Star City
ADAPALA · Khammam · RERA P00800005695
STAR CITY is a proposed residential plotted development in THIRUMALAYAPALEM, Thirumalayapalem mandal, Khammam district. The registration certificate names Adapala Sampath Kumar as the registered promoter developing the project. The RERA-filed site area is 22751.42 sqmts, and the draft-layout approval describes 59 residential plots; buildings, floors and configurations are not disclosed. The TG-RERA registration is P00800005695, and the promoter’s declared completion date is 06/04/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
5 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | STAR CITY RERA record |
| Project type | Plotted development / proposed residential layout RERA record RERA filing |
| Phase or registered portion | Phase not disclosed; registration is for the project identified as STAR CITY Approvals record |
| TG-RERA registration | P00800005695 Approvals record |
| Registration validity | 09/01/2023 to 06/04/2025; certificate says two years and records no extension Approvals record |
| Registered promoter | Adapala Sampath Kumar on the registration certificate; the Form-B declaration identifies M/s. SRI VENKATESWARA GARDENS as promoter and Adapala Sampath Kumar as authorised signatory |
| RERA status in supplied record | Registered; certificate validity ended 06/04/2025. No extension certificate is supplied. The supplied record does not establish current registration status Approvals record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / address | THIRUMALAYAPALEM; street recorded as KOKKIRENI RERA record RERA filing |
| Revenue village | Kokkireni Revenue Village in the draft-layout approval; the RERA land fields identify Thirumalayapalem as the village. The supplied records do not resolve this village-label distinction Land records |
| Mandal | Thirumalayapalem in the draft-layout approval; the RERA land fields say not disclosed Land records |
| District / PIN | Khammam / 507163 RERA record RERA filing |
| Project survey numbers and subdivisions | 37/1 PART, 37/2 PART, 38/PART, 39/PART RERA record Land records |
| RERA-filed site area | Total area 22751.42 sqmts; net area 22751.42 sqmts; affected area recorded as 0 RERA filing Land records |
| Draft-layout extent | Ac.5.622 Cents; 27210.48 Sq.Yds. |
| Boundaries | North, south, east and west are each recorded as “VACANT LAND -” RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning, Government of Telangana; draft-layout communication states delegation to Kokkireni Gram Panchayat Approvals record |
| Principal approval | Draft-TLP.No.114/2022/W, approved 06-04-2022; the RERA filing also lists 114/2022/W Approvals record |
| Development described in approval | Draft residential layout comprising 59 plots, roads and reserved open space |
| RERA-filed approved built-up area | 13577.20 sqmts RERA filing |
| Buildings / floor configuration | Not disclosed in the supplied project record; the approval is for a plotted layout, not a described multi-storey building scheme |
| Parking | No project-wide parking count or parking-level information supplied RERA filing |
| Unit count | Draft-layout approval states 59 plots. A separate RERA inventory count is not supplied |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Residential plots; the draft-layout approval identifies 59 plots |
| Plot sizes | A complete RERA-filed plot-size inventory is not supplied. The vendor data lists plot sizes from 146.56 sq.yd to 375.44 sq.yd; these are vendor-attributed, not RERA-filed figures Promoter website |
| Booked / available counts | Not supplied RERA unit table |
| Construction / development stage | RERA header labels the project “New Project”; the supplied evidence gives a declared completion date but no independently verified site-progress assessment RERA record |
| Completion deadline | Form-B promoter declaration states 06/04/2025 |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The project is a plotted layout; the supplied documents do not establish final-layout release |
2. The project story
STAR CITY is recorded as a proposed residential plotted layout associated with Kokkireni and Thirumalayapalem, Khammam district. Its draft-layout approval describes 59 plots, with land allocated to plots, roads and open space; it also identifies nine plots reserved as mortgage security to the Gram Panchayat. The approval describes roads of 10.05MT (33-0) and 12.19MT (40-0), as well as an existing-road notation recorded as “EXSTING 30-BIT/10-01 MEREB ROND.”
