Primera One
PRIMERA CONSTRUCTIONS · Rangareddy · RERA P02400002918
PRIMERA ONE is a residential apartment project at TSPA Junction, Serilingampally, Ranga Reddy District, developed by Primera Constructions. The site covers 1,388.68 Sq. Mt. and has one residential building with 1Cellar + 1Stilt + 5 Upper floors and 25 apartments. The filed configurations are 2BHK, 3BHK and 4BHK. The project is registered under TG-RERA number P02400002918, with proposed completion on 22/03/2022.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | TG-RERA record |
|---|---|
| Registered project name | PRIMERA ONE |
| Project type | Residential apartment project RERA filing |
| Phase / registered portion | Not separately identified as a phase in the supplied record; the registration is for this project |
| TG-RERA registration number | P02400002918 |
| Registration validity | 14/05/2021 to 22/03/2022; the certificate records no extension |
| Registered promoter | Primera Constructions (project records also render the name as PRIMERA CONSTRUCTIONS) |
| RERA status | The certificate records a registration period ending 22/03/2022. Current registration status is not established by the supplied record. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | TSPA Junction [header; fields: Canonical identity] |
| Revenue village | RERA project fields identify Tspa Junction. The filed HMDA technical approval describes Peeranchervu-ORRGC Village; the title documents also refer to Peerancheruvu village. [header; fields: Canonical identity; doc:163723 p1] |
| Mandal | Not disclosed in the RERA project identity fields. The HMDA technical approval says ORRGC Mandal; the registration certificate says Serilingampally. RERA filing |
| District / PIN | Ranga Reddy; 500086 [header; doc:REGCERT-21976 p1] |
| Survey numbers / subdivisions | Sy. No. 24 and 18 in the certificate and technical approval; the project fields identify “24,IN PART OF 18”. |
| Plots identified in filed approval/title documents | Plot Nos. 77 & 78; the title material describes land in Survey No. 24, Parts 18 and 17. |
| Registered site extent | 1,388.68 Sq. Mt. in the HMDA technical approval; the RERA land fields state total and net area of 1388.68 sqmts. |
| Boundaries in RERA project fields | North: ROAD WIDTH 12; South: PLOT NO 76; East: PLOT NO 65 AND 66; West: ROAD WIDTH-9. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the technical approval names Bandlaguda Jagir Municipal Corporation–ORRGC as the delegated local authority. |
| Principal approval | 036205/SKP/R1/U6/HMDA/03062020, technically approved 12/10/2020 |
| Approved building | One residential building, identified in the technical approval as A1 (RESIDENTIAL BUILDING) |
| Sanctioned floor configuration | 1Cellar + 1Stilt + 5 Upper floors |
| Approved built-up area | 3323.2 (sanctioned parameters); RERA project fields state approved built-up area 3323.18 sqmts. |
| Other area figure in technical approval | Total Built up Area (In Sq.mts) 4115.28; this is separately stated in the approval and is not treated here as the approved built-up-area figure. |
| RERA-declared building and unit count | 1 proposed building; 25 units in the filed unit schedule RERA filing |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK, 3BHK and 4BHK [units; unit_types_filed] |
| RERA-filed saleable areas | 2BHK: 127.15 sqm; 3BHK: 150.0 sqm; 4BHK: 242.0 sqm [units; unit_types_filed] |
| Filed counts and portal booking snapshot | 25 units total: 15 2BHK, 5 3BHK and 5 4BHK. The portal extract shows 0 booked and 25 available, but supplies no as-of date; treat these counts as indicative. [units; unit_types_filed] |
| Construction stage | No independently verified site-progress evidence is supplied. The RERA amenity schedule records 0% for listed infrastructure items and does not provide a building-completion percentage. RERA amenities |
| Completion deadline | The project fields state proposed completion 22/03/2022. The supplied RERA registration certificate has the same end date; no revised completion date is supplied. [header; fields: Project Information; doc:REGCERT-21976 p1] |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied evidence. The approved letter states that an Occupancy Certificate is compulsory before occupation. |
2. The project story
PRIMERA ONE is filed with TG-RERA as a residential apartment project under registration P02400002918, for land identified in the project fields as Survey No. 24, in part of 18, at TSPA Junction, Ranga Reddy District. The filed HMDA technical approval places the proposed building on Plot Nos. 77 and 78 and describes the locality as Peeranchervu-ORRGC Village. [header; fields: Land Details; doc:163723 pp.1–2; doc:REGCERT-21976 p1]
The technical approval describes one residential building with a cellar, stilt and five upper floors. The RERA unit schedule lists 25 apartments across 2BHK, 3BHK and 4BHK configurations. The record does not establish that construction is complete or that any part has received an occupancy certificate; the portal booking snapshot is undated.
