Serene Park
DHANASHREE INFRA · Hyderabad · RERA P02500005482
SERENE PARK is a residential apartment project in B.S.MAQTHA, KHAIRTABAD, Hyderabad. It is being developed by registered promoter DHANASHREE INFRA, a partnership. The project occupies 553.98 Sq. Mtrs and comprises one residential building, Building Name - A (MALATHI), with 1 Stilt + 5 upper floors and 10 3BHK apartments of 169.59 sqm saleable area per unit. Its TG-RERA registration number is P02500005482, and its proposed completion date is 24/02/2025.
More from Dhanashree Infra · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SERENE PARK |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration covers the project at the address and survey number listed below. |
| TG-RERA registration | P02500005482 |
| Registration validity | Valid from 07/12/2022 to 24/02/2025; the certificate records no extension. Registration validity is distinct from the construction completion deadline. |
| Registered promoter | DHANASHREE INFRA; partnership. RERA record RERA filing |
| RERA status | The supplied certificate records the registration period above. A current registration-status determination is not supplied. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | B.S.MAQTHA; the building permit also identifies B.S.Maqtha. RERA record |
| Revenue village | B.s.maqtha as stated in the RERA project fields. The supplied building permit uses “Khairatabad” in its location fields; the precise revenue-village identity is not independently verified here. RERA filing |
| Mandal / district / PIN | KHAIRTABAD, Hyderabad, 500082. RERA record |
| Survey number / subdivision | Survey No. 218; the title records also refer to T.S. No. 10. No other project survey number or subdivision is identified in the supplied record. RERA filing |
| Site extent | 553.98 Sq. Mtrs; the permit records both plot area and net plot area as 553.98 Sq. Mtrs, with road-affected and nala-affected area each 0.0. |
| Boundaries filed with RERA | East: OTHERS LAND; West: ROAD WIDTH -; North: OTHERS LAND; South: OTHERS LAND. RERA filing |
| Permit road reference | The building permit refers to an 18 mt. road. |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). |
| Principal building approval | Revised Building Permit Order 0299/GHMC/KHB/2022-BP, approved 24 February, 2022. |
| File number | 001267/GHMC/0673/KHB2/2022-BP. |
| Approved built-up area | Residential: 5 upper floors, 1,355.60 Sq.Mt. The permit separately lists Stilt: 1, 259.65 Sq.Mt. |
| Building count and configuration | One residential building, Building Name - A (MALATHI); 1 Stilt + 5 upper floors. The permit states building height 14.99; the supplied record does not specify a unit for this figure. |
| Parking provision in permit | Stilt/stack parking area 272.2 and total parking area 272.2; the supplied extraction does not state a parking-space count. |
| Approved versus RERA-declared units | RERA land details record 1 total building unit and 1 proposed building unit; the unit schedule records 10 apartments. The supplied material does not clarify the “building units” field’s meaning. RERA filing RERA unit table RERA unit details |
| Other approval identifiers | Earlier application 000380/GHMC/0249/KHB2/2021-BP and earlier permit 0470/GHMC/KHB/2021-BP are recorded in the revised permit. |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configuration | 3BHK, 10 units. RERA unit details RERA unit table |
| RERA-filed saleable area | 169.59 sqm per unit (filed minimum and maximum). RERA unit details |
| Booking / availability | 0 booked; 10 available in the RERA portal record, but the booking figures have no stated as-of date and are indicative only. RERA unit details RERA unit table |
| Construction completion deadline | 24/02/2025, as recorded in the RERA registration certificate and promoter’s Form B declaration; the building permit also states construction to be completed before that date. |
| Construction stage | No dated construction-progress percentage or independently verified site-stage evidence is supplied. The amenities schedule lists progress as 0 for its entries. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. The building permit says an occupancy certificate is compulsory before occupation. |
2. The project story
- SERENE PARK is recorded with TG-RERA as a residential apartment project on Survey No. 218, at B.S.Maqtha, Khairatabad, Hyderabad. The GHMC revised building permit describes one building, Building Name - A (MALATHI), with one stilt level and five upper floors, on a site of 553.98 Sq. Mtrs. The RERA unit schedule records ten 3BHK apartments, zero booked and ten available, but gives no as-of date for those counts. The registration and permit specify 24/02/2025 as the completion deadline; the supplied materials do not establish actual construction progress or an occupancy-certified portion. RERA unit details
3. Master plan, architecture & building design
- The GHMC permit describes a single residential building on a 553.98 Sq. Mtrs plot, with 1 Stilt + 5 upper floors. It records 1,355.60 Sq.Mt. for the five upper residential floors and 259.65 Sq.Mt. for the stilt, and building height 14.99 without a unit in the supplied extraction.