The promoter declared completion by 06/04/2025. That is a declaration, not independent confirmation that development was completed. The supplied record contains no verified construction-progress report, final-layout release, or occupancy/completion certificate.
3. Master plan, architecture & building design
The project is presented in the supplied approval as a plotted layout, not as a building or apartment scheme. The draft-layout communication records a total layout extent of Ac.5.622 Cents; 27210.48 Sq.Yds. Its land-use figures are: Plotted Area (59.68%) — Ac.3.355 Cents; 16238.20 Sq. Yds.; Area of the Roads (30.32%) — Ac.1.705 Cents; 8252.20 Sq.Yds.; and Area of the Open Space (10.00%) — Ac.0.562 Cents; 2720.08 Sq.Yds.
The approval identifies 59 plots and nine mortgage-reserved plots: Plot Nos.39 to 44 & 51, 52, 56. It requires the open space and roads to be gifted to the Gram Panchayat before release of the final layout, and describes layout-development works including road formation, drains, storm-water channelization, greenery, rainwater-harvesting pits, open-space fencing, street lighting, electricity, sewerage disposal and protected water supply. These are conditions and proposed works in the approval; the supplied evidence does not establish their completion.
The RERA filing separately records site area 22751.42 sqmts and approved built-up area 13577.20 sqmts. The supplied record does not explain the built-up-area figure’s application to this plotted layout, or provide a building schedule, floor configuration, or drawing-derived plot arrangement. RERA filing RERA filing
4. Homes, configurations & floor plans
This is a plotted development, so apartment configuration and carpet-area comparisons do not apply. The approval records 59 plots, but a plot-by-plot RERA inventory, booked/available counts and RERA-filed plot-size schedule are not supplied. RERA unit table
The vendor data lists residential plot sizes as follows; these are vendor-attributed values, not RERA-filed inventory figures: 146.56, 148.78, 155.56, 156.44, 168, 172.44, 175, 182.67, 198.44, 204.11, 208.78, 213.33, 222.22, 238, 240.56, 245.22, 296.11, 333.67, 340.89 and 375.44 sq.yd. Promoter website
Six drawings are recorded, all scans pending; none has been software-measured. No plot or room dimensions are therefore reported as drawing measurements. Floor plans
5. Parking & vehicle circulation
The supplied record does not establish a sanctioned parking count, visitor or accessible parking provision, parking allocation to individual plots, or any dedicated parking facility. The draft-layout approval specifies roads and access conditions, including opening roads for neighbouring-site accessibility, but provides no detailed internal-driveway, pedestrian-separation or parking arrangement in the extracted evidence. RERA filing
6. Amenities, recreation & open spaces
The draft-layout approval identifies a park/open-space reservation and specifies layout infrastructure and development works. The RERA amenity schedule lists facilities, but records 0% progress for the listed items; this is a filed schedule, not confirmation of completion. RERA amenities
| Description / size | Approval records 10.00%, Ac.0.562 Cents; 2720.08 Sq.Yds.; it also lists park area as 2274.33 Sq Mts.; 2,724.41 SqYds in the sanctioned parameters |
|---|---|
| Evidence source | Draft-layout approval |
| Declared progress / verified status | Reserved/proposed; completion not independently verified |
| Description / size | Road area recorded as 30.32%, Ac.1.705 Cents; 8252.20 Sq.Yds. |
|---|---|
| Evidence source | Draft-layout approval; RERA amenity schedule RERA amenities |
| Declared progress / verified status | Listed in RERA schedule at 0%; completion not independently verified |
| Description / size | No separate dimensions supplied RERA amenities |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Listed at 0%; completion not independently verified |
| Description / size | No quantities or specifications supplied RERA amenities |
|---|---|
