TREASURE COUNTY PHASE I is a plotted development in Yacharam, Thakkallapally Revenue Village, Yacharam Mandal, Ranga Reddy District. The registered promoter is GRUPE BUILDERS & DEVELOPERS LLP. The project covers 48,574.41 sq. m and the filed draft layout describes 145 plots; plot-size configurations are not supplied. It is registered with TG-RERA under P02400004443, with proposed completion on 04/04/2025.
📘 Project brochure from the promoter’s website ↗More from Grupe Builders & Developers LLP · 7 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | TREASURE COUNTY PHASE I RERA record |
| Project type | Plotted development / layout RERA record |
| Phase / registered portion | Phase I; registration is for the named project. The filed draft layout identifies 145 plots. RERA record |
| TG-RERA registration | P02400004443 RERA record |
| Registration validity | 02/05/2022 to 04/04/2025, as stated on the certificate; the certificate says extension would require Authority action. |
| Registered promoter | GRUPE BUILDERS & DEVELOPERS LLP, an LLP RERA record Corporate record |
| RERA status in supplied record | Registration certificate issued under section 5. The record lists the registration end date as 04/04/2025; no extension is recorded in the supplied evidence. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Yacharam; the filed draft-layout document identifies Thakkallapally Thanda RERA record |
| Revenue village | Thakkallapally Revenue Village in the filed draft-layout document; the project header identifies Yacharam as village. RERA record |
| Mandal | Yacharam (filed draft-layout document) |
| District / PIN | Ranga Reddy / 501509 RERA record |
| Project survey numbers | 165/P and 166/P RERA record |
| Registered site extent | 48,574.41 sq. m in the project record Land records |
| Draft-layout extent | Ac. 12-0.12 Guntas; also stated as Ac. 12.003 Cents; 58,094.52 Sq. Yds |
| Net / total area | RERA land details show total and net area as 48,574.41 sq. m; affected area is recorded as 0. Land records |
| Boundaries | North, south, east and west are each recorded as “OTHERS LAND”; adjoining parcel identities are not disclosed. Land records |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning; the filed document says the draft layout was delegated to Thakkallapally Thanda Gram Panchayat. |
| Principal layout approval | Draft-TLP.No.110/2022/H, dated 04-04-2022 Approvals record |
| Approval status in filed document | Draft Technical Layout Pattern approved; the document describes further development, mortgage and gift-deed requirements before final layout release. |
| Approved built-up area | 28,064.94 sq. m is recorded in the project filing; a building-wise breakdown is not supplied. RERA filing |
| Layout scale and land allocation | 145 plots; draft-layout allocation lists plotted area Ac. 6.935 Cents; 33,565.40 Sq. Yds (57.77%), roads Ac. 3.807 Cents; 18,425.88 Sq. Yds (31.71%), open space Ac. 1.20 Cents; 5,808.00 Sq. Yds (10.00%), HT Line Buffer area Ac. 0.061 Cents; 295.24 Sq. Yds, and mortgage area Ac. 1.110 Cents; 5,372.40 Sq. Yds (16.00%). |
| Buildings / floors | Not disclosed as apartment buildings. The filed record describes a plotted layout; apartment floor configuration and building count are not applicable or not supplied. |
| Parking | No plot- or project-wide parking count or parking allocation is supplied. |
Offering and status
| Item | Project record |
|---|---|
| Product offered | Plots; the filed draft layout describes 145 plots. Plot-size bands and unit-wise availability are not supplied. RERA record |
| Booked / available | Counts are not supplied in the evidence provided for this overview. Document index |
| RERA completion undertaking | Registration certificate lists validity through 04/04/2025. |
| Form B completion declaration | Promoter’s Form-B affidavit states a completion timeframe of 04/5/2024. |
| Architect-reported progress | Architect’s certificate dated 24/07/2025 reports the listed common-area works at 100% or not proposed; building-work activities are marked not applicable for this plotted project. This is a filed professional certificate, not an independent site inspection in the supplied record. |
| Completion / occupancy certificate | No completion certificate or occupancy certificate is included in the supplied project documents. The architect certificate is not itself an authority-issued completion or occupancy certificate. Document index |
2. The project story
TREASURE COUNTY PHASE I is registered with TG-RERA as a plotted development in survey numbers 165/P and 166/P. Its filed draft-layout document describes a 145-plot scheme at Thakkallapally Thanda, Yacharam Mandal, Ranga Reddy District. The document divides the layout among plotted land, roads, open space, a stated HT Line Buffer area and plots designated for mortgage. RERA record
The layout approval document is expressly a Draft Technical Layout Pattern. It describes conditions to be completed before final layout release, including development works, mortgage of designated plots and transfer of open-space and road areas by registered gift deed.
