Western Windsor Park
WESTERN CONSTRUCTIONS WINDSOR PARK LLP · Rangareddy · RERA P02400005581
WESTERN WINDSOR PARK is a commercial project in Puppalaguda, Gandipet mandal, Ranga Reddy district, developed by Western Constructions Windsor Park LLP. The site area is 33,169.19 sq. m; the approved configuration is an IT/ITES building with 4 cellars, Ground + 20 upper floors and an Environmental Deck Floor, plus a utility block with Ground + 1 upper floor. The TG-RERA record lists 22 office-space units, with a saleable area of 11,821.99 sq. m per unit. It is registered under TG-RERA number P02400005581, with proposed completion on 28/04/2028.
More from Western Constructions Windsor Park LLP · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | WESTERN WINDSOR PARK RERA record |
| Project type | Commercial in the TG-RERA project record; the filed HMDA technical approval describes an IT/ITES building and utility block. RERA record RERA filing |
| Phase / registered portion | RERA phase designation not disclosed. The registration and technical-approval records identify the project by the site and survey numbers listed below. |
| TG-RERA registration | P02400005581; granted 20/12/2022; stated validity 20/12/2022–28/12/2027. The certificate records a five-year validity and says extension is subject to the Act and Rules. |
| Registered promoter | Western Constructions Windsor Park LLP (also styled “M/s. WESTERN CONSTRUCTIONS WINDSOR PARK LLP” in filed material). RERA record |
| RERA status | The supplied certificate records registration; no extension is recorded in the certificate extract. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Puppalaguda / Puppalguda village (spelling as recorded in the project and approval records). RERA record RERA filing |
| Mandal | Gandipet. RERA record RERA filing |
| District | Ranga Reddy (the approval also abbreviates this as “R.R. district”). RERA record |
| PIN | 500089. RERA record RERA filing |
| Project survey numbers / subdivisions | 277/P, 282/P, 342 and 341/P. RERA record Land records |
| Site extent | RERA land details state 33,169.19 sq. m total and 32,010.32 sq. m net, with 1,158.87 sq. m affected by road widening/FTL/nala widening. HMDA technical approval states 33,164.19 sq. m. RERA filing |
| Boundaries | East: ORR; west: WESTERN SPRINGS; north: OTHERS LAND; south: 100 FEET ROAD. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the technical approval says plans are forwarded to Manikonda Municipality for necessary sanction and release. Approvals record |
| Principal approval | HMDA file 047998/ZOA/C1/U6/HMDA/05082021, technical approval dated 09-02-2022. Approvals record |
| Approved building configuration | IT/ITES building: 4 cellars + Ground + 20 upper floors & Environmental Deck Floor. Utility block: Ground + 1 upper floor. |
| Approved built-up area | 260,519.08 sq. m in the RERA project fields. RERA filing |
| Building count | RERA fields record 1 total approved building unit and 1 proposed building unit. The technical approval separately describes the IT/ITES building and a utility block. RERA filing |
| Parking levels / counts | Four cellar levels are in the technical-approval configuration. A total sanctioned parking-space count and allocation details are not available in the supplied extracts. RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed unit type | OFFICE SPACE; 22 units, 0 booked and 22 available in the supplied portal snapshot (no as-of date supplied). RERA unit table RERA unit details |
| RERA-filed saleable area | 11,821.99 sq. m per unit, as recorded in the unit configuration. RERA unit table RERA unit details |
| Construction stage | The supplied RERA amenity-progress record reports sewerage at 41%, storm-water drains at 13%, and fire protection/fire-safety requirements at 23%; other listed items show 0%. These are portal-recorded progress figures, not an independent site inspection. RERA amenities |
| Completion date | The RERA project header records proposed completion 28/04/2028; Form B declarations state an undertaking to complete by 28.12.2027. These are promoter/RERA-filed records, not proof of completion. RERA record |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is supplied in the reviewed project materials; its status is therefore not established by this evidence pack. Document index |
2. The project story
- Western Windsor Park is registered as a commercial development in Puppalaguda, Gandipet mandal, Ranga Reddy district. RERA record
- The RERA unit record lists 22 office-space units, all shown as available in the supplied snapshot. It also includes an “Amenities Floor” row with zero units; this is not an additional sale unit. The floor-plan set supplied for review consists of 24 drawings, all still awaiting scan-based measurement, so no drawing-derived carpet-area or room-layout description can be confirmed here. RERA unit table RERA unit details Floor plans
