JONAS PEEPAL TREE APARTMENT is a residential apartment project in BANGLAGUDA JAGIR, Gandipet mandal, Ranga Reddy district, developed by registered promoter PRBS CONSTRUCTIONS PRIVATE LIMITED. The project covers 501.60 sq. m. and comprises one residential building with 1 stilt + 5 upper floors and 15 2BHK apartments, with a RERA-filed saleable area of 49.86 sq. m. for the 2BHK configuration. It is registered under TG-RERA P02400002581, with proposed completion by 07.09.2026.

More from Prbs Constructions Pvt Ltd · 2 projects →

01What we found

Period endedTG-RERA registration ran to 7 Sep 2026 - check its extension on TG-RERA
14documents on file - each fact links to its page
1court case on this project's land (survey 48, 49, Bandlaguda)
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameJONAS PEEPAL TREE APARTMENT RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNot separately identified in the supplied RERA record; registration is for this project RERA record
TG-RERA registrationP02400002581
Registration validity23/02/2021 to 07/09/2026; the certificate says five years and allows extension in accordance with the Act and Rules. No extension is recorded in the supplied evidence.
Registered promoterPRBS CONSTRUCTIONS PRIVATE LIMITED RERA record Corporate record
RERA statusThe supplied certificate records registration; the available record lists the validity end date above. Current registration status beyond that date is not established by the supplied evidence.

Land and geographic identity

FieldProject record
LocalityBANGLAGUDA JAGIR RERA record RERA filing
Revenue villageBandlaguda; the filed approval and certificate also identify Bandlaguda (Jagir) / Bandlaguda Jagir. RERA record
MandalGandipet RERA record
DistrictRanga Reddy RERA record
PIN500086 RERA record
Project survey numbers48 and 49; no subdivision is stated in the RERA project identity or the supplied approval documents. RERA record Land records
Registered site extent501.60 sq. m. RERA filing
Total / net land area501.60 sq. m. total; 501.60 sq. m. net; affected area recorded as 0. RERA filing
BoundariesNorth: Plot No. 115; South: Plot No. 118; East: Plot Nos. 125, 126 and 127; West: 30 wide road. RERA filing

Development identity

FieldProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal approvalTechnical Approval No. 031074/SKP/R1/U6/HMDA/28112019, dated 07 September 2020 Approvals record
Building configurationOne residential building: 1 stilt + 5 upper floors, as stated in the technical approval.
Approved built-up area1203.85 sq. m., as recorded in the project fields and approval parameters. The same approval extraction separately records “Proposed Built-up Area 1446.89”; these labels are retained as stated and are not interchangeable. RERA filing
Building height14.9 m, as stated in the approval parameters.
Sanctioned / RERA-declared unit countThe RERA filing records 15 apartments; the approval letter says sanctioned unit numbers must not be increased but the supplied extract does not state an apartment count. RERA unit table
ParkingThe approval extraction records a parking-area field of 0 in the occupancy-certificate particulars; a specific sanctioned parking-space count or allocation is not established in the supplied evidence.

Offering and status

FieldProject record
RERA-filed configuration2BHK: 15 units; 0 booked and 15 available in the portal data supplied. The portal extract has no as-of date, so counts are indicative. RERA unit table RERA unit details
RERA-filed saleable area49.86 sq. m. for the 2BHK configuration RERA unit table RERA unit details
Construction stageThe supplied HMDA record includes an occupancy certificate for a residential building at Plot Nos. 116 and 117, Survey Nos. 48 and 49, and states it is fit for occupation. That certificate’s scope is the building it identifies; the evidence does not independently establish current on-site condition.
Completion undertaking / deadlineForm B declares completion by 07.09.2026. The TG-RERA certificate is valid through 07/09/2026. These are distinct from the occupancy certificate.
Occupancy certificateHMDA Occupancy Certificate No. 000281/OC/HMDA/SKP/2022, dated 18 February 2022; it identifies Stilt + 5 floors and Survey Nos. 48 and 49. Approvals record

2. The project story

JONAS PEEPAL TREE APARTMENT is registered with TG-RERA as a residential apartment project at BANGLAGUDA JAGIR, in Bandlaguda village, Gandipet mandal, Ranga Reddy district, PIN 500086. Its filed land identity covers Survey Nos. 48 and 49 and a site extent of 501.60 sq. m. RERA record Land records

The HMDA technical approval describes one residential building with a stilt and five upper floors. The RERA filing lists fifteen 2BHK apartments. RERA unit table The supplied HMDA occupancy certificate identifies a Stilt + 5 floors residential building on Plot Nos. 116 and 117 in Survey Nos. 48 and 49, and certifies that the inspected building is fit for occupation. This records the certificate’s stated scope, not a separate independent inspection of current condition.

