Gowtham Arcade
SADANA INFRA · Medchal-Malkajgiri · RERA P02200004549
GOWTHAM ARCADE is a residential apartment project near Sainathapuram, Malkajgiri mandal, Medchal-Malkajgiri district. The registered promoter is SADANA INFRA. The project is on 635.55 sq. m of land and comprises one building with 1 Stilt + 5 upper floors and 20 2BHK apartments, each with a saleable area of 95.22 sq. m. Its TG-RERA registration number is P02200004549, and its declared completion date is 14 March, 2025.
More from Sadana Infra · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | GOWTHAM ARCADE RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; the registration is for GOWTHAM ARCADE RERA record |
| TG-RERA registration | P02200004549 |
| Registration validity | 30/05/2022 to 14/03/2025; the certificate records a two-year validity and says extension is subject to Authority approval |
| Registered promoter | SADANA INFRA RERA record |
| RERA status in supplied record | Registered; no extension is recorded in the supplied certificate |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Near Sainathapuram; the building-permit order describes the site as Sainadha Puram RERA record RERA filing |
| Revenue village | Malkajgiri is stated in the building-permit extraction; the RERA land record does not disclose a village. Exact revenue-village identity is therefore not fully established in the supplied record Land records |
| Mandal / district / PIN | Malkajgiri / Medchal-Malkajgiri / 500056 RERA record |
| Project survey number | 303/1 RERA record |
| Plot reference | I-7 RERA filing |
| Registered site extent | RERA land record: 635.55 sq. m total and net area; affected area recorded as 0 sq. m RERA filing |
| Building-permit site figures | Plot area 635.55 sq. m; net plot area 633.33 sq. m; road-affected and nala-affected areas each recorded as 0.0 sq. m |
| Boundaries | East and south: 30 FEET WIDE ROAD; west: PLOT NO I-8; north: PLOT NO I-6 RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | 0540/GHMC/SEC/2022-BP, dated 14 March, 2022 Approvals record |
| File number | 001197/GHMC/0642/SEC2/2022-BP |
| Approved building configuration | One building: 1 Stilt + 5 upper floors, residential |
| Approved built-up area | 1,577.45 sq. m |
| Parking area recorded in permit | 315.5 sq. m; the supplied extraction does not state a parking-space count |
| Unit count | RERA record: 20 apartments; the approved-plan count is not separately stated in the supplied approval extraction RERA unit table RERA unit details |
| Other plan identifier | PERMIT NO.G1/213/93, recorded in the building-permit document |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 2BHK, 20 units; saleable area 95.22 sq. m per unit RERA unit table RERA unit details |
| Booked / available | 0 booked / 20 available as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative RERA unit table |
| Completion deadline declared at registration | 14 March, 2025 |
| Occupancy certificate | GHMC OC 5394/GHMC/SEC/2 024-OC, dated 27/01/2024; an architect’s certificate records the project as completed |
| Construction stage | Architect-certified as complete; this is a filed certificate, not an independent site inspection |
2. The project story
GOWTHAM ARCADE is registered as a residential apartment development on survey 303/1, plot reference I-7, in the Malkajgiri area of Medchal-Malkajgiri district. The RERA record identifies one building and 20 two-bedroom apartments. GHMC’s building-permit order describes a residential building with one stilt level and five upper floors. RERA record RERA filing RERA unit table
The RERA-filed completion undertaking gives 14 March, 2025 as the completion date. Separately, the filed architect’s certificate, dated 25/01/2024, records a GHMC occupancy certificate dated 27/01/2024 and states that the project was completed in all aspects. This status is based on the submitted certificate; the supplied evidence does not include an independent inspection report.
3. Master plan, architecture & building design
The GHMC permit records a single residential building configured as 1 Stilt + 5 upper floors, with a building height of 15.00 as recorded in the permit extraction. It lists 1,577.45 sq. m as residential built-up area, 315.5 sq. m as total parking area and 633.33 sq. m as net plot area. These are permit-recorded figures; no separate FSI-counted area or gross-built-up-area figure is supplied.
The RERA land record identifies one building unit, while the unit schedule records 20 apartments. The approved floor-plan drawing is identified as “TYPICAL - 2, 3, 4& 5 FLOOR PLAN (SCALE=1:100)”. The supplied material does not establish the full floor-by-floor unit arrangement, number of flats per floor, lifts, stairs, circulation details, or open-space distribution. RERA filing RERA unit table
The building permit lists four rainwater-harvesting pits and requires a transformer space. It also records a tot-lot as “NA”; no recreational open-space area is stated in the supplied data.