| Evidence source | Draft-layout conditions; RERA amenity schedule |
| Declared progress / verified status | Required/listed; completion not independently verified |
| Description / size | No description or size supplied Promoter website |
|---|---|
| Evidence source | Vendor data |
| Declared progress / verified status | Vendor-listed; no delivery status supplied |
7. Utilities, building services & safety
The draft-layout approval requires road formation, drains, storm-water channelization, greenery, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. The RERA amenity schedule also lists water supply, sewerage, storm-water drains, solid-waste management, water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station. These entries describe filed or required provisions; the supplied data does not provide capacities, technical designs, or independent evidence of completed operation. RERA amenities
| Evidence in supplied record | Protected water supply is a draft-layout condition; “Water Supply” is listed in the RERA amenity schedule RERA amenities |
|---|---|
| Status supported by the evidence | Required/listed; source, storage and completion not established |
| Evidence in supplied record | Sewerage disposal, drains and storm-water channelization appear in the approval conditions; sewerage and storm-water drains are listed in the RERA amenity schedule RERA amenities |
|---|---|
| Status supported by the evidence | Required/listed; system type, treatment capacity and completion not established |
| Evidence in supplied record | Rainwater-harvesting pits are specified in the approval conditions; water conservation/rainwater harvesting is listed by RERA RERA amenities |
|---|---|
| Status supported by the evidence | Required/listed; completion not established |
| Evidence in supplied record | Street lighting/electricity are approval conditions; electrical meter room/sub-station/receiving station is listed in the RERA schedule RERA amenities |
|---|---|
| Status supported by the evidence | Required/listed; capacity and completion not established |
| Evidence in supplied record | Solid-waste management and disposal is listed in the RERA amenity schedule RERA amenities |
|---|---|
| Status supported by the evidence | Listed at 0%; arrangements and completion not established |
| Evidence in supplied record | Fire-protection requirements appear in the RERA amenity schedule; the supplied record does not describe fire systems, accessible circulation or ramps RERA amenities |
|---|---|
| Status supported by the evidence | No technical details or verified compliance supplied |
8. Location, access & connectivity
The registered project identity places STAR CITY in THIRUMALAYAPALEM, Khammam district, PIN 507163, with the street recorded as KOKKIRENI. The draft-layout approval identifies Kokkireni Revenue Village and Thirumalayapalem mandal. RERA record RERA filing
The supplied location data gives a connectivity point labelled Financial District (Nanakramguda), 1.2 km and a geocode labelled cadastral parcel centroid (17.41528, 78.35459). These are location-dataset entries; the supplied material does not establish a measured route from the project entrance. Location record The vendor separately markets “Shadnagar, Hyderabad” and travel-time claims, but those claims are not used here as the project’s registered location or verified connectivity. Promoter website
9. Developer & development status
The TG-RERA registration certificate names Adapala Sampath Kumar as promoter. The Form-B affidavit names M/s. SRI VENKATESWARA GARDENS as promoter and identifies Adapala Sampath Kumar as its authorised signatory. The legal entity type, corporate identifiers, registered office and official contact details are not established in the supplied evidence. Corporate record
The promoter’s Form-B declaration sets a completion date of 06/04/2025 and includes undertakings concerning separate-account deposits, withdrawals and audit. The record provides no independent assessment of physical or financial progress and no evidence that the stated completion date was met.