The project’s Form B includes a promoter declaration of completion by 07.09.2026; the RERA certificate records registration validity to 07/09/2026. These dates do not substitute for the separate HMDA occupancy certificate record.

3. Master plan, architecture & building design

The RERA-filed land area is 501.60 sq. m. The project fields state an approved built-up area of 1203.85 sq. m.; HMDA’s technical approval extraction also records a proposed built-up area of 1446.89. The supplied material does not provide a drawing-derived breakdown of those areas, a floor-by-floor area schedule, or an FSI-counted area, so these figures should not be treated as equivalents. RERA filing RERA filing

The technical approval describes a residential building named “PRBS (S5)” with 1 stilt + 5 upper floors and a height of 14.9 m. The occupancy certificate also identifies a Stilt + 5 floors building and records deviations of 6.00, 4.29 and 3.92 percent.

The available evidence does not establish the building footprint, apartment-per-floor arrangement, lift and stair configuration, internal circulation, landscape dimensions, or a detailed common-area schedule. The RERA-filed total is one building and 15 apartments. RERA unit table Detailed approved plan drawings are not available in the supplied drawing-derived data.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1501549.86 sq. m.Not established from the supplied floor-plan measurementsNot supplied

The configuration, unit count, booking counts and saleable area are from the TG-RERA filing data. Booking and availability figures are indicative because the extract has no as-of date. RERA unit details RERA unit table

The drawing review records two drawings, of which one is measured and one is pending scan review, but no 2BHK flat design was measured. Therefore, no software-measured carpet area or room dimensions can be reported. Floor plans Saleable area and carpet area are different measures: the supplied data describes RERA saleable area as including the home’s share of common areas, while no carpet-area measurement is available to compare. Floor plans

5. Parking & vehicle circulation

The supplied occupancy-certificate particulars record a parking-area field of 0 as per the sanctioned plan and 0 as per the completed building plan. The project evidence does not establish a count of car or two-wheeler spaces, visitor or accessible parking, parking levels, ramps, EV charging, or a unit-wise parking allocation.

The technical approval states that no parking or construction is to be made in setback areas. A specific parking arrangement or exclusive parking entitlement for any apartment is not established by the supplied evidence.

6. Amenities, recreation & open spaces

Transformer space
Description / sizeTransformer space to be provided within the site
Evidence sourceHMDA technical approval
Declared progress / verified statusApproval condition; completion is not established
Garbage house
Description / sizeGarbage house to be made within the premises
Evidence sourceHMDA technical approval
Declared progress / verified statusApproval condition; completion is not established
Tot-lot / green area
Description / sizeTot-lot to be fenced and maintained as greenery
Evidence sourceHMDA technical approval; RERA amenities RERA amenities
Declared progress / verified statusApproval condition; RERA amenities record says available, but independent completion verification is not supplied
Rainwater harvesting
Description / sizePercolation pit required by the technical approval; occupancy certificate lists rainwater harvesting
Evidence sourceHMDA technical approval; occupancy certificate; RERA amenities RERA amenities
Declared progress / verified statusRequired by approval; the certificate lists it, but current operation is not independently verified

The supplied amenities record also lists water supply and solid-waste management as available, and water conservation/rainwater harvesting and a green strip/tot-lot/park at 100%. It lists internal roads and footpaths, sewerage, storm-water drains, street lighting, community buildings, sewage treatment/disposal, energy management, fire safety, electrical meter room/substation/receiving station, and aggregate recreational open space at 0%. These are RERA-recorded amenity fields, not independent site verification. RERA amenities

No separately evidenced clubhouse or indoor recreation facility is identified in the supplied project records. The vendor data lists additional facilities, but those are not used here as evidence of sanctioned or delivered project amenities. Promoter website

7. Utilities, building services & safety

The HMDA technical approval requires a rainwater-harvesting percolation pit, transformer space, and a garbage house. It also requires a septic tank according to standard specifications and directs that fire-service department norms be followed. These are approval conditions; the supplied evidence does not establish completion or operating capacity for these services. The RERA amenities record marks water supply, solid-waste management and water conservation/rainwater harvesting as available. It does not establish water source, storage or treatment capacity. Sewerage, storm-water drains, sewage/sullage treatment and disposal, electrical meter room/substation/receiving station, and fire protection/safety are recorded at 0% in that amenity extract. RERA amenities

The supplied records do not establish lift numbers or capacities, backup-power capacity, CCTV or access-control arrangements, accessible circulation, or operating fire systems. The occupancy certificate states the inspected building is fit for occupation and refers to a Fire NOC field, but the supplied extract does not identify the Fire NOC reference or its detailed conditions.

