Moonglade Avenue
SARADA PROJECTS LIMITED & OTHERS · Yadadri Bhuvanagiri · RERA P02000009399
MOONGLADE AVENUE is a plotted development / open layout at Kondamadugu, Bibinagar, Yadadri Bhuvanagiri. It is being developed by SARADA PROJECTS LIMITED & OTHERS. The project has a total site area of 90598.7 sq.m and 187 numbered residential plots; no building count, floors or plot configurations are disclosed. Its TG-RERA registration is P02000009399, and the Form B declaration states a proposed completion date of 27/02/2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | MOONGLADE AVENUE RERA record |
| Project type | Plotted development / open layout RERA record RERA filing |
| Phase / registered portion | New project; the registration identifies the plotted layout on the listed survey land. A separate phase designation is not disclosed. RERA record |
| TG-RERA registration | P02000009399, recorded as valid from 28 February 2025 RERA record |
| Registration validity | The certificate states validity from 28/02/2025 through 27/02/2028, unless extended by the Authority. This is the registration period, not the project’s completion deadline. |
| Registered promoter | SARADA PROJECTS LIMITED & OTHERS RERA record RERA filing |
| RERA status | Registered; the supplied record identifies the project as a “New Project.” RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Kondamadugu (also styled “Kondamadugu Village” in the filed approval and title material) RERA record RERA filing |
| Mandal | Bibinagar RERA record RERA filing |
| District | Yadadri Bhuvanagiri RERA record RERA filing |
| PIN | 508216 RERA record |
| Project survey numbers | 291/P, 294/P, 295/P, 298/P, 326/P, 336, 337/P and 338/P RERA record Land records |
| Total site area | 90598.7 sq.m in the RERA land details and filed HMDA approval material RERA filing |
| Road-widening / affected area | 1235.12 sq.m RERA filing |
| Net area | 89363.58 sq.m in the RERA land details RERA filing |
| Net layout area in drawing | 89060.05 sq.m shown on the filed layout drawing |
| Boundaries | East: ROAD; West, North and South: OTHERS LAND RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout permit | 000022/LO/Plg/HMDA/2025, dated 28 February 2025; the filed material describes a draft layout permit / draft layout letter. Approvals record |
| Application / file number | 062517/GHT/LT/U6/HMDA/27032024 Approvals record |
| Approved use stated in drawing | Residential open layout; the drawing records “Residential” plot use and “Residential zone-1 (urban areas contiguous to growth corridor).” |
| Layout plot count | 187, read from the plot numbers printed on the drawing; drawing-based count, not a RERA unit-count disclosure. Layout record |
| Approved built-up area | Not stated in the supplied plotted-layout records; the RERA filing’s “Approved Built up Area” field records 46236.7 sq.m, and the layout drawing labels this as plotted area. RERA filing |
| Buildings / floors | Not applicable to the offered plotted layout as described in the supplied evidence; no building count or floor configuration is disclosed. RERA record |
| Parking | No parking count, parking level or allocation is disclosed in the supplied project records. |
Offering and status
| Field | Project record |
|---|---|
| Offered product | Residential plots in an open layout RERA record |
| Plot-size range | Not established in the supplied structured drawing extraction; plot numbers are printed, but plot dimensions are not available in the extracted layout data. Layout record |
| Booked / available counts | Not disclosed in the supplied evidence. |
| Construction / development stage | The project is registered as a new project. The supplied evidence does not establish independently verified on-site progress. RERA record RERA amenities |
| Promoter-declared completion deadline | 27/02/2028 in the Form B declaration. |
| Completion date in project header | 27/06/2028 RERA record |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is supplied. This is a plotted-layout project; the supplied record does not provide an OC status for any building or phase. Document index |
2. The project story
- MOONGLADE AVENUE is registered as a residential plotted development at Kondamadugu, Bibinagar Mandal, Yadadri Bhuvanagiri District. The TG-RERA registration identifies the project and its survey land; the filed HMDA material describes an open layout with 187 numbered plots. Plot dimensions, inventory status and plot-wise booking or availability figures are not established in the supplied data. RERA record Layout record
- The drawing allocates land to plots, internal roads, parks/open space and social infrastructure. Its area statement records 46236.70 sq.m of plotted area, 29511.46 sq.m of road area, 11038.49 sq.m of organized open-space/park/utility area, and 2273.44 sq.m of social infrastructure area. The filed approval material describes a draft layout permit and states that the Executive Authority is to release the plans; it also sets out development works and conditions. The evidence supplied does not establish that those works are complete or independently verified.
