ASHA RESIDENCY is a residential apartment project in ATTAPUR, Rajendranagar, Ranga Reddy, developed by the registered promoter SREENIVASA CONSTRUCTIONS, a partnership. The registered site area is 836 sq.m, with one building comprising Cellar + Stilt + 5 and 15 homes. The RERA-filed configuration is 3BHK, with a saleable area of 153.84 sq.m. Its TG-RERA registration number is P02400000430, and its proposed completion date is 23/08/2024.

More from Sreenivasa Constructions · 4 projects →

01What we found

Period endedTG-RERA registration ran to 23 Aug 2024 - check its extension on TG-RERA
26documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameASHA RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo separate phase name is disclosed. The RERA record describes one building and 15 units. RERA filing RERA unit table
TG-RERA registrationP02400000430 RERA record
Registration validity12/03/2019 to 23/08/2024; certificate says subject to extension by the Authority. Extension status is not established in the supplied record. RERA record
Registered promoterSREENIVASA CONSTRUCTIONS, a partnership RERA record RERA filing Parties record
RERA statusListed as “On-Going Project.” The registration end date and completion deadline are separate from the occupancy-certificate record described below. RERA filing RERA record

Land and geographic identity

FieldProject record
LocalityATTAPUR RERA record RERA filing
Revenue villageAttapur RERA record RERA filing
Mandal / district / PINRajendranagar / Ranga Reddy / 500048 RERA record RERA filing
Project survey numbers as stated in the RERA record438/P 472/P 473 474 AND 474 RERA record RERA filing
Survey numbers in the building permit438/P, 472/P, 473, 474
Registered site extent836 sq.m total area; 836 sq.m net area; road-affected area recorded as 0 sq.m RERA filing
BoundariesEast: 30 FEET WIDE ROAD; West: 40 FEET WIDE ROAD; North: PLOT NOS 37 AND 46; South: PLOT NOS 34 AND 49 RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permissionBuilding Permit Order 2/C11/13734/2018, approved 23 August, 2018; file no. 2/C11/13730/2018 Approvals record
Sanctioned building arrangementOne residential building: Cellar + Stilt + 5
Sanctioned parameters recorded in the permitResidential area 2,052.40 m2; cellar 345.92 m2; stilt 341.75 m2; height 14.5 m
Approved built-up area in the RERA fields2,052.40 sq.m RERA filing
Building countOne building / one block in the RERA record RERA filing RERA unit table
Units15 units in the RERA unit record; the land-details fields state one total building unit and one proposed building unit, not an apartment count. RERA unit table RERA filing
Parking levels / provisionCellar and stilt are identified as parking in the building-permit conditions; a separate car-space count is not supplied.

Offering and status

FieldProject record
RERA-filed configuration3BHK RERA unit table
RERA-filed saleable area153.84 sq.m RERA unit table
Booking and availability0 booked; 15 available, as last read from the TG-RERA portal. The portal record has no as-of date, so counts are indicative. RERA unit table
Promoter-declared completion date23/08/2024, also shown as the revised proposed completion date RERA record RERA filing
Occupancy-certificate recordA GHMC Occupancy Certificate, 1429/GHMC/CHR/2021-OC, is on file for the Attapur residential apartment building; the filed certificate says it was inspected and declared fit for occupation. Approvals record
Scope of OC recordThe certificate identifies the building on the listed Attapur plots and survey numbers; the supplied evidence does not provide a separate phase-wise OC schedule.
Construction stageNo independently verified current site-progress assessment is supplied. The portal status remains “On-Going Project.” RERA filing RERA record

2. The project story

Asha Residency is recorded with TG-RERA as a single-building residential apartment project at Attapur, Rajendranagar, on a registered site extent of 836 sq.m. The RERA unit record lists one 3BHK configuration comprising 15 units. RERA record RERA filing RERA unit table

The building permit describes a residential building with a cellar, stilt and five upper floors. It also identifies the cellar and stilt as approved for vehicle parking. The promoter’s Form B affidavit-cum-declaration undertakes completion by 23 August 2024.

A GHMC Occupancy Certificate is filed for the residential apartment building at Attapur. It records a completion date of 01 May 2021 and states that the building was inspected and declared fit for occupation. The TG-RERA portal nevertheless labels the project “On-Going Project”; the supplied information does not explain that status label or provide a current independent site inspection. RERA filing RERA record

3. Master plan, architecture & building design

The RERA record describes a 836 sq.m site and records approved built-up area of 2,052.40 sq.m. The building-permit extract separately lists a residential area of 2,052.40 m2, a cellar of 345.92 m2, a stilt of 341.75 m2, and five residential upper floors. RERA filing RERA filing

The filed GHMC Occupancy Certificate identifies the completed building as a residential apartment building and records floor area of 2055.45 m2 and height of 14.75 m. No evidence supplied here establishes the building footprint, flats per floor, lift or stair arrangement, entry/exit configuration, internal circulation, or residential common-area distribution.

The permit lists a 42.18 m2 tot-lot and 40 trees; the filed occupancy-certificate extraction lists a tot-lot area of 3.00 m2. No landscape plan or drawing-based explanation of these spaces is supplied in this Overview evidence.

4. Homes, configurations & floor plans

The TG-RERA filing lists 15 3BHK units, each with a saleable area of 153.84 sq.m; its latest captured booking count shows 0 booked and 15 available, without an as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK15015153.84 sq.mSoftware-measured range: 89.4–136.5 sq.m; median 97.5 sq.m37%

Carpet-area figures are software measurements from the supplied floor-plan drawing geometry, not RERA-filed areas; the measurement record says two drawings need review. The RERA saleable area is a separate filed measure and includes the home’s share of common areas, so it should not be read as carpet area. Floor plans RERA unit details

The measured second-floor flat plan includes a living/dining area, kitchen, three bedrooms and three toilets. The supplied drawing extraction gives room dimensions for one flat, but does not establish that every unit has the same arrangement. RERA unit details

5. Parking & vehicle circulation

The GHMC building-permit conditions identify both the cellar and stilt as approved for parking and state that those spaces are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit extraction also records a cellar area of 345.92 m2 and a stilt area of 341.75 m2.