3. Master plan, architecture & building design
The filed technical approval identifies A1 (RESIDENTIAL BUILDING) and sanctions 1Cellar + 1Stilt + 5 Upper floors. It records a building height of 14.45 and sanctioned built-up area of 3323.2; the RERA project fields state 3323.18 sqmts approved built-up area. The approval separately records Total Built up Area (In Sq.mts) 4115.28. These are the figures as labelled in the supplied records; the evidence does not provide a drawing-based breakdown reconciling the area categories.
The approval describes the project site extent as 1,388.68 Sq. Mt. and identifies a road width of 18 mt. in the approval record. The supplied material does not establish building footprint, flats per floor, lift or stair count, detailed circulation, landscaping/open-space dimensions, or residential/common-area area distribution. The filed floor-plan document is identified as a layout/building-floor-plan document, but its drawing extraction is not supplied as an approved area schedule.
4. Homes, configurations & floor plans
The TG-RERA filing lists 25 units in three configurations. The 2BHK drawing measurement is software-measured from the filed floor-plan drawings, not a RERA carpet-area disclosure; it is a separate measurement from the RERA saleable area. The supplied measurement records flag the drawing-derived values as needing review. [units; unit_types_filed; unit_details; floor_plans]
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 127.15 sqm | 67.5–101.8 sqm; median 90.2 sqm (software-measured) | 29% |
| 3BHK | 5 | 0 | 5 | 150.0 sqm | Not supplied | Not supplied |
| 4BHK | 5 | 0 | 5 | 242.0 sqm | Not supplied | Not supplied |
The drawing-based 2BHK measurements cover six flat designs. The supplied room extract for one second-floor plan identifies a kitchen, hall, two bedrooms and two toilets, with dimensions recorded in the drawing-measurement data. These are software measurements from drawing geometry and should be checked against the plan itself. [unit_details; floor_plans]
Carpet area refers to the measured internal area in the drawing record; saleable area is the RERA-filed area and is not interchangeable with carpet area. No separate balcony, utility or common-area loading breakdown is supplied for the RERA configurations. [unit_details; floor_plans; units]
5. Parking & vehicle circulation
The sanctioned plan approval identifies the cellar and stilt as parking levels and states that those areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The approval does not give a parking-space count, parking allocation by apartment, visitor or accessible parking provision, two-wheeler count, ramp arrangement, or EV-charging provision. A unit-specific parking entitlement cannot be established from the supplied evidence.
6. Amenities, recreation & open spaces
The RERA filing lists 14 infrastructure and amenity items. For most entries, the recorded progress is 0%; the schedule marks “YES” for water supply, sewerage, energy management, fire protection/fire safety requirements, and electrical meter room/sub-station/receiving station. These are filing entries, not evidence that the facilities have been completed or independently verified. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not supplied | RERA amenities | 0%; completion not independently verified |
| Water Supply | No source, capacity or storage details supplied | RERA amenities | Marked “YES”; 0%; completion not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | No system capacity or component detail supplied | RERA amenities | Marked “YES”; 0%; completion not independently verified |
| Storm Water Drains | Size not supplied | RERA amenities | 0%; completion not independently verified |
| Green Strip/TOT LOT/Park | No area or capacity supplied | RERA amenities | 0%; completion not independently verified |
| Street Lighting | Details not supplied | RERA amenities | 0%; completion not independently verified |
| Community Buildings | Details not supplied | RERA amenities | 0%; completion not independently verified |
| Treatment and Disposal of Sewage and Sullage Water | Details not supplied | RERA amenities | 0%; completion not independently verified |
| Solid Waste Management and Disposal | Details not supplied | RERA amenities | 0%; completion not independently verified |
| Water Conservation, Rain Water Harvesting | No size or capacity supplied; approval also requires rain-water harvesting structures | [amenities; doc:163723 p2] | 0% in RERA schedule; completion not independently verified |
| Energy management | Details not supplied | RERA amenities | Marked “YES”; 0%; completion not independently verified |
| Fire Protection and Fire Safety Requirements | Details not supplied | RERA amenities | Marked “YES”; 0%; completion not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | Details not supplied | RERA amenities | Marked “YES”; 0%; completion not independently verified |
| Aggregate area of recreational Open Space | Area not supplied | RERA amenities | 0%; completion not independently verified |
The vendor record separately lists children’s play areas/sand pits, power backup, 24*7 water supply, lift, 24 x 7 security and a normal park/central green. These are vendor-listed claims, not established by the supplied TG-RERA amenity schedule or an independent completion record. Promoter website
7. Utilities, building services & safety
The RERA schedule marks water supply, sewerage, energy management, fire protection/fire safety requirements, and an electrical meter room/sub-station/receiving station as available, while recording 0% progress for those listed items. It does not specify water source or storage, sewerage-treatment capacity, reuse arrangements, storm-water or drainage design, power supply or backup capacity, lift count or capacity, or security and waste-management operating details. RERA amenities
The HMDA technical approval requires rain-water-harvesting structures and provision for a transformer and garbage house within the premises. It also says Occupancy Certificate is compulsory before occupation. These are approval conditions; the supplied evidence does not establish their completion or statutory compliance. No fire-system design details, emergency access/escape arrangement, accessibility features, CCTV or access-control details are supplied.