- The RERA filing identifies Survey No. 218 and a net area of 553.98 sqm. The permit’s plot-area breakdown records 553.98 Sq. Mtrs plot area, 0.0 road-affected area, 0.0 nala-affected area, and 553.98 Sq. Mtrs net plot area. RERA filing
- No extracted floor-by-floor plan details, building footprint, flats per floor, lift or stair count, entrance/exit arrangement, or measured carpet-area results are supplied. The floor-plan data records two drawings but no measured flats matching the RERA-filed 3BHK configuration; it therefore does not support a drawing-based unit description. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 169.59 sqm | Not established for this RERA configuration | Not supplied |
The unit count, booking figures and saleable area are from the TG-RERA filing; booking figures have no stated as-of date. RERA unit details The floor-plan review does not provide measured carpet-area figures for a configuration matched to the filed 3BHK. Its figures are software-measurement data, not RERA disclosures, and the supplied record does not establish a measured carpet area for these homes. Floor plans
5. Parking & vehicle circulation
- The building permit lists a stilt level of 259.65 Sq.Mt., a 272.2 stack area and 272.2 total parking area; the supplied extraction does not specify the unit for the stack and total parking figures or state the number of parking spaces. The permit requires cellar/stilt areas approved for parking to be used exclusively for vehicle parking without partition walls or rolling shutters.
- The RERA unit schedule marks the 3BHK units as mortgaged, but the supplied record does not identify a buyer-specific parking allocation or establish exclusive parking rights. RERA unit table
- No visitor, accessible, two-wheeler or EV-charging space counts, or details of ramps, driveways and pedestrian separation, are provided in the project’s RERA-filed material.
6. Amenities, recreation & open spaces
The RERA amenities schedule lists the following facilities and progress fields. A listed “YES” or amenity entry is not evidence that the facility has been completed; the schedule reports 0 progress for the entries. RERA amenities
| Description / size | Size and area not supplied |
|---|---|
| Evidence source | RERA amenities schedule; GHMC permit requires a fenced tot-lot maintained as greenery and a peripheral greenery strip. RERA amenities |
| Declared progress / verified status | Schedule: 0; completion not independently verified |
| Description / size | Size and use not specified |
|---|---|
| Evidence source | RERA amenities schedule RERA amenities |
| Declared progress / verified status | 0; completion not independently verified |
| Description / size | Size and capacity not supplied |
|---|---|
| Evidence source | RERA amenities schedule; GHMC permit requires a rainwater-harvesting structure and lists rainwater-harvesting pits 1. RERA amenities |
| Declared progress / verified status | Schedule: 0; completion not independently verified |
| Description / size | Internal roads and footpaths; water supply; sewerage; storm-water drains; street lighting; sewage and sullage treatment/disposal; solid-waste management and disposal; energy management; fire protection and fire safety; electrical meter room/sub-station/receiving station; aggregate recreational open space. No sizes or capacities supplied. |
|---|---|
| Evidence source | RERA amenities schedule RERA amenities |
| Declared progress / verified status | Schedule: 0 for the listed entries; completion not independently verified |
No project-specific RERA-filed clubhouse or indoor recreation facility is identified in the supplied amenities schedule.
7. Utilities, building services & safety
- The RERA amenities schedule marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, while also recording 0 progress for its entries. These are schedule disclosures, not confirmation of completed or operational services. No capacities or detailed system designs are supplied. RERA amenities
- The GHMC permit requires a rainwater-harvesting structure, space for a transformer and a garbage house. It also lists 1 rainwater-harvesting pit and a working fire extinguisher. The permit requires a fire NOC before issue of an occupancy certificate and specifies CCTV installation and linkage to the concerned SHO. These are permit conditions; the supplied record does not establish that the systems have been installed or that a fire NOC or occupancy certificate has been issued.
- No water source or storage capacity, STP capacity or reuse arrangements, backup-power provision, lift numbers or capacities, fire-escape details, waste-segregation system, security-access arrangements, or accessibility provisions are established in the supplied project records. RERA amenities
8. Location, access & connectivity
The RERA record places the project at B.S.MAQTHA, Khairatabad mandal, Hyderabad district, PIN 500082, on Survey No. 218. The GHMC permit identifies B.S.Maqtha and records an 18 mt. road reference; the RERA-filed western boundary is described as “ROAD WIDTH -”. RERA record RERA filing
The supplied location record gives Financial District (Nanakramguda) at 1.2 km as a connectivity point. Location record No approach-route description, public-transport information, or further measured landmark distances are supplied.