- The Form B affidavit declares a completion deadline of 27/02/2028. The project header separately records 27/06/2028; the Overview reports both recorded dates without reconciling them. No occupancy or completion certificate is included in the supplied documents. RERA record Document index
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey residential building scheme in the supplied project record. The filed layout drawing identifies 187 plots and shows the following land-use statement: Layout record
| Drawing land-use item | Area |
|---|---|
| Total site area (drawing) | 90598.70 sq.m |
| Net area of plot | 89060.05 sq.m |
| Road-widening area | 1235.12 sq.m |
| Plotted area | 46236.70 sq.m |
| Road area | 29511.46 sq.m |
| Organized open space / park / utility area | 11038.49 sq.m |
| Social infrastructure area | 2273.44 sq.m |
| Amenity area total (drawing) | 1538.65 sq.m |
| Buffer zone area | 303.53 sq.m |
The RERA land details separately report a net area of 89363.58 sq.m. No building footprints, apartment plans, floors, tower heights or building arrangement are established in the supplied records. The two drawing sheets are layout sheets, and the floor-plan review records no flats measured. RERA filing Floor plans Layout record
4. Homes, configurations & floor plans
The RERA evidence describes plots, not apartments. No RERA-filed plot-size bands, plot-wise saleable areas, booked counts or available counts are supplied. The layout extraction identifies 187 plots, based on plot numbers printed on the drawing; it does not provide plot dimensions in the structured extraction. RERA record Layout record
| Offering | Count | Booked | Available | RERA-filed size | Drawing measurement |
|---|---|---|---|---|---|
| Residential plots | 187 (drawing-based count) | Not disclosed | Not disclosed | Not disclosed | Plot sizes not measured / not available in the supplied extraction |
The supplied floor-plan data concerns two layout sheets, with no flats measured. Accordingly, there is no measured carpet-area or loading information for homes to report. Floor plans
5. Parking & vehicle circulation
No project parking count, visitor or accessible parking provision, parking arrangement, or plot-specific parking allocation is established in the supplied evidence. The layout drawing reports internal roads, but the available extracted data does not identify parking bays, vehicle-entry arrangements, pedestrian separation or EV charging. RERA amenities
6. Amenities, recreation & open spaces
The filed layout and RERA amenity fields identify layout-level facilities and open-space uses. The RERA amenity entries show 0% progress where a progress figure is provided; this is a filed progress field, not independent site verification. RERA amenities
| Facility / provision | Park and organized open space |
|---|---|
| Description / size | 11038.49 sq.m shown as organized open space/park/utility area on the drawing |
| Evidence source | Layout record |
| Declared progress / verified status | RERA amenity progress recorded as 0%; completion not independently verified RERA amenities |
| Facility / provision | Social infrastructure area |
|---|---|
| Description / size | 2273.44 sq.m |
| Declared progress / verified status | No completion status supplied |
| Facility / provision | Utility area |
|---|---|
| Description / size | Included in the drawing’s organized open-space/park/utility entry; a separate utility-area measurement is not established in the supplied structured data |
| Declared progress / verified status | No completion status supplied |
| Facility / provision | No specific sports or recreation facility item identified |
|---|---|
| Description / size | Not disclosed |
| Evidence source | RERA amenities |
| Declared progress / verified status | Not disclosed |
7. Utilities, building services & safety
The filed layout and RERA amenity schedule identify proposed layout infrastructure, but the supplied records do not establish that these facilities have been completed. The available material names water supply, a common septic tank/STP, storm-water drains, rainwater harvesting, street lighting, electrical infrastructure and waste-management items; no capacities or independent completion checks are provided. RERA amenities
| Evidence in project record | Internal water-supply pipelines and an overhead tank are listed in the filed layout approval material. |
|---|---|