8. Location, access & connectivity
The registered project location is TSPA Junction, Ranga Reddy District, PIN 500086. The RERA project fields describe the site boundaries as roads to the north (ROAD WIDTH 12) and west (ROAD WIDTH-9), with Plot Nos. 65 and 66 to the east and Plot No. 76 to the south. [header; fields: Address Details; fields: Land Details]
The supplied location dataset gives the following distances from its cadastral-parcel-centroid location record. These are dataset distances; no travel times or transport-service frequency is supplied. Location record
| Nearby location | Recorded distance |
|---|---|
| Financial District (Nanakramguda) | 1.2 km |
| IndusInd Bank | 0.4 km |
| Unnamed bus station | 2.2 km |
| Manuu Polytechnic Hyderabad | 1.6 km |
| Sankaraya Eye Hospital | 1.6 km |
| ADP | 0.0 km |
| South india shopping mall | 2.6 km |
| Unnamed park | 1.2 km |
| Nanakramguda Govt primary school | 0.5 km |
9. Developer & development status
The TG-RERA registration names Primera Constructions as promoter. The project filing identifies the organization type as Partnership and names Mahendra Kumar Vaddineni and Karthik Vaddineni as partners; Mahendra Kumar Vaddineni is also identified as authorized signatory. The supplied records do not provide a corporate identification number, registered office address, official website or contact details.
The promoter’s Form B declaration is dated 20-04-2021 and is made by Mahendra Kumar Vaddineni on behalf of Primera Constructions. It contains the promoter’s title and encumbrance declarations and project-fund, audit and approval undertakings; the completion-period field in that declaration is left blank. This is a promoter declaration, not independent verification of title or project progress.
The project fields state a proposed completion date of 22/03/2022; no revised completion date or independently verified construction-stage report is supplied. The registration certificate states that registration ran from 14/05/2021 to 22/03/2022, with no extension recorded in the supplied certificate. No occupancy or completion certificate is supplied. [header; fields: Project Information; doc:REGCERT-21976 p1; documents]
10. Approvals, official records & documents
| Record | Supplied evidence and scope |
|---|---|
| TG-RERA registration | Form C registers PRIMERA ONE, registration P02400002918, under section 5; certificate period 14/05/2021–22/03/2022. |
| HMDA technical building approval | 036205/SKP/R1/U6/HMDA/03062020, approved 12/10/2020, for a residential building; the letter describes technical approval and states that building plans are to be sanctioned by the Executive Authority in conformity with the technically approved plans. |
| Filed title report | Advocate’s legal scrutiny report for the project land at Peeranchervu village, described in Sy. No. 24 and part of Sy. No. 18. |
| Development agreement cum GPA | Development rights and attorney powers for the described land in Survey No. 24, Parts 18 and 17; the document summary states it does not transfer title. |
| Sale deeds in title material | Sale deed for Plot No. 78 in Survey No. 24, Part No. 17, dated 04 December 2019; sale deed for Plot No. 77 in Survey No. 24, Part No. 18, dated 07 November 2019. |
| Form B declaration | Promoter declaration dated 20-04-2021, signed by Mahendra Kumar Vaddineni on behalf of Primera Constructions. |
| Floor-plan/layout filing | TG-RERA document register lists document 163718 as a layout/building-floor-plan record; software measurements are reported from its drawings. The supplied extract does not establish a complete approved drawing set. [documents; floor_plans] |
| Occupancy/completion certificate | Not present in the supplied project documents. Document index |
1. Project at a glance
Project identity
Registered project name: PRIMERA ONE
Project type: Residential apartment project
Phase / registered portion: Not separately identified as a phase in the supplied record; the registration is for this project
TG-RERA registration number: P02400002918
Registration validity: 14/05/2021 to 22/03/2022; the certificate records no extension
Registered promoter: Primera Constructions (project records also render the name as PRIMERA CONSTRUCTIONS)
RERA status: The certificate records a registration period ending 22/03/2022. Current registration status is not established by the supplied record.