- The records indicate a proposed development and report some infrastructure progress, but do not establish the overall construction stage through an independent site inspection or provide an occupancy/completion certificate. RERA amenities Document index
3. Master plan, architecture & building design
- The project is on the survey parcels 277/P, 282/P, 342 and 341/P in Puppalaguda. The RERA land fields record a total area of 33,169.19 sq. m, a net area of 32,010.32 sq. m and 1,158.87 sq. m affected by road widening/FTL/nala widening. The HMDA technical-approval extract gives a site extent of 33,164.19 sq. m. Land records RERA filing
- The technical approval describes a single multi-storey IT/ITES building—4 cellars + Ground + 20 upper floors & Environmental Deck Floor—and a utility block of Ground + 1 upper floor. The RERA fields report an approved built-up area of 260,519.08 sq. m. No building-footprint area, floor-by-floor area schedule, floor-wise office count, landscaped/open-space area or detailed internal circulation dimensions are available in the supplied extracts. RERA filing RERA filing
- The approval record’s building configuration is not a RERA-filed unit schedule. The supplied RERA unit schedule lists office space, while the floor-plan drawings have not yet been software-measured; consequently, no measured carpet-area or room-layout figures can be reported. Approved built-up area, RERA saleable area and carpet area are distinct measures and should not be treated as interchangeable. RERA unit table Floor plans
4. Homes, configurations & floor plans
This is a commercial project. The RERA filing lists office space rather than residential homes. RERA record RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Office space | 22 | 0 | 22 | 11,821.99 sq. m per unit | Not available: all 24 supplied floor-plan drawings are pending scan-based measurement | Not supplied |
RERA unit table RERA unit details Floor plans
The RERA area shown is saleable area, not a drawing-measured carpet area. The supplied drawing set has not been measured, so room sizes, office layouts, balconies or other unit-level dimensions cannot be described from the evidence provided. The booking and availability counts are a portal snapshot with no stated “as of” date and should be treated as indicative. RERA unit details Floor plans RERA unit table
5. Parking & vehicle circulation
- The approved configuration includes four cellar levels, but the supplied extracts do not establish the number of parking spaces, whether they are resident/visitor or accessible spaces, or how parking is allocated to individual office units. They also do not specify ramp dimensions, vehicle entry and exit arrangements, mechanical parking, two-wheeler spaces or EV charging. RERA unit table Document index
- The technical approval refers to a minimum width of 4.5 mtrs and height clearance of 5 mtrs among its stated parameters, but the supplied extract does not identify this as a parking-ramp measurement; no parking-specific interpretation is made here.
6. Amenities, recreation & open spaces
The RERA amenity-progress record lists the following items. Progress percentages are portal-recorded figures; the supplied data does not independently verify completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | Listed as available: YES; no size or facility details supplied | RERA amenity record | 0%; not independently verified |
| Green strip / TOT LOT / park | Listed as available: YES; no area or layout detail supplied | RERA amenity record | 0%; not independently verified |
| Aggregate recreational open space | Listed as available: YES; area not supplied | RERA amenity record | 0%; not independently verified |
| Internal roads & footpaths | Listed as available: YES; no dimensions supplied | RERA amenity record | 0%; not independently verified |
| Street lighting | Listed as available: YES; no specification supplied | RERA amenity record | 0%; not independently verified |
The technical-approval extract identifies a separate utility block (Ground + 1 upper floor), but does not give its room-by-room facility schedule. No detailed clubhouse, indoor recreation or sports-facility inventory is supplied.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, sewage/sullage treatment, solid-waste management, rainwater harvesting, energy management, fire protection, and electrical meter/sub-station/receiving-station provision. Its recorded progress is 41% for sewerage, 13% for storm-water drains and 23% for fire protection/fire safety; the other listed items show 0%. These progress entries do not establish independent completion or operating capacity. RERA amenities
The HMDA technical-approval extract specifies or lists:
- Sewerage and water: STP and reuse of recycled water for gardening; rainwater-harvesting structures; an underground static water-storage tank with stated capacity of 25,000 Its Capacity; and a terrace tank stated as 25,000 lits capacity for Residential Buildings.