| Status / limits | Source, storage capacity and completed status not stated. |
| Evidence in project record | Common septic tank / STP and underground drainage lines are listed; storm-water drains are also identified. RERA amenities |
|---|---|
| Status / limits | Treatment capacity, reuse arrangements and completed status not stated. |
| Evidence in project record | Rainwater-harvesting pits are listed; the RERA amenity schedule includes water conservation/rainwater harvesting. RERA amenities |
|---|---|
| Status / limits | Quantity, capacity and completed status not stated. |
| Evidence in project record | Transformer / transformer yard and street lighting are listed; the RERA schedule identifies an electrical meter room, sub-station or receiving station. RERA amenities |
|---|---|
| Status / limits | Supply capacity, backup power and completed status not stated. |
| Evidence in project record | The layout drawing lists a garbage pit; the RERA schedule includes solid-waste management and disposal. RERA amenities |
|---|---|
| Status / limits | Design, capacity and completed status not stated. |
| Evidence in project record | A fire-protection and fire-safety item appears in the RERA amenity schedule. RERA amenities |
|---|---|
| Status / limits | Specific equipment, layout provisions, clearances and implementation status are not supplied. |
| Evidence in project record | No project-specific accessibility or security details are established in the supplied evidence. |
|---|---|
| Status / limits | Not disclosed. |
8. Location, access & connectivity
- The registered location is Kondamadugu Village, Bibinagar Mandal, Yadadri Bhuvanagiri District, Telangana, 508216. The supplied cadastral point is identified as the parcel centroid at 17.48870, 78.78087. RERA record Cadastral map
- The location data gives the nearest sampled Outer Ring Road interchange as approximately 11.5 km. No public-transport routes or verified travel times are provided in the project location evidence. Location record
9. Developer & development status
- The registered promoter is SARADA PROJECTS LIMITED & OTHERS. The RERA filing identifies the organization type as “Others,” with the description “OTHERS”; the legal form of the full “& Others” promoter group is not established in the supplied structured data. The corporate identifier supplied is GSTIN 36AADCS4145A1ZS. RERA record RERA filing Corporate record
- The project certificate names Sarada Projects Limited & Others as promoter. A Board resolution in the supplied evidence authorizes Managing Director JAGADISHKUMAR BOPPANA to submit project-registration applications and related documents. The certificate gives a Hyderabad address for Sarada Projects Limited; the project filing also gives an address at Sri Balaji Tower, Erraman zhil Colony, Kondamadugu/Bibinagar, Yadadri Bhuvanagiri, 508216. No official project website or contact details are supplied. RERA filing Parties record
- The project is registered as a new project. The Form B declaration states a completion undertaking of 27/02/2028; no independently verified construction-progress information or occupancy/completion certificate is supplied. RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence and scope |
|---|---|
| TG-RERA registration certificate | Form C certificate for MOONGLADE AVENUE, registration P02000009399; records the project location, survey numbers, registration validity and promoter conditions. |
| HMDA draft layout permit | Layout Permit 000022/LO/Plg/HMDA/2025, dated 28 February 2025, for the stated Kondamadugu survey land; the filed material describes a draft layout letter / draft layout permit. |
| HMDA application / file | 062517/GHT/LT/U6/HMDA/27032024. |
| Filed layout drawing | Drawing records the 187-plot layout and land-use schedule. |
| Form B declaration | Authorized signatory JAGADISHKUMAR BOPPANA declares the land-title and encumbrance statements and undertakes completion by 27/02/2028. |
| Occupancy / completion certificate | None supplied; no building- or phase-specific certificate is available in the evidence reviewed. Document index |
The filed HMDA material lists layout infrastructure and development works, including roads, drainage, water lines, overhead tank, street lighting, transformer, avenue plantation, park development and rainwater-harvesting pits. The supplied evidence does not establish completion of these works.
