LAKSHMI NIVASAM is a residential apartment project in MALLAMPET, Qutballapur mandal, Medchal-Malkajgiri district. It is being developed by registered promoter DHANUNJAYA INFRA AND DEVELOPERS on a site of 1,337.81 sq. m., with one residential building, Block A (DHANUNJAYA), comprising 1Stilt + 5 Upper floors and 35 homes. The homes are in 1BHK and 2BHK configurations, with RERA-filed saleable areas of 79.15 sq. m. and 101.84 sq. m., respectively. The project is registered under TG-RERA number P02200001794, and the promoter’s declared completion date is 23rd August 2025.

01What we found

Period endedTG-RERA registration ran to 23 Aug 2025 - check its extension on TG-RERA
28documents on file - each fact links to its page
51court cases on this project's land (survey 25, 26, 28, 33, 38, Dundigal)
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from jllhomes.co.in
Dundigal, Qutballapur, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameLAKSHMI NIVASAM RERA record
Project typeResidential apartment project; registered as a new project RERA record RERA filing
Phase / registered portionOne residential building, Block A (DHANUNJAYA); no separate phase name is disclosed
TG-RERA registrationP02200001794, granted 20/03/2020; certificate states a five-year validity ending 23/08/2025 RERA record
Registered promoterDHANUNJAYA INFRA AND DEVELOPERS, a partnership RERA record Parties record
Registration statusThe supplied certificate records the stated validity and no extension; current registration status is not established by these records

Land and geographic identity

ItemRecord
Locality / revenue villageProject filing identifies MALLAMPET; approval records Mallampet-ORRGC Village. The RERA certificate locality field says Dundigal. Revenue-village identity should be confirmed against the registered parcel records. RERA filing
Mandal / district / PINQutballapur / Medchal-Malkajgiri / 500090 RERA record
Project survey numbers and subdivisions25, 26, 28, 30, 33, 38/A RERA filing
Registered site extent1,337.81 sq. m. in the RERA land filing; HMDA technical approval also states 1,337.81 Sq. Mt. RERA filing
Total / net area; affected areaTotal area 1,337.81 sq. m.; net area 1,337.81 sq. m.; area recorded as affected by road widening/FTL/nala widening: 0 sq. m. RERA filing
Boundary descriptionEast: 4O FEET WIDE ROAD; West: 40 FEET WIDE ROAD; North: Plot Nos. 228 and 255; South: Plot Nos. 232 and 251 RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the technical approval says building plans are to be sanctioned by the Executive Authority in conformity with HMDA’s technical approval
Principal approvalTechnical Approval / building-permit record 023163/MED/R1/U6/HMDA/30042019, approved 23/08/2019 Approvals record
Approved built-up areaHMDA parameter records Built up Area 3080.9 and Total Built up Area (In Sq.mts) 3777.16 as separate entries; the supplied record does not define their respective area bases
Building count and configurationOne residential building, Block A (DHANUNJAYA), with 1Stilt + 5 Upper floors RERA filing
Parking levels / provisionOne stilt level is recorded. The supplied extracts do not state a sanctioned parking-space count or allocation
Unit countHMDA condition says the sanctioned number of units must not be increased, but the supplied approval extract does not state that number. TG-RERA filing records 35 units RERA unit table

Offering and status

ItemRecord
Configurations1BHK and 2BHK RERA unit table
RERA-filed saleable sizes and inventory1BHK: 79.15 sq. m., 5 units; 2BHK: 101.84 sq. m., 30 units RERA unit table
Booked / availablePortal-read counts show 0 booked and 5 available 1BHK units; 0 booked and 30 available 2BHK units. The portal record has no as-of date, so these counts are indicative. RERA unit table
Construction stageNo independently verified construction-progress or site-inspection record is supplied. The RERA amenity schedule records 0% for the listed progress fields; this is not an independently verified site assessment. RERA amenities
Completion deadlinePromoter’s Form-B declaration undertakes completion by 23rd August 2025; RERA certificate validity ends on the same stated date. These are completion and registration dates, respectively.
Occupancy / completion certificateThe supplied records do not establish issuance of an occupancy certificate (OC) or completion certificate for Block A. HMDA’s technical approval states an OC is compulsory before occupation.