The project file includes an architect’s certificate dated 24/07/2025 reporting specified layout services and common-area items as 100% complete or not proposed. That is a reported certificate status; the supplied evidence does not independently verify site completion or provide an authority-issued completion/occupancy certificate.
The TG-RERA certificate lists validity to 04/04/2025, while the promoter’s Form-B affidavit records a completion timeframe of 04/5/2024. These are separate filed dates, not confirmation of current registration validity or project completion.
3. Master plan, architecture & building design
This is a plotted layout rather than an apartment or multi-storey building project. The filed draft-layout document describes 145 plots over Ac. 12-0.12 Guntas, also stated as Ac. 12.003 Cents; 58,094.52 Sq. Yds. The project land-details record gives total and net area as 48,574.41 sq. m. Land records
The draft layout’s stated land-use schedule is:
| Layout component | Filed area / share |
|---|---|
| Plotted area | Ac. 6.935 Cents; 33,565.40 Sq. Yds (57.77%) |
| Roads | Ac. 3.807 Cents; 18,425.88 Sq. Yds (31.71%) |
| Open space | Ac. 1.20 Cents; 5,808.00 Sq. Yds (10.00%) |
| HT Line Buffer area | Ac. 0.061 Cents; 295.24 Sq. Yds |
| Mortgage area | Ac. 1.110 Cents; 5,372.40 Sq. Yds (16.00%); designated as Plot Nos. 129 to 145 in the filed conditions |
The layout document also identifies side drains, nala channelization, avenue plantation, rainwater-harvesting pits, fencing of open spaces, street lighting and electricity facilities, sewerage disposal, and protected water supply as development items. It does not provide road-by-road dimensions, individual plot areas, building footprints, or a building/floor arrangement.
The filed architect’s certificate treats building-work activities as not applicable because the project is plotted. It lists internal roads and footpaths, water supply, sewerage, storm-water drains, landscaping and tree planting, street lighting, solid-waste management, rainwater harvesting and electrical-service areas in its completion schedule. No software-measured carpet-area or dwelling floor-plan measurements are available: the supplied drawing data records no measured plans and no flats. Floor plans
4. Homes, configurations & floor plans
The offering evidenced in the filed draft layout is plots, not apartments. The layout document states 145 plots, but the supplied records do not include plot-by-plot areas, plot-size bands, booked/available counts, or a plot schedule suitable for a unit table. Document index
The drawing review contains no measured plans and no flats. Carpet-area, room-dimension and apartment saleable-area measurements therefore do not apply to the supplied evidence for this plotted layout. Floor plans
5. Parking & vehicle circulation
The supplied layout information identifies roads as Ac. 3.807 Cents; 18,425.88 Sq. Yds (31.71%), but does not give a parking count, visitor parking provision, parking allocation to plots, or a parking plan. The filed evidence also does not establish individual parking rights or exclusive parking areas.
6. Amenities, recreation & open spaces
The filed draft-layout approval identifies a 10.00% open-space allocation of Ac. 1.20 Cents; 5,808.00 Sq. Yds and lists layout-service works. The architect’s certificate reports progress for the listed project works. The status below reflects those records; it is not independent site verification.