10. Approvals, official records & documents
| Supplied evidence | Form ‘C’, P00800005695 |
|---|---|
| What it establishes | Registration of STAR CITY from 09/01/2023 to 06/04/2025, subject to listed conditions |
| Supplied evidence | Draft-TLP.No.114/2022/W, dated 06-04-2022; File No. E.P. File No.11855/354/2022/V; application No. e-Panchayat No. 11855/354/2022/ |
|---|---|
| What it establishes | Draft Technical Layout Pattern communication for a residential layout; the document states permission is not proof of land title and requires further compliance and final-layout release |
| Supplied evidence | Document 258073, page 1 |
|---|---|
| What it establishes | Promoter declarations and undertakings, including declared completion by 06/04/2025 |
| Supplied evidence | Document 277554 |
|---|---|
| What it establishes | Advocate’s search report and title opinion concerning the land; detailed title-chain review belongs in Land & Title |
| Supplied evidence | Documents 234390 and 234391 |
|---|---|
| What it establishes | Filed documents relating to gift and mortgage in favour of Kokkireni Gram Panchayat |
| Supplied evidence | Documents 289269, 292865 and 292866 Document index |
|---|---|
| What it establishes | Listed as layout-plan/approval submissions; supplied extraction does not establish a final-layout release |
| Supplied evidence | Not supplied Document index |
|---|---|
| What it establishes | No such certificate is established by the material reviewed |
1. Project at a glance
Project identity
Registered project name: STAR CITY
Project type: Plotted development / proposed residential layout
Phase or registered portion: Phase not disclosed; registration is for the project identified as STAR CITY
TG-RERA registration: P00800005695
Registration validity: 09/01/2023 to 06/04/2025; certificate says two years and records no extension
Registered promoter: Adapala Sampath Kumar on the registration certificate; the Form-B declaration identifies M/s. SRI VENKATESWARA GARDENS as promoter and Adapala Sampath Kumar as authorised signatory
RERA status in supplied record: Registered; certificate validity ended 06/04/2025. No extension certificate is supplied. The supplied record does not establish current registration status
Land and geographic identity
Locality / address: THIRUMALAYAPALEM; street recorded as KOKKIRENI
Revenue village: Kokkireni Revenue Village in the draft-layout approval; the RERA land fields identify Thirumalayapalem as the village. The supplied records do not resolve this village-label distinction
Mandal: Thirumalayapalem in the draft-layout approval; the RERA land fields say not disclosed
District / PIN: Khammam / 507163
Project survey numbers and subdivisions: 37/1 PART, 37/2 PART, 38/PART, 39/PART
RERA-filed site area: Total area 22751.42 sqmts; net area 22751.42 sqmts; affected area recorded as 0
Draft-layout extent: Ac.5.622 Cents; 27210.48 Sq.Yds.
Boundaries: North, south, east and west are each recorded as “VACANT LAND -”
Development identity
Sanctioning authority: Director of Town and Country Planning, Government of Telangana; draft-layout communication states delegation to Kokkireni Gram Panchayat
Principal approval: Draft-TLP.No.114/2022/W, approved 06-04-2022; the RERA filing also lists 114/2022/W
Development described in approval: Draft residential layout comprising 59 plots, roads and reserved open space
RERA-filed approved built-up area: 13577.20 sqmts
Buildings / floor configuration: Not disclosed in the supplied project record; the approval is for a plotted layout, not a described multi-storey building scheme
Parking: No project-wide parking count or parking-level information supplied
Unit count: Draft-layout approval states 59 plots. A separate RERA inventory count is not supplied
Offering and status
Unit type: Residential plots; the draft-layout approval identifies 59 plots
Plot sizes: A complete RERA-filed plot-size inventory is not supplied. The vendor data lists plot sizes from 146.56 sq.yd to 375.44 sq.yd; these are vendor-attributed, not RERA-filed figures
Booked / available counts: Not supplied
Construction / development stage: RERA header labels the project “New Project”; the supplied evidence gives a declared completion date but no independently verified site-progress assessment
Completion deadline: Form-B promoter declaration states 06/04/2025
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The project is a plotted layout; the supplied documents do not establish final-layout release
2. The project story
STAR CITY is recorded as a proposed residential plotted layout associated with Kokkireni and Thirumalayapalem, Khammam district. Its draft-layout approval describes 59 plots, with land allocated to plots, roads and open space; it also identifies nine plots reserved as mortgage security to the Gram Panchayat. The approval describes roads of 10.05MT (33-0) and 12.19MT (40-0), as well as an existing-road notation recorded as “EXSTING 30-BIT/10-01 MEREB ROND.”
The promoter declared completion by 06/04/2025. That is a declaration, not independent confirmation that development was completed. The supplied record contains no verified construction-progress report, final-layout release, or occupancy/completion certificate.
3. Master plan, architecture & building design
The project is presented in the supplied approval as a plotted layout, not as a building or apartment scheme. The draft-layout communication records a total layout extent of Ac.5.622 Cents; 27210.48 Sq.Yds. Its land-use figures are: Plotted Area (59.68%) — Ac.3.355 Cents; 16238.20 Sq. Yds.; Area of the Roads (30.32%) — Ac.1.705 Cents; 8252.20 Sq.Yds.; and Area of the Open Space (10.00%) — Ac.0.562 Cents; 2720.08 Sq.Yds.