Land and geographic identity
Locality: TSPA Junction [header; fields: Canonical identity]
Revenue village: RERA project fields identify Tspa Junction. The filed HMDA technical approval describes Peeranchervu-ORRGC Village; the title documents also refer to Peerancheruvu village. [header; fields: Canonical identity; doc:163723 p1]
Mandal: Not disclosed in the RERA project identity fields. The HMDA technical approval says ORRGC Mandal; the registration certificate says Serilingampally.
District / PIN: Ranga Reddy; 500086 [header; doc:REGCERT-21976 p1]
Survey numbers / subdivisions: Sy. No. 24 and 18 in the certificate and technical approval; the project fields identify “24,IN PART OF 18”.
Plots identified in filed approval/title documents: Plot Nos. 77 & 78; the title material describes land in Survey No. 24, Parts 18 and 17.
Registered site extent: 1,388.68 Sq. Mt. in the HMDA technical approval; the RERA land fields state total and net area of 1388.68 sqmts.
Boundaries in RERA project fields: North: ROAD WIDTH 12; South: PLOT NO 76; East: PLOT NO 65 AND 66; West: ROAD WIDTH-9.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the technical approval names Bandlaguda Jagir Municipal Corporation–ORRGC as the delegated local authority.
Principal approval: 036205/SKP/R1/U6/HMDA/03062020, technically approved 12/10/2020
Approved building: One residential building, identified in the technical approval as A1 (RESIDENTIAL BUILDING)
Sanctioned floor configuration: 1Cellar + 1Stilt + 5 Upper floors
Approved built-up area: 3323.2 (sanctioned parameters); RERA project fields state approved built-up area 3323.18 sqmts.
Other area figure in technical approval: Total Built up Area (In Sq.mts) 4115.28; this is separately stated in the approval and is not treated here as the approved built-up-area figure.
RERA-declared building and unit count: 1 proposed building; 25 units in the filed unit schedule
Offering and status
RERA-filed configurations: 2BHK, 3BHK and 4BHK [units; unit_types_filed]
RERA-filed saleable areas: 2BHK: 127.15 sqm; 3BHK: 150.0 sqm; 4BHK: 242.0 sqm [units; unit_types_filed]
Filed counts and portal booking snapshot: 25 units total: 15 2BHK, 5 3BHK and 5 4BHK. The portal extract shows 0 booked and 25 available, but supplies no as-of date; treat these counts as indicative. [units; unit_types_filed]
Construction stage: No independently verified site-progress evidence is supplied. The RERA amenity schedule records 0% for listed infrastructure items and does not provide a building-completion percentage.
Completion deadline: The project fields state proposed completion 22/03/2022. The supplied RERA registration certificate has the same end date; no revised completion date is supplied. [header; fields: Project Information; doc:REGCERT-21976 p1]
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied evidence. The approved letter states that an Occupancy Certificate is compulsory before occupation.
2. The project story
PRIMERA ONE is filed with TG-RERA as a residential apartment project under registration P02400002918, for land identified in the project fields as Survey No. 24, in part of 18, at TSPA Junction, Ranga Reddy District. The filed HMDA technical approval places the proposed building on Plot Nos. 77 and 78 and describes the locality as Peeranchervu-ORRGC Village. [header; fields: Land Details; doc:163723 pp.1–2; doc:REGCERT-21976 p1]
The technical approval describes one residential building with a cellar, stilt and five upper floors. The RERA unit schedule lists 25 apartments across 2BHK, 3BHK and 4BHK configurations. The record does not establish that construction is complete or that any part has received an occupancy certificate; the portal booking snapshot is undated.