2. The project story

LAKSHMI NIVASAM is recorded with TG-RERA as a residential apartment project at Mallampet, Medchal-Malkajgiri district, on a stated site extent of 1,337.81 sq. m. Its RERA filing describes one building and offers 1BHK and 2BHK homes. The six landowners are identified in the promoter’s Form-B declaration, which says the development arrangement is under Development Agreement-cum-General Power of Attorney No. 1617/2019. RERA record RERA filing RERA unit table

HMDA’s technical approval describes Block A (DHANUNJAYA) as 1Stilt + 5 Upper floors. The promoter declared a completion date of 23rd August 2025, but the supplied evidence does not verify construction progress or establish that an OC has been issued. The listed RERA amenity-progress fields are recorded at 0%; no independent site verification is supplied. RERA amenities

3. Master plan, architecture & building design

The HMDA technical approval concerns one residential block on the stated plot Nos. 229, 230, 231, 252, 253 and 254 in K.V.R. Valley, Mallampet. It records 1Stilt + 5 Upper floors and a site extent of 1,337.81 Sq. Mt.

The approval lists Built up Area 3080.9, Total Built up Area (In Sq.mts) 3777.16, Required 10% Mortgage area 308.09, and Provided Mortgage area (In Sq.mts) 308.36. These entries are reproduced as recorded; the supplied extract does not define the area bases for the two built-up-area figures. A separate approval condition records a mortgage of 311.00 Sq mtrs in Second Floor under document No. 18377/2019.

The available approval extract does not specify the building footprint, apartments per floor, lifts, stair arrangements, internal circulation, landscaping/open-space area, or a residential/common-area breakdown. It requires construction in accordance with the sanctioned plan and prior approval for modifications.

The RERA-filed layout/building-plan document record is identified as document 103989, but its extraction is not supplied here beyond the typical-floor-plan measurements used below. Document index

4. Homes, configurations & floor plans

RERA filing records 35 homes in two configurations. Saleable area is the RERA-filed figure. The carpet figures below are software measurements from the supplied floor-plan drawings, not RERA disclosures; the drawing-measurement record flags the measurements as requiring review. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK50579.15 sq. m.Median 76.4 sq. m.; range 72.9–77.3 sq. m.Not supplied
2BHK30030101.84 sq. m.Median 90.8 sq. m.; range 90.6–96.9 sq. m.Not supplied

The drawing-based room examples show a 1BHK plan with a master bedroom, kitchen, puja and toilet; a balcony is marked separately and excluded from the software-measured carpet figure. The measured 2BHK example shows two bedrooms, a kitchen, two toilets and a utility marked 1.02M WIDE UTILITY; the utility is excluded from the measured carpet figure. These are measurements/readings from drawing document 103989, not independent site measurements. RERA unit details

Carpet area and saleable area are distinct measures in the supplied records: the floor-plan note says saleable area also counts the home’s share of common areas. The RERA portal inventory has no as-of date, so booked and available counts should be treated as indicative. Floor plans RERA unit table

5. Parking & vehicle circulation

The building approval records one stilt level, but the supplied approved-plan extract does not give a number of sanctioned car or two-wheeler spaces, identify visitor or accessible spaces, or describe a parking allocation arrangement. The promoter’s marketing-source amenity list mentions visitor parking, but no count or project-specific allocation evidence is supplied. A drawn or listed parking provision alone would not establish exclusive ownership of a space. Promoter website

The approval refers to road widths of 18 mt. road widths and a minimum approach-road width as indicated in the technically approved plans; the supplied extract does not establish ramp design, entries/exits, internal driveways, pedestrian separation or EV charging.

6. Amenities, recreation & open spaces

The RERA amenity schedule records the following entries. Where a field states “YES,” that is a filed availability entry, not proof of completion. Its progress fields are recorded as 0%; no independent completion verification is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water SupplyAvailable: YESRERA amenity schedule0% progress field; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Available: YESRERA amenity schedule0% progress field; not independently verified
Storm Water DrainsAvailable: YESRERA amenity schedule0% progress field; not independently verified
Green Strip/TOT LOT/ParkAvailable: YESRERA amenity schedule; HMDA conditions also list a tot-lot0% progress field; not independently verified
Water Conservation / Rain Water HarvestingAvailable: YESRERA amenity schedule; HMDA conditions require rain-water-harvesting structures0% progress field; not independently verified
Electrical Meter Room, Sub-Station, Receiving StationAvailable: YESRERA amenity schedule0% progress field; not independently verified
Internal Roads & FootpathsListed; no availability entry suppliedRERA amenity schedule0% progress field; not independently verified
Street LightingListed; no availability entry suppliedRERA amenity schedule0% progress field; not independently verified
Community BuildingsListed; no availability entry suppliedRERA amenity schedule0% progress field; not independently verified
Treatment and Disposal of Sewage and Sullage WaterListed; no availability entry suppliedRERA amenity schedule0% progress field; not independently verified
Solid Waste Management and DisposalListed; no availability entry suppliedRERA amenity schedule0% progress field; not independently verified
Energy managementListed; no availability entry suppliedRERA amenity schedule0% progress field; not independently verified
Fire Protection and Fire Safety RequirementsListed; no availability entry suppliedRERA amenity schedule; HMDA conditions list fire-safety installations0% progress field; not independently verified
Aggregate area of recreational Open SpaceListed; no area suppliedRERA amenity schedule0% progress field; not independently verified