4. Homes, configurations & floor plans
The TG-RERA unit record lists 20 2BHK apartments, with 0 booked and 20 available as last read from the portal; no as-of date accompanies those counts. The filed saleable area is 95.22 sq. m per apartment. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 95.22 sq. m | 53.5–53.6 sq. m; median 53.5 sq. m | 44% |
The carpet-area figures are software measurements from the approved floor-plan drawing, not RERA-filed disclosures; the drawing-based measurement is flagged as requiring review. The measured sample comprises four flat designs. The plan identifies a hall, kitchen, two bedrooms, a toilet and a 1.11 M. WIDE BALC; the listed room dimensions are drawing measurements for one flat and should be checked against the drawing. RERA unit details Floor plans
Carpet area describes the measured internal area shown by the drawing exercise. RERA saleable area is the separately filed figure and can include the home’s share of common areas; the supplied record does not provide a separate balcony-area disclosure or a RERA-filed loading figure. RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC permit records 315.5 sq. m of total parking area and states that the stilt and cellar approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. However, the supplied permit extraction does not state the number of parking spaces or identify a parking level-by-level count.
The RERA record marks the 2BHK configuration as mortgaged, but the supplied data does not establish unit-specific parking allocations, visitor or accessible parking, a parking allotment arrangement, ramps, internal driveways, pedestrian separation or EV charging. A parking-area figure does not establish exclusive parking rights for a particular unit. RERA unit table RERA unit details
6. Amenities, recreation & open spaces
The amenities record includes percentage entries and “YES” availability entries, but does not establish independent verification of delivery. The permit separately specifies certain site provisions. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No source, storage or capacity specified | RERA amenities | Listed “YES” at 100%; not independently verified |
| Sewerage | “Sewerage (Chamber, Lines, Septic Tank, STP)” listed; no capacity or system detail supplied | RERA amenities | Listed “YES” at 100%; not independently verified |
| Storm-water drains | No dimensions or system details supplied | RERA amenities | 0% recorded |
| Water conservation / rainwater harvesting | Permit specifies 4 rainwater-harvesting pits | RERA amenities | Listed “YES” at 100% in the amenities record; completion not independently verified |
| Green strip / tot-lot / park | Permit extraction records “Tot Lot NA”; no open-space area stated | RERA amenities | 0% recorded |
| Street lighting | No specification supplied | RERA amenities | 0% recorded |
| Community buildings | No facility details supplied | RERA amenities | 0% recorded |
| Solid-waste management and disposal | No system or capacity specified | RERA amenities | 0% recorded |
| Energy management | No system details supplied | RERA amenities | Listed “YES” at 100%; not independently verified |
| Fire protection and fire safety | No system details supplied in the amenities record | RERA amenities | 0% recorded |
| Electrical meter room / sub-station / receiving station | Permit requires space for a transformer; no capacity supplied | RERA amenities | Listed “YES” at 100%; not independently verified |
| Recreational open space | No area specified | RERA amenities | 0% recorded |
7. Utilities, building services & safety
The RERA amenities record lists water supply, sewerage, storm-water drains, rainwater harvesting, energy management and an electrical meter-room/sub-station/receiving-station item. It does not state water source or storage capacity, sewerage-treatment capacity, reuse arrangements, electrical supply or backup capacity. The building permit requires four rainwater-harvesting pits and transformer space. RERA amenities
The permit requires services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. It also requires an occupancy Fire NOC before issue of the occupancy certificate and places structural-safety and means-of-escape safety responsibility on the owner, builder/developer and technical professionals. These are permit conditions; the supplied material does not describe the installed systems or provide their capacities.