The approval identifies 59 plots and nine mortgage-reserved plots: Plot Nos.39 to 44 & 51, 52, 56. It requires the open space and roads to be gifted to the Gram Panchayat before release of the final layout, and describes layout-development works including road formation, drains, storm-water channelization, greenery, rainwater-harvesting pits, open-space fencing, street lighting, electricity, sewerage disposal and protected water supply. These are conditions and proposed works in the approval; the supplied evidence does not establish their completion.
The RERA filing separately records site area 22751.42 sqmts and approved built-up area 13577.20 sqmts. The supplied record does not explain the built-up-area figure’s application to this plotted layout, or provide a building schedule, floor configuration, or drawing-derived plot arrangement.
4. Homes, configurations & floor plans
This is a plotted development, so apartment configuration and carpet-area comparisons do not apply. The approval records 59 plots, but a plot-by-plot RERA inventory, booked/available counts and RERA-filed plot-size schedule are not supplied.
The vendor data lists residential plot sizes as follows; these are vendor-attributed values, not RERA-filed inventory figures: 146.56, 148.78, 155.56, 156.44, 168, 172.44, 175, 182.67, 198.44, 204.11, 208.78, 213.33, 222.22, 238, 240.56, 245.22, 296.11, 333.67, 340.89 and 375.44 sq.yd.
Six drawings are recorded, all scans pending; none has been software-measured. No plot or room dimensions are therefore reported as drawing measurements.
5. Parking & vehicle circulation
The supplied record does not establish a sanctioned parking count, visitor or accessible parking provision, parking allocation to individual plots, or any dedicated parking facility. The draft-layout approval specifies roads and access conditions, including opening roads for neighbouring-site accessibility, but provides no detailed internal-driveway, pedestrian-separation or parking arrangement in the extracted evidence.
6. Amenities, recreation & open spaces
The draft-layout approval identifies a park/open-space reservation and specifies layout infrastructure and development works. The RERA amenity schedule lists facilities, but records 0% progress for the listed items; this is a filed schedule, not confirmation of completion.
| Description / size | Approval records 10.00%, Ac.0.562 Cents; 2720.08 Sq.Yds.; it also lists park area as 2274.33 Sq Mts.; 2,724.41 SqYds in the sanctioned parameters |
|---|---|
| Evidence source | Draft-layout approval |
| Declared progress / verified status | Reserved/proposed; completion not independently verified |
| Description / size | Road area recorded as 30.32%, Ac.1.705 Cents; 8252.20 Sq.Yds. |
|---|---|
| Evidence source | Draft-layout approval; RERA amenity schedule |
| Declared progress / verified status | Listed in RERA schedule at 0%; completion not independently verified |
| Description / size | No separate dimensions supplied |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Listed at 0%; completion not independently verified |
| Description / size | No quantities or specifications supplied |
|---|---|
| Evidence source | Draft-layout conditions; RERA amenity schedule |
| Declared progress / verified status | Required/listed; completion not independently verified |
| Description / size | No description or size supplied |
|---|---|
| Evidence source | Vendor data |
| Declared progress / verified status | Vendor-listed; no delivery status supplied |
7. Utilities, building services & safety
The draft-layout approval requires road formation, drains, storm-water channelization, greenery, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. The RERA amenity schedule also lists water supply, sewerage, storm-water drains, solid-waste management, water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station. These entries describe filed or required provisions; the supplied data does not provide capacities, technical designs, or independent evidence of completed operation.
