Sign in

Radha Krishna Towers

RAMI REDDY CONSTRUCTIONS · Rangareddy · RERA P02400000006

Radha Krishna Towers is a residential apartment project in Attapur, Rajendranagar mandal, Ranga Reddy district. The registered promoter is RAMI REDDY CONSTRUCTIONS. The project is on 897.71 sq m of land and comprises one building with a cellar, stilt, ground floor and four upper floors, with 20 2BHK units. Its TG-RERA registration is P02400000006, and its proposed completion date is 31/03/2020.

More from Rami Reddy Constructions · 6 projects →

01What we found

Period endedTG-RERA registration ran to 31 Mar 2020 - check its extension on TG-RERA
12documents on file - each fact links to its page
1court case on this project's land (survey 480, 483, Attapur)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameRadha Krishna Towers RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo separate phase name is disclosed. The registration is for the project at Plot Nos. 93, 94, 95 & 96, Attapur.
TG-RERA registrationP02400000006, granted under section 5; valid from 29/11/2018 through 31/03/2020. The certificate records no extension. Registration validity is distinct from the completion deadline and from occupancy certification. RERA record
Registered promoterRAMI REDDY CONSTRUCTIONS RERA record Corporate record
RERA statusOn-Going Project in the supplied project record. The registration certificate’s stated validity ended on 31/03/2020; current registration status is not established by the supplied record. RERA filing

Land and geographic identity

FieldRecord
Locality / revenue villageAttapur; the building-permit extraction identifies ATTAPUR (V). RERA record RERA filing
Mandal / district / PINRajendranagar / Ranga Reddy / 500048 RERA record
Project survey numbers480/P & 483/P RERA record RERA filing
Additional survey reference in building-permit extraction481/P is also listed in the extracted permit survey numbers.
Site extentRERA land details: total and net area 897.71 sq m. The building-permit extraction states site and net area 891.8 m². RERA filing
Plot numbers93, 94, 95 & 96 RERA filing
Recorded boundariesEast: 30-0 Wide Road; West: Plot No- 97; North: 30-0 Wide Road; South: 30-0 Wide Road. RERA filing
Road-affected areaRERA land details: 0 sq m; the permit extraction also records road-affected area 0. RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit Order / approval no. 1/C6/08759/2017, approved 11 July, 2018. The permit extraction also lists file no. 1/C6/06601/2017. Approvals record
Approved built-up areaRERA filing records 2,128.75 sq m as approved built-up area. The permit extraction gives separate floor-area figures: residential 1,703.00 m², cellar 606.17 m², and stilt 412.55 m²; these are not interchangeable area measures. RERA filing
Buildings and floorsOne building is recorded. The GHMC permit describes Cellar + Stilt + Ground + 4 floors and building height 14.99 m. RERA filing
Parking provisionThe permit says the cellar and stilt approved for parking are to be used exclusively for vehicle parking. A parking-space count is not established in the supplied record.
Unit countsRERA filing: 20 2BHK units. The project record also reports one building unit as per approved plan and one proposed building unit as per agreement; those fields are not a count of apartments. RERA unit details RERA filing

Offering and status

FieldRecord
Configuration2BHK RERA unit table RERA unit details
RERA-filed saleable area110.18 sq m RERA unit table RERA unit details
Booked / available0 booked / 20 available, as last read from the TG-RERA portal; the record provides no as-of date, so counts are indicative. RERA unit table
Construction stageThe RERA project record lists completeness at 90%; this is a reported record value, not independent site verification. RERA record
Completion datesOriginal and revised proposed completion dates are both 31/03/2020. The promoter’s Form B also declares completion by 31th March 2020. RERA record RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is established in the supplied evidence. The permit makes occupancy certification compulsory before occupation. Document index

2. The project story

Radha Krishna Towers is recorded with TG-RERA as a residential apartment project in Attapur, Rajendranagar mandal, Ranga Reddy district. Its registered land identity names survey numbers 480/P & 483/P, at Plot Nos. 93, 94, 95 & 96. The building-permit extraction additionally lists 481/P. RERA record RERA filing