| Description / size | Ac. 1.20 Cents; 5,808.00 Sq. Yds (10.00%) |
|---|---|
| Evidence source | Draft layout |
| Declared progress / verified status | Allocated in draft layout; the architect certificate lists aggregate recreational open space at 0% in its amenity schedule. No independent completion verification supplied. RERA amenities |
| Description / size | Size not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | Recorded YES, 100%; filed progress declaration, not independently verified. |
| Description / size | Size not stated |
|---|---|
| Evidence source | Draft layout and architect certificate |
| Declared progress / verified status | Architect certificate reports 100%; not independently verified. |
| Description / size | Size and tree count not stated |
|---|---|
| Evidence source | Draft layout and architect certificate |
| Declared progress / verified status | Architect certificate reports 100%; not independently verified. |
| Description / size | Not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule RERA amenities |
| Declared progress / verified status | Recorded at 0%; no community building is evidenced as provided. |
| Description / size | No sanctioned or RERA-filed sizes or quantities supplied |
|---|---|
| Evidence source | Promoter marketing Promoter website |
| Declared progress / verified status | Marketing claims only; the supplied project-file evidence does not establish these as sanctioned or completed facilities. |
7. Utilities, building services & safety
The filed draft-layout document lists side drains, nala channelization, rainwater-harvesting pits, street lighting and electricity facilities, sewerage disposal and protected water supply. The architect’s certificate lists water supply, sewerage, storm-water drains, solid-waste management, water conservation/rainwater harvesting, street lighting and electrical meter-room/substation/receiving-station works.
| Evidence in the project record | Protected water supply is listed in the draft-layout document; water supply is recorded YES, 100% in the RERA amenity schedule. RERA amenities |
|---|---|
| Status / limitation | No source, storage capacity, treatment arrangement or independent verification is supplied. |
| Evidence in the project record | Sewerage disposal and side drains are listed in the draft layout; sewerage and storm-water drains are recorded YES, 100% in the RERA amenity schedule. RERA amenities |
|---|---|
| Status / limitation | The architect certificate lists sewerage (chamber, lines, septic tank, STP), but the supplied record does not specify capacities or establish an operating treatment plant. |
| Evidence in the project record | Rainwater-harvesting pits are listed in the draft layout; water conservation/rainwater harvesting is recorded YES, 100% in the RERA amenity schedule. RERA amenities |
|---|---|
| Status / limitation | Capacity and independent operating-status evidence are not supplied. |
| Evidence in the project record | Street lighting and electricity facilities are listed in the draft layout; electrical meter room/substation/receiving station is recorded YES, 100% in the amenity schedule. RERA amenities |
|---|---|
| Status / limitation | No supply capacity, backup-power or EV-charging details are supplied. |
| Evidence in the project record | The RERA amenity schedule records fire-protection and fire-safety requirements at 0%. RERA amenities |
|---|---|
| Status / limitation | No fire-system specifications or clearance are supplied. |
| Evidence in the project record | Solid-waste management and disposal is recorded YES, 100% in the RERA amenity schedule and listed in the architect certificate. RERA amenities |
|---|---|
| Status / limitation | No collection, processing or disposal capacity is supplied. |
| Evidence in the project record | Not established by the supplied filed layout/service evidence. |
|---|---|
| Status / limitation | No project-file specifications for CCTV, access control, accessible circulation or ramps are supplied. |
8. Location, access & connectivity
The project identity places the registered development in Yacharam, Ranga Reddy District, PIN 501509, and the filed draft-layout document identifies Thakkallapally Revenue Village, Yacharam Mandal. The project survey numbers are 165/P and 166/P. RERA record
The supplied location-distance dataset lists nearby reference points, including Financial District (Nanakramguda) at 1.2 km, a bus station at 2.2 km, Manuu Polytechnic Hyderabad at 1.6 km, Sankaraya Eye Hospital at 1.6 km, South India Shopping Mall at 2.6 km, Nanakramguda Government Primary School at 0.5 km, and ADP at 0.0 km. These are supplied location-dataset measurements; no route basis or travel times are provided. Location record
The promoter’s marketing material describes the site as “YACHARAM Near RRR, Hyd.” and includes travel-time claims; those are marketing statements, not used here as verified distances or connectivity facts.