1. Project at a glance
Project identity
Registered project name: MOONGLADE AVENUE
Project type: Plotted development / open layout
Phase / registered portion: New project; the registration identifies the plotted layout on the listed survey land. A separate phase designation is not disclosed.
TG-RERA registration: P02000009399, recorded as valid from 28 February 2025
Registration validity: The certificate states validity from 28/02/2025 through 27/02/2028, unless extended by the Authority. This is the registration period, not the project’s completion deadline.
Registered promoter: SARADA PROJECTS LIMITED & OTHERS
RERA status: Registered; the supplied record identifies the project as a “New Project.”
Land and geographic identity
Locality / revenue village: Kondamadugu (also styled “Kondamadugu Village” in the filed approval and title material)
Mandal: Bibinagar
District: Yadadri Bhuvanagiri
PIN: 508216
Project survey numbers: 291/P, 294/P, 295/P, 298/P, 326/P, 336, 337/P and 338/P
Total site area: 90598.7 sq.m in the RERA land details and filed HMDA approval material
Road-widening / affected area: 1235.12 sq.m
Net area: 89363.58 sq.m in the RERA land details
Net layout area in drawing: 89060.05 sq.m shown on the filed layout drawing
Boundaries: East: ROAD; West, North and South: OTHERS LAND
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout permit: 000022/LO/Plg/HMDA/2025, dated 28 February 2025; the filed material describes a draft layout permit / draft layout letter.
Application / file number: 062517/GHT/LT/U6/HMDA/27032024
Approved use stated in drawing: Residential open layout; the drawing records “Residential” plot use and “Residential zone-1 (urban areas contiguous to growth corridor).”
Layout plot count: 187, read from the plot numbers printed on the drawing; drawing-based count, not a RERA unit-count disclosure.
Approved built-up area: Not stated in the supplied plotted-layout records; the RERA filing’s “Approved Built up Area” field records 46236.7 sq.m, and the layout drawing labels this as plotted area.
Buildings / floors: Not applicable to the offered plotted layout as described in the supplied evidence; no building count or floor configuration is disclosed.
Parking: No parking count, parking level or allocation is disclosed in the supplied project records.
Offering and status
Offered product: Residential plots in an open layout
Plot-size range: Not established in the supplied structured drawing extraction; plot numbers are printed, but plot dimensions are not available in the extracted layout data.
Booked / available counts: Not disclosed in the supplied evidence.
Construction / development stage: The project is registered as a new project. The supplied evidence does not establish independently verified on-site progress.
Promoter-declared completion deadline: 27/02/2028 in the Form B declaration.
Completion date in project header: 27/06/2028
Occupancy / completion certificate: No occupancy certificate or completion certificate is supplied. This is a plotted-layout project; the supplied record does not provide an OC status for any building or phase.
2. The project story
- MOONGLADE AVENUE is registered as a residential plotted development at Kondamadugu, Bibinagar Mandal, Yadadri Bhuvanagiri District. The TG-RERA registration identifies the project and its survey land; the filed HMDA material describes an open layout with 187 numbered plots. Plot dimensions, inventory status and plot-wise booking or availability figures are not established in the supplied data.
- The drawing allocates land to plots, internal roads, parks/open space and social infrastructure. Its area statement records 46236.70 sq.m of plotted area, 29511.46 sq.m of road area, 11038.49 sq.m of organized open-space/park/utility area, and 2273.44 sq.m of social infrastructure area. The filed approval material describes a draft layout permit and states that the Executive Authority is to release the plans; it also sets out development works and conditions. The evidence supplied does not establish that those works are complete or independently verified.