| Evidence in supplied record | Protected water supply is a draft-layout condition; “Water Supply” is listed in the RERA amenity schedule |
|---|---|
| Status supported by the evidence | Required/listed; source, storage and completion not established |
| Evidence in supplied record | Sewerage disposal, drains and storm-water channelization appear in the approval conditions; sewerage and storm-water drains are listed in the RERA amenity schedule |
|---|---|
| Status supported by the evidence | Required/listed; system type, treatment capacity and completion not established |
| Evidence in supplied record | Rainwater-harvesting pits are specified in the approval conditions; water conservation/rainwater harvesting is listed by RERA |
|---|---|
| Status supported by the evidence | Required/listed; completion not established |
| Evidence in supplied record | Street lighting/electricity are approval conditions; electrical meter room/sub-station/receiving station is listed in the RERA schedule |
|---|---|
| Status supported by the evidence | Required/listed; capacity and completion not established |
| Evidence in supplied record | Solid-waste management and disposal is listed in the RERA amenity schedule |
|---|---|
| Status supported by the evidence | Listed at 0%; arrangements and completion not established |
| Evidence in supplied record | Fire-protection requirements appear in the RERA amenity schedule; the supplied record does not describe fire systems, accessible circulation or ramps |
|---|---|
| Status supported by the evidence | No technical details or verified compliance supplied |
8. Location, access & connectivity
The registered project identity places STAR CITY in THIRUMALAYAPALEM, Khammam district, PIN 507163, with the street recorded as KOKKIRENI. The draft-layout approval identifies Kokkireni Revenue Village and Thirumalayapalem mandal.
The supplied location data gives a connectivity point labelled Financial District (Nanakramguda), 1.2 km and a geocode labelled cadastral parcel centroid (17.41528, 78.35459). These are location-dataset entries; the supplied material does not establish a measured route from the project entrance. The vendor separately markets “Shadnagar, Hyderabad” and travel-time claims, but those claims are not used here as the project’s registered location or verified connectivity.
9. Developer & development status
The TG-RERA registration certificate names Adapala Sampath Kumar as promoter. The Form-B affidavit names M/s. SRI VENKATESWARA GARDENS as promoter and identifies Adapala Sampath Kumar as its authorised signatory. The legal entity type, corporate identifiers, registered office and official contact details are not established in the supplied evidence.
The promoter’s Form-B declaration sets a completion date of 06/04/2025 and includes undertakings concerning separate-account deposits, withdrawals and audit. The record provides no independent assessment of physical or financial progress and no evidence that the stated completion date was met.
10. Approvals, official records & documents
| Supplied evidence | Form ‘C’, P00800005695 |
|---|---|
| What it establishes | Registration of STAR CITY from 09/01/2023 to 06/04/2025, subject to listed conditions |
| Supplied evidence | Draft-TLP.No.114/2022/W, dated 06-04-2022; File No. E.P. File No.11855/354/2022/V; application No. e-Panchayat No. 11855/354/2022/ |
|---|---|
| What it establishes | Draft Technical Layout Pattern communication for a residential layout; the document states permission is not proof of land title and requires further compliance and final-layout release |
| Supplied evidence | Document 258073, page 1 |
|---|---|
| What it establishes | Promoter declarations and undertakings, including declared completion by 06/04/2025 |
| Supplied evidence | Document 277554 |
|---|---|
| What it establishes | Advocate’s search report and title opinion concerning the land; detailed title-chain review belongs in Land & Title |
| Supplied evidence | Documents 234390 and 234391 |
|---|---|
| What it establishes | Filed documents relating to gift and mortgage in favour of Kokkireni Gram Panchayat |
| Supplied evidence | Documents 289269, 292865 and 292866 |
|---|---|
| What it establishes | Listed as layout-plan/approval submissions; supplied extraction does not establish a final-layout release |
| Supplied evidence | Not supplied |
|---|---|
| What it establishes | No such certificate is established by the material reviewed |
Frequently asked questions
Is STAR CITY registered with Telangana RERA?
Yes. STAR CITY is registered with the Telangana Real Estate Regulatory Authority as P00800005695; the registration status is New Project.
Who is the developer of STAR CITY?
The promoter named in the RERA registration is ADAPALA.
Where is STAR CITY located?
STAR CITY is in THIRUMALAYAPALEM, Khammam, Telangana (507163).
When will STAR CITY be completed?
The promoter's proposed date of completion filed with RERA is 06/04/2025. This is the promoter's declaration, not a guarantee.