Kirans Doyen Crest

DOYEN ESTATES · Rangareddy · RERA P02400000229

KIRANS DOYEN CREST is a residential apartment project in Panjagutta, Ranga Reddy district; the mandal is not disclosed. The registered promoter is Doyen Estates. The project is on a total site area of 1007.18 sq. m and is recorded as one building and one block, with a G+3 building and 10 3BHK units. Its TG-RERA registration number is P02400000229, and its proposed completion date is 31/07/2021.

01What we found

Period endedTG-RERA registration ran to 31 Jul 2021 - check its extension on TG-RERA
7documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameKIRANS DOYEN CREST RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration is for the project as a whole RERA record
TG-RERA registrationP02400000229, granted 21/01/2019; stated validity through 31/07/2021. Registration validity is distinct from the stated project completion date. RERA record
Registered promoterDoyen Estates (also written “M/s Doyen Estates” in Form B); entity type stated as Partnership Parties record RERA filing
RERA status in project recordListed as “On-Going Project.” The supplied certificate records validity through 31/07/2021 and says it was not extended; no current extension or replacement validity is evidenced here. RERA record

Land and geographic identity

ItemProject record
Locality / revenue villagePanjagutta; the supplied record does not separately confirm whether this locality entry is the revenue-village name. RERA record Land records
MandalNot disclosed Land records
DistrictRanga Reddy RERA record Land records
PIN500082 RERA record
Survey numbers135, 136, 137, 138 & 140 RERA record Land records
SubdivisionsNone disclosed Land records
Plot / site address identifier6-3-347/10 RERA filing
Site areaTotal area 1007.18 sq. m; net area 886.64 sq. m; road-widening/FTL-affected area 120.53 sq. m, as recorded in the RERA land details. RERA filing
BoundariesEast: neighbours’ land; West: 30 Road; North: neighbours’ land; South: 30 Road RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal approval identifiersRERA-filed plan approval 1/C17/13718/2018; the supplied building permit extraction identifies permit 1/C17/1310/2018 and file 1/C17/1181/2018, dated 22 Aug. 2018. RERA record Approvals record
Approved built-up area2851.41 sq. m, as recorded in the project fields RERA filing
Building arrangementOne building / one block is recorded in the RERA land and unit summaries. RERA filing RERA unit table
Sanctioned floors and heightThe permit extraction describes a residential G+3 building, height 14.4 m. Basement, stilt and podium configuration is not reliably established in the supplied extraction.
ParkingPermit conditions refer to cellar and stilt approved for parking, but a reliable approved parking-space count or floor-by-floor parking schedule is not supplied.
Unit countsGHMC permit extraction: sanctioned unit count is not legible in the supplied record. RERA filing: 10 3BHK units. RERA unit table

Offering and status

ItemProject record
RERA-filed configuration3BHK; filed saleable area 179.04 sq. m RERA unit table
Booked / available9 booked; 1 available, as last read from the TG-RERA portal; no as-of date is supplied, so these counts are indicative. RERA unit table
Construction stageProject record labels the project “On-Going Project” and records completeness as 80%; the date and independent site verification basis for that percentage are not supplied. RERA record
Completion datesOriginal and revised proposed completion date: 31/07/2021; also stated in the promoter’s Form-B declaration. RERA record
Occupancy / completion certificateThe supplied GHMC permit extraction says an occupancy certificate is mandatory before occupation and records that completion is not certified in that extraction. No project OC or completion certificate is supplied.

2. The project story

  • Project identity and site: KIRANS DOYEN CREST is registered with TG-RERA as a residential apartment project at the recorded Panjagutta locality, on the site identified as 6-3-347/10 and survey numbers 135, 136, 137, 138 and 140. The RERA land record gives a total area of 1007.18 sq. m, a net area of 886.64 sq. m and an affected area of 120.53 sq. m. RERA record RERA filing
  • Building, units and progress: The project is recorded as one building and one block. TG-RERA lists ten 3BHK units, with nine booked and one available in the portal data supplied; those booking figures have no stated capture date. The project record gives 80% completeness, but does not provide a dated progress certificate or independent site inspection evidence establishing that stage. RERA unit table RERA record
  • Completion and registration status: The RERA certificate and Form-B declaration state a completion date of 31/07/2021. The supplied permit extraction does not certify completion, and no occupancy certificate is included in the supplied project documents. The completion deadline, the registration validity period and the status of an occupancy certificate are separate matters; the supplied records do not establish a later registration extension or an OC.

