Poulomi Avante

POULOMI ESTATES PRIVATE LIMITED · Rangareddy · RERA P02400002634

POULOMI AVANTE is a residential apartment project in Kokapet, Gandipet Mandal, Ranga Reddy District. It is being developed by the registered promoter POULOMI ESTATES PRIVATE LIMITED on a site with a total area of 19,227.81 sq.m. The project comprises residential Blocks A, B and C and an amenities block, with 464 homes: 23 2BHK and 441 3BHK. Its TG-RERA registration is P02400002634, and the proposed completion date is 24.01.2027.

More from Poulomi Estates Pvt Ltd · 4 projects →

01What we found

RegisteredTG-RERA - valid till 24 Jan 2027
40documents on file - each fact links to its page
1court case on this project's land (survey 125, Kokapet)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project namePOULOMI AVANTE RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase is not separately identified in the supplied record; registration is for POULOMI AVANTE RERA record
TG-RERA registrationP02400002634
Registration validity03/03/2021 to 24/01/2027; the certificate states five years, unless extended by the Authority
Registered promoterPOULOMI ESTATES PRIVATE LIMITED
RERA statusRegistered; the certificate records the registration as not extended. Registration validity is distinct from the project completion date.

Land and geographic identity

ItemRecord
Locality / revenue villageKokapet; the RERA-filed identity and registration certificate identify Kokapet. The technical approval uses “Kokapet-ORRGC Village.” RERA record RERA filing
MandalGandipet RERA record RERA filing
District / PINRanga Reddy / 500075 RERA record
Project survey numbers123, 125, 126 and 127 RERA record RERA filing
Subdivisions appearing in filed title material123/A, 123(Part), 123/AA, 123/88, 123/e8, 123/C8 (also rendered “123/C$”), 125/AA and 126/A; the filed material also refers to 123/P and 123/€8. These are source-rendered identifiers, not a finding that each is a separate project parcel.
Site extentRERA land-details filing: total area 19,227.81 sq.m, area affected by road widening/FTL/Nala widening 121.85 sq.m, and net area 19,105.96 sq.m. RERA filing
Boundaries in the RERA filingEast: 126; West: 129; North: ROAD; South: ROAD RERA filing

Development identity

ItemRecord
Sanctioning authoritiesHMDA technical approval; building permit order issued by Narsingi Municipality
Principal approvalHMDA technical approval 029070/SKP/R1/U6/HMDA/11102019, dated 25/01/2021
Building permitNarsingi Municipality Building Permit Order BA.NO: 38/2020-21, dated 22.02.2021
Approved built-up areaHMDA technical approval records total built-up area 88,475.67 sq.m. This is the approved built-up figure stated in that approval.
Buildings / blocksThree residential blocks—A, B and C—and one amenities block are identified in the HMDA technical approval.
Sanctioned floor configurationHMDA technical approval: Block A—2 Cellar + 1 Ground + 22; Blocks B and C—1 Ground + 22 each; amenities block—1 Ground + 4. The municipal permit extraction describes Block A as Ground + 4, so the building-permit floor configuration is not fully established by the supplied extracts.
Parking levels / provisionHMDA technical approval states cellar and stilt parking are to be used exclusively for vehicle parking; the supplied extracts do not establish parking-space counts or a complete tower-by-tower parking schedule.
UnitsRERA filing records 464 homes: 441 3BHK and 23 2BHK; the registered building-permit document does not provide a separate unit-count figure in the supplied extraction. RERA unit table RERA unit table

Offering and status

ItemRecord
RERA-filed configurations and saleable area2BHK: 122.92 sq.m; 3BHK: 148.9 sq.m RERA unit table RERA unit table
Booked / available2BHK: 3 booked / 20 available; 3BHK: 167 booked / 274 available; total 170 booked / 294 available. These portal counts are indicative; the record has no as-of date. RERA unit table RERA unit table
Completion datePromoter’s Form B completion undertaking: 24.01.2027.
Registration-validity end date24/01/2027, as stated in the TG-RERA certificate. This is a registration date, not an occupancy certificate or proof of completion.
Construction stageThe supplied RERA amenity/status table reports several items at 30%, 50% or 60%; it does not provide a whole-project construction percentage or independently verified site progress. RERA amenities
Occupancy / completion certificateNot evidenced in the supplied documents; the HMDA technical approval is not an occupancy certificate and records completion/occupancy certification as a later requirement.

2. The project story

POULOMI AVANTE is a RERA-registered residential apartment development on land identified in the filing as Survey Nos. 123, 125, 126 and 127, Kokapet, Gandipet Mandal, Ranga Reddy District. The technical approval describes residential Blocks A, B and C together with a separate amenities block. RERA record RERA filing

The RERA unit schedule offers 2BHK and 3BHK homes, with the recorded inventory weighted toward 3BHK units. The approval identifies multi-level residential buildings and parking in cellar/stilt areas; it also identifies a separate amenities building. RERA unit table The supplied records do not establish a full project-wide construction-completion percentage or independently verified site status. The RERA amenity/status table reports progress against individual infrastructure and facility categories, but those entries are not independent site verification. RERA amenities

The promoter’s Form B states a completion undertaking of 24.01.2027. That undertaking and the TG-RERA registration-validity date are distinct from completion certification: no occupancy or completion certificate is present in the supplied material.