- Electrical and building services: A/C plant room, generator room, electrical installations and transformer are listed; capacity and backup duration are not supplied.
- Fire and life safety: Hose Reel, Down Comer and Automatic Sprinkler system are listed. The extract also specifies four fire extinguishers per floor and a minimum of two 5 kg DCP extinguishers at the generator and transformer area. It records a requirement to obtain clearance from the A.P. Fire Services Department; no fire-clearance document is included in this overview evidence.
- Waste and other facilities: Garbage house and laundry are listed. No detailed waste-processing capacity, CCTV/access-control system, lift count/capacity or accessibility provisions are supplied.
8. Location, access & connectivity
- The registered project location is Puppalaguda village, Gandipet mandal, Ranga Reddy district, PIN 500089, on survey numbers 277/P, 282/P, 342 and 341/P. The RERA land record gives the project boundaries as ORR to the east, WESTERN SPRINGS to the west, other land to the north and a 100-foot road to the south. RERA record Land records RERA filing
- The HMDA technical-approval extract refers to handover of an existing 30 Mtrs wide approach road area to the local body under deed No. 13695/2021, dated 10.08.2021.
- The supplied location data reports these measured distances: Financial District (Nanakramguda) 1.2 km; IndusInd Bank 0.4 km; an unnamed bus station 2.2 km; Manuu Polytechnic Hyderabad 1.6 km; Sankaraya Eye Hospital 1.6 km; ADP 0.0 km; South india shopping mall 2.6 km; an unnamed park 1.2 km; and Nanakramguda Govt primary school 0.5 km. These are location-record measurements; no travel times are supplied. Location record
9. Developer & development status
- The registered legal promoter is WESTERN CONSTRUCTIONS WINDSOR PARK LLP, an LLP. Its supplied corporate identifier includes GSTIN 36AAFFE8624D1ZK. The project record gives a promoter address at SY NO 277, PUPPALAGUDA VILLAGE, PUPPALAGUDA, Gandipet, Ranga Reddy, 500089; the registration certificate lists the promoter office as Village: Kondapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500084. RERA record Corporate record Parties record
- The promoter’s Form B declarations state a completion undertaking of 28.12.2027. The RERA project header separately records proposed completion 28/04/2028. These are filed/declaration timelines, not evidence that construction has been completed. RERA record
- The supplied amenity record reports partial progress for sewerage, storm-water drains and fire protection, but does not establish overall construction progress or provide an independently verified site inspection. No occupancy or completion certificate is supplied in the reviewed materials. RERA amenities Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for WESTERN WINDSOR PARK, registration P02400005581, issued 20/12/2022 and valid through 28/12/2027 as stated in the certificate. |
| Principal building approval | HMDA Technical Approval, file 047998/ZOA/C1/U6/HMDA/05082021, dated 09-02-2022, for the IT/ITES building and utility block at the stated site and survey numbers. The extract states it was forwarded to Manikonda Municipality for necessary sanction and release. |
| HMDA-recorded environmental-clearance reference | The technical-approval extract lists Environmental Clearance SIA/TG/MIS/68570/2021, dated 08.02.2022, and an environmental-clearance order reference SEEIAA/TG/MIS/68570/2021, dated 08.02.2022. |
| Approach-road deed | Deed 13695/2021, dated 10.08.2021, is cited in the approval extract for handover of the existing 30-metre-wide approach-road area to the local body. |
| HMDA mortgage references | The approval extract lists registered mortgage deeds 13693/2021, 13692/2021 and 13694/2021. |
| Floor plans | 24 drawings are recorded; all 24 are awaiting scan-based measurement, so no software-measured carpet areas are available. Floor plans |
| Occupancy/completion evidence | No occupancy or completion certificate is included in the supplied materials. Document index |
| Further project records | Filed Form B declarations are available as document IDs 266165 and 567030. |
1. Project at a glance
Project identity
Registered project name: WESTERN WINDSOR PARK
Project type: Commercial in the TG-RERA project record; the filed HMDA technical approval describes an IT/ITES building and utility block.