GHMC’s extracted building permit describes one residential building with a cellar, stilt, ground floor and four upper floors, with a maximum stated height of 14.99 m. The project’s RERA unit schedule lists 20 2BHK apartments. The permit describes the cellar and stilt as parking areas, but the available evidence does not state the number of parking bays. RERA unit details

The RERA record reports 90% completeness, while the registered completion date is 31/03/2020. That percentage is a reported project-record figure, not an independently verified inspection result. The supplied documents do not establish whether any building or phase has received an occupancy or completion certificate. RERA record Document index

3. Master plan, architecture & building design

The extracted GHMC permit describes a single residential building, Cellar + Stilt + Ground + 4, height 14.99 m. Its floor-area schedule records 425.75 m² residential area on the ground floor and 1,703.00 m² residential area across four upper floors, with 606.17 m² for the cellar and 412.55 m² for the stilt. The RERA filing separately states approved built-up area of 2,128.75 sq m; the supplied data does not define this as FSI-counted area or reconcile it to the permit’s floor-area entries. RERA filing

The permit extraction records 891.8 m² site and net area and a 45.6 m² tot-lot. RERA land details state total and net land area of 897.71 sq m. RERA filing

The approved-plan document is identified in the RERA filing as document 903, but its layout-plan extraction is unavailable. Consequently, the supplied evidence does not establish flat arrangement per floor, building footprint, lift or stair locations, detailed circulation, or the distribution of common areas. Document index

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020110.18 sq mSoftware-measured range: 76.7–83.8 sq m; median 77.5 sq m30%

RERA records the 2BHK saleable area as 110.18 sq m. Carpet-area figures above are software measurements from approved floor-plan drawing geometry, not RERA-filed disclosures; eight flat designs were measured, and all eight are marked as needing review. The source notes that saleable area also includes a home’s share of common areas, so it should not be treated as carpet area. RERA unit details Floor plans

The measured typical-floor plan identifies a living/dining area, kitchen, utility, two bedrooms and two toilets. For the illustrated flat, the listed room dimensions include living/dining 3.39 × 7.64 m, kitchen 2.44 × 3.39 m, and utility 1.07 × 3.39 m. These are drawing-based software measurements and should be checked against the drawing.

5. Parking & vehicle circulation

The GHMC permit describes one cellar and one stilt and requires both to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a parking-space count, distinguish resident from visitor or accessible spaces, or establish unit-specific parking allocations.

The permit extraction refers to a ramp and requires the gate to be shifted from the north-east corner to the north-west corner to maintain splay for ramp turning. Detailed driveway dimensions, pedestrian separation, mechanical parking, EV charging and parking allocation documents are not established in the supplied evidence.

6. Amenities, recreation & open spaces

The TG-RERA amenity record contains project-level progress entries; the percentages below are reported entries, not independently verified completion. The GHMC permit also includes specific site conditions and provisions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lot / parkPermit states tot-lot 45.6 m² and requires it to be fenced and maintained as greenery before occupancy certificate.TG-RERA amenity record: 0%; completion not independently verified. RERA amenities
Street lightingNo size or quantity supplied.TG-RERA amenity record RERA amenities100% recorded; independent completion verification not supplied.
Internal roads & footpathsNo dimensions supplied.TG-RERA amenity record RERA amenities0% recorded.
Community buildingsNo facility details supplied.TG-RERA amenity record RERA amenities0% recorded.

The supplied evidence does not identify clubhouse or indoor facilities, sports facilities, or additional convenience/community amenities.