9. Developer & development status
The registered promoter is GRUPE BUILDERS & DEVELOPERS LLP, an LLP. The supplied corporate record lists GSTIN 36AAXFG4121F1ZC. The project filing identifies Goli Gurunath as an authorized signatory and Goli Uttam as a partner. Corporate record Parties record
The registered project record gives proposed completion as 04/04/2025, and the TG-RERA certificate gives registration validity through 04/04/2025. The promoter’s Form-B affidavit separately states a completion timeframe of 04/5/2024. RERA record The supplied evidence includes an architect’s certificate dated 24/07/2025 reporting the listed works as 100% complete or not proposed; it does not include independent site verification or an authority-issued completion/occupancy certificate.
The promoter’s listed address is B, Nagarjuna Colony, Thakkallapally, Yacharam, Ranga Reddy, 501509. A promoter website is listed at https://www.grupe.in/treasure_county.html. Parties record
10. Approvals, official records & documents
| Supplied document / identifier | Certificate P02400004443, issued 02/05/2022 |
|---|---|
| What it establishes | Registration certificate for TREASURE COUNTY PHASE I; states validity through 04/04/2025 and includes promoter conditions. |
| Supplied document / identifier | Draft-TLP.No.110/2022/H, dated 04-04-2022; file Lr.Roc.No.20199/44/2022/e-Panchayat |
|---|---|
| What it establishes | Draft Technical Layout Pattern for a 145-plot layout over survey numbers 165/P and 166/P; document states further conditions apply before final layout release. |
| Supplied document / identifier | Lr.Roc. No. 20199/44/2022/e-panchayath, dated 04.04.2022 |
|---|---|
| What it establishes | OCR text names the promoter, extent and DTCP, but the document heading and approval details are not legible in the extraction. |
| Supplied document / identifier | Form-B affidavit |
|---|---|
| What it establishes | Promoter’s declarations concerning title, encumbrances, project funds, approvals and completion timeframe. |
| Supplied document / identifier | Dated 24/07/2025 |
|---|---|
| What it establishes | Architect’s certificate for the plotted project, listing layout-service items and reported completion percentages. |
| Supplied document / identifier | Layout-plan document listed in the project file Document index |
|---|---|
| What it establishes | The supplied entry is not extracted, so its drawing contents cannot be described here. |
| Supplied document / identifier | Not supplied Document index |
|---|---|
| What it establishes | No authority-issued completion certificate or occupancy certificate is evidenced in the supplied documents. |
1. Project at a glance
Project identity
Registered project name: TREASURE COUNTY PHASE I
Project type: Plotted development / layout
Phase / registered portion: Phase I; registration is for the named project. The filed draft layout identifies 145 plots.
TG-RERA registration: P02400004443
Registration validity: 02/05/2022 to 04/04/2025, as stated on the certificate; the certificate says extension would require Authority action.
Registered promoter: GRUPE BUILDERS & DEVELOPERS LLP, an LLP
RERA status in supplied record: Registration certificate issued under section 5. The record lists the registration end date as 04/04/2025; no extension is recorded in the supplied evidence.
Land and geographic identity
Locality: Yacharam; the filed draft-layout document identifies Thakkallapally Thanda
Revenue village: Thakkallapally Revenue Village in the filed draft-layout document; the project header identifies Yacharam as village.
Mandal: Yacharam (filed draft-layout document)
District / PIN: Ranga Reddy / 501509
Project survey numbers: 165/P and 166/P
Registered site extent: 48,574.41 sq. m in the project record
Draft-layout extent: Ac. 12-0.12 Guntas; also stated as Ac. 12.003 Cents; 58,094.52 Sq. Yds
Net / total area: RERA land details show total and net area as 48,574.41 sq. m; affected area is recorded as 0.
Boundaries: North, south, east and west are each recorded as “OTHERS LAND”; adjoining parcel identities are not disclosed.
Development identity
Sanctioning authority: Director of Town and Country Planning; the filed document says the draft layout was delegated to Thakkallapally Thanda Gram Panchayat.
Principal layout approval: Draft-TLP.No.110/2022/H, dated 04-04-2022
Approval status in filed document: Draft Technical Layout Pattern approved; the document describes further development, mortgage and gift-deed requirements before final layout release.
Approved built-up area: 28,064.94 sq. m is recorded in the project filing; a building-wise breakdown is not supplied.