A separate marketing-source list names security, CCTV camera, children’s play area, power backup, STP and visitor parking. These are not substantiated in the supplied material as completed facilities; the HMDA approval’s specific utility and safety conditions are summarized in the next section. Promoter website

7. Utilities, building services & safety

HMDA’s approval conditions require rain-water-harvesting structures and provision for a transformer and garbage house within the premises. The technical approval also lists water supply, drainage and sewerage disposal, a septic tank and fire-safety installations. The RERA amenity schedule marks water supply, sewerage (including septic tank/STP), storm-water drains, rain-water harvesting, and an electrical meter room/sub-station/receiving station as “YES,” while recording 0% in the progress fields. The supplied records do not establish completion, utility capacities, water source or storage, STP capacity, wastewater reuse, electrical backup, lift provision, fire-system specifications, or accessibility features. RERA amenities

The approval says the location of the water-supply source and sewerage-disposal source should be at an appropriate distance within the site, preferably 100 feet, to avoid contamination. It also states that the building may be occupied only after completion in accordance with the technically approved plans and that an occupancy certificate is compulsory before occupation. These are approval conditions; the supplied evidence does not confirm compliance or issuance of an OC.

8. Location, access & connectivity

The project is identified in the RERA filing at MALLAMPET, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500090. The land filing lists plot Nos. 229, 230, 231, 252, 253 and 254 and describes roads along the east and west boundaries as 4O FEET WIDE ROAD and 40 FEET WIDE ROAD, respectively. RERA record RERA filing

The supplied location data gives an approximate distance of 8.7 km to the nearest sampled Outer Ring Road interchange. No public-transport details or other measured landmark distances are supplied. A third-party listing names Mallampet as the nearest landmark, but does not provide a measured distance. Location record Promoter website

9. Developer & development status

The registered promoter is DHANUNJAYA INFRA AND DEVELOPERS, recorded as a partnership. The project filing identifies authorized signatories BHUPATHIRAJU LAKSHMI and KALIDINDI AVINASH VARMA. Their Form-B affidavit-cum-declaration, dated 3rd day of February 2020, states that the promoter would complete the project by 23rd August 2025. Parties record Corporate record

The registration certificate gives the promoter-office field as “Village: Mandal: District: Ranga Reddy, Pin: 500043”; a complete street or office address is not supplied in that certificate extract. A separate RERA filing lists the promoter address as Sanvi Springwoods, Sambhupur, Mallampet, Qutballapur, Medchal-Malkajgiri, 500090. Parties record

No independent construction-progress verification, revised completion date, extension record or OC for the project is supplied. The portal-read unit availability is indicative because the record has no as-of date. RERA record RERA unit table

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm “C” certificate for LAKSHMI NIVASAM, registration P02200001794, issued 20/03/2020; stated validity to 23/08/2025
HMDA technical building approvalApproval 023163/MED/R1/U6/HMDA/30042019, dated 23/08/2019, for Block A (DHANUNJAYA), 1Stilt + 5 Upper floors
RERA-filed plan recordDocument 103989, identified as layout/building-floor-plan material; supplied drawing measurements are software-derived and flagged for review Document index Floor plans
Promoter declarationForm-B affidavit-cum-declaration dated 3 February 2020, signed by authorized representatives; includes the promoter’s completion undertaking
Designated account informationRERA filing identifies ICICI Bank, Bachupally Branch, account ending 0718, IFSC ICIC0002799 Parties record

The HMDA letter is described as a technical approval and states that building plans are to be sanctioned by the Executive Authority in conformity with the technically approved plans. The supplied records do not include an occupancy/completion certificate. No project-specific public land-use sheet or publicly retrievable HMDA DPMS approved-layout lookup is established in the supplied evidence. HMDA

Frequently asked questions

Is LAKSHMI NIVASAM registered with Telangana RERA?

Yes. LAKSHMI NIVASAM is registered with the Telangana Real Estate Regulatory Authority as P02200001794; the registration status is New Project.

Who is the developer of LAKSHMI NIVASAM?

The promoter named in the RERA registration is DHANUNJAYA INFRA AND DEVELOPERS.

Where is LAKSHMI NIVASAM located?

LAKSHMI NIVASAM is in MALLAMPET, Dundigal, Qutballapur, Medchal-Malkajgiri, Telangana (500090).

When will LAKSHMI NIVASAM be completed?

The promoter's proposed date of completion filed with RERA is 23/08/2025. This is the promoter's declaration, not a guarantee.