7. Utilities, building services & safety

ServiceEvidence in the record
WaterTG-RERA lists water supply as available and records 50% progress. The permit requires a rainwater-harvesting structure; the filing records 8 RWHPs. Water source, storage, treatment and independent completion status are not established. RERA amenities
Sewerage and drainageTG-RERA lists sewerage and storm-water drains as available, each with 0% progress; treatment and disposal of sewage and sullage water is also recorded at 0%. No STP capacity or reuse arrangement is supplied. RERA amenities
ElectricalThe permit requires transformer space on site. TG-RERA lists an electrical meter room/sub-station/receiving station with 0% progress. Backup power and capacity are not established. RERA amenities
WasteThe permit requires a garbage house within the premises. TG-RERA records solid-waste management and disposal at 0% progress. RERA amenities
Fire and life safetyTG-RERA lists fire protection and fire-safety requirements at 0% progress. Detailed systems, clearances and independent compliance evidence are not supplied. RERA amenities
Construction safetyThe permit requires construction-worker insurance and developer responsibility for worker safety; it also requires construction to be covered by contractors-all-risk insurance until occupancy certificate. The permit extraction lists policy no. 433702/44/2018/686, with validity through 31 August, 2019.
Accessibility and vertical transportationLift details, accessible routes, ramp specifications and accessibility features are not established in the supplied evidence.

8. Location, access & connectivity

The project’s official location is Attapur revenue village, Rajendranagar mandal, Ranga Reddy district, PIN 500048. The RERA filing identifies Plot Nos. 93, 94, 95 & 96 and survey numbers 480/P & 483/P. RERA record RERA filing

The permit records 30-0 Wide Road on the east, north and south boundaries and Plot No- 97 on the west; it also refers to an 18 mt. road width in its conditions. RERA filing

The supplied connectivity record gives these measured distances: Panchavati Hospital 1.7 km, Zilla Parishath High School Bhuthpur 1.7 km, MVS Degree College 3.2 km, and Outer Ring Road (nearest sampled interchange, approx) 71.0 km. These are listed distances; no travel times or public-transport details are supplied. Location record

9. Developer & development status

The registered promoter is RAMI REDDY CONSTRUCTIONS, recorded as a partnership. The project record identifies P. S. V. Rami Reddy as authorized signatory and lists Ganga Shiva Pallerla, Shivani Reddy Pallerla and Venkata Rama Laxmi Pallerla as partners. RERA record Corporate record Parties record

The promoter’s Form B declares that the project will be completed by 31th March 2020, and includes undertakings concerning the separate account, annual audit, pending approvals and updates to information filed with the Authority. The declaration’s verification place is Telangana, but no completed verification date is filled in.

The project has one recorded building, and no separate phase-wise completion status is established. RERA filing Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C records registration P02400000006, issued 29/11/2018, valid through 31/03/2020; no extension is recorded in the certificate.
GHMC building permitBuilding Permit Order, approval no. 1/C6/08759/2017, approved 11 July, 2018; associated file no. 1/C6/06601/2017.
Layout referencePermit extraction lists LRS/787/CR-VI/SZ/GHMC/2008. The RERA-filed layout-plan document 903 is listed, but its extracted plan content is unavailable.
RERA promoter declarationForm B affidavit by P. S. V. Rami Reddy, identifying RAMI REDDY CONSTRUCTIONS and recording the promoter’s completion and regulatory undertakings.
Occupancy / completion certificateNot established in the supplied documents. The building permit requires a completion notice and occupancy certificate and states that occupancy certification is compulsory before occupation. Document index

Frequently asked questions

Is Radha Krishna Towers registered with Telangana RERA?

Yes. Radha Krishna Towers is registered with the Telangana Real Estate Regulatory Authority as P02400000006; the registration status is On-Going Project.

Who is the developer of Radha Krishna Towers?

The promoter named in the RERA registration is RAMI REDDY CONSTRUCTIONS.

Where is Radha Krishna Towers located?

Radha Krishna Towers is in Attapur, Rajendranagar, Rangareddy, Telangana (500048).

When will Radha Krishna Towers be completed?

The promoter's proposed date of completion filed with RERA is 31/03/2020. This is the promoter's declaration, not a guarantee.