Layout scale and land allocation: 145 plots; draft-layout allocation lists plotted area Ac. 6.935 Cents; 33,565.40 Sq. Yds (57.77%), roads Ac. 3.807 Cents; 18,425.88 Sq. Yds (31.71%), open space Ac. 1.20 Cents; 5,808.00 Sq. Yds (10.00%), HT Line Buffer area Ac. 0.061 Cents; 295.24 Sq. Yds, and mortgage area Ac. 1.110 Cents; 5,372.40 Sq. Yds (16.00%).
Buildings / floors: Not disclosed as apartment buildings. The filed record describes a plotted layout; apartment floor configuration and building count are not applicable or not supplied.
Parking: No plot- or project-wide parking count or parking allocation is supplied.
Offering and status
Product offered: Plots; the filed draft layout describes 145 plots. Plot-size bands and unit-wise availability are not supplied.
Booked / available: Counts are not supplied in the evidence provided for this overview.
RERA completion undertaking: Registration certificate lists validity through 04/04/2025.
Form B completion declaration: Promoter’s Form-B affidavit states a completion timeframe of 04/5/2024.
Architect-reported progress: Architect’s certificate dated 24/07/2025 reports the listed common-area works at 100% or not proposed; building-work activities are marked not applicable for this plotted project. This is a filed professional certificate, not an independent site inspection in the supplied record.
Completion / occupancy certificate: No completion certificate or occupancy certificate is included in the supplied project documents. The architect certificate is not itself an authority-issued completion or occupancy certificate.
2. The project story
TREASURE COUNTY PHASE I is registered with TG-RERA as a plotted development in survey numbers 165/P and 166/P. Its filed draft-layout document describes a 145-plot scheme at Thakkallapally Thanda, Yacharam Mandal, Ranga Reddy District. The document divides the layout among plotted land, roads, open space, a stated HT Line Buffer area and plots designated for mortgage.
The layout approval document is expressly a Draft Technical Layout Pattern. It describes conditions to be completed before final layout release, including development works, mortgage of designated plots and transfer of open-space and road areas by registered gift deed.
The project file includes an architect’s certificate dated 24/07/2025 reporting specified layout services and common-area items as 100% complete or not proposed. That is a reported certificate status; the supplied evidence does not independently verify site completion or provide an authority-issued completion/occupancy certificate.
The TG-RERA certificate lists validity to 04/04/2025, while the promoter’s Form-B affidavit records a completion timeframe of 04/5/2024. These are separate filed dates, not confirmation of current registration validity or project completion.
3. Master plan, architecture & building design
This is a plotted layout rather than an apartment or multi-storey building project. The filed draft-layout document describes 145 plots over Ac. 12-0.12 Guntas, also stated as Ac. 12.003 Cents; 58,094.52 Sq. Yds. The project land-details record gives total and net area as 48,574.41 sq. m.
The draft layout’s stated land-use schedule is:
Plotted area: Ac. 6.935 Cents; 33,565.40 Sq. Yds (57.77%)
Roads: Ac. 3.807 Cents; 18,425.88 Sq. Yds (31.71%)
Open space: Ac. 1.20 Cents; 5,808.00 Sq. Yds (10.00%)
HT Line Buffer area: Ac. 0.061 Cents; 295.24 Sq. Yds
Mortgage area: Ac. 1.110 Cents; 5,372.40 Sq. Yds (16.00%); designated as Plot Nos. 129 to 145 in the filed conditions
The layout document also identifies side drains, nala channelization, avenue plantation, rainwater-harvesting pits, fencing of open spaces, street lighting and electricity facilities, sewerage disposal, and protected water supply as development items. It does not provide road-by-road dimensions, individual plot areas, building footprints, or a building/floor arrangement.
The filed architect’s certificate treats building-work activities as not applicable because the project is plotted. It lists internal roads and footpaths, water supply, sewerage, storm-water drains, landscaping and tree planting, street lighting, solid-waste management, rainwater harvesting and electrical-service areas in its completion schedule. No software-measured carpet-area or dwelling floor-plan measurements are available: the supplied drawing data records no measured plans and no flats.