- The Form B affidavit declares a completion deadline of 27/02/2028. The project header separately records 27/06/2028; the Overview reports both recorded dates without reconciling them. No occupancy or completion certificate is included in the supplied documents.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey residential building scheme in the supplied project record. The filed layout drawing identifies 187 plots and shows the following land-use statement:
Total site area (drawing): 90598.70 sq.m
Net area of plot: 89060.05 sq.m
Road-widening area: 1235.12 sq.m
Plotted area: 46236.70 sq.m
Road area: 29511.46 sq.m
Organized open space / park / utility area: 11038.49 sq.m
Social infrastructure area: 2273.44 sq.m
Amenity area total (drawing): 1538.65 sq.m
Buffer zone area: 303.53 sq.m
The RERA land details separately report a net area of 89363.58 sq.m. No building footprints, apartment plans, floors, tower heights or building arrangement are established in the supplied records. The two drawing sheets are layout sheets, and the floor-plan review records no flats measured.
4. Homes, configurations & floor plans
The RERA evidence describes plots, not apartments. No RERA-filed plot-size bands, plot-wise saleable areas, booked counts or available counts are supplied. The layout extraction identifies 187 plots, based on plot numbers printed on the drawing; it does not provide plot dimensions in the structured extraction.
| Offering | Count | Booked | Available | RERA-filed size | Drawing measurement |
|---|---|---|---|---|---|
| Residential plots | 187 (drawing-based count) | Not disclosed | Not disclosed | Not disclosed | Plot sizes not measured / not available in the supplied extraction |
The supplied floor-plan data concerns two layout sheets, with no flats measured. Accordingly, there is no measured carpet-area or loading information for homes to report.
5. Parking & vehicle circulation
No project parking count, visitor or accessible parking provision, parking arrangement, or plot-specific parking allocation is established in the supplied evidence. The layout drawing reports internal roads, but the available extracted data does not identify parking bays, vehicle-entry arrangements, pedestrian separation or EV charging.
6. Amenities, recreation & open spaces
The filed layout and RERA amenity fields identify layout-level facilities and open-space uses. The RERA amenity entries show 0% progress where a progress figure is provided; this is a filed progress field, not independent site verification.
| Facility / provision | Park and organized open space |
|---|---|
| Description / size | 11038.49 sq.m shown as organized open space/park/utility area on the drawing |
| Declared progress / verified status | RERA amenity progress recorded as 0%; completion not independently verified |
| Facility / provision | Social infrastructure area |
|---|---|
| Description / size | 2273.44 sq.m |
| Declared progress / verified status | No completion status supplied |
| Facility / provision | Utility area |
|---|---|
| Description / size | Included in the drawing’s organized open-space/park/utility entry; a separate utility-area measurement is not established in the supplied structured data |
| Declared progress / verified status | No completion status supplied |
| Facility / provision | No specific sports or recreation facility item identified |
|---|---|
| Description / size | Not disclosed |
| Declared progress / verified status | Not disclosed |
7. Utilities, building services & safety
The filed layout and RERA amenity schedule identify proposed layout infrastructure, but the supplied records do not establish that these facilities have been completed. The available material names water supply, a common septic tank/STP, storm-water drains, rainwater harvesting, street lighting, electrical infrastructure and waste-management items; no capacities or independent completion checks are provided.