9. Developer & development status
- The registered promoter is DHANASHREE INFRA, identified in the RERA record as a partnership. Its stated address is B, MAHANKALI STREET, BHOLE SAHEB MAQTA, B.S.MAQTHA, KHAIRTABAD, Hyderabad, 500082. The GSTIN recorded for the entity is 36AAOFD0566G1ZD. RERA filing Parties record
- The RERA filing names KARTHIK JAIN SINGHVI as authorized signatory and identifies SHANTIAL SURESH KUMAR JAIN, P RAKESH JAIN, and ANKESH RATHODE as partners. The registration certificate lists the promoter office as “Village: Mandal: Secunderabad, District: Hyderabad, Pin: 500003.” Parties record
- Form B, verified on 29 September 2022, declares a completion date of 24/02/2025 and states that the land is free from encumbrances. These are promoter declarations. No dated construction-progress update or independently verified completion evidence is provided here.
10. Approvals, official records & documents
| Identifier / date | P02500005482, issued 07/12/2022; valid to 24/02/2025 |
|---|---|
| What the supplied document establishes | FORM C registration for SERENE PARK; the certificate records a separate-account condition. No extension is recorded in the supplied certificate. |
| Identifier / date | 0299/GHMC/KHB/2022-BP, approved 24 February, 2022; file 001267/GHMC/0673/KHB2/2022-BP |
|---|---|
| What the supplied document establishes | Permit for one residential building at B.S.Maqtha on SY.NO. 218, comprising 1 Stilt + 5 upper floors, subject to permit conditions. |
| Identifier / date | Application 000380/GHMC/0249/KHB2/2021-BP; permit 0470/GHMC/KHB/2021-BP, both dated 01 October, 2021 |
|---|---|
| What the supplied document establishes | Earlier identifiers reproduced in the revised permit. |
| Identifier / date | Verified 29 September 2022 |
|---|---|
| What the supplied document establishes | Promoter’s declarations on title basis, encumbrances, completion date, project funds, audit and approvals. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied document establishes | No project occupancy or completion certificate is established by the documents reviewed. |
| Identifier / date | No extracted approved layout or usable floor-plan measurements supplied |
|---|---|
| What the supplied document establishes | RERA includes a layout-plan document entry without an extracted plan; the supplied drawing review does not yield a measured 3BHK unit plan. Document index Floor plans |
1. Project at a glance
Project identity
Registered project name: SERENE PARK
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration covers the project at the address and survey number listed below.
TG-RERA registration: P02500005482
Registration validity: Valid from 07/12/2022 to 24/02/2025; the certificate records no extension. Registration validity is distinct from the construction completion deadline.
Registered promoter: DHANASHREE INFRA; partnership.
RERA status: The supplied certificate records the registration period above. A current registration-status determination is not supplied.
Land and geographic identity
Locality: B.S.MAQTHA; the building permit also identifies B.S.Maqtha.
Revenue village: B.s.maqtha as stated in the RERA project fields. The supplied building permit uses “Khairatabad” in its location fields; the precise revenue-village identity is not independently verified here.
Mandal / district / PIN: KHAIRTABAD, Hyderabad, 500082.
Survey number / subdivision: Survey No. 218; the title records also refer to T.S. No. 10. No other project survey number or subdivision is identified in the supplied record.
Site extent: 553.98 Sq. Mtrs; the permit records both plot area and net plot area as 553.98 Sq. Mtrs, with road-affected and nala-affected area each 0.0.
Boundaries filed with RERA: East: OTHERS LAND; West: ROAD WIDTH -; North: OTHERS LAND; South: OTHERS LAND.
Permit road reference: The building permit refers to an 18 mt. road.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Revised Building Permit Order 0299/GHMC/KHB/2022-BP, approved 24 February, 2022.
File number: 001267/GHMC/0673/KHB2/2022-BP.
Approved built-up area: Residential: 5 upper floors, 1,355.60 Sq.Mt. The permit separately lists Stilt: 1, 259.65 Sq.Mt.
Building count and configuration: One residential building, Building Name - A (MALATHI); 1 Stilt + 5 upper floors. The permit states building height 14.99; the supplied record does not specify a unit for this figure.
Parking provision in permit: Stilt/stack parking area 272.2 and total parking area 272.2; the supplied extraction does not state a parking-space count.