8. Location, access & connectivity

The registered location is BANGLAGUDA JAGIR, Bandlaguda village, Gandipet mandal, Ranga Reddy district, Telangana, PIN 500086. The project boundaries identify a 30 wide road on the west. RERA record RERA filing

The supplied location data gives the following distances, without specifying a measurement method: Financial District (Nanakramguda), 8.0 km; ICICI Bank, 0.0 km; an unnamed bus station, 0.4 km; Shadan College of Engineering, 0.4 km; Urban Primary Health Centre, Bandlaguda Jagir, 0.0 km; St Micheals Colony Park, 0.4 km; and Rao’s High School, 0.5 km. Location record

The supplied evidence does not provide a verified public-transport service schedule, road-by-road route, or travel times. The distance entries should be read as recorded location data, not as a statement of travel time or route accessibility. Location record

9. Developer & development status

The registered promoter is PRBS CONSTRUCTIONS PRIVATE LIMITED, a private limited company. Its GSTIN is 36AAJCP1544Q1ZV. The RERA filing identifies PANDURANGA REDDY KOLAN as authorized signatory and BHARATH REDDY KOLAN as managing director. Corporate record Parties record

Form B is a promoter affidavit dated 4 February 2021, signed by Kolan Pandu Ranga Reddy as authorized person. It declares a completion period ending 07.09.2026 and includes undertakings concerning project funds, audits and pending approvals. These are promoter declarations, not independent evidence of construction progress.

The supplied HMDA occupancy certificate is dated 18 February 2022 and concerns the Stilt + 5 floors residential building it identifies. The TG-RERA registration certificate separately records validity through 07/09/2026; the supplied evidence does not establish an extension.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400002581; issued 23/02/2021; valid to 07/09/2026
What the supplied record establishesRegistration of JONAS PEEPAL TREE APARTMENT under section 5; certificate conditions include a separate-account requirement.
HMDA technical building approval
Identifier / date031074/SKP/R1/U6/HMDA/28112019; 07 September 2020
What the supplied record establishesTechnical approval for the residential building at Plot Nos. 116 and 117, Survey Nos. 48 and 49, Bandlaguda (Jagir); records a 1 stilt + 5 upper-floor configuration and approval conditions.
HMDA occupancy certificate
Identifier / date000281/OC/HMDA/SKP/2022; 18 February 2022; application 005106/OC/HMDA/0737/SKP/2021
What the supplied record establishesOccupancy certificate for the building identified as Stilt + 5 floors at Plot Nos. 116 and 117, Survey Nos. 48 and 49; states the inspected building is fit for occupation and records deviations.
Form B affidavit-cum-declaration
Identifier / date4 February 2021
What the supplied record establishesPromoter declaration concerning the proposed project, completion undertaking, title and project obligations.
Encumbrance statement filed with RERA
Identifier / dateSearch period 01-10-2007 to 21-12-2020
What the supplied record establishesFiled record includes entries for 11786/2019 and 6196/2020; this is not a current search.
Project plan / layout records
Identifier / dateLayout and floor-plan documents are listed in the RERA document register; detailed drawing-derived layout information is not available in the supplied data.
What the supplied record establishesThe supplied evidence does not establish a separate approved-layout description or detailed apartment floor-plan measurements. Document index Floor plans
HMDA layout portal
Identifier / datePublic lookup unavailable in the supplied evidence
What the supplied record establishesThe HMDA DPMS approved-layout lookup is reported as not publicly reachable; this does not establish approval or refusal. HMDA

The supplied approval records also list a registered mortgage document, 6196/2020, dated 08/07/2020, in the approval material. Full mortgage and title analysis belongs in the relevant title and risk sections.

Frequently asked questions

Is JONAS PEEPAL TREE APARTMENT registered with Telangana RERA?

Yes. JONAS PEEPAL TREE APARTMENT is registered with the Telangana Real Estate Regulatory Authority as P02400002581; the registration status is New Project.

Who is the developer of JONAS PEEPAL TREE APARTMENT?

The promoter named in the RERA registration is PRBS CONSTRUCTIONS PRIVATE LIMITED.

Where is JONAS PEEPAL TREE APARTMENT located?

JONAS PEEPAL TREE APARTMENT is in BANGLAGUDA JAGIR, Bandlaguda, Gandipet, Rangareddy, Telangana (500086).

When will JONAS PEEPAL TREE APARTMENT be completed?

The promoter's proposed date of completion filed with RERA is 07/01/2027. This is the promoter's declaration, not a guarantee.