3. Master plan, architecture & building design

  • Building and area: The project record describes one residential building on the recorded site. The RERA-filed approved built-up area is 2851.41 sq. m. The GHMC building-permit extraction describes a G+3 residential building with a stated height of 14.4 m; it also records a site area of 100710(, an open area of 59264 and a tot lot of 492, but those extracted figures are truncated or ambiguously formatted and should not be treated as reliable measurements. RERA filing RERA filing
  • Plan detail: The permit extraction lists a cellar and stilt for parking and requires the sanctioned plan to be followed. It does not provide a dependable floor-by-floor plan description, building footprint, flats-per-floor count, lift or stair layout, circulation arrangement, or a clear account of residential versus common-area distribution. Basement, stilt and podium details therefore remain unverified beyond the permit’s reference to cellar and stilt parking.
  • Affected land: The RERA-filed land record identifies 120.53 sq. m as affected by road widening/FTL and records a net area of 886.64 sq. m. The permit extraction separately states that the road-affected portion is to be surrendered to GHMC without compensation. Detailed parcel and approval interpretation is addressed in the relevant land and approvals sections of the report. RERA filing

4. Homes, configurations & floor plans

  • Unit mix and booking: TG-RERA records ten 3BHK units, with nine booked and one available, and a filed saleable area of 179.04 sq. m. Booking counts have no as-of date in the supplied portal data. RERA unit table
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1091179.04 sq. m140.8 sq. m (software-measured from drawing)21% (software-derived from drawing records)
  • Area measurements: The 3BHK carpet-area figure is measured by software from the supplied approved floor-plan drawing, not a TG-RERA disclosure; it is marked for review. The filed saleable area is a separate RERA figure and includes the home’s share of common areas, so it should not be treated as carpet area. RERA unit details Floor plans
  • Drawing layout: The measured 3BHK drawing includes bedrooms, living/dining and drawing areas, toilets, a kitchen and two utility areas. The drawing-based measurements are not a substitute for verification against the approved plan and the unit’s final agreement documents. RERA unit details

5. Parking & vehicle circulation

The GHMC permit extraction states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not converted to another use. It does not establish the number of sanctioned spaces, whether spaces are for cars or two-wheelers, visitor or accessible provision, or any unit-specific parking allocation.

No reliable information is supplied on parking ramps, entry and exit points, internal driveways, pedestrian separation, mechanical parking or EV charging. A parking bay shown on a drawing, if any, would not by itself establish exclusive ownership or an allotment to a particular unit.

6. Amenities, recreation & open spaces

The TG-RERA amenities record lists water supply, sewerage including chambers/lines/septic tank/STP, storm-water drains, rainwater harvesting and a substation/electrical meter room as available at 100%. Other listed amenity progress fields are recorded at 0%; these are portal progress entries, not independent verification of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplyNo source or capacity disclosedTG-RERA amenities RERA amenitiesListed available; 100% recorded
Sewerage / STPSewerage entry includes chambers, lines, septic tank and STP; capacity not disclosedTG-RERA amenities RERA amenitiesListed available; 100% recorded
Storm-water drainsNo system dimensions disclosedTG-RERA amenities RERA amenitiesListed available; 100% recorded
Rainwater harvestingNo storage or recharge capacity disclosedTG-RERA amenities RERA amenitiesListed available; 100% recorded
Electrical meter room / substation / receiving stationNo capacity disclosedTG-RERA amenities RERA amenitiesListed available; 100% recorded
Green strip / tot lot / parkNo reliable project size established in the supplied recordTG-RERA amenities; GHMC permit extraction RERA amenitiesRERA progress recorded at 0%; permit requires tot-lot fencing and greenery, but delivery is not independently verified
Internal roads and footpathsNo dimensions disclosedTG-RERA amenities RERA amenitiesProgress recorded at 0%
Street lightingNo details disclosedTG-RERA amenities RERA amenitiesProgress recorded at 0%
Community buildings; reception and lobbyNo size or facility details disclosedTG-RERA amenities RERA amenitiesProgress recorded at 0%
Solid-waste management and sewage/sullage treatment and disposalNo further operational details disclosedTG-RERA amenities RERA amenitiesProgress recorded at 0%

The GHMC permit extraction also lists 50 trees and a rainwater-harvesting structure as permit-related provisions, without evidence here that these have been completed.