| Evidence in project record | Internal water-supply pipelines and an overhead tank are listed in the filed layout approval material. |
|---|---|
| Status / limits | Source, storage capacity and completed status not stated. |
| Evidence in project record | Common septic tank / STP and underground drainage lines are listed; storm-water drains are also identified. |
|---|---|
| Status / limits | Treatment capacity, reuse arrangements and completed status not stated. |
| Evidence in project record | Rainwater-harvesting pits are listed; the RERA amenity schedule includes water conservation/rainwater harvesting. |
|---|---|
| Status / limits | Quantity, capacity and completed status not stated. |
| Evidence in project record | Transformer / transformer yard and street lighting are listed; the RERA schedule identifies an electrical meter room, sub-station or receiving station. |
|---|---|
| Status / limits | Supply capacity, backup power and completed status not stated. |
| Evidence in project record | The layout drawing lists a garbage pit; the RERA schedule includes solid-waste management and disposal. |
|---|---|
| Status / limits | Design, capacity and completed status not stated. |
| Evidence in project record | A fire-protection and fire-safety item appears in the RERA amenity schedule. |
|---|---|
| Status / limits | Specific equipment, layout provisions, clearances and implementation status are not supplied. |
| Evidence in project record | No project-specific accessibility or security details are established in the supplied evidence. |
|---|---|
| Status / limits | Not disclosed. |
8. Location, access & connectivity
- The registered location is Kondamadugu Village, Bibinagar Mandal, Yadadri Bhuvanagiri District, Telangana, 508216. The supplied cadastral point is identified as the parcel centroid at 17.48870, 78.78087.
- The location data gives the nearest sampled Outer Ring Road interchange as approximately 11.5 km. No public-transport routes or verified travel times are provided in the project location evidence.
9. Developer & development status
- The registered promoter is SARADA PROJECTS LIMITED & OTHERS. The RERA filing identifies the organization type as “Others,” with the description “OTHERS”; the legal form of the full “& Others” promoter group is not established in the supplied structured data. The corporate identifier supplied is GSTIN 36AADCS4145A1ZS.
- The project certificate names Sarada Projects Limited & Others as promoter. A Board resolution in the supplied evidence authorizes Managing Director JAGADISHKUMAR BOPPANA to submit project-registration applications and related documents. The certificate gives a Hyderabad address for Sarada Projects Limited; the project filing also gives an address at Sri Balaji Tower, Erraman zhil Colony, Kondamadugu/Bibinagar, Yadadri Bhuvanagiri, 508216. No official project website or contact details are supplied.
- The project is registered as a new project. The Form B declaration states a completion undertaking of 27/02/2028; no independently verified construction-progress information or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C certificate for MOONGLADE AVENUE, registration P02000009399; records the project location, survey numbers, registration validity and promoter conditions.
HMDA draft layout permit: Layout Permit 000022/LO/Plg/HMDA/2025, dated 28 February 2025, for the stated Kondamadugu survey land; the filed material describes a draft layout letter / draft layout permit.
HMDA application / file: 062517/GHT/LT/U6/HMDA/27032024.
Filed layout drawing: Drawing records the 187-plot layout and land-use schedule.
Form B declaration: Authorized signatory JAGADISHKUMAR BOPPANA declares the land-title and encumbrance statements and undertakes completion by 27/02/2028.
Occupancy / completion certificate: None supplied; no building- or phase-specific certificate is available in the evidence reviewed.
The filed HMDA material lists layout infrastructure and development works, including roads, drainage, water lines, overhead tank, street lighting, transformer, avenue plantation, park development and rainwater-harvesting pits. The supplied evidence does not establish completion of these works.
Frequently asked questions
Is MOONGLADE AVENUE registered with Telangana RERA?
Yes. MOONGLADE AVENUE is registered with the Telangana Real Estate Regulatory Authority as P02000009399; the registration status is New Project.
Who is the developer of MOONGLADE AVENUE?
The promoter named in the RERA registration is SARADA PROJECTS LIMITED & OTHERS.
Where is MOONGLADE AVENUE located?
MOONGLADE AVENUE is in BIBINAGAR, Kondamadugu, Yadadri Bhuvanagiri, Telangana (508216).
When will MOONGLADE AVENUE be completed?
The promoter's proposed date of completion filed with RERA is 27/06/2028. This is the promoter's declaration, not a guarantee.