Approved versus RERA-declared units: RERA land details record 1 total building unit and 1 proposed building unit; the unit schedule records 10 apartments. The supplied material does not clarify the “building units” field’s meaning.
Other approval identifiers: Earlier application 000380/GHMC/0249/KHB2/2021-BP and earlier permit 0470/GHMC/KHB/2021-BP are recorded in the revised permit.
Offering and status
RERA-filed configuration: 3BHK, 10 units.
RERA-filed saleable area: 169.59 sqm per unit (filed minimum and maximum).
Booking / availability: 0 booked; 10 available in the RERA portal record, but the booking figures have no stated as-of date and are indicative only.
Construction completion deadline: 24/02/2025, as recorded in the RERA registration certificate and promoter’s Form B declaration; the building permit also states construction to be completed before that date.
Construction stage: No dated construction-progress percentage or independently verified site-stage evidence is supplied. The amenities schedule lists progress as 0 for its entries.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. The building permit says an occupancy certificate is compulsory before occupation.
2. The project story
- SERENE PARK is recorded with TG-RERA as a residential apartment project on Survey No. 218, at B.S.Maqtha, Khairatabad, Hyderabad. The GHMC revised building permit describes one building, Building Name - A (MALATHI), with one stilt level and five upper floors, on a site of 553.98 Sq. Mtrs. The RERA unit schedule records ten 3BHK apartments, zero booked and ten available, but gives no as-of date for those counts. The registration and permit specify 24/02/2025 as the completion deadline; the supplied materials do not establish actual construction progress or an occupancy-certified portion.
3. Master plan, architecture & building design
- The GHMC permit describes a single residential building on a 553.98 Sq. Mtrs plot, with 1 Stilt + 5 upper floors. It records 1,355.60 Sq.Mt. for the five upper residential floors and 259.65 Sq.Mt. for the stilt, and building height 14.99 without a unit in the supplied extraction.
- The RERA filing identifies Survey No. 218 and a net area of 553.98 sqm. The permit’s plot-area breakdown records 553.98 Sq. Mtrs plot area, 0.0 road-affected area, 0.0 nala-affected area, and 553.98 Sq. Mtrs net plot area.
- No extracted floor-by-floor plan details, building footprint, flats per floor, lift or stair count, entrance/exit arrangement, or measured carpet-area results are supplied. The floor-plan data records two drawings but no measured flats matching the RERA-filed 3BHK configuration; it therefore does not support a drawing-based unit description.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 169.59 sqm | Not established for this RERA configuration | Not supplied |
The unit count, booking figures and saleable area are from the TG-RERA filing; booking figures have no stated as-of date. The floor-plan review does not provide measured carpet-area figures for a configuration matched to the filed 3BHK. Its figures are software-measurement data, not RERA disclosures, and the supplied record does not establish a measured carpet area for these homes.
5. Parking & vehicle circulation
- The building permit lists a stilt level of 259.65 Sq.Mt., a 272.2 stack area and 272.2 total parking area; the supplied extraction does not specify the unit for the stack and total parking figures or state the number of parking spaces. The permit requires cellar/stilt areas approved for parking to be used exclusively for vehicle parking without partition walls or rolling shutters.
- The RERA unit schedule marks the 3BHK units as mortgaged, but the supplied record does not identify a buyer-specific parking allocation or establish exclusive parking rights.
- No visitor, accessible, two-wheeler or EV-charging space counts, or details of ramps, driveways and pedestrian separation, are provided in the project’s RERA-filed material.
6. Amenities, recreation & open spaces
The RERA amenities schedule lists the following facilities and progress fields. A listed “YES” or amenity entry is not evidence that the facility has been completed; the schedule reports 0 progress for the entries.
| Description / size | Size and area not supplied |
|---|---|
| Evidence source | RERA amenities schedule; GHMC permit requires a fenced tot-lot maintained as greenery and a peripheral greenery strip. |
| Declared progress / verified status | Schedule: 0; completion not independently verified |
| Description / size | Size and use not specified |
|---|---|
| Evidence source | RERA amenities schedule |
| Declared progress / verified status | 0; completion not independently verified |
| Description / size | Size and capacity not supplied |
|---|---|
| Evidence source | RERA amenities schedule; GHMC permit requires a rainwater-harvesting structure and lists rainwater-harvesting pits 1. |
| Declared progress / verified status | Schedule: 0; completion not independently verified |
| Description / size | Internal roads and footpaths; water supply; sewerage; storm-water drains; street lighting; sewage and sullage treatment/disposal; solid-waste management and disposal; energy management; fire protection and fire safety; electrical meter room/sub-station/receiving station; aggregate recreational open space. No sizes or capacities supplied. |
|---|---|
| Evidence source | RERA amenities schedule |
| Declared progress / verified status | Schedule: 0 for the listed entries; completion not independently verified |
No project-specific RERA-filed clubhouse or indoor recreation facility is identified in the supplied amenities schedule.