No lift count or capacity, service-lift provision, fire-equipment inventory, CCTV or access-control details, waste-segregation arrangements, accessibility features or ramp details are established by the supplied project record. RERA amenities Document index
8. Location, access & connectivity
The registered location is Near Sainathapuram, Malkajgiri mandal, Medchal-Malkajgiri district, PIN 500056. The RERA land record gives the site boundaries as roads on the east and south, PLOT NO I-8 on the west and PLOT NO I-6 on the north. The precise revenue-village field is not disclosed in the RERA land record. RERA record RERA filing Land records
The supplied location dataset lists these measured distances: ADP 0.0 km; IndusInd Bank 0.4 km; Nanakramguda Govt primary school 0.5 km; Financial District (Nanakramguda) 1.2 km; an unnamed park 1.2 km; Manuu Polytechnic Hyderabad 1.6 km; Sankaraya Eye Hospital 1.6 km; an unnamed bus station 2.2 km; and South india shopping mall 2.6 km. These are the supplied location-record distances; no travel times or route details are provided. Location record
9. Developer & development status
The registered promoter is SADANA INFRA, recorded as a partnership. The supplied project identity includes GSTIN 36AEKFS8183G1ZH; the project record does not supply a separate company registration identifier or official website/contact details. RERA filing Corporate record
The Form-B affidavit, represented by authorized signatory Kotamraju Ratna Kumar, declares a completion date of 14 March, 2025 and includes the promoter’s land-title and project-funding undertakings. The architect’s filed certificate records project completion and the GHMC OC dated 27/01/2024. These are promoter and professional-filed statements, respectively; no independent site-progress verification is supplied.
10. Approvals, official records & documents
| Identifier / date | P02200004549, issued 30/05/2022; validity to 14/03/2025 |
|---|---|
| What the supplied record establishes | Form C registration for GOWTHAM ARCADE; registration conditions include a separate-account requirement |
| Identifier / date | 0540/GHMC/SEC/2022-BP, 14 March, 2022; file 001197/GHMC/0642/SEC2/2022-BP |
|---|---|
| What the supplied record establishes | Conditional residential-building permission; one stilt plus five upper floors |
| Identifier / date | PERMIT NO.G1/213/93 |
|---|---|
| What the supplied record establishes | Reference recorded in the permit extraction; the supplied layout-plan document record is not extracted Document index |
| Identifier / date | 5394/GHMC/SEC/2 024-OC, 27/01/2024 |
|---|---|
| What the supplied record establishes | Recorded in the filed architect’s completion certificate |
| Identifier / date | Dated 25/01/2024 |
|---|---|
| What the supplied record establishes | States that the project is completed in all aspects and records the GHMC OC |
| Identifier / date | Verified at Hyderabad, 13th April, 2022 |
|---|---|
| What the supplied record establishes | Promoter declaration includes completion undertaking and title/encumbrance statements |
| Identifier / date | Document 229684 |
|---|---|
| What the supplied record establishes | Layout-plan document listed; drawing-based unit measurement is supplied from this document Document index |
The supplied record does not include an extracted layout approval document or a separate commencement notice. The building-permit order requires a commencement notice before construction and a completion notice and occupancy certificate before occupation. Document index
1. Project at a glance
Project identity
Registered project name: GOWTHAM ARCADE
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified; the registration is for GOWTHAM ARCADE
TG-RERA registration: P02200004549
Registration validity: 30/05/2022 to 14/03/2025; the certificate records a two-year validity and says extension is subject to Authority approval
Registered promoter: SADANA INFRA
RERA status in supplied record: Registered; no extension is recorded in the supplied certificate
Land and geographic identity
Locality: Near Sainathapuram; the building-permit order describes the site as Sainadha Puram
Revenue village: Malkajgiri is stated in the building-permit extraction; the RERA land record does not disclose a village. Exact revenue-village identity is therefore not fully established in the supplied record
Mandal / district / PIN: Malkajgiri / Medchal-Malkajgiri / 500056
Project survey number: 303/1
Plot reference: I-7
Registered site extent: RERA land record: 635.55 sq. m total and net area; affected area recorded as 0 sq. m
Building-permit site figures: Plot area 635.55 sq. m; net plot area 633.33 sq. m; road-affected and nala-affected areas each recorded as 0.0 sq. m
Boundaries: East and south: 30 FEET WIDE ROAD; west: PLOT NO I-8; north: PLOT NO I-6
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: 0540/GHMC/SEC/2022-BP, dated 14 March, 2022
File number: 001197/GHMC/0642/SEC2/2022-BP
Approved building configuration: One building: 1 Stilt + 5 upper floors, residential
Approved built-up area: 1,577.45 sq. m
Parking area recorded in permit: 315.5 sq. m; the supplied extraction does not state a parking-space count
Unit count: RERA record: 20 apartments; the approved-plan count is not separately stated in the supplied approval extraction
Other plan identifier: PERMIT NO.G1/213/93, recorded in the building-permit document
Offering and status
RERA-filed configuration: 2BHK, 20 units; saleable area 95.22 sq. m per unit
Booked / available: 0 booked / 20 available as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative
Completion deadline declared at registration: 14 March, 2025
Occupancy certificate: GHMC OC 5394/GHMC/SEC/2 024-OC, dated 27/01/2024; an architect’s certificate records the project as completed
Construction stage: Architect-certified as complete; this is a filed certificate, not an independent site inspection
2. The project story
GOWTHAM ARCADE is registered as a residential apartment development on survey 303/1, plot reference I-7, in the Malkajgiri area of Medchal-Malkajgiri district. The RERA record identifies one building and 20 two-bedroom apartments. GHMC’s building-permit order describes a residential building with one stilt level and five upper floors.