Phase / registered portion: RERA phase designation not disclosed. The registration and technical-approval records identify the project by the site and survey numbers listed below.
TG-RERA registration: P02400005581; granted 20/12/2022; stated validity 20/12/2022–28/12/2027. The certificate records a five-year validity and says extension is subject to the Act and Rules.
Registered promoter: Western Constructions Windsor Park LLP (also styled “M/s. WESTERN CONSTRUCTIONS WINDSOR PARK LLP” in filed material).
RERA status: The supplied certificate records registration; no extension is recorded in the certificate extract.
Land and geographic identity
Locality / revenue village: Puppalaguda / Puppalguda village (spelling as recorded in the project and approval records).
Mandal: Gandipet.
District: Ranga Reddy (the approval also abbreviates this as “R.R. district”).
PIN: 500089.
Project survey numbers / subdivisions: 277/P, 282/P, 342 and 341/P.
Site extent: RERA land details state 33,169.19 sq. m total and 32,010.32 sq. m net, with 1,158.87 sq. m affected by road widening/FTL/nala widening. HMDA technical approval states 33,164.19 sq. m.
Boundaries: East: ORR; west: WESTERN SPRINGS; north: OTHERS LAND; south: 100 FEET ROAD.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the technical approval says plans are forwarded to Manikonda Municipality for necessary sanction and release.
Principal approval: HMDA file 047998/ZOA/C1/U6/HMDA/05082021, technical approval dated 09-02-2022.
Approved building configuration: IT/ITES building: 4 cellars + Ground + 20 upper floors & Environmental Deck Floor. Utility block: Ground + 1 upper floor.
Approved built-up area: 260,519.08 sq. m in the RERA project fields.
Building count: RERA fields record 1 total approved building unit and 1 proposed building unit. The technical approval separately describes the IT/ITES building and a utility block.
Parking levels / counts: Four cellar levels are in the technical-approval configuration. A total sanctioned parking-space count and allocation details are not available in the supplied extracts.
Offering and status
RERA-filed unit type: OFFICE SPACE; 22 units, 0 booked and 22 available in the supplied portal snapshot (no as-of date supplied).
RERA-filed saleable area: 11,821.99 sq. m per unit, as recorded in the unit configuration.
Construction stage: The supplied RERA amenity-progress record reports sewerage at 41%, storm-water drains at 13%, and fire protection/fire-safety requirements at 23%; other listed items show 0%. These are portal-recorded progress figures, not an independent site inspection.
Completion date: The RERA project header records proposed completion 28/04/2028; Form B declarations state an undertaking to complete by 28.12.2027. These are promoter/RERA-filed records, not proof of completion.
Occupancy / completion certificate: No occupancy certificate or completion certificate is supplied in the reviewed project materials; its status is therefore not established by this evidence pack.
2. The project story
- Western Windsor Park is registered as a commercial development in Puppalaguda, Gandipet mandal, Ranga Reddy district.
- The RERA unit record lists 22 office-space units, all shown as available in the supplied snapshot. It also includes an “Amenities Floor” row with zero units; this is not an additional sale unit. The floor-plan set supplied for review consists of 24 drawings, all still awaiting scan-based measurement, so no drawing-derived carpet-area or room-layout description can be confirmed here.
- The records indicate a proposed development and report some infrastructure progress, but do not establish the overall construction stage through an independent site inspection or provide an occupancy/completion certificate.