7. Utilities, building services & safety
- The RERA amenities schedule marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, while also recording 0 progress for its entries. These are schedule disclosures, not confirmation of completed or operational services. No capacities or detailed system designs are supplied.
- The GHMC permit requires a rainwater-harvesting structure, space for a transformer and a garbage house. It also lists 1 rainwater-harvesting pit and a working fire extinguisher. The permit requires a fire NOC before issue of an occupancy certificate and specifies CCTV installation and linkage to the concerned SHO. These are permit conditions; the supplied record does not establish that the systems have been installed or that a fire NOC or occupancy certificate has been issued.
- No water source or storage capacity, STP capacity or reuse arrangements, backup-power provision, lift numbers or capacities, fire-escape details, waste-segregation system, security-access arrangements, or accessibility provisions are established in the supplied project records.
8. Location, access & connectivity
The RERA record places the project at B.S.MAQTHA, Khairatabad mandal, Hyderabad district, PIN 500082, on Survey No. 218. The GHMC permit identifies B.S.Maqtha and records an 18 mt. road reference; the RERA-filed western boundary is described as “ROAD WIDTH -”.
The supplied location record gives Financial District (Nanakramguda) at 1.2 km as a connectivity point. No approach-route description, public-transport information, or further measured landmark distances are supplied.
9. Developer & development status
- The registered promoter is DHANASHREE INFRA, identified in the RERA record as a partnership. Its stated address is B, MAHANKALI STREET, BHOLE SAHEB MAQTA, B.S.MAQTHA, KHAIRTABAD, Hyderabad, 500082. The GSTIN recorded for the entity is 36AAOFD0566G1ZD.
- The RERA filing names KARTHIK JAIN SINGHVI as authorized signatory and identifies SHANTIAL SURESH KUMAR JAIN, P RAKESH JAIN, and ANKESH RATHODE as partners. The registration certificate lists the promoter office as “Village: Mandal: Secunderabad, District: Hyderabad, Pin: 500003.”
- Form B, verified on 29 September 2022, declares a completion date of 24/02/2025 and states that the land is free from encumbrances. These are promoter declarations. No dated construction-progress update or independently verified completion evidence is provided here.
10. Approvals, official records & documents
| Identifier / date | P02500005482, issued 07/12/2022; valid to 24/02/2025 |
|---|---|
| What the supplied document establishes | FORM C registration for SERENE PARK; the certificate records a separate-account condition. No extension is recorded in the supplied certificate. |
| Identifier / date | 0299/GHMC/KHB/2022-BP, approved 24 February, 2022; file 001267/GHMC/0673/KHB2/2022-BP |
|---|---|
| What the supplied document establishes | Permit for one residential building at B.S.Maqtha on SY.NO. 218, comprising 1 Stilt + 5 upper floors, subject to permit conditions. |
| Identifier / date | Application 000380/GHMC/0249/KHB2/2021-BP; permit 0470/GHMC/KHB/2021-BP, both dated 01 October, 2021 |
|---|---|
| What the supplied document establishes | Earlier identifiers reproduced in the revised permit. |
| Identifier / date | Verified 29 September 2022 |
|---|---|
| What the supplied document establishes | Promoter’s declarations on title basis, encumbrances, completion date, project funds, audit and approvals. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied document establishes | No project occupancy or completion certificate is established by the documents reviewed. |
| Identifier / date | No extracted approved layout or usable floor-plan measurements supplied |
|---|---|
| What the supplied document establishes | RERA includes a layout-plan document entry without an extracted plan; the supplied drawing review does not yield a measured 3BHK unit plan. |
Frequently asked questions
Is SERENE PARK registered with Telangana RERA?
Yes. SERENE PARK is registered with the Telangana Real Estate Regulatory Authority as P02500005482; the registration status is New Project.
Who is the developer of SERENE PARK?
The promoter named in the RERA registration is DHANASHREE INFRA.
Where is SERENE PARK located?
SERENE PARK is in B.S.MAQTHA, KHAIRTABAD, Hyderabad, Telangana (500082).
When will SERENE PARK be completed?
The promoter's proposed date of completion filed with RERA is 24/02/2025. This is the promoter's declaration, not a guarantee.
More projects in Khairtabad