3. Master plan, architecture & building design
The filed technical approval identifies A1 (RESIDENTIAL BUILDING) and sanctions 1Cellar + 1Stilt + 5 Upper floors. It records a building height of 14.45 and sanctioned built-up area of 3323.2; the RERA project fields state 3323.18 sqmts approved built-up area. The approval separately records Total Built up Area (In Sq.mts) 4115.28. These are the figures as labelled in the supplied records; the evidence does not provide a drawing-based breakdown reconciling the area categories.
The approval describes the project site extent as 1,388.68 Sq. Mt. and identifies a road width of 18 mt. in the approval record. The supplied material does not establish building footprint, flats per floor, lift or stair count, detailed circulation, landscaping/open-space dimensions, or residential/common-area area distribution. The filed floor-plan document is identified as a layout/building-floor-plan document, but its drawing extraction is not supplied as an approved area schedule.
4. Homes, configurations & floor plans
The TG-RERA filing lists 25 units in three configurations. The 2BHK drawing measurement is software-measured from the filed floor-plan drawings, not a RERA carpet-area disclosure; it is a separate measurement from the RERA saleable area. The supplied measurement records flag the drawing-derived values as needing review. [units; unit_types_filed; unit_details; floor_plans]
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 127.15 sqm | 67.5–101.8 sqm; median 90.2 sqm (software-measured) | 29% |
| 3BHK | 5 | 0 | 5 | 150.0 sqm | Not supplied | Not supplied |
| 4BHK | 5 | 0 | 5 | 242.0 sqm | Not supplied | Not supplied |
The drawing-based 2BHK measurements cover six flat designs. The supplied room extract for one second-floor plan identifies a kitchen, hall, two bedrooms and two toilets, with dimensions recorded in the drawing-measurement data. These are software measurements from drawing geometry and should be checked against the plan itself. [unit_details; floor_plans]
Carpet area refers to the measured internal area in the drawing record; saleable area is the RERA-filed area and is not interchangeable with carpet area. No separate balcony, utility or common-area loading breakdown is supplied for the RERA configurations. [unit_details; floor_plans; units]
5. Parking & vehicle circulation
The sanctioned plan approval identifies the cellar and stilt as parking levels and states that those areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The approval does not give a parking-space count, parking allocation by apartment, visitor or accessible parking provision, two-wheeler count, ramp arrangement, or EV-charging provision. A unit-specific parking entitlement cannot be established from the supplied evidence.
6. Amenities, recreation & open spaces
The RERA filing lists 14 infrastructure and amenity items. For most entries, the recorded progress is 0%; the schedule marks “YES” for water supply, sewerage, energy management, fire protection/fire safety requirements, and electrical meter room/sub-station/receiving station. These are filing entries, not evidence that the facilities have been completed or independently verified.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not supplied | 0%; completion not independently verified | |
| Water Supply | No source, capacity or storage details supplied | Marked “YES”; 0%; completion not independently verified | |
| Sewerage (Chamber, Lines, Septic Tank, STP) | No system capacity or component detail supplied | Marked “YES”; 0%; completion not independently verified | |
| Storm Water Drains | Size not supplied | 0%; completion not independently verified | |
| Green Strip/TOT LOT/Park | No area or capacity supplied | 0%; completion not independently verified | |
| Street Lighting | Details not supplied | 0%; completion not independently verified | |
| Community Buildings | Details not supplied | 0%; completion not independently verified | |
| Treatment and Disposal of Sewage and Sullage Water | Details not supplied | 0%; completion not independently verified | |
| Solid Waste Management and Disposal | Details not supplied | 0%; completion not independently verified | |
| Water Conservation, Rain Water Harvesting | No size or capacity supplied; approval also requires rain-water harvesting structures | [amenities; doc:163723 p2] | 0% in RERA schedule; completion not independently verified |
| Energy management | Details not supplied | Marked “YES”; 0%; completion not independently verified | |
| Fire Protection and Fire Safety Requirements | Details not supplied | Marked “YES”; 0%; completion not independently verified | |
| Electrical Meter Room, Sub-Station, Receiving Station | Details not supplied | Marked “YES”; 0%; completion not independently verified | |
| Aggregate area of recreational Open Space | Area not supplied | 0%; completion not independently verified |
The vendor record separately lists children’s play areas/sand pits, power backup, 24*7 water supply, lift, 24 x 7 security and a normal park/central green. These are vendor-listed claims, not established by the supplied TG-RERA amenity schedule or an independent completion record.