3. Master plan, architecture & building design
- The project is on the survey parcels 277/P, 282/P, 342 and 341/P in Puppalaguda. The RERA land fields record a total area of 33,169.19 sq. m, a net area of 32,010.32 sq. m and 1,158.87 sq. m affected by road widening/FTL/nala widening. The HMDA technical-approval extract gives a site extent of 33,164.19 sq. m.
- The technical approval describes a single multi-storey IT/ITES building—4 cellars + Ground + 20 upper floors & Environmental Deck Floor—and a utility block of Ground + 1 upper floor. The RERA fields report an approved built-up area of 260,519.08 sq. m. No building-footprint area, floor-by-floor area schedule, floor-wise office count, landscaped/open-space area or detailed internal circulation dimensions are available in the supplied extracts.
- The approval record’s building configuration is not a RERA-filed unit schedule. The supplied RERA unit schedule lists office space, while the floor-plan drawings have not yet been software-measured; consequently, no measured carpet-area or room-layout figures can be reported. Approved built-up area, RERA saleable area and carpet area are distinct measures and should not be treated as interchangeable.
4. Homes, configurations & floor plans
This is a commercial project. The RERA filing lists office space rather than residential homes.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Office space | 22 | 0 | 22 | 11,821.99 sq. m per unit | Not available: all 24 supplied floor-plan drawings are pending scan-based measurement | Not supplied |
The RERA area shown is saleable area, not a drawing-measured carpet area. The supplied drawing set has not been measured, so room sizes, office layouts, balconies or other unit-level dimensions cannot be described from the evidence provided. The booking and availability counts are a portal snapshot with no stated “as of” date and should be treated as indicative.
5. Parking & vehicle circulation
- The approved configuration includes four cellar levels, but the supplied extracts do not establish the number of parking spaces, whether they are resident/visitor or accessible spaces, or how parking is allocated to individual office units. They also do not specify ramp dimensions, vehicle entry and exit arrangements, mechanical parking, two-wheeler spaces or EV charging.
- The technical approval refers to a minimum width of 4.5 mtrs and height clearance of 5 mtrs among its stated parameters, but the supplied extract does not identify this as a parking-ramp measurement; no parking-specific interpretation is made here.
6. Amenities, recreation & open spaces
The RERA amenity-progress record lists the following items. Progress percentages are portal-recorded figures; the supplied data does not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | Listed as available: YES; no size or facility details supplied | RERA amenity record | 0%; not independently verified |
| Green strip / TOT LOT / park | Listed as available: YES; no area or layout detail supplied | RERA amenity record | 0%; not independently verified |
| Aggregate recreational open space | Listed as available: YES; area not supplied | RERA amenity record | 0%; not independently verified |
| Internal roads & footpaths | Listed as available: YES; no dimensions supplied | RERA amenity record | 0%; not independently verified |
| Street lighting | Listed as available: YES; no specification supplied | RERA amenity record | 0%; not independently verified |
The technical-approval extract identifies a separate utility block (Ground + 1 upper floor), but does not give its room-by-room facility schedule. No detailed clubhouse, indoor recreation or sports-facility inventory is supplied.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, sewage/sullage treatment, solid-waste management, rainwater harvesting, energy management, fire protection, and electrical meter/sub-station/receiving-station provision. Its recorded progress is 41% for sewerage, 13% for storm-water drains and 23% for fire protection/fire safety; the other listed items show 0%. These progress entries do not establish independent completion or operating capacity.
The HMDA technical-approval extract specifies or lists:
- Sewerage and water: STP and reuse of recycled water for gardening; rainwater-harvesting structures; an underground static water-storage tank with stated capacity of 25,000 Its Capacity; and a terrace tank stated as 25,000 lits capacity for Residential Buildings.
- Electrical and building services: A/C plant room, generator room, electrical installations and transformer are listed; capacity and backup duration are not supplied.
- Fire and life safety: Hose Reel, Down Comer and Automatic Sprinkler system are listed. The extract also specifies four fire extinguishers per floor and a minimum of two 5 kg DCP extinguishers at the generator and transformer area. It records a requirement to obtain clearance from the A.P. Fire Services Department; no fire-clearance document is included in this overview evidence.
