be verified against the drawing. Layout record

The supplied floor-plan record contains two layout sheets and no measured apartment floor plans. Floor plans

5. Parking & vehicle circulation

The project evidence supplied here does not state a sanctioned parking-space count, visitor or accessible parking provision, or plot-specific parking allocation. Because this is a plotted layout, the available records do not describe apartment parking levels, parking ramps or mechanical parking. Layout record

HMDA’s draft approval refers to internal layout roads and requires roads to be opened for accessibility to neighbouring sites; it also specifies road-width categories, including 30 Mts, 9 mtrs and 18 mts and above. The supplied material does not set out a complete road-by-road circulation schedule.

6. Amenities, recreation & open spaces

The layout approval and RERA filing list the following amenities or open-space elements. The records provide declared availability fields for some items, but no independent site verification is supplied.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsNo dimensions stated in the RERA amenity entryRERA amenitiesRERA amenity field: YES, 100%; not independently verified
Park / green strip / tot lotPark/open-space area is shown in the layout area statement; individual facility dimensions are not suppliedRERA amenities Layout recordRERA amenity field: YES, 100%; not independently verified
Community buildingsNo description or size suppliedRERA amenitiesRERA amenity field: 0%; status not otherwise established
Social infrastructure3240.13 sq.m in the layout area statementLayout recordArea shown on drawing; completion not independently verified
Amenity land4842.85 sq.m in the layout area statementLayout recordArea shown on drawing; facility mix and completion not established

The vendor listing also mentions Security, Park, Rain Water Harvesting, RO Water System, Garden View and Sewage treatment plant; these are vendor-provided details, not established here as delivered or independently verified project facilities. Promoter website

7. Utilities, building services & safety

HMDA’s draft layout approval lists proposed or required layout services including common septic tank / STP, internal water-supply pipelines and overhead tank, transformer, underground drainage lines, storm-water drains, street lights, avenue plantation, park, rainwater-harvesting pits, transformer yard and bio-compost unit. The supplied approval does not provide capacities or independently verified completion evidence for these systems.

The RERA amenity fields mark water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, street lighting, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as YES at 100%. These are filing status entries, not independent inspections. RERA amenities

The supplied records do not give water-source or storage capacities, STP capacity or reuse details, power-backup capacity, waste-processing capacity, security-system specifications, accessibility arrangements, or fire-safety design particulars. RERA amenities

8. Location, access & connectivity

The registered project location is Aloor, Aloor I Village, Chevella Mandal, Ranga Reddy District, PIN 501503. The project parcel centroid supplied for location reference is 17.31757, 78.06601. RERA record Location record

The nearest sampled Outer Ring Road interchange is listed at approximately 31.2 km. This is a supplied location measurement; no travel time is provided. Location record

9. Developer & development status

The registered promoter is URBAN SPACES, identified in the RERA project record as a partnership. Its GSTIN is 36AAGFU9624C1Z3. The RERA filing identifies Chinnam Chaitanya as authorised signatory, with Neelesh Rao Julapally and Thatiparthi Nishanth listed as partners. RERA record RERA filing Corporate record Parties record

The registration certificate lists the promoter office as Village: SR NAGAR, Mandal: AMEERPET, District: Hyderabad, PIN: 500038. The project address in the RERA filing is in Aloor, Chevella, Ranga Reddy District; the supplied records do not provide an official promoter website or contact details. RERA filing

The promoter’s Form B declares a project completion period ending 01.09.2025. A project architect certificate filed under this registration states that the project is completed in all aspects; the supplied documents do not include a populated occupancy-certificate record or independent site verification.

10. Approvals, official records & documents

TG-RERA registration certificate (Form C)
Identifier / dateP02400005531; issued 14/12/2022; stated validity through 01/09/2025
What the supplied record establishesRegistration of HIGHGARDEN and registration-period conditions.
HMDA draft layout approval
Identifier / dateDraft Layout Permit 000188/LO/Plg/HMDA/2022; approved 23 September 2022
What the supplied record establishesDraft approval for the plotted layout at Aloor I Village, Chevella Mandal, on survey numbers 310, 311, 312, 314/P and 315/P.
RERA-filed plan number
Identifier / date1605/MSB/SKP/Plg/HMDA/2022
What the supplied record establishesPlan number shown in the project information fields. RERA filing
Form B promoter declaration
Identifier / dateDated 21.09.2022
What the supplied record establishesPromoter declaration including a completion period of 01.09.2025.
Architect’s overall-completion certificate
Identifier / dateForm 1A; RERA number P02400005531
What the supplied record establishesArchitect certifies overall completion; occupancy-certificate details are blank in the supplied certificate.
Layout drawing
Identifier / dateDocument 267535, two sheets
What the supplied record establishesDrawing-derived plot numbering, plot-size extraction and layout area statement. Layout record
HMDA plan approval letter filed as document
Identifier / dateDocument 275238
What the supplied record establishesDraft open-plot layout approval and conditions, including the HMDA-mortgaged plots and development requirements.

No building-permit or occupancy-certificate number for HIGHGARDEN is established by the supplied project-specific records. The project is presented in the supplied approval evidence as a plotted layout.

Frequently asked questions

Is HIGHGARDEN registered with Telangana RERA?

Yes. HIGHGARDEN is registered with the Telangana Real Estate Regulatory Authority as P02400005531; the registration status is New Project.

Who is the developer of HIGHGARDEN?

The promoter named in the RERA registration is URBAN SPACES.

Where is HIGHGARDEN located?

HIGHGARDEN is in ALOOR, Chevella, Rangareddy, Telangana (501503).

When will HIGHGARDEN be completed?

The promoter's proposed date of completion filed with RERA is 01/09/2025. This is the promoter's declaration, not a guarantee.

More projects in Aloor