7. Utilities, building services & safety
The RERA schedule marks water supply, sewerage, energy management, fire protection/fire safety requirements, and an electrical meter room/sub-station/receiving station as available, while recording 0% progress for those listed items. It does not specify water source or storage, sewerage-treatment capacity, reuse arrangements, storm-water or drainage design, power supply or backup capacity, lift count or capacity, or security and waste-management operating details.
The HMDA technical approval requires rain-water-harvesting structures and provision for a transformer and garbage house within the premises. It also says Occupancy Certificate is compulsory before occupation. These are approval conditions; the supplied evidence does not establish their completion or statutory compliance. No fire-system design details, emergency access/escape arrangement, accessibility features, CCTV or access-control details are supplied.
8. Location, access & connectivity
The registered project location is TSPA Junction, Ranga Reddy District, PIN 500086. The RERA project fields describe the site boundaries as roads to the north (ROAD WIDTH 12) and west (ROAD WIDTH-9), with Plot Nos. 65 and 66 to the east and Plot No. 76 to the south. [header; fields: Address Details; fields: Land Details]
The supplied location dataset gives the following distances from its cadastral-parcel-centroid location record. These are dataset distances; no travel times or transport-service frequency is supplied.
Financial District (Nanakramguda): 1.2 km
IndusInd Bank: 0.4 km
Unnamed bus station: 2.2 km
Manuu Polytechnic Hyderabad: 1.6 km
Sankaraya Eye Hospital: 1.6 km
ADP: 0.0 km
South india shopping mall: 2.6 km
Unnamed park: 1.2 km
Nanakramguda Govt primary school: 0.5 km
9. Developer & development status
The TG-RERA registration names Primera Constructions as promoter. The project filing identifies the organization type as Partnership and names Mahendra Kumar Vaddineni and Karthik Vaddineni as partners; Mahendra Kumar Vaddineni is also identified as authorized signatory. The supplied records do not provide a corporate identification number, registered office address, official website or contact details.
The promoter’s Form B declaration is dated 20-04-2021 and is made by Mahendra Kumar Vaddineni on behalf of Primera Constructions. It contains the promoter’s title and encumbrance declarations and project-fund, audit and approval undertakings; the completion-period field in that declaration is left blank. This is a promoter declaration, not independent verification of title or project progress.
The project fields state a proposed completion date of 22/03/2022; no revised completion date or independently verified construction-stage report is supplied. The registration certificate states that registration ran from 14/05/2021 to 22/03/2022, with no extension recorded in the supplied certificate. No occupancy or completion certificate is supplied. [header; fields: Project Information; doc:REGCERT-21976 p1; documents]
10. Approvals, official records & documents
TG-RERA registration: Form C registers PRIMERA ONE, registration P02400002918, under section 5; certificate period 14/05/2021–22/03/2022.
HMDA technical building approval: 036205/SKP/R1/U6/HMDA/03062020, approved 12/10/2020, for a residential building; the letter describes technical approval and states that building plans are to be sanctioned by the Executive Authority in conformity with the technically approved plans.
Filed title report: Advocate’s legal scrutiny report for the project land at Peeranchervu village, described in Sy. No. 24 and part of Sy. No. 18.
Development agreement cum GPA: Development rights and attorney powers for the described land in Survey No. 24, Parts 18 and 17; the document summary states it does not transfer title.
Sale deeds in title material: Sale deed for Plot No. 78 in Survey No. 24, Part No. 17, dated 04 December 2019; sale deed for Plot No. 77 in Survey No. 24, Part No. 18, dated 07 November 2019.
Form B declaration: Promoter declaration dated 20-04-2021, signed by Mahendra Kumar Vaddineni on behalf of Primera Constructions.
Floor-plan/layout filing: TG-RERA document register lists document 163718 as a layout/building-floor-plan record; software measurements are reported from its drawings. The supplied extract does not establish a complete approved drawing set. [documents; floor_plans]
Occupancy/completion certificate: Not present in the supplied project documents.
Frequently asked questions
Is PRIMERA ONE registered with Telangana RERA?
Yes. PRIMERA ONE is registered with the Telangana Real Estate Regulatory Authority as P02400002918; the registration status is New Project.
Who is the developer of PRIMERA ONE?
The promoter named in the RERA registration is PRIMERA CONSTRUCTIONS.
Where is PRIMERA ONE located?
PRIMERA ONE is in TSPA Junction, Rangareddy, Telangana (500086).
When will PRIMERA ONE be completed?
The promoter's proposed date of completion filed with RERA is 22/03/2022. This is the promoter's declaration, not a guarantee.