4. Homes, configurations & floor plans
The offering evidenced in the filed draft layout is plots, not apartments. The layout document states 145 plots, but the supplied records do not include plot-by-plot areas, plot-size bands, booked/available counts, or a plot schedule suitable for a unit table.
The drawing review contains no measured plans and no flats. Carpet-area, room-dimension and apartment saleable-area measurements therefore do not apply to the supplied evidence for this plotted layout.
5. Parking & vehicle circulation
The supplied layout information identifies roads as Ac. 3.807 Cents; 18,425.88 Sq. Yds (31.71%), but does not give a parking count, visitor parking provision, parking allocation to plots, or a parking plan. The filed evidence also does not establish individual parking rights or exclusive parking areas.
6. Amenities, recreation & open spaces
The filed draft-layout approval identifies a 10.00% open-space allocation of Ac. 1.20 Cents; 5,808.00 Sq. Yds and lists layout-service works. The architect’s certificate reports progress for the listed project works. The status below reflects those records; it is not independent site verification.
| Description / size | Ac. 1.20 Cents; 5,808.00 Sq. Yds (10.00%) |
|---|---|
| Evidence source | Draft layout |
| Declared progress / verified status | Allocated in draft layout; the architect certificate lists aggregate recreational open space at 0% in its amenity schedule. No independent completion verification supplied. |
| Description / size | Size not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule |
| Declared progress / verified status | Recorded YES, 100%; filed progress declaration, not independently verified. |
| Description / size | Size not stated |
|---|---|
| Evidence source | Draft layout and architect certificate |
| Declared progress / verified status | Architect certificate reports 100%; not independently verified. |
| Description / size | Size and tree count not stated |
|---|---|
| Evidence source | Draft layout and architect certificate |
| Declared progress / verified status | Architect certificate reports 100%; not independently verified. |
| Description / size | Not stated |
|---|---|
| Evidence source | TG-RERA amenity schedule |
| Declared progress / verified status | Recorded at 0%; no community building is evidenced as provided. |
| Description / size | No sanctioned or RERA-filed sizes or quantities supplied |
|---|---|
| Evidence source | Promoter marketing |
| Declared progress / verified status | Marketing claims only; the supplied project-file evidence does not establish these as sanctioned or completed facilities. |
7. Utilities, building services & safety
The filed draft-layout document lists side drains, nala channelization, rainwater-harvesting pits, street lighting and electricity facilities, sewerage disposal and protected water supply. The architect’s certificate lists water supply, sewerage, storm-water drains, solid-waste management, water conservation/rainwater harvesting, street lighting and electrical meter-room/substation/receiving-station works.
| Evidence in the project record | Protected water supply is listed in the draft-layout document; water supply is recorded YES, 100% in the RERA amenity schedule. |
|---|---|
| Status / limitation | No source, storage capacity, treatment arrangement or independent verification is supplied. |
| Evidence in the project record | Sewerage disposal and side drains are listed in the draft layout; sewerage and storm-water drains are recorded YES, 100% in the RERA amenity schedule. |
|---|---|
| Status / limitation | The architect certificate lists sewerage (chamber, lines, septic tank, STP), but the supplied record does not specify capacities or establish an operating treatment plant. |
| Evidence in the project record | Rainwater-harvesting pits are listed in the draft layout; water conservation/rainwater harvesting is recorded YES, 100% in the RERA amenity schedule. |
|---|---|
| Status / limitation | Capacity and independent operating-status evidence are not supplied. |
| Evidence in the project record | Street lighting and electricity facilities are listed in the draft layout; electrical meter room/substation/receiving station is recorded YES, 100% in the amenity schedule. |
|---|---|
| Status / limitation | No supply capacity, backup-power or EV-charging details are supplied. |
| Evidence in the project record | The RERA amenity schedule records fire-protection and fire-safety requirements at 0%. |
|---|---|
| Status / limitation | No fire-system specifications or clearance are supplied. |
| Evidence in the project record | Solid-waste management and disposal is recorded YES, 100% in the RERA amenity schedule and listed in the architect certificate. |
|---|---|
| Status / limitation | No collection, processing or disposal capacity is supplied. |
| Evidence in the project record | Not established by the supplied filed layout/service evidence. |
|---|---|
| Status / limitation | No project-file specifications for CCTV, access control, accessible circulation or ramps are supplied. |
8. Location, access & connectivity
The project identity places the registered development in Yacharam, Ranga Reddy District, PIN 501509, and the filed draft-layout document identifies Thakkallapally Revenue Village, Yacharam Mandal. The project survey numbers are 165/P and 166/P.