7. Utilities, building services & safety

  • Utilities: The RERA amenities record lists water supply, sewerage/STP, storm-water drainage, rainwater harvesting and an electrical meter room/substation/receiving station as available, each at 100% progress. No capacities, water source, treatment process, reuse arrangement, drainage outlet or electrical supply details are supplied. RERA amenities
  • Permit-related provisions: The GHMC permit extraction lists an STP, water supply, electricity connections and a generator, and requires rainwater harvesting, a transformer space and an on-site garbage house. The extraction does not establish the capacity or current operational status of these provisions.
  • Safety and building services: The permit extraction requires fire access where required, lift provision, and safety measures during construction. Its conditions also address technical supervision of sanitation, plumbing, fire safety and electrical installations. The supplied record does not include evidence establishing fire-system specifications, fire clearance, lift capacity, emergency-escape details or completion of these systems.
  • Other facilities: No project-specific evidence is supplied for CCTV, controlled access, waste segregation, accessibility ramps or accessible circulation. Permit conditions referring to general accessibility requirements do not establish that accessible facilities were provided in this project.

8. Location, access & connectivity

  • Official location: The official project record identifies the locality as Panjagutta, district Ranga Reddy, PIN 500082, with site address identifier 6-3-347/10 and survey numbers 135, 136, 137, 138 and 140. The mandal and a separately verified revenue-village name are not disclosed. RERA record Land records RERA filing
  • Location-record coordinates and distances: The project location record provides a cadastral-parcel centroid at 16.71420, 78.03656. Its listed nearby reference distances are Outer Ring Road (nearest sampled interchange, approximate): 71.0 km; MVS Degree College: 3.2 km; Panchavati Hospital: 1.7 km; and Zilla Parishath High School Bhuthpur: 1.7 km. These are supplied location-record distances, not travel-time estimates. Location record
  • Connectivity: The promoter/vendor location description and connectivity claims are not used here to supplement the official location record. No project-specific approach-road route, public-transport distance or travel time is established by the supplied official project data.

9. Developer & development status

  • Promoter: The registered promoter is Doyen Estates, identified in the RERA filing as a partnership. The recorded address is Doyen Galaxy, Srinagar Colony, 6-3-347/10, Dwarakapuri Colony, Panjagutta, Ranga Reddy, 500082. An authorized signatory is recorded as Anish Prem Kumar Polavarapu. The supplied record does not provide a verified corporate registration number or promoter contact details. Parties record RERA filing
  • Project status: The RERA project record states 80% completeness and gives a proposed completion date of 31/07/2021. These are project-record and promoter-declared details; no dated independent construction inspection is supplied. The GHMC permit extraction does not certify completion, and the supplied documents do not include an occupancy certificate. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400000229; issued 21/01/2019; valid through 31/07/2021
What the supplied record establishesForm C records registration of KIRANS DOYEN CREST to Doyen Estates and includes the stated separate-account condition.
RERA-filed plan approval identifier
Identifier / date1/C17/13718/2018; approval date recorded as 23/08/2018
What the supplied record establishesProject filing identifies this as the plan approval number. RERA record Approvals record
GHMC building permit order
Identifier / datePermit 1/C17/1310/2018; file 1/C17/1181/2018; dated 22 Aug. 2018
What the supplied record establishesExtracted permit describes a G+3 residential building and lists conditions and project provisions.
Approved drawing
Identifier / dateDocument 12202, drawing stamp dated 23-08-2018
What the supplied record establishesDrawing-derived floor-plan measurements are available for review; the supplied record notes the stamp reading needs review.
Form-B promoter declaration
Identifier / dateVerified at Hyderabad, 05 January 2019
What the supplied record establishesDoyen Estates declares the land free of encumbrances or encumbrance details NIL and undertakes completion by 31.07.2021. This is a promoter declaration, not independent verification.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesThe GHMC permit extraction records that an occupancy certificate is mandatory before occupation and that completion is not certified in that extraction.
Approved-layout lookup
Identifier / dateHMDA DPMS source unavailable to public access in the supplied record
What the supplied record establishesNo approved-layout lookup result is available from that portal; this is an information limitation, not evidence of refusal. HMDA

The supplied approvals and portal records do not include an occupancy certificate or a documented registration extension. The complete permit conditions and separate land/title evidence are addressed in the report’s relevant sections.

Frequently asked questions

Is KIRANS DOYEN CREST registered with Telangana RERA?

Yes. KIRANS DOYEN CREST is registered with the Telangana Real Estate Regulatory Authority as P02400000229; the registration status is On-Going Project.

Who is the developer of KIRANS DOYEN CREST?

The promoter named in the RERA registration is DOYEN ESTATES.

Where is KIRANS DOYEN CREST located?

KIRANS DOYEN CREST is in Panjagutta, Rangareddy, Telangana (500082).

When will KIRANS DOYEN CREST be completed?

The promoter's proposed date of completion filed with RERA is 31/07/2021. This is the promoter's declaration, not a guarantee.