The RERA-filed completion undertaking gives 14 March, 2025 as the completion date. Separately, the filed architect’s certificate, dated 25/01/2024, records a GHMC occupancy certificate dated 27/01/2024 and states that the project was completed in all aspects. This status is based on the submitted certificate; the supplied evidence does not include an independent inspection report.
3. Master plan, architecture & building design
The GHMC permit records a single residential building configured as 1 Stilt + 5 upper floors, with a building height of 15.00 as recorded in the permit extraction. It lists 1,577.45 sq. m as residential built-up area, 315.5 sq. m as total parking area and 633.33 sq. m as net plot area. These are permit-recorded figures; no separate FSI-counted area or gross-built-up-area figure is supplied.
The RERA land record identifies one building unit, while the unit schedule records 20 apartments. The approved floor-plan drawing is identified as “TYPICAL - 2, 3, 4& 5 FLOOR PLAN (SCALE=1:100)”. The supplied material does not establish the full floor-by-floor unit arrangement, number of flats per floor, lifts, stairs, circulation details, or open-space distribution.
The building permit lists four rainwater-harvesting pits and requires a transformer space. It also records a tot-lot as “NA”; no recreational open-space area is stated in the supplied data.
4. Homes, configurations & floor plans
The TG-RERA unit record lists 20 2BHK apartments, with 0 booked and 20 available as last read from the portal; no as-of date accompanies those counts. The filed saleable area is 95.22 sq. m per apartment.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 95.22 sq. m | 53.5–53.6 sq. m; median 53.5 sq. m | 44% |
The carpet-area figures are software measurements from the approved floor-plan drawing, not RERA-filed disclosures; the drawing-based measurement is flagged as requiring review. The measured sample comprises four flat designs. The plan identifies a hall, kitchen, two bedrooms, a toilet and a 1.11 M. WIDE BALC; the listed room dimensions are drawing measurements for one flat and should be checked against the drawing.
Carpet area describes the measured internal area shown by the drawing exercise. RERA saleable area is the separately filed figure and can include the home’s share of common areas; the supplied record does not provide a separate balcony-area disclosure or a RERA-filed loading figure.
5. Parking & vehicle circulation
The GHMC permit records 315.5 sq. m of total parking area and states that the stilt and cellar approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. However, the supplied permit extraction does not state the number of parking spaces or identify a parking level-by-level count.
The RERA record marks the 2BHK configuration as mortgaged, but the supplied data does not establish unit-specific parking allocations, visitor or accessible parking, a parking allotment arrangement, ramps, internal driveways, pedestrian separation or EV charging. A parking-area figure does not establish exclusive parking rights for a particular unit.
6. Amenities, recreation & open spaces
The amenities record includes percentage entries and “YES” availability entries, but does not establish independent verification of delivery. The permit separately specifies certain site provisions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No source, storage or capacity specified | Listed “YES” at 100%; not independently verified | |
| Sewerage | “Sewerage (Chamber, Lines, Septic Tank, STP)” listed; no capacity or system detail supplied | Listed “YES” at 100%; not independently verified | |
| Storm-water drains | No dimensions or system details supplied | 0% recorded | |
| Water conservation / rainwater harvesting | Permit specifies 4 rainwater-harvesting pits | Listed “YES” at 100% in the amenities record; completion not independently verified | |
| Green strip / tot-lot / park | Permit extraction records “Tot Lot NA”; no open-space area stated | 0% recorded | |
| Street lighting | No specification supplied | 0% recorded | |
| Community buildings | No facility details supplied | 0% recorded | |
| Solid-waste management and disposal | No system or capacity specified | 0% recorded | |
| Energy management | No system details supplied | Listed “YES” at 100%; not independently verified | |
| Fire protection and fire safety | No system details supplied in the amenities record | 0% recorded | |
| Electrical meter room / sub-station / receiving station | Permit requires space for a transformer; no capacity supplied | Listed “YES” at 100%; not independently verified | |
| Recreational open space | No area specified | 0% recorded |
7. Utilities, building services & safety
The RERA amenities record lists water supply, sewerage, storm-water drains, rainwater harvesting, energy management and an electrical meter-room/sub-station/receiving-station item. It does not state water source or storage capacity, sewerage-treatment capacity, reuse arrangements, electrical supply or backup capacity. The building permit requires four rainwater-harvesting pits and transformer space.