3. Master plan, architecture & building design

The HMDA technical approval describes three residential blocks and an amenities block. It records approved built-up areas of 20,029.91 sq.m for Block A, 33,060.75 sq.m for Block B, 33,009.55 sq.m for Block C, and 2,375.46 sq.m for the amenities block; the stated total approved built-up area is 88,475.67 sq.m.

The same approval gives a height of 69.6 for each residential block and 19.5 for the amenities block; the supplied extract does not specify the unit for these height figures. Its floor schedule is Block A—2 Cellar + 1 Ground + 22, Blocks B and C—1 Ground + 22, and amenities block—1 Ground + 4. The municipal permit extraction gives a different floor description for Block A (“Ground + 4”); this overview therefore reports both document descriptions rather than resolving the building configuration.

The HMDA approval also specifies that cellar and stilt areas approved for parking are to remain for vehicle parking, and that approved circulation and parking arrangements are not to be changed. It identifies internal roads of 36 mtrs, 30 mtrs and 18 mt. and requires the approved circulation pattern to be maintained. The supplied extracts do not provide a reliable building-footprint schedule, flats-per-floor count, lift/stair count, or quantified landscaped/open-space area.

The RERA land filing records total area 19,227.81 sq.m, affected area 121.85 sq.m, and net area 19,105.96 sq.m. These are site-area disclosures; they are distinct from the approval’s built-up-area figure. RERA filing

4. Homes, configurations & floor plans

The RERA-filed unit schedule records 464 homes across two configurations. The saleable areas below are the RERA-filed figures; carpet areas are software measurements from approved floor-plan drawings, not RERA disclosures, and require review against the drawings. The filing’s saleable area includes a different area basis from the drawing-measured carpet area; the supplied record does not establish that the filing’s area is carpet area. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK23320122.92 sq.m84.6 sq.m median; range 79.3–85.9 sq.m31%
3BHK441167274148.9 sq.m99.1 sq.m median; range 97.2–100.7 sq.m33%

Drawing measurements cover four 2BHK and five 3BHK designs from document 152532. A sample 2BHK drawing includes a bedroom, master bedroom, dining, kitchen, two toilets and a utility area; the utility is excluded from the measured carpet area. A sample 3BHK drawing includes three bedrooms, dining, kitchen, three toilets, a lobby and a utility area; the utility is excluded from the measured carpet area. These sample room details do not establish that every unit follows the same plan. RERA unit details

5. Parking & vehicle circulation

The HMDA technical approval identifies cellar and stilt parking and states that those areas are to be used exclusively for vehicle parking. The approval also says that the approved parking arrangement and internal circulation pattern are not to be changed. It identifies internal roads of 36 mtrs, 30 mtrs and 18 mt.

The supplied material does not establish the total number of car or two-wheeler spaces, visitor or accessible-space counts, the number of parking levels by block, EV charging provision, or unit-specific parking allocations. A parking bay shown in a plan, without a documented allocation, would not establish an individual buyer’s exclusive parking right. Document index

6. Amenities, recreation & open spaces

The RERA filing records infrastructure and amenities under progress/status fields. The percentages below are the supplied filing values, not independent confirmation of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green strip / parkSize not suppliedRERA amenitiesRERA status table: 0%; not independently verified
Community buildingsSize or capacity not suppliedRERA amenitiesRERA status table: 50%; not independently verified
Internal roads and footpathsDimensions not supplied hereRERA amenitiesRERA status table: 0%; not independently verified
Sewage system and treatment/disposalSTP is listed in the HMDA technical approval; capacity not suppliedRERA amenitiesRERA status table: sewerage 30%; treatment/disposal 60%; not independently verified
Storm-water drainsSize/capacity not suppliedRERA amenitiesRERA status table: 30%; not independently verified
Water conservation / rainwater harvestingRainwater-harvesting structures are listed in the technical approvalRERA amenitiesRERA status table: 0%; not independently verified
Fire protection and fire safety requirementsSpecific systems and capacities not suppliedRERA amenitiesRERA status table: 50%; not independently verified
Electrical meter room / substation / receiving stationEquipment capacity not suppliedRERA amenitiesRERA status table: 0%; not independently verified

The approval also names an amenities block and a tot-lot/open-space area, but the supplied extracts do not identify a detailed facility schedule, individual amenity sizes, or completion evidence.

7. Utilities, building services & safety

Water and conservation: The HMDA technical approval lists a separate underground static water-storage tank of 25,000 lts. and a separate terrace tank of 25,000 lts. capacity for Residential buildings, together with rainwater-harvesting structures and a water-recycling plan. The water source, treatment capacity and verified operating status are not stated in the supplied record.