The supplied location-distance dataset lists nearby reference points, including Financial District (Nanakramguda) at 1.2 km, a bus station at 2.2 km, Manuu Polytechnic Hyderabad at 1.6 km, Sankaraya Eye Hospital at 1.6 km, South India Shopping Mall at 2.6 km, Nanakramguda Government Primary School at 0.5 km, and ADP at 0.0 km. These are supplied location-dataset measurements; no route basis or travel times are provided.
The promoter’s marketing material describes the site as “YACHARAM Near RRR, Hyd.” and includes travel-time claims; those are marketing statements, not used here as verified distances or connectivity facts.
9. Developer & development status
The registered promoter is GRUPE BUILDERS & DEVELOPERS LLP, an LLP. The supplied corporate record lists GSTIN 36AAXFG4121F1ZC. The project filing identifies Goli Gurunath as an authorized signatory and Goli Uttam as a partner.
The registered project record gives proposed completion as 04/04/2025, and the TG-RERA certificate gives registration validity through 04/04/2025. The promoter’s Form-B affidavit separately states a completion timeframe of 04/5/2024. The supplied evidence includes an architect’s certificate dated 24/07/2025 reporting the listed works as 100% complete or not proposed; it does not include independent site verification or an authority-issued completion/occupancy certificate.
The promoter’s listed address is B, Nagarjuna Colony, Thakkallapally, Yacharam, Ranga Reddy, 501509. A promoter website is listed at https://www.grupe.in/treasure_county.html.
10. Approvals, official records & documents
| Supplied document / identifier | Certificate P02400004443, issued 02/05/2022 |
|---|---|
| What it establishes | Registration certificate for TREASURE COUNTY PHASE I; states validity through 04/04/2025 and includes promoter conditions. |
| Supplied document / identifier | Draft-TLP.No.110/2022/H, dated 04-04-2022; file Lr.Roc.No.20199/44/2022/e-Panchayat |
|---|---|
| What it establishes | Draft Technical Layout Pattern for a 145-plot layout over survey numbers 165/P and 166/P; document states further conditions apply before final layout release. |
| Supplied document / identifier | Lr.Roc. No. 20199/44/2022/e-panchayath, dated 04.04.2022 |
|---|---|
| What it establishes | OCR text names the promoter, extent and DTCP, but the document heading and approval details are not legible in the extraction. |
| Supplied document / identifier | Form-B affidavit |
|---|---|
| What it establishes | Promoter’s declarations concerning title, encumbrances, project funds, approvals and completion timeframe. |
| Supplied document / identifier | Dated 24/07/2025 |
|---|---|
| What it establishes | Architect’s certificate for the plotted project, listing layout-service items and reported completion percentages. |
| Supplied document / identifier | Layout-plan document listed in the project file |
|---|---|
| What it establishes | The supplied entry is not extracted, so its drawing contents cannot be described here. |
| Supplied document / identifier | Not supplied |
|---|---|
| What it establishes | No authority-issued completion certificate or occupancy certificate is evidenced in the supplied documents. |
Other registrations of Treasure County
Frequently asked questions
Is TREASURE COUNTY PHASE I registered with Telangana RERA?
Yes. TREASURE COUNTY PHASE I is registered with the Telangana Real Estate Regulatory Authority as P02400004443; the registration status is New Project.
Who is the developer of TREASURE COUNTY PHASE I?
The promoter named in the RERA registration is GRUPE BUILDERS & DEVELOPERS LLP.
Where is TREASURE COUNTY PHASE I located?
TREASURE COUNTY PHASE I is in YACHARAM, Rangareddy, Telangana (501509).
When will TREASURE COUNTY PHASE I be completed?
The promoter's proposed date of completion filed with RERA is 04/04/2025. This is the promoter's declaration, not a guarantee.