- Waste and other facilities: Garbage house and laundry are listed. No detailed waste-processing capacity, CCTV/access-control system, lift count/capacity or accessibility provisions are supplied.
8. Location, access & connectivity
- The registered project location is Puppalaguda village, Gandipet mandal, Ranga Reddy district, PIN 500089, on survey numbers 277/P, 282/P, 342 and 341/P. The RERA land record gives the project boundaries as ORR to the east, WESTERN SPRINGS to the west, other land to the north and a 100-foot road to the south.
- The HMDA technical-approval extract refers to handover of an existing 30 Mtrs wide approach road area to the local body under deed No. 13695/2021, dated 10.08.2021.
- The supplied location data reports these measured distances: Financial District (Nanakramguda) 1.2 km; IndusInd Bank 0.4 km; an unnamed bus station 2.2 km; Manuu Polytechnic Hyderabad 1.6 km; Sankaraya Eye Hospital 1.6 km; ADP 0.0 km; South india shopping mall 2.6 km; an unnamed park 1.2 km; and Nanakramguda Govt primary school 0.5 km. These are location-record measurements; no travel times are supplied.
9. Developer & development status
- The registered legal promoter is WESTERN CONSTRUCTIONS WINDSOR PARK LLP, an LLP. Its supplied corporate identifier includes GSTIN 36AAFFE8624D1ZK. The project record gives a promoter address at SY NO 277, PUPPALAGUDA VILLAGE, PUPPALAGUDA, Gandipet, Ranga Reddy, 500089; the registration certificate lists the promoter office as Village: Kondapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500084.
- The promoter’s Form B declarations state a completion undertaking of 28.12.2027. The RERA project header separately records proposed completion 28/04/2028. These are filed/declaration timelines, not evidence that construction has been completed.
- The supplied amenity record reports partial progress for sewerage, storm-water drains and fire protection, but does not establish overall construction progress or provide an independently verified site inspection. No occupancy or completion certificate is supplied in the reviewed materials.
10. Approvals, official records & documents
TG-RERA registration: Form C for WESTERN WINDSOR PARK, registration P02400005581, issued 20/12/2022 and valid through 28/12/2027 as stated in the certificate.
Principal building approval: HMDA Technical Approval, file 047998/ZOA/C1/U6/HMDA/05082021, dated 09-02-2022, for the IT/ITES building and utility block at the stated site and survey numbers. The extract states it was forwarded to Manikonda Municipality for necessary sanction and release.
HMDA-recorded environmental-clearance reference: The technical-approval extract lists Environmental Clearance SIA/TG/MIS/68570/2021, dated 08.02.2022, and an environmental-clearance order reference SEEIAA/TG/MIS/68570/2021, dated 08.02.2022.
Approach-road deed: Deed 13695/2021, dated 10.08.2021, is cited in the approval extract for handover of the existing 30-metre-wide approach-road area to the local body.
HMDA mortgage references: The approval extract lists registered mortgage deeds 13693/2021, 13692/2021 and 13694/2021.
Floor plans: 24 drawings are recorded; all 24 are awaiting scan-based measurement, so no software-measured carpet areas are available.
Occupancy/completion evidence: No occupancy or completion certificate is included in the supplied materials.
Further project records: Filed Form B declarations are available as document IDs 266165 and 567030.
Frequently asked questions
Is WESTERN WINDSOR PARK registered with Telangana RERA?
Yes. WESTERN WINDSOR PARK is registered with the Telangana Real Estate Regulatory Authority as P02400005581; the registration status is New Project.
Who is the developer of WESTERN WINDSOR PARK?
The promoter named in the RERA registration is WESTERN CONSTRUCTIONS WINDSOR PARK LLP.
Where is WESTERN WINDSOR PARK located?
WESTERN WINDSOR PARK is in PUPPALAGUDA, Gandipet, Rangareddy, Telangana (500089).
When will WESTERN WINDSOR PARK be completed?
The promoter's proposed date of completion filed with RERA is 28/04/2028. This is the promoter's declaration, not a guarantee.
More projects in Puppalguda