The permit requires services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. It also requires an occupancy Fire NOC before issue of the occupancy certificate and places structural-safety and means-of-escape safety responsibility on the owner, builder/developer and technical professionals. These are permit conditions; the supplied material does not describe the installed systems or provide their capacities.
No lift count or capacity, service-lift provision, fire-equipment inventory, CCTV or access-control details, waste-segregation arrangements, accessibility features or ramp details are established by the supplied project record.
8. Location, access & connectivity
The registered location is Near Sainathapuram, Malkajgiri mandal, Medchal-Malkajgiri district, PIN 500056. The RERA land record gives the site boundaries as roads on the east and south, PLOT NO I-8 on the west and PLOT NO I-6 on the north. The precise revenue-village field is not disclosed in the RERA land record.
The supplied location dataset lists these measured distances: ADP 0.0 km; IndusInd Bank 0.4 km; Nanakramguda Govt primary school 0.5 km; Financial District (Nanakramguda) 1.2 km; an unnamed park 1.2 km; Manuu Polytechnic Hyderabad 1.6 km; Sankaraya Eye Hospital 1.6 km; an unnamed bus station 2.2 km; and South india shopping mall 2.6 km. These are the supplied location-record distances; no travel times or route details are provided.
9. Developer & development status
The registered promoter is SADANA INFRA, recorded as a partnership. The supplied project identity includes GSTIN 36AEKFS8183G1ZH; the project record does not supply a separate company registration identifier or official website/contact details.
The Form-B affidavit, represented by authorized signatory Kotamraju Ratna Kumar, declares a completion date of 14 March, 2025 and includes the promoter’s land-title and project-funding undertakings. The architect’s filed certificate records project completion and the GHMC OC dated 27/01/2024. These are promoter and professional-filed statements, respectively; no independent site-progress verification is supplied.
10. Approvals, official records & documents
| Identifier / date | P02200004549, issued 30/05/2022; validity to 14/03/2025 |
|---|---|
| What the supplied record establishes | Form C registration for GOWTHAM ARCADE; registration conditions include a separate-account requirement |
| Identifier / date | 0540/GHMC/SEC/2022-BP, 14 March, 2022; file 001197/GHMC/0642/SEC2/2022-BP |
|---|---|
| What the supplied record establishes | Conditional residential-building permission; one stilt plus five upper floors |
| Identifier / date | PERMIT NO.G1/213/93 |
|---|---|
| What the supplied record establishes | Reference recorded in the permit extraction; the supplied layout-plan document record is not extracted |
| Identifier / date | 5394/GHMC/SEC/2 024-OC, 27/01/2024 |
|---|---|
| What the supplied record establishes | Recorded in the filed architect’s completion certificate |
| Identifier / date | Dated 25/01/2024 |
|---|---|
| What the supplied record establishes | States that the project is completed in all aspects and records the GHMC OC |
| Identifier / date | Verified at Hyderabad, 13th April, 2022 |
|---|---|
| What the supplied record establishes | Promoter declaration includes completion undertaking and title/encumbrance statements |
| Identifier / date | Document 229684 |
|---|---|
| What the supplied record establishes | Layout-plan document listed; drawing-based unit measurement is supplied from this document |
The supplied record does not include an extracted layout approval document or a separate commencement notice. The building-permit order requires a commencement notice before construction and a completion notice and occupancy certificate before occupation.
Frequently asked questions
Is GOWTHAM ARCADE registered with Telangana RERA?
Yes. GOWTHAM ARCADE is registered with the Telangana Real Estate Regulatory Authority as P02200004549; the registration status is New Project.
Who is the developer of GOWTHAM ARCADE?
The promoter named in the RERA registration is SADANA INFRA.
Where is GOWTHAM ARCADE located?
GOWTHAM ARCADE is in Near Sainathapuram, Malkajgiri, Medchal-Malkajgiri, Telangana (500056).
When will GOWTHAM ARCADE be completed?
The promoter's proposed date of completion filed with RERA is 14/03/2025. This is the promoter's declaration, not a guarantee.
More projects in Malkajgiri