The occupancy-certificate extraction records parking area of 242.18 m2. No sanctioned car or two-wheeler space count, visitor or accessible-space count, ramp details, internal driveway arrangement, EV provision, or legally documented individual-unit parking allocation is supplied. A parking area or drawn provision alone does not establish exclusive ownership or allocation.

6. Amenities, recreation & open spaces

The following are facilities appearing in the RERA amenity record or GHMC building-permit / occupancy-certificate extracts. The RERA amenity record assigns 0 progress to each listed item; no independent completion verification is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green stripBuilding permit records 42.18 m2; occupancy-certificate extraction records tot-lot area 3.00 m2.GHMC permit and occupancy-certificate recordsNot independently verified complete; RERA amenity record shows 0%. RERA amenities
Green Strip / TOT LOT / ParkRERA amenity item; no further description supplied.RERA amenity record RERA amenitiesListed “YES”; progress recorded as 0%.
Community buildingsNo size or description supplied.RERA amenity record RERA amenitiesProgress recorded as 0%.
Internal roads and footpathsNo layout detail supplied.RERA amenity record RERA amenitiesProgress recorded as 0%.
Street lightingNo fixture or coverage details supplied.RERA amenity record RERA amenitiesProgress recorded as 0%.

No clubhouse, indoor recreation facility, or sports facility is identified in the supplied RERA amenity data.

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage (including chambers, lines, septic tank and STP), and water conservation/rainwater harvesting as available, but records 0% progress for these items. RERA amenities The building permit requires a rainwater-harvesting percolation pit, a garbage house, and an STP and septic tank; it also records three rainwater-harvesting pits. The occupancy-certificate extraction records 6 rainwater-harvesting units.

The building permit requires space for a transformer and identifies an STP and septic tank, but the supplied record does not establish the water source, storage or treatment capacity, sewer connection, storm-water design, electrical backup capacity, or transformer installation status. The RERA amenity list includes storm-water drains, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements, each with progress recorded as 0%. RERA amenities

No lift specifications, service-lift details, fire-system particulars, escape-stair or fire-access details, CCTV or access-control details in the RERA filing, or accessibility provisions are established by the supplied project records.

8. Location, access & connectivity

The registered location is Attapur, Rajendranagar Mandal, Ranga Reddy District, PIN 500048. The RERA boundary record describes a 30 FEET WIDE ROAD to the east and a 40 FEET WIDE ROAD to the west. RERA record RERA filing RERA filing

The location data supplied identifies HITEC City at 9.6 km from the cadastral parcel centroid. Location record No public-transport routes, nearby landmarks, or other measured distances are supplied in the project evidence.

9. Developer & development status

The registered promoter is SREENIVASA CONSTRUCTIONS, recorded as a partnership. The promoter’s RERA address is Nandini Enclave, 15, Sri Laxmi Nagar Colony, Attapur, Rajendranagar, Ranga Reddy, 500048; the supplied corporate identifier is GSTIN 36ABUFS1521M1ZO. Parties record RERA filing Corporate record

RERA lists JULOORI SREENIVASULU as an authorized signatory and JULOORI SARITHA as a partner. In Form B, Juloori Sreenivasulu declares for Sreenivasa Constructions, identifies the landowners as the title basis, and undertakes completion by 23 August 2024. These are promoter-filed declarations. Parties record

The project is registered for 15 3BHK units, with the portal showing 0 booked and 15 available; those counts have no recorded as-of date. The current site-progress stage is not independently verified in the supplied evidence. RERA unit table RERA unit details

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400000430; issued 12/03/2019; valid through 23/08/2024 unless extended
What the supplied record establishesForm C records ASHA RESIDENCY, Sreenivasa Constructions and the registration period.
GHMC building permit
Identifier / date2/C11/13734/2018; 23 August, 2018; file no. 2/C11/13730/2018
What the supplied record establishesConditional building permission for a residential building at Attapur; permit includes building parameters and conditions.
GHMC Occupancy Certificate
Identifier / date1429/GHMC/CHR/2021-OC; 14 December, 2021; application no. 000809/GHMC/0450/CHR2/2021-OC
What the supplied record establishesFiled certificate identifies the Attapur residential apartment building and states that it was inspected and declared fit for occupation; completion date recorded as 01 May, 2021.
Form B affidavit-cum-declaration
Identifier / dateDated 29 December, 2018
What the supplied record establishesPromoter declaration covering the stated title basis, encumbrance statement, completion undertaking and RERA-related commitments.
Floor-plan record
Identifier / dateDocument 22830
What the supplied record establishesDrawing-based plan information was used for software measurement; the supplied material does not establish a separate plan-approval identifier in that document record.
Layout reference in building permit
Identifier / date2946/MP2/HUDA/1998
What the supplied record establishesListed as a layout / subdivision number in the permit extract.

Frequently asked questions

Is ASHA RESIDENCY registered with Telangana RERA?

Yes. ASHA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02400000430; the registration status is On-Going Project.

Who is the developer of ASHA RESIDENCY?

The promoter named in the RERA registration is SREENIVASA CONSTRUCTIONS.

Where is ASHA RESIDENCY located?

ASHA RESIDENCY is in ATTAPUR, Rajendranagar, Rangareddy, Telangana (500048).

When will ASHA RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 23/08/2024. This is the promoter's declaration, not a guarantee.