Sewerage and drainage: The approval lists an STP and refuse chute; the RERA status table reports sewerage at 30%, storm-water drains at 30%, and treatment/disposal of sewage and sullage water at 60%. The extracts do not state capacities or independently verified operating status. RERA amenities

Electrical and energy: The approval requires provision for a transformer and lists solar water heating and solar lighting. The RERA status table reports the electrical meter room/substation/receiving station category at 0%. No supply capacity, backup capacity or EV-charging provision is established in the supplied project records. RERA amenities

Fire and life safety: The HMDA approval requires the promoter to fulfil conditions of Fire Service NOCs and other listed clearances; the RERA status table reports the fire-protection/fire-safety category at 50%. The supplied extracts do not include the relevant fire NOC or confirm installed systems, escape-stair arrangements or completed statutory clearance. RERA amenities

Other services and accessibility: The approval calls for a garbage house and refuse chute. The supplied material does not establish CCTV/security systems, accessibility arrangements, lift numbers or capacities, or verified completion of these services.

8. Location, access & connectivity

The registered location is Kokapet, Gandipet Mandal, Ranga Reddy District, Telangana, PIN 500075. The RERA filing gives roads on the north and south boundaries, and the approval identifies internal-road widths of 36 mtrs, 30 mtrs and 18 mt. RERA record RERA filing

The supplied location record provides the following mapped distances; it does not establish travel times or the route taken:

Place / featureRecorded distance
ADP0.0 km
IndusInd Bank0.4 km
Nanakramguda Govt primary school0.5 km
Financial District (Nanakramguda)1.2 km
(unnamed park)1.2 km
Manuu Polytechnic Hyderabad1.6 km
Sankaraya Eye Hospital1.6 km
(unnamed bus_station)2.2 km
South india shopping mall2.6 km

Location record

9. Developer & development status

The registered legal promoter is POULOMI ESTATES PRIVATE LIMITED, a company. The RERA record identifies Juvvadi Madan Mohan Rao as authorized signatory and Juvvadi Sujatha, Juvvadi Sujit Rao and Makunoor Prashanth Rao as directors. Corporate record Parties record

The registration certificate lists a promoter-office entry as “Village: Mandal: District: Hyderabad, Pin: 500016.” The supplied corporate record separately lists the promoter address as Madhupala Towers, Greenlands, Kokapet, Gandipet, Ranga Reddy, 500075; no official contact details are provided in the supplied evidence. Parties record

The promoter’s Form B, signed by its authorized person on 12 February 2021, declares a completion time period ending 24.01.2027 and undertakes to secure pending approvals. This is a promoter declaration, not a completion certificate. The supplied evidence does not provide an independently verified overall construction-progress figure or an occupancy certificate. RERA amenities

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400002634; issued 03/03/2021; validity to 24/01/2027
What the supplied record establishesForm C registration for POULOMI AVANTE; certificate includes the separate-account condition.
HMDA technical approval
Identifier / date029070/SKP/R1/U6/HMDA/11102019; 25/01/2021
What the supplied record establishesTechnical approval for the apartment project and amenities block on Survey Nos. 123, 125, 126 and 127. It is not an occupancy certificate.
Narsingi Municipality building permit
Identifier / dateBA.NO: 38/2020-21; 22.02.2021; File No. G1/201/2021
What the supplied record establishesBuilding Permit Order referring to HMDA technical approval and the project survey numbers.
Form B affidavit
Identifier / date12 February 2021
What the supplied record establishesPromoter declaration covering the proposed project, completion undertaking and statutory undertakings.
Project-unit schedule
Identifier / dateTG-RERA filing
What the supplied record establishes2BHK and 3BHK inventory and booked/available counts. RERA unit table RERA unit table
Floor-plan drawing record
Identifier / dateDocument 152532
What the supplied record establishesSource for software-measured carpet-area and sample room measurements; these are not RERA-filed area disclosures. Floor plans
Occupancy / completion certificate
Identifier / dateNot present in supplied records
What the supplied record establishesNo certificate is evidenced in the material reviewed.

The supplied HMDA technical approval and municipal building permit include approval conditions and parking, circulation and utility requirements; the table above is an evidence index, not a complete reproduction of those conditions.

Frequently asked questions

Is POULOMI AVANTE registered with Telangana RERA?

Yes. POULOMI AVANTE is registered with the Telangana Real Estate Regulatory Authority as P02400002634; the registration status is New Project.

Who is the developer of POULOMI AVANTE?

The promoter named in the RERA registration is POULOMI ESTATES PRIVATE LIMITED.

Where is POULOMI AVANTE located?

POULOMI AVANTE is in KOKAPET, Gandipet, Rangareddy, Telangana (500075).

When will POULOMI AVANTE be completed?

The promoter's proposed date of completion filed with RERA is 24/05/2027. This is the promoter's declaration, not a guarantee